CN109439808A - A kind of stamp first layer lether and its processing technology - Google Patents

A kind of stamp first layer lether and its processing technology Download PDF

Info

Publication number
CN109439808A
CN109439808A CN201811256519.0A CN201811256519A CN109439808A CN 109439808 A CN109439808 A CN 109439808A CN 201811256519 A CN201811256519 A CN 201811256519A CN 109439808 A CN109439808 A CN 109439808A
Authority
CN
China
Prior art keywords
embossing
layer lether
frame
lether
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811256519.0A
Other languages
Chinese (zh)
Other versions
CN109439808B (en
Inventor
陈振富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinjiang Yuantai Leather Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811256519.0A priority Critical patent/CN109439808B/en
Publication of CN109439808A publication Critical patent/CN109439808A/en
Application granted granted Critical
Publication of CN109439808B publication Critical patent/CN109439808B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14BMECHANICAL TREATMENT OR PROCESSING OF SKINS, HIDES OR LEATHER IN GENERAL; PELT-SHEARING MACHINES; INTESTINE-SPLITTING MACHINES
    • C14B1/00Manufacture of leather; Machines or devices therefor
    • C14B1/02Fleshing, unhairing, samming, stretching-out, setting-out, shaving, splitting, or skiving skins, hides, or leather
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14BMECHANICAL TREATMENT OR PROCESSING OF SKINS, HIDES OR LEATHER IN GENERAL; PELT-SHEARING MACHINES; INTESTINE-SPLITTING MACHINES
    • C14B1/00Manufacture of leather; Machines or devices therefor
    • C14B1/40Softening or making skins or leather supple, e.g. by staking, boarding, or crippling machines, by dry mills
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14BMECHANICAL TREATMENT OR PROCESSING OF SKINS, HIDES OR LEATHER IN GENERAL; PELT-SHEARING MACHINES; INTESTINE-SPLITTING MACHINES
    • C14B1/00Manufacture of leather; Machines or devices therefor
    • C14B1/44Mechanical treatment of leather surfaces
    • C14B1/56Ornamenting, producing designs, embossing
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14BMECHANICAL TREATMENT OR PROCESSING OF SKINS, HIDES OR LEATHER IN GENERAL; PELT-SHEARING MACHINES; INTESTINE-SPLITTING MACHINES
    • C14B1/00Manufacture of leather; Machines or devices therefor
    • C14B1/58Drying
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14CCHEMICAL TREATMENT OF HIDES, SKINS OR LEATHER, e.g. TANNING, IMPREGNATING, FINISHING; APPARATUS THEREFOR; COMPOSITIONS FOR TANNING
    • C14C1/00Chemical treatment prior to tanning
    • C14C1/06Facilitating unhairing, e.g. by painting, by liming
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14CCHEMICAL TREATMENT OF HIDES, SKINS OR LEATHER, e.g. TANNING, IMPREGNATING, FINISHING; APPARATUS THEREFOR; COMPOSITIONS FOR TANNING
    • C14C1/00Chemical treatment prior to tanning
    • C14C1/08Deliming; Bating; Pickling; Degreasing
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14CCHEMICAL TREATMENT OF HIDES, SKINS OR LEATHER, e.g. TANNING, IMPREGNATING, FINISHING; APPARATUS THEREFOR; COMPOSITIONS FOR TANNING
    • C14C11/00Surface finishing of leather
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14CCHEMICAL TREATMENT OF HIDES, SKINS OR LEATHER, e.g. TANNING, IMPREGNATING, FINISHING; APPARATUS THEREFOR; COMPOSITIONS FOR TANNING
    • C14C3/00Tanning; Compositions for tanning
    • CCHEMISTRY; METALLURGY
    • C14SKINS; HIDES; PELTS; LEATHER
    • C14CCHEMICAL TREATMENT OF HIDES, SKINS OR LEATHER, e.g. TANNING, IMPREGNATING, FINISHING; APPARATUS THEREFOR; COMPOSITIONS FOR TANNING
    • C14C9/00Impregnating leather for preserving, waterproofing, making resistant to heat or similar purposes
    • C14C9/02Impregnating leather for preserving, waterproofing, making resistant to heat or similar purposes using fatty or oily materials, e.g. fat liquoring

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Shaping Of Tube Ends By Bending Or Straightening (AREA)
  • Massaging Devices (AREA)

Abstract

The present invention discloses a kind of processing technology of stamp first layer lether, the stamp first layer lether through depilation, degreasing, liming, deliming, tanning, stuffing, drying, draw it is soft, cover with paint, lacquer, colour wash, etc. and embossing processing forms;In embossing step, the embossing machine of first layer lether completes the embossing to first layer lether, and the embossing machine includes embossing frame, flattening device, embossing device and chill roll, and the flattening device, embossing device and chill roll are sequentially arranged on embossing frame by processing sequence;The flattening device includes heating plate, smooth part and several pressure springs, several pressure springs are evenly arranged on vertically on embossing frame, one end of the pressure spring is connect with embossing frame, the other end of the pressure spring and the lower surface of heating plate connect, the smooth part is played to the smooth of first layer lether and is pushed, the embossing device is embossed first layer lether after smooth, and the first layer lether after embossing is cooled down through chill roll.Compared with prior art, embossing effects of the invention and embossing efficiency greatly improve.

Description

A kind of stamp first layer lether and its processing technology
Technical field
The present invention relates to field of leather, and in particular to be a kind of stamp first layer lether and its processing technology.
Background technique
Stamp first layer lether be first layer lether be embossed or the mode of stamp and make first layer lether surface on have beauty The printed pattern of sight.The general of stamp first layer lether passes through depilation, degreasing, liming, deliming, pickling, tanning, retanning, dyeing, adds Rouge, drying are drawn soft, covering with paint and stamp and are process.And existing printing equipment is directly pressed first layer lether Flower processing does not have the smooth processing that early period is carried out to first layer lether, so that being easy the folding because of first layer lether during stamp It is folded, and the partial region of first layer lether is made to fail to be embossed, cause the product quality of first layer lether to decline.
In view of this, the applicant furthers investigate regarding to the issue above, there is this case generation then.
Summary of the invention
The main purpose of the present invention is to provide a kind of stamp first layer lether and its processing technologys, uniformly press with first layer lether It spends and is embossed the high feature of quality.
In order to achieve the above objectives, solution of the invention is:
A kind of processing technology of stamp first layer lether, wherein the stamp first layer lether is through depilation, degreasing, liming, deliming, tan System, drying, draws soft, covering with paint and embossing step to be process at stuffing;
In embossing step, the embossing machine of first layer lether completes the embossing to first layer lether, and the embossing machine includes embossing frame, puts down Engagement positions, embossing device and chill roll, the flattening device, embossing device and chill roll are sequentially arranged at embossing by processing sequence On frame;The flattening device includes heating plate, smooth part and several pressure springs, several pressure springs are evenly arranged on embossing frame vertically On, one end of the pressure spring is connect with embossing frame, and the other end of the pressure spring and the lower surface of heating plate connect, the smooth part It plays to the smooth of first layer lether and pushes, the smooth part includes rotary electric machine, rotation axis and smooth piece, the rotation axis One end is connect with rotary electric machine, and the other end of the rotation axis is connect with smooth piece, and the rotary electric machine drives the rotation axis Rotation, the rotation axis is L-shaped, and the rotary electric machine is obliquely installed, and described smooth piece is justified under the drive of rotary electric machine Week rotation, the embossing device are embossed first layer lether after smooth, and the first layer lether after embossing is cooled down through chill roll.
Further, the embossing device includes central cylinder, impression cylinder, the first hot-pressing roller, knurling rolls and the second hot pressing Roller, the first frame plate, the second frame plate and third frame plate, first frame plate, the second frame plate and third frame plate by processing sequence successively Setting embossing frame on, first frame plate, the second frame plate and third frame plate it is equal there are two, two the first frame plates are symmetrically arranged at pressure The two sides of flower stand, the first hot-pressing roller level are located on two the first frame plates and are rotatablely connected by shaft and the first frame plate, The central cylinder is located on embossing frame, and the central cylinder is located at the inside of the impression cylinder, the central cylinder and pressure It is filled with heat conductive rubber between engraved roll, is set on the embossing frame there are two pressure adjusting through-hole, two the second frame plates are symmetrically set It sets, and the lower end of two frame plates both passes through pressure and adjusts through-hole, the knurling rolls level is located at the top of two the second frame plates simultaneously It is rotatablely connected by shaft and the second frame plate, and knurling rolls are located at the top of impression cylinder, two third frame plates are symmetrically arranged at pressure The two sides of flower stand, the second hot-pressing roller level are located on third frame plate and are rotatablely connected by shaft and third frame plate.
Further, pressure-regulating device is additionally provided on the embossing device, the pressure-regulating device includes level board, spiral shell Rasp bar and pressure regulating handle, the level board is horizontally disposed and connect with the lower end of two the second frame plates, the level board It is equipped with tapped through hole, the threaded rod and the tapped through hole cooperate, and one end of the threaded rod is equipped with round locating part, The lower surface of the embossing frame is equipped with the limit hole matched with round locating part, the circle locating part and the limit hole phase Cooperation, the other end of the threaded rod are connect with pressure regulating handle.
Further, handler is additionally provided in the central cylinder.
A kind of stamp first layer lether, wherein the stamp first layer lether by a kind of above-mentioned stamp first layer lether processing technology system At.
After adopting the above structure, the processing technology of a kind of stamp first layer lether of the present invention, by embossing process Middle elder generation carries out smooth processing to first layer lether by flattening device, and smooth first layer lether will be so that more smooth during embossing and have Effect avoids the partial region for leading to first layer lether because of the overlapping of first layer lether from failing to be embossed device embossing and make first layer lether Quality cannot be met the requirements.Therefore, compared with prior art, the present invention is by first carrying out smooth processing so that rear to first layer lether Continuous embossing process is more smooth, is embossed the higher feature of quality.
Detailed description of the invention
Fig. 1 is process flow diagram of the invention.
Fig. 2 is the schematic perspective view of embossing machine in the present invention.
Fig. 3 is the top view of embossing machine in the present invention.
Fig. 4 is the side view of embossing machine in the present invention.
Fig. 5 is the enlarged diagram of the part D in Fig. 4.
Fig. 6 is the schematic perspective view of drum unit in the present invention.
Fig. 7 is the side view of drum unit in the present invention.
Fig. 8 is the section view stereoscopic schematic diagram of A-A hatching in Fig. 7.
Fig. 9 is that the suction means of drum unit in the present invention is in the schematic diagram of absorption or ejection position.
Figure 10 is not in the schematic diagram of absorption or ejection position for the suction means in drum unit of the invention.
Figure 11 is the dimensional decomposition structure diagram of dryer in the present invention.
Figure 12 is the front view of the decomposition texture of dryer in the present invention.
Figure 13 is the exploded sectional view of B-B hatching in Figure 12.
Figure 14 is the schematic perspective view of the second air-dried part in the present invention in dryer.
Figure 15 is the schematic perspective view of the first air-dried part in the present invention in dryer.
Figure 16 is the top view of the Drying in the present invention in dryer.
Figure 17 is the schematic perspective view of the clamp shaft in the present invention in dryer.
Figure 18 is the integrally-built stereoscopic schematic diagram of staking machine in the present invention.
Figure 19 is the integrally-built side view of staking machine in the present invention.
Figure 20 is the top view of staking machine in the present invention.
Figure 21 is the cross-sectional view of C-C in Figure 20.
In figure:
Drum unit -1;Rotary drum pedestal -11;First roller -12;Second tin roller -13;
Rotary drum motor -14;Suction means -15;Exhaust column -151;Support block -152;
Pressure spring -153;First through hole -154;Second through-hole -155;Third through-hole -156;
First hose -1571;Second hose -1572;Third hose -1573;Sealing cover -17;
4th hose -1574;First supports plate -161;First support bar -162;
Second supports plate -163;Second support bar -164;Connecting plate -165;
First adjustable plate -1661;Second adjustable plate -1662;Bar shaped through hole -1663;
Rack gear -1664;Gear -1665;Rotational handle -1666;Adjusting rod -167;
Dryer -2;Drying -21;Limited block -211;Infrared ray bulb -2111;
Drying tray -22;Second drying through-hole -221;Dry motor -23;Dry shaft -24;
Power transmission block -241;Clamp shaft -25;Sleeve joint hole -251;Bar shaped notch -252;
Fixed block -253;Power transmission groove -254;First air-dried part -26;First socket ring -261;
First supports block -262;First outlet air spoke -263;Second air-dried part -27;
Second socket ring -271;Second supports block -272;Second outlet air spoke -273;
Drying lid -28;First drying through-hole -281;Stoving rack -29;Transverse slat -291;Riser -292;
Staking machine -3;Draw soft pedestal -31;Dovetail groove guide rail -311;Draw soft groove -312;
First carriage -32;Second carriage -33;Driving shaft -331;Driven shaft -332;
Conveyer belt -333;Positioning protrusion -3331;Adsorbent equipment -34;Adsorb cylinder -341;
Adsorb through-hole -3411;First carriage -342;Connecting tube -343;
Draw soft handle -344;Clamping device -35;Clamping cylinder -351;
Clamping plate -352;Adsorption tube -353;Exhaust apparatus -36;Chimney fan -361;
Air blade -362 out;Air outlet -364;Second carriage -365;
Bracket -3651;Sliding shoe -3652;Embossing machine -4;It is embossed frame -41;
Flattening device -42;Heating plate -421;Smooth part -422;
Rotary electric machine -4221;Rotation axis -4222;Smooth piece -4223;Pressure spring -423;
Central cylinder -431;Impression cylinder -432;First hot-pressing roller -433;
Knurling rolls -434;Second hot-pressing roller -435;First frame plate -4361;Second frame plate -4362;
Third frame plate -4363;Heat conductive rubber -437;Chill roll -44;
Level board -451;Threaded rod -452;Pressure regulating handle -453;
Round locating part -454;Limit hole -455.
Specific embodiment
In order to further explain the technical solution of the present invention, being explained in detail below by specific embodiment the present invention It states.
As shown in Fig. 1-2 0, a kind of processing technology of first layer lether modelled after an antique, wherein the first layer lether modelled after an antique through depilation, degreasing, Liming, tanning, stuffing, drying, draws soft, covering with paint and embossing step to be process at deliming;
In embossing step, the first layer lether completes embossing by embossing machine 4, in order to allow first layer lether more effectively to be pressed Flower obtains better embossing effects.So the embossing machine 4 includes embossing frame 41, flattening device 42, embossing device and cooling Roller 44, the flattening device 42, embossing device and chill roll 44 are sequentially arranged on embossing frame 41 by processing sequence, and first layer lether is successively By smooth, embossing and cooling;The flattening device 42 includes heating plate 421, smooth part 422 and several pressure springs 423, if Dry pressure spring 423 is evenly arranged on vertically on embossing frame 41, and one end of the pressure spring 423 is connect with embossing frame 41, the pressure spring 423 The other end is connect with the lower surface of heating plate 421, and the pressure spring 423 plays the role of having vibration under force, mainly It is that smooth part 422 exerts a force to heating plate 421, so that heating plate 421 moves up and down, so that first layer lether is shaken, First layer lether after shake is spread out, and is smoothed under the rotation of smooth part 422 to first layer lether, so that first layer lether is spread If obtaining more smooth.The smooth part 422 is played to the smooth of first layer lether and is pushed, and the smooth part 422 includes rotary electric machine 4221, one end of rotation axis 4222 and rotating block 4223, the rotation axis 4222 is connect with rotary electric machine 4221, the rotation The other end of axis 4222 is connect with rotating block 4223, and the rotary electric machine 4221 drives the rotation axis 4222 to rotate, and described turn Moving axis 4222 is L-shaped, and the rotary electric machine 4221 is obliquely installed, the rotating block 4223 under the drive of rotary electric machine 4221 into Row circular-rotation, the embossing device are embossed first layer lether after smooth, and the first layer lether after embossing is carried out through chill roll 44 Cooling, the smooth part 422 has two sets, and two sets of flattening devices 42 are symmetrically distributed in the two sides of heating plate 421, passes through in first layer lether When flattening device 42, first first layer lether is heated by heating plate 421, then drives 4222 turns of rotation axis by rotary electric machine 4221 It is dynamic, since rotary electric machine 4221 is obliquely installed and rotation axis 4222 is L-shaped, so that band of the rotating block 4223 in rotary electric machine 4221 Dynamic lower downward active force and forward active force with to first layer lether, to play being pressed down against and forward to first layer lether The effect of promotion.And after the power being pressed down against generates the pressure to pressure spring 423, then pressure is cancelled, pressure spring 423 realizes reciprocal vibration It is dynamic, to achieve the purpose that heating plate 421 is vibrated, it is finally reached the effect of smooth first layer lether.
Preferably, the embossing device includes central cylinder 431, impression cylinder 432, the first hot-pressing roller 433, knurling rolls 434 and second hot-pressing roller 435, the first frame plate 4361, the second frame plate 4362 and third frame plate 4363, first frame plate 4361, Second frame plate 4362 and third frame plate 4363 are successively set on embossing frame 41 by processing sequence, first frame plate 4361, the Two frame plates 4362 and third frame plate 4363 there are two, two the first frame plates 4361 are symmetrically arranged at the two sides of embossing frame 41, described First hot-pressing roller, 433 level is located on two the first frame plates 4361 and is rotatablely connected by shaft and the first frame plate 4361, described First hot-pressing roller 433 plays the heat effect to first layer lether, and the central cylinder 431 is located on embossing frame 41, the center rolling Cylinder 431 is located at the inside of the impression cylinder 432, and heat conductive rubber is filled between the central cylinder 431 and impression cylinder 432 437, the first layer lether being placed in the central cylinder 431 after drying, and central cylinder is driven by rotation handler 431 rotations, the first layer lether in central cylinder 431 falls soft and plays the role of softening in advance through preliminary, soft using drawing Operation will be so that draw soft process quicker, and soft efficiency is drawn in raising.Moreover, carrying out during softening in advance, first layer lether will also It can generate heat, and avoid the compromised quality of first layer lether in order to which heat can effectively be distributed, while also for allowing heat It makes full use of.Therefore, heat conductive rubber 437 is filled between the central cylinder 431 and impression cylinder 432, so that center be rolled In heat transfer to impression cylinder 432 in cylinder 431, heat is provided for embossing process, so that heat is fully utilized, The energy is saved.
Preferably, it is set on the embossing frame 41 there are two pressure adjusting through-hole (not shown), two the second frame plates 4362 are right Claim setting, and the lower end of two frame plates both passes through pressure and adjusts through-hole, 434 level of knurling rolls is located at two the second frame plates 4362 top is simultaneously rotatablely connected by shaft and the second frame plate 4362, and knurling rolls 434 are located at the top of impression cylinder 432, The knurling rolls 434 are embossed first layer lether.Two third frame plates 4363 be symmetrically arranged at embossing frame 41 two sides, described second 435 level of hot-pressing roller is located on third frame plate 4363 and is rotatablely connected by shaft and third frame plate 4363, second hot pressing Roller 435 plays the further hot pressing function to first layer lether, allows embossing effects to obtain further secured.
Preferably, the difference for the pressure being applied on first layer lether due to knurling rolls 434 will lead to the difference of embossing effects, and And embossing pressure also has relationship with the thickness of pressed first layer lether, therefore, in order to effectively be applied according to the actual situation to knurling rolls 434 The pressure being added on first layer lether is adjusted.So being additionally provided with pressure-regulating device on the embossing device, the pressure is adjusted Device includes level board 451, threaded rod 452 and pressure regulating handle 453, the level board 451 it is horizontally disposed and with two The lower end of second frame plate 4362 connects, and the level board 451 is equipped with tapped through hole (not shown), the threaded rod 452 and institute Tapped through hole cooperation is stated, and one end of the threaded rod 452 is equipped with round locating part 454, the lower surface of the embossing frame 41 is set There is the limit hole 455 matched with round locating part 454, the circle locating part 454 matches with the limit hole 455, makes Threaded rod 452 rotates movement.The other end of the threaded rod 452 is connect with pressure regulating handle 453.It is needing to adjust pressure When flower roll 434 is to the pressure of first layer lether, rotation pressure regulation handle 453 is first passed through, pressure regulating handle 453 drives threaded rod 452 rotations, so under the cooperation of threaded rod 452 and tapped through hole, so that level board 451 moves up or down, level board 451 the second frame plates 4362 of drive move up or down, and the second frame plate 4362 will drive knurling rolls 434 to move upward or downward It is dynamic, and the spacing between knurling rolls 434 and impression cylinder 432 is finally made to change, make knurling rolls 434 correct accordingly The pressure of layer skin will also change.
Preferably, handler is additionally provided in the central cylinder 431, the handler drives central cylinder 431 to rotate, and rises Impression cylinder 432 is transferred to the effect softened in advance to the first layer lether in central cylinder 431, and by the heat energy of generation On, so that heat is fully utilized, save the energy.
Preferably, in depilation, degreasing and the liming the step of, first layer lether is completed in drum unit 1, the drum unit 1 includes rotary drum pedestal 11, the first roller 12, second tin roller 13, rotary drum motor 14 and suction means 15, first roller 12 It is located on rotary drum pedestal 11, the diameter of first roller 12 is greater than the diameter of second tin roller 13 and the second tin roller 13 is located at Inside first roller 12, one end of the second tin roller 13 is closed end, and the other end of the second tin roller 13 is open end, is opened Mouthful end is equipped with sealing cover 17, and the central axis of the central axis of the second tin roller 13 and the first roller 12 is located on same vertical plane And first roller 12 central axis level height be higher than second tin roller 13 central axis level height so that second rolling The outer surface of cylinder 13 to the first roller 12 inner surface distance it is different.The rotary drum motor 14 is located on rotary drum pedestal 11 and band The second tin roller 13 that dynamic second tin roller 13 is rotated, and rotated drives the suction means 15 being located on second tin roller 13 to rotate, and draws Device 15 in the course of rotation due to the outer surface of second tin roller 13 to the first roller 12 inner surface distance difference, into And the exhaust column 151 on suction means 15 is stretched in second tin roller 13.The second tin roller 13 is provided with first layer lether, institute It states suction means 15 to be located on second tin roller 13 and be used to that the first layer lether in second tin roller 13 to be drawn and sprayed, to suction After taking first layer lether, by the rotation of second tin roller 13, first layer lether is driven to the top of second tin roller 13, then first layer lether is carried out It sprays, first layer lether is in self gravity and the second air-jet device under the double action of the active force superposition of first layer lether, increasing pair The impact force of first layer lether, so that first layer lether can adequately be lost hair or feathers, degreasing or liming.
Preferably, the suction means 15 includes exhaust column 151, supports block 152, pressure spring 423, the first air extractor (figure Do not show) and the second air-jet device (not shown), the circumferential direction of first roller 12 is equipped with first through hole 154, second rolling The circumferential direction of cylinder 13 is equipped with second through-hole 155 corresponding with first through hole 154, and the block 152 of supporting is equipped with third through-hole 156, one end of the exhaust column 151 passes through second tin roller 13, and the other end of the exhaust column 151 is connect simultaneously with block 152 is supported Be connected to the third through-hole 156 supported on block 152, the pressure spring 423 be socketed on exhaust column 151 and one end of pressure spring 423 with The connection of block 152 is supported, the other end of the pressure spring 423 is connect with the periphery wall of second tin roller 13, on first roller 12 The first hose 1571 and the second hose 1572 are additionally provided on periphery, first hose 1571 is located under the first roller 12 vertically Side, second hose 1572 are located at the top of the first roller 12 vertically, and first hose 1571 and the first air extractor connect It connects, second hose 1572 is connect with the second air-jet device.
After adopting the above structure, lost hair or feathers to first layer lether, the main process of degreasing or liming is first by head layer Skin is put by the open end of second tin roller 13, after material needed for adding depilation, degreasing or liming, rotates top cover labyrinth 17, sealing cover 17 seals up the open end of second tin roller 13.Then second tin roller 13 is rotated by rotary drum motor 14, in second tin roller Under 13 rotation, the suction means 15 on second tin roller 13 follows rotation.And due to the outer surface of second tin roller 13 to The distance of the inner surface of one roller 12 is different, so that the pressure that the pressure spring 423 on suction means 15 is subject in the course of rotation Difference, and under the action of pressure spring 423, it is connect so that supporting contacted inner surfaces of the block 152 always with the first roller 12.Not only such as This, since the distance difference of inner surface of outer surface to the first roller 12 of second tin roller 13 also makes exhaust column 151 protrude into The length of two rollers 13 is different, at the bottom of the first roller 12 and second tin roller 13, the first roller 12 and second tin roller 13 it Between distance it is most short, exhaust column 151 protrudes into the length of second tin roller 13;At the top of the first roller 12 and second tin roller 13 When, the distance between the first roller 12 and second tin roller 13 longest, the length that exhaust column 151 protrudes into second tin roller 13 shorten.
Therefore, when exhaust column 151 is in the bottom of second tin roller 13, the first air extractor is correct by exhaust column 151 Layer skin is drawn, and exhaust column 151 also hangs up first layer lether by the pipe shaft of itself.It is rotated in second tin roller 13 Afterwards, the rotation of exhaust column 151 is to the top of second tin roller 13, and the second air-jet device is by exhaust column 151 to being evacuated in exhaust column 151 Interior first layer lether is sprayed, and the first layer lether of ejection increases the impact to first layer lether under the double action of gravity and blowing force Power enables depilation, degreasing or the liming of first layer lether sufficiently to carry out, and avoids carrying out secondary operation and reducing efficiency.And by The first layer lether that exhaust column 151 is hung up also while is under gravity fallen, therefore, first layer lether in second tin roller 13 It can be haved the function that adequately depilation, degreasing or liming by the effect of exhaust column 151, to greatly improve production Efficiency.
Preferably, it is taken out from second tin roller 13 for the ease of first layer lether after treatment, on first roller 12 It is additionally provided with angle adjustment device.The angle adjustment device includes first supporting plate 161, first support bar 162, second supporting plate 163, second support bar 164, connecting plate 165, adjustment base and adjusting rod 167, described first, which supports plate 161, is resisted against first The front of roller 12, described second supports the rear portion that plate 163 is resisted against the first roller 12, is additionally provided with two on the rotary drum pedestal 11 A adjusting through-hole (not shown), two adjusting through-holes are located on the front-rear direction of rotary drum pedestal 11, the first support bar 162 One end, which is placed through after the adjusting through-hole of front direction, to be supported plate 161 with first and connect, and one end of the second support bar 164 passes through Be located behind to adjusting through-hole after support plate 163 with second and connect, described first, which supports plate 161 and second, supports plate 163 and is in Symmetrical L shape setting, described first, which supports plate 161, plays and supports to the first bottom of roller 12 and supporting for front, described second Top plate 163, which plays, supports 12 bottom of the first roller and rear portion, supports plate 161 and second by first and supports plate 163 to One roller 12 is supported so that the first roller 12 is not fallen off after run-off the straight.The connecting plate 165 is horizontal positioned and rotates The other end of second support bar 164 and the other end of first support bar 162 are connected, the adjustment base is located at rotary drum pedestal 11 Lower section, the adjustment base are arranged along the longitudinal direction;
Preferably, the adjustment base includes the first adjustable plate 1661 and the second adjustable plate 1662, first adjustable plate 1661 and second are equipped with bar shaped through hole 1663, bar shaped through hole 1663 on first adjustable plate 1661 on adjustable plate 1662 Lower surface arrange be equipped with rack gear 1664 at equal intervals, 167 left and right horizontal of adjusting rod passes through the first adjustable plate 1661 and second and adjusts It is additionally provided on bar shaped through hole 1663 and adjusting rod 167 on section plate 1662 and is nibbled with 1664 phase of rack gear on the first adjustable plate 1661 The gear 1665 of conjunction, and the adjusting rod 167 is supported in the lower surface of connecting plate 165;It is additionally provided on the adjusting rod 167 Rotational handle 1666.
After using above-mentioned angle adjustment device, when needing to take out the first layer lether in second tin roller 13, pass through the inverse time Needle rotates rotational handle 1666, by the cooperation of gear 1665 on adjusting rod 167 and rack gear 1664 so that adjusting rod 167 to Rear direction is mobile, and also backward directions are mobile simultaneously for the position of supporting of adjusting rod 167 and connecting plate 165, so that adjusting rod 167 Be no longer on the centre of connecting plate 165, the both ends of connecting plate 165 are no longer on force balance state, adjusting rod 167 rearward To after movement, connecting plate 165 rotates, so that first support bar 162 will move down, so that before the first roller 12 Portion tilts down, and the open end on second tin roller 13 is driven to tilt down, and finally makes the head layer being located in second tin roller 13 Skin is slided to the open end of second tin roller 13, and facilitates the taking-up of first layer lether.And after rotating clockwise rotational handle 1666, it adjusts Pole 167 is resisted against the middle part of connecting plate 165, the both ends stress balance of connecting plate 165 again, and the first roller 12 is also restored to Horizontality completes the processing to first layer lether of next time.
Preferably, it draws to reduce exhaust column 151 and is fallen during second tin roller 13 rotates after first layer lether, and made It is insufficient to obtain difference in height, impact force is caused to reduce.It is additionally provided with third hose 1573 and the 4th hose 1574 on first roller 12, The third hose 1573 and the 4th hose 1574 are symmetricly set on the left and right sides of the first roller 12, the third hose 1573 It is connected to rotary drum air extractor (not shown) with the 4th hose 1574, the suction means 15 has four groups, four groups of suction means 15 are arranged at equal intervals on second tin roller 13, and each suction means 15 during rotation will be with the first hose 1571, Three hoses 1573, the second hose 1572 are connected to the 4th hose 1574.Pass through setting for third hose 1573 and the 4th hose 1574 It sets, so that second tin roller 13 is in the course of rotation, the first layer lether on exhaust column 151 can avoid rotation again by suction The landing of the first layer lether of process, and due to the second tin roller 13 arranged symmetrically that enables of third hose 1573 and the 4th hose 1574 Enough rotate counterclockwise or clockwise.
Preferably, in baking step, first layer lether drying machine 2 is dried, and in order to preferably be carried out to first layer lether Dry and reduce the shrinking percentage of first layer lether.Therefore, the dryer 2 includes Drying 21, drying tray 22, drying motor 23, does Dry shaft 24, clamp shaft 25, the first air-dried part 26 and the second air-dried part 27, the drying motor 23 are located at drying tray 22 vertically Lower surface, the dry shaft 24 are located at the upper surface of the drying tray 22, and the drying motor 23 drives the dry shaft 24 rotations, the Drying 21 is connected to the upper surface of drying tray 22, if being equipped at intervals on the inner peripheral surface of the Drying 21 etc. Dry limited block 211, several limited blocks 211 are with the coaxial setting of Drying 21, and the clamp shaft 25 is for first layer lether Be clamped on one side, the first air-dried part 26 and the second air-dried part 27 be set on clamp shaft 25 and with limited block 211 Also first layer lether is carried out while being matched for clamping tightly the another side of first layer lether air-dried.
After above-mentioned dryer 2, when first layer lether will be dried, first layer lether being clamped on one side by first layer lether is taken out On clamp shaft 25, and the first air-dried part 26 is passed through into dry shaft 24 and is placed on drying tray 22, then the clamping that first layer lether will be accompanied Axis 25 is set in after dry shaft 24 and makes the outer surface of clamp shaft 25 and first on the first air-dried part 26 to be socketed ring 261 Contacted inner surfaces connect, and clamp shaft 25 plays the clamping action to first layer lether and being socketed the abutting against effect of ring 261 with first, So that first layer lether is not deviate from from clamp shaft 25, and block 262 and limit are supported by the way that the another side of first layer lether is clamped in first The clamping action to first layer lether another side is played between the block 211 of position.Then, it is set on clamp shaft 25 by the second air-dried part 27 And the fixed block 253 of 25 upper end of clamp shaft offsets, and supports block 272 and limited block 211 by second on the second air-dried part 27 Cooperate further to clamp the another side of first layer lether.
The rotation of dry shaft 24 is driven by the clockwise rotation of drying motor 23 again, dry shaft 24, which drives, to be clamped Axis 25 rotates, and clamp shaft 25 drives first layer lether rotation.Due to being fixed on clamp shaft 25 on one side for first layer lether, first layer lether it is another While being fixed on Drying 21, so that the clamp shaft 25 of rotation drives Drying 21 to rotate by first layer lether.First layer lether plays When the effect for pulling Drying 21 to rotate, the stretching action to itself is also acted as, to reduce the shrinking percentage after drying.Moreover, Drive first is air-dried the rotation of part 26 and the second air-dried part 27 by the Drying 21 after rotation, and the first air-dried part 26 and the second wind Dry part 27 generates wind-force in the course of rotation and plays drying function to first layer lether, to accelerate to dry the entirety of first layer lether Process.
Preferably, the clamp shaft 25 is equipped with sleeve joint hole 251, bar shaped notch 252 and fixed block 253, the sleeve joint hole 251 are extended to the other end of clamp shaft 25 by one end of clamp shaft 25, and the clamp shaft 25 is set in drying by sleeve joint hole 251 In shaft 24 and as dry shaft 24 rotates, 253 level of fixed block is located on clamp shaft 25 and close to clamp shaft 25 One end, the bar shaped notch 252 is connected to clamp shaft 25 and sleeve joint hole 251 and the bar shaped notch 252 by clamping radially The other end of axis 25 axially extends to fixed block 253 along clamp shaft 25, and the bar shaped notch 252 is for clamping the one of first layer lether Side.One bar shaped notch 252 is simultaneously clamped on there are two first layer lether, wherein one side of a first layer lether is pressed from both sides by bar shaped notch 252 Tightly, another side is supported block 262 from first and is clamped with the limited block 211 in its counter clockwise direction;And another One side of first layer lether is clamped by identical bar shaped notch 252, and another side supports block 262 by first and is located at it clockwise Limited block 211 cooperation and clamp.So a bar shaped notch 252 can clamp two first layer lethers and two head layers are skin-deep mutually It is spaced apart, also ensuring each first layer lether while increasing and drying first layer lether quantity can effectively be dried.
Preferably, the described first air-dried part 26 include first socket ring 261, first support block 262 and first go out wind wheel Spoke 263, the first socket ring 261 are greater than the first socket ring for being socketed in clamp shaft 25, the first thickness for supporting block 262 261 thickness, so that first supports block 262 and can match with limited block 211 and clamp first layer lether, described first supports block 262 and first outlet air spoke 263 have several, several first are supported block 262 and match with several limited blocks 211 and be used in combination In the other end for clamping first layer lether, several the first outlet air spokes 263 and several first support the one-to-one correspondence of block 262, and the One end of one outlet air spoke 263 is supported block 262 with first and is connect, the other end of the first outlet air spoke 263 and the first socket ring 261 Connection, the cross section of the first outlet air spoke 263 is arc-shaped and upward wind is generated when rotating clockwise, and passes through generation Upward wind plays the drying function to the first layer lether being positioned above.
Preferably, the described second air-dried part 27 include second socket ring 271, second support block 272 and second go out wind wheel Spoke 273, for being socketed on clamp shaft 25 and abutting with the upper surface of fixed block 253, second supports the second socket ring 271 The thickness of block 272 be greater than second socket ring 271 thickness so that second support block 272 can be matched with limited block 211 and Clamp first layer lether, described second, which supports block 272 and the second outlet air spoke 273, several, several second support block 272 with Several limited blocks 211 match and for clamping the another side of first layer lether, several the second outlet air spokes 273 and several the Two support the one-to-one correspondence of block 272, and one end of the second outlet air spoke 273 is supported block 272 with second and connect, the second outlet air spoke 273 other end is connect with the second socket ring 271, and the cross section of the second outlet air spoke 273 is arc-shaped and is doing clockwise Downward wind is generated when rotation, and the drying function to the first layer lether being disposed below is played by the wind for generating downward.
Preferably, if be additionally provided on each limited block 211 several infrared ray bulbs 2111 for being from top to bottom arranged and Dry battery, each infrared ray bulb 2111 are correspondingly connected with a battery, by the way that infrared ray bulb 2111 is arranged, and then by red The radiation of outside line light bulb 2111 and promote the temperature in Drying 21, play the drying functions to first layer lether.
Preferably, Power transmission block 241 is additionally provided in the dry shaft 24, there are two the Power transmission blocks 241, and two A Power transmission block 241 is symmetrical and is vertically arranged on the outer peripheral surface of dry shaft 24, on the sleeve joint hole 251 of the clamp shaft 25 Equipped with power transmission groove 254, there are two the power transmission grooves 254, and two power transmission grooves 254 are transmitted with two power respectively The matching of block 241 corresponds to, and by the cooperation of power transmission groove 254 and Power transmission block 241 dry shaft 24 is driven and clamps Axis 25 rotates.
Preferably, drying lid 28 is additionally provided on the Drying 21, the drying lid 28 covers the upper surface in Drying 21, The drying lid 28 is equipped with the first drying through-hole 281, is additionally provided with the second drying through-hole 221 on the drying tray 22.Pass through The setting of one drying through-hole 281 and the second drying through-hole 221 is so that the air in Drying 21 is flowed, so as to better The temperature in Drying 21 is controlled, avoids drying excessive and causes the damage of first layer lether.
Preferably, the bottom of the drying tray 22 is additionally provided with stoving rack 29, and the stoving rack 29 includes transverse slat 291 and riser 292, one end of the transverse slat 291 is connect with drying tray 22, and the other end of the transverse slat 291 is connect with riser 292, the drying Frame 29 plays the supporting role to Drying 21.
Preferably, in drawing soft step, the first layer lether is soft through the completion drawing of staking machine 3, and in order to be carried out to first layer lether It quickly and uniformly draws soft, improves the soft efficiency of drawing of first layer lether and further increase the drawing soft-quality of first layer lether.Therefore, described Staking machine 3 includes drawing soft pedestal 31, the first carriage 32, adsorbent equipment 34 and clamping device 35, first carriage 32, Adsorbent equipment 34 and clamping device 35, which are each provided at, to be drawn on soft pedestal 31, and the adsorbent equipment 34 is located at first carriage 32 Top, the clamping device 35 are located at the rear of the conveying direction of first carriage 32, and the adsorbent equipment 34 is for inhaling Attached one side for tensing first layer lether, the clamping device 35 are used to clamp the another side of first layer lether, by adsorbent equipment 34, clamp dress Set 35 and first the cooperation of carriage 32 realize and automatic conveying soft to the drawing of first layer lether.
Preferably, the adsorbent equipment 34 includes absorption cylinder 341, first carriage 342, the pumping of connecting tube 343, first Device (not shown) and soft handle 344 is drawn, is equipped with dovetail groove guide rail 311 on the two sides for drawing soft pedestal 31, it is described First carriage 342 is slidably connected with dovetail groove guide rail 311, by according to the size for drawing soft first layer lether and from layer skin need into Row draws soft degree, and adjusts the position that first carriage 342 is located on dovetail groove guide rail 311.The absorption cylinder 341 is horizontal It is located in first carriage 342 and is additionally provided with several absorption through-holes 3411, the absorption on the outer peripheral surface of the absorption cylinder 341 Through-hole 3411 is connected to extraneous and absorption cylinder 341 inside, is adsorbed by adsorbing through-hole 3411 to first layer lether.Described first Connection through-hole (not shown), the inside company of one end of the connection through-hole and the absorption cylinder 341 are additionally provided on sliding rack 342 Logical, the other end of the connection through-hole is connected to one end of the connecting tube 343, the other end and first of the connecting tube 343 Air extractor connection, it is described to draw soft handle 344 to be located on the absorption cylinder 341 and for rotating absorption cylinder 341.
After above-mentioned staking machine 3, when to carry out drawing soft to first layer lether, the first layer lether after drying need to be only laid in On first carriage 32, first layer lether is conveyed by the conveyer belt 333 on the first carriage 32, when first layer lether is delivered to absorption When the lower section of cylinder 341, absorption cylinder 341 has adsorbed one side of first layer lether, the another side of first layer lether then by conveyer belt 333 after The continuous another side conveyed and first layer lether is finally clamped by clamping device 35.Then, soft handle 344 is drawn in manually rotation, made The first layer lether that must be adsorbed on absorption cylinder 341 starts to be looped around on absorption cylinder 341.After being enclosed around absorption cylinder 341 1, The frictional force between first layer lether will also will be present in first layer lether in the pulling force by absorption cylinder 341.Therefore, by justifying to absorption The rotation of cylinder 341 so that first layer lether uniformly drawn it is soft, and by according to first layer lether need it is to be achieved draw soft degree, and The position appropriate for adjusting first carriage 342, and then the position between absorption cylinder 341 and clamping device 35 is adjusted, reach It is most suitable to draw soft effect.
Preferably, in order to which the another side to first layer lether is effectively clamped.Then, described draw is additionally provided on soft pedestal 31 Soft groove 312 is drawn, the rear portion for drawing soft groove 312 to be located at first carriage 32, it is soft that the clamping device 35 is located at drawing In groove 312, the clamping device 35 includes clamping cylinder 351, clamping plate 352, adsorption tube 353 and the second air extractor, The clamping cylinder 351 is horizontally disposed, and the clamping plate 352 is connect with the piston rod on the clamping cylinder 351, the absorption One end of pipe 353 is connect with the second air extractor, and the other end of the adsorption tube 353 is connected to soft groove 312 is drawn.In first layer lether After the conveying of the first carriage 32, first layer lether is adsorbed the absorption of cylinder 341 on one side, and the another side of first layer lether is by the first carriage 32 end for being delivered to the first carriage 32.Then, first layer lether is inhaled by the adsorption tube 353 in clamping device 35 It is attached, it is drawn in soft groove 312 so that first layer lether drops into, then the movement of clamping plate 352 is pushed by clamping cylinder 351, and by clamping plate 352 clamp first layer lether with the cooperation of soft groove 312 is drawn.Moreover, being additionally provided with control switch on the clamping cylinder 351, (figure is not Show), the control switch is used to control the flexible of the piston rod in clamping cylinder 351.
Preferably, in order to allow entire drawing soft process more to automate, therefore, described draw is additionally provided with outlet air dress on soft pedestal 31 36 are set, the exhaust apparatus 36 is located at the top of first carriage 32, and the exhaust apparatus 36 includes chimney fan 361, goes out Air blade 362 goes out wind turbine (not shown), air outlet 364 and second carriage 365, the second carriage 365 and dovetail groove Guide rail 311 is slidably connected, and 361 level of chimney fan, which is located in second carriage 365 and rotates with second carriage 365, to be connected It connects, the air blade 362 out is located in chimney fan 361, and the wind turbine out drives out air blade 362 to rotate, the air outlet 364 are located on chimney fan 361, drive out air blade 362 to rotate by going out wind turbine, the wind that air blade 362 generates out is by outlet air Air outlet 364 on cylinder 361 is blown out, since chimney fan 361 and second carriage 365 are rotatablely connected, on chimney fan 361 The angle of air outlet 364 can be adjusted according to actual needs.The main function of the exhaust apparatus 36 is when positioned at first After adsorbent equipment 34 on carriage 32 stops to the soft absorption of the drawing on one side of first layer lether, first layer lether is no longer influenced by constraint on one side Power.At this point, by 36 pairs of exhaust apparatus draw it is soft after first layer lether be blowed on one side so that one side of first layer lether is by the first conveying Frame 32 is blown on the second carriage 33, and is delivered to the adsorbent equipment above the second carriage 33 by the second carriage 33 34, then by rotating the absorption cylinder 341 on the adsorbent equipment 34 to carry out drawing again to first layer lether soft, and draw it is soft after, Cylinder 341 is desorbed to the adsorption capacity of first layer lether, and makes clamping plate 352 unclamp first layer lether by control switch, is finally existed First layer lether is transported to subsequent processing under the conveying of second carriage 33.
Wherein, the adsorption capacity of the absorption cylinder 341 and adsorption tube 353 can be by absorption switch (not shown) come real It is existing, to realize that whether there is or not the controls of adsorption capacity, and it is convenient for the operation of whole flow process.
Preferably, the first carriage 342 and second carriage 365 include bracket 3651 and sliding shoe 3652, institute State sliding shoe 3652 and bracket 3651 there are two, two sliding shoes 3652 respectively and are located at the dovetail groove for drawing soft 31 two sides of pedestal Guide rail 311 is slidably connected, and two brackets 3651 are vertically arranged and one end of bracket 3651 is connect with sliding shoe 3652.
Preferably, described draw is additionally provided with the second carriage 33 on soft pedestal 31, and second carriage 33 is located at clamping dress 35 rear is set, first carriage 32 and the second carriage 33 include conveyer belt 333, driving shaft 331, driven shaft 332 With feeder motor (not shown), the conveyer belt 333 is set on driving shaft 331 and driven shaft 332, and the feeder motor drives Driving shaft 331 rotates, and 331 driving conveying belt 333 of driving shaft is mobile, and the upper surface of the conveyer belt 333 is additionally provided with positioning Protrusion 3331, the positioning protrusion 3331 have several in cone, the positioning protrusion 3331, several positioning protrusion 3331 It is evenly arranged on the upper surface of conveyer belt 333, enables first layer lether to be effectively laid in conveyer belt by the setting of positioning protrusion 3331 On 333, the top of second carriage 33 is additionally provided with adsorbent equipment 34.
Preferably, a kind of stamp first layer lether, the stamp first layer lether is by a kind of above-mentioned processing technology system of stamp first layer lether At.
Above-described embodiment and schema and non-limiting product form and style of the invention, any technical field it is common The appropriate changes or modifications that technical staff does it all should be regarded as not departing from patent category of the invention.

Claims (5)

1. a kind of processing technology of stamp first layer lether, which is characterized in that the stamp first layer lether is through depilation, degreasing, liming, de- Ash, stuffing, drying, draws soft, covering with paint and embossing step to be process at tanning;
In embossing step, the embossing machine of first layer lether completes the embossing to first layer lether, and the embossing machine includes embossing frame, smooth dress It sets, embossing device and chill roll, the flattening device, embossing device and chill roll are sequentially arranged at embossing frame by processing sequence On;The flattening device includes heating plate, smooth part and several pressure springs, several pressure springs are evenly arranged on vertically on embossing frame, One end of the pressure spring is connect with embossing frame, and the other end of the pressure spring and the lower surface of heating plate connect, and the smooth part rises To the smooth of first layer lether and pushing, the smooth part includes rotary electric machine, rotation axis and smooth piece, and the one of the rotation axis End is connect with rotary electric machine, and the other end of the rotation axis is connect with smooth piece, and the rotary electric machine drives the rotation axis to turn Dynamic, the rotation axis is L-shaped, and the rotary electric machine is obliquely installed, and described smooth piece carries out circumference under the drive of rotary electric machine Rotation, the embossing device are embossed first layer lether after smooth, and the first layer lether after embossing is cooled down through chill roll.
2. a kind of processing technology of stamp first layer lether as described in claim 1, which is characterized in that during the embossing device includes Heart roller, impression cylinder, the first hot-pressing roller, knurling rolls and the second hot-pressing roller, the first frame plate, the second frame plate and third frame plate, institute It states the first frame plate, the second frame plate and third frame plate to be successively set on embossing frame by processing sequence, first frame plate, the second frame Plate and third frame plate it is equal there are two, two the first frame plates are symmetrically arranged at the two sides of embossing frame, and the first hot-pressing roller level is located at It is rotatablely connected on two the first frame plates and by shaft and the first frame plate, the central cylinder is located on embossing frame, the center Roller is located at the inside of the impression cylinder, and heat conductive rubber, the embossing are filled between the central cylinder and impression cylinder It is set on frame there are two pressure adjusting through-hole, two the second frame plates are symmetrical arranged, and the lower end of two frame plates both passes through pressure adjusting Through-hole, the knurling rolls level is located at the top of two the second frame plates and is rotatablely connected by shaft and the second frame plate, and is embossed Roller is located at the top of impression cylinder, and two third frame plates are symmetrically arranged at the two sides of embossing frame, and the second hot-pressing roller level is located at It is rotatablely connected on third frame plate and by shaft and third frame plate.
3. a kind of processing technology of stamp first layer lether as claimed in claim 2, which is characterized in that also set on the embossing device There is pressure-regulating device, the pressure-regulating device includes level board, threaded rod and pressure regulating handle, the level board water Flat to be arranged and connect with the lower end of two the second frame plates, the level board is equipped with tapped through hole, the threaded rod and the spiral shell The cooperation of line through-hole, and one end of the threaded rod is equipped with round locating part, the lower surface of the embossing frame is equipped with to be limited with circle The limit hole that part matches, the circle locating part are matched with the limit hole, the other end and pressure tune of the threaded rod Save handle connection.
4. a kind of processing technology of stamp first layer lether as claimed in claim 2, which is characterized in that also set in the central cylinder There is handler.
5. a kind of stamp first layer lether, which is characterized in that the stamp first layer lether is by a kind of described in any item prints of claim 1-4 The processing technology of flower first layer lether is made.
CN201811256519.0A 2018-10-26 2018-10-26 Printing head layer leather and processing technology thereof Active CN109439808B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811256519.0A CN109439808B (en) 2018-10-26 2018-10-26 Printing head layer leather and processing technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811256519.0A CN109439808B (en) 2018-10-26 2018-10-26 Printing head layer leather and processing technology thereof

Publications (2)

Publication Number Publication Date
CN109439808A true CN109439808A (en) 2019-03-08
CN109439808B CN109439808B (en) 2020-12-01

Family

ID=65548468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811256519.0A Active CN109439808B (en) 2018-10-26 2018-10-26 Printing head layer leather and processing technology thereof

Country Status (1)

Country Link
CN (1) CN109439808B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638839A (en) * 2009-07-14 2010-02-03 东莞贰发毛绒有限公司 Processing technology and embossing machine of flocking product
CN205134002U (en) * 2015-12-04 2016-04-06 东阳市金茂塑胶有限公司 Embossing machine
CN206201672U (en) * 2016-08-30 2017-05-31 俞小康 A kind of stereoscopic printing embossing machine
CN206326989U (en) * 2016-12-23 2017-07-14 绍兴新航纺织有限公司 A kind of Multifunctional embossing machine and its fabric of making
CN207031461U (en) * 2017-06-28 2018-02-23 辛集市海洋皮革有限公司 A kind of multifunctional leather embossing machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638839A (en) * 2009-07-14 2010-02-03 东莞贰发毛绒有限公司 Processing technology and embossing machine of flocking product
CN205134002U (en) * 2015-12-04 2016-04-06 东阳市金茂塑胶有限公司 Embossing machine
CN206201672U (en) * 2016-08-30 2017-05-31 俞小康 A kind of stereoscopic printing embossing machine
CN206326989U (en) * 2016-12-23 2017-07-14 绍兴新航纺织有限公司 A kind of Multifunctional embossing machine and its fabric of making
CN207031461U (en) * 2017-06-28 2018-02-23 辛集市海洋皮革有限公司 A kind of multifunctional leather embossing machine

Also Published As

Publication number Publication date
CN109439808B (en) 2020-12-01

Similar Documents

Publication Publication Date Title
CN108855820B (en) Mould shell drying box with rotation and revolution functions
CN109182613A (en) A kind of natural environmental-protective first layer lether and its processing technology
CN105475528A (en) Tea leaf drying device
CN109746156A (en) A kind of insole processing viscose glue water installations
CN109109477A (en) A kind of temperature controlled printing device for packing case production
CN109439808A (en) A kind of stamp first layer lether and its processing technology
CN209116665U (en) A kind of timber drying device
CN209037146U (en) A kind of adjustable-pressure adhesive tape composite device
CN108895781A (en) A kind of hot air circulation drying device
CN208324494U (en) A kind of drying unit of circular screen printer
CN109439811A (en) A kind of first layer lether modelled after an antique and its processing technology
CN109402301A (en) A kind of environmentally protective vegetable tanning first layer lether and its processing technology
CN110283552B (en) High-covering vehicle sticker
CN111871680A (en) Hot melt adhesive spraying machine for spring mattress
CN112144254A (en) Complete set of clothes ironing device
US3303574A (en) Method of and apparatus for vacuum drying of flat material in foil shape, especiallyleather
CN109579499A (en) A kind of pharmacy consistent mechanical drying equipment
CN107323082A (en) Iron-printing machine sheet material preheating device
CN208392868U (en) A kind of pressing machine
CN207105864U (en) Iron-printing machine sheet material preheating device
CN207984275U (en) A kind of printing device for blended textile
US2545396A (en) Dinnerware decorating apparatus
CN213881625U (en) Polishing barrel equipment for chocolate food production
US1954210A (en) Automatic heel spraying machine
CN106473568B (en) Christmas glues sphere of powder drying process units and its method of work

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201030

Address after: No.58 Jinshan Road (Dongshi town), Jinjiang Economic Development Zone, Quanzhou City, Fujian Province

Applicant after: JINJIANG YUANTAI LEATHER Co.,Ltd.

Address before: Room 702, 218 Siming South Road, Siming District, Xiamen City, Fujian Province, 361000

Applicant before: Chen Zhenfu

GR01 Patent grant
GR01 Patent grant