CN109437530A - A kind of Double Layer Circular glassware circumference seal welding Processes and apparatus - Google Patents
A kind of Double Layer Circular glassware circumference seal welding Processes and apparatus Download PDFInfo
- Publication number
- CN109437530A CN109437530A CN201811355368.4A CN201811355368A CN109437530A CN 109437530 A CN109437530 A CN 109437530A CN 201811355368 A CN201811355368 A CN 201811355368A CN 109437530 A CN109437530 A CN 109437530A
- Authority
- CN
- China
- Prior art keywords
- layer glass
- glass tube
- outside
- heated
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/20—Uniting glass pieces by fusing without substantial reshaping
- C03B23/207—Uniting glass rods, glass tubes, or hollow glassware
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/04—Re-forming tubes or rods
- C03B23/13—Reshaping combined with uniting or heat sealing, e.g. for making vacuum bottles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P40/00—Technologies relating to the processing of minerals
- Y02P40/50—Glass production, e.g. reusing waste heat during processing or shaping
- Y02P40/57—Improving the yield, e-g- reduction of reject rates
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)
Abstract
The invention discloses a kind of Double Layer Circular glassware circumference seal welding Processes and apparatus, and specific steps include: step 1: the inside and outside layer glass tube of the double-layer glass vessel to be processed being clamped on slewing, its synchronous rotary is made;Step 2: the oral area of the heating inside and outside layer glass tube to be welded softens;Step 3: being arranged the block for preventing outer layer glass tube from moving radially in glass outer pipe outer wall, inside and outside layer glass tube accelerates rotation, and under the action of the centrifugal force, inner layer glass spout part softening part outer-facing layer glass inside pipe wall direction is mobile and welds therewith;Step 4: the oral area to inside and outside layer glass tube reaches the welded condition of setting, stops heating, stops rotating, the double-layer glass vessel processed is removed from slewing.Technique of the invention greatly reduces the difficulty of processing of Double Layer Circular glassware circumference seal welding, and processing cost is effectively reduced, and improves yield rate, production efficiency.
Description
Technical field
The present invention relates to glass processing field, in particular to a kind of Double Layer Circular glassware circumference seal welding technique and
Equipment.
Background technique
High-boron-silicon glass product requires to complete by welding procedure to reach moulding needed for certain or function,
It is widely applied in the processing of glass container.
Glass Welding majority rests in old traditional " lamp work " welding procedure at present, and low efficiency, processing cost are high, also have
Minority is helped using simple tooling, but efficiency does not improve how many yet, can only reduce labor intensity.Such as Double layer cup rim of a cup
Circumferential weld can only control the quality of rim of a cup with personal technology, and unified standard is not achieved in batch production, therefore, cannot be extensive
Popularization and application.If in order to improve the practicability of production, rim of a cup is single layer, and wall of cup is double-deck teacup, at present can only be advanced
" lamp work " could be completed, and then processing cost is expensive, and terminal client acceptance is not high, not yet overcomes technical problem.
Summary of the invention
The object of the present invention is to provide a kind of Double Layer Circular glassware circumference seal welding Processes and apparatus, can be quick
Double-layer glass vessel circumference seal welding is completed, it is high-efficient, at low cost.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of Double Layer Circular glassware circumference seal welding technique, specific steps include:
Step 1: the inside and outside layer glass tube of the double-layer glass vessel to be processed is clamped on slewing, its synchronization is made
Rotation;
Step 2: the oral area of the heating inside and outside layer glass tube to be welded softens;
Step 3: the block for preventing outer layer glass tube from moving radially, inside and outside layer glass are set in glass outer pipe outer wall
Glass pipe accelerates rotation, and under the action of the centrifugal force, inner layer glass spout part softening part outer-facing layer glass inside pipe wall direction is mobile simultaneously
It welds therewith;
Step 4: the oral area to inside and outside layer glass tube reaches the welded condition of setting, stops heating, stops rotating, will add
The good double-layer glass vessel of work is removed from slewing.
Preferably, 55~100mm of the inner layer glass pipe outside diameter, the glass outer pipe outside diameter 62~106mm, it is described
The wall thickness of inside and outside layer glass tube is 1.5~4mm, and the inner layer glass pipe outside diameter in Double Layer Circular glassware is less than glass outer
Bore.
Preferably, in step 2, the revolving speed of inside and outside layer glass tube when heated is 80~150 revs/min, inside and outside layer glass
The heating time of pipe is 5~15 seconds, and the inner layer glass tube is heated to 750~850 DEG C, and the outer layer glass tube is heated to 500
~650 DEG C.
Preferably, in step 3, inside and outside layer glass tube accelerates rotation to 300~400 revs/min of generation centrifugal actions, centrifugation
Action time is 3~10 seconds.
Preferably, inner layer glass pipe outside diameter 55mm, wall thickness 1.5mm, glass outer pipe outside diameter 62mm, wall thickness 1.5mm;In step
In rapid two, the revolving speed of inside and outside layer glass tube when heated is 80 revs/min, and the heating time of inside and outside layer glass tube is 5 seconds, internal layer
For glass tube heating to 750 DEG C, outer layer glass tube is heated to 500 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 300
Rev/min, centrifugal action is generated, it is for 3 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is moved
It moves and welds therewith.
Preferably, inner layer glass pipe outside diameter 62mm, wall thickness 2mm, glass outer pipe outside diameter 70mm, wall thickness 2mm;In step 2
In, the revolving speed of inside and outside layer glass tube when heated is 100 revs/min, and the heating time of inside and outside layer glass tube is 8 seconds, internal layer glass
Glass pipe is heated to 780 DEG C, and outer layer glass tube is heated to 540 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 320
Rev/min, centrifugal action is generated, for 4 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is moved
It moves and welds therewith.
Preferably, inner layer glass pipe outside diameter 78mm, wall thickness 3mm, glass outer pipe outside diameter 85mm, wall thickness 3mm;In step 2
In, the revolving speed of inside and outside layer glass tube when heated is 120 revs/min, and the heating time of inside and outside layer glass tube is 12 seconds, internal layer glass
Glass pipe is heated to 810 DEG C, and outer layer glass tube is heated to 580 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 340
Rev/min, centrifugal action is generated, it is for 6 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is moved
It moves and welds therewith.
Preferably, inner layer glass pipe outside diameter 85mm, wall thickness 4mm, glass outer pipe outside diameter 96mm, wall thickness 4mm;In step 2
In, the revolving speed of inside and outside layer glass tube when heated is 150 revs/min, and the heating time of inside and outside layer glass tube is 15 seconds, internal layer glass
Glass pipe is heated to 850 DEG C, and outer layer glass tube is heated to 650 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 400
Rev/min, centrifugal action is generated, it is for 10 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube
Movement is simultaneously welded therewith.
Preferably, inner layer glass pipe outside diameter 96mm, wall thickness 1.5mm, glass outer pipe outside diameter 106mm, wall thickness 1.5mm;?
In step 2, the revolving speed of inside and outside layer glass tube when heated is 150 revs/min, and the heating time of inside and outside layer glass tube is 8 seconds,
Inner layer glass tube is heated to 750 DEG C, and outer layer glass tube is heated to 500 DEG C;In step 3, inside and outside layer glass tube accelerates rotation
To 300 revs/min, centrifugal action is generated, it is for 3 seconds, so that the quick outer-facing layer glass inside pipe wall of the heating oral area of inner layer glass tube
Direction is mobile and welds therewith.
A kind of Double Layer Circular glassware circumference seal welding equipment, including workbench, outer fixture, interior fixture, flame dress
It sets, limiting device and power device;
The outer fixture includes the fixed station being fixedly arranged on workbench, is rotatably connected on the fixed station outer for clamping
The multi-jaw chuck of layer glass tube, the multi-jaw chuck are driven by power device;
The interior fixture includes the device for spreading being rotatably connected to for clamping inner layer glass tube, and the device for spreading is by moving
The driving of power device is rotated synchronously with multi-jaw chuck;
The flame device includes the nozzle boss being slideably positioned on workbench, and the nozzle boss is equipped with firn-jet head, institute
Nozzle boss is stated set on the lower section of outer fixture, interior fixture clamping end;
The limiting device includes the bracket being set on nozzle boss, the handle being articulated on bracket and is rotationally connected with hand
Cylindrical blocks on handle.
In conclusion the invention has the following advantages:
Compared with Double Layer Circular glassware circumference seal welding technique in the prior art, technique of the invention drops significantly
The low difficulty of processing of Double Layer Circular glassware circumference seal welding, general worker by simple training can quickly upper hand into
Row production, can be effectively reduced cost of labor, and also improve yield rate, production efficiency greatly improved, reduce and be processed into
This, finally can reach the range of terminal client receiving in price, improve the market competitiveness of manufacturer.
Detailed description of the invention
Fig. 1 is a kind of double-layer glass sealing machine for this technique.
In figure, 10, workbench;20, outer fixture;21, fixed station;22, multi-jaw chuck;30, interior fixture;31, device for spreading;
40, flame device;41, nozzle boss;42, firn-jet head;43, connecting tube;50, limiting device;51, bracket;52, handle;53, it keeps off
Block;60, power device;61, motor;62, transmission shaft.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
A kind of Double Layer Circular glassware circumference seal welding technique, specific steps include:
Step 1: the inside and outside layer glass tube of the double-layer glass vessel to be processed is clamped on slewing, its synchronization is made
Rotation;
Step 2: the oral area of the heating inside and outside layer glass tube to be welded softens;
Step 3: the block for preventing outer layer glass tube from moving radially, inside and outside layer glass are set in glass outer pipe outer wall
Glass pipe accelerates rotation, and under the action of the centrifugal force, inner layer glass spout part softening part outer-facing layer glass inside pipe wall direction is mobile simultaneously
It welds therewith;
Step 4: the oral area to inside and outside layer glass tube reaches the welded condition of setting, stops heating, stops rotating, will add
The good double-layer glass vessel of work is removed from slewing.
In the present embodiment, inner layer glass pipe outside diameter 55mm, wall thickness 1.5mm, glass outer pipe outside diameter 62mm, wall thickness
1.5mm;In step 2, the revolving speed of inside and outside layer glass tube when heated is 80 revs/min, the heating time of inside and outside layer glass tube
It is 5 seconds, inner layer glass tube is heated to 750 DEG C, and outer layer glass tube is heated to 500 DEG C;In step 3, inside and outside layer glass tube adds
Speed rotation generates centrifugal action to 300 revs/min, for 3 seconds, so that the quick outer-facing layer glass of the heating oral area of inner layer glass tube
Inside pipe wall direction is mobile and welds therewith.
The technique greatly reduces the difficulty of processing of Double Layer Circular glassware circumference seal welding, and general worker is by training
Instruction can quickly upper hand be produced, and cost of labor can be effectively reduced, and also improve yield rate, production effect greatly improved
Rate reduces processing cost, finally can reach the range of terminal client receiving in price, and the market for improving manufacturer is competing
Strive power.
The welding equipment that above-mentioned process requirement is used can use double-layer glass sealing machine as shown in Figure 1, including work
Make platform 10, outer fixture 20, interior fixture 30, flame device 40, limiting device 50 and power device 60.The rotation mentioned in above-mentioned technique
Turning equipment mainly includes workbench 10, outer fixture 20, interior fixture 30 and power device 60.Concretely:
Outer fixture 20 includes: the fixed station 21 for being fixed on 10 left part of workbench, is rotatably arranged on fixed station 21
Multi-jaw chuck 22, and the multi-jaw chuck 22 is connected with the power device 60 for rotating it.Wherein, which can be three
Chuck is grabbed, which is used for the left part outer wall of clamping skin glass tube.
Interior fixture 30 includes: the device for spreading 31 being rotatably arranged on fixed station 21, and device for spreading 31 is located at multijaw
The Clamping Center of chuck 22, device for spreading 31 is also connected with the power device 60 for rotating it, so that device for spreading 31 and multijaw
Chuck 22 rotates synchronously, which can be used in holding out against the left part inner wall of clamping inner layer glass tube after strutting.
Multi-jaw chuck 22 and device for spreading 31 are common clamping device in the prior art, are not described in detail herein.
Flame device 40 includes: the nozzle boss 41 being slideably positioned on workbench 10, is fixedly connected on nozzle boss 41 more
The firn-jet head 42 of the gas sources such as a coal gas or natural gas, nozzle boss 41 are located at the lower section of outer fixture 20,30 clamping end of interior fixture, flame
First 42 for heating the oral area of inside and outside layer glass tube, and part of firn-jet head 42 is connected through adjustment face by connecting tube 43
It is heated in the oral area of inner layer glass tube.
Limiting device 50 includes: the bracket 51 being installed on nozzle boss 41, the handle being articulated on bracket 51 52 and turns
The dynamic cylindrical blocks 53 being connected on handle 52, the axis of block 53 are parallel with the pivot center of inside and outside fixture 30,20.Outside
The oral area of layer glass tube is because heating softens, and by rotational handle 52, so that block 53 is pressed in glass outer pipe outer wall, prevents from turning
It is moved radially during dynamic because centrifugal force effect causes the oral area of outer layer glass tube to generate.
Power device 60 includes: the motor 61 being fixedly arranged on inside workbench 10, the biography being rotationally connected with inside workbench 10
Moving axis 62, motor 61 drive transmission shaft 62 to rotate by the drive mechanism of sprocket wheel and chain, and transmission shaft 62 passes through sprocket wheel and chain
Drive mechanism drive multi-jaw chuck 22 and device for spreading 31 to rotate synchronously.
Embodiment two:
A kind of Double Layer Circular glassware circumference seal welding technique, the difference between this embodiment and the first embodiment lies in,
Inner layer glass pipe outside diameter 62mm, wall thickness 2mm, glass outer pipe outside diameter 70mm, wall thickness 2mm;In step 2, interior,
The revolving speed of outer layer glass tube when heated is 100 revs/min, and the heating time of inside and outside layer glass tube is 8 seconds, and inner layer glass tube adds
For heat to 780 DEG C, outer layer glass tube is heated to 540 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 320 revs/min, produces
Raw centrifugal action, for 4 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is mobile and therewith
Welding.
Embodiment three:
A kind of Double Layer Circular glassware circumference seal welding technique, the difference between this embodiment and the first embodiment lies in,
Inner layer glass pipe outside diameter 78mm, wall thickness 3mm, glass outer pipe outside diameter 85mm, wall thickness 3mm;In step 2, interior,
The revolving speed of outer layer glass tube when heated is 120 revs/min, and the heating time of inside and outside layer glass tube is 12 seconds, and inner layer glass tube adds
For heat to 810 DEG C, outer layer glass tube is heated to 580 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 340 revs/min, produces
Raw centrifugal action, it is for 6 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is mobile and therewith
Welding.
Example IV:
A kind of Double Layer Circular glassware circumference seal welding technique, the difference between this embodiment and the first embodiment lies in,
Inner layer glass pipe outside diameter 85mm, wall thickness 4mm, glass outer pipe outside diameter 96mm, wall thickness 4mm;In step 2, interior,
The revolving speed of outer layer glass tube when heated is 150 revs/min, and the heating time of inside and outside layer glass tube is 15 seconds, and inner layer glass tube adds
For heat to 850 DEG C, outer layer glass tube is heated to 650 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 400 revs/min, produces
Raw centrifugal action, it is for 10 seconds so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube it is mobile and with
Welding.
Embodiment five:
A kind of Double Layer Circular glassware circumference seal welding technique, the difference between this embodiment and the first embodiment lies in,
Inner layer glass pipe outside diameter 96mm, wall thickness 1.5mm, glass outer pipe outside diameter 106mm, wall thickness 1.5mm;In step 2
In, the revolving speed of inside and outside layer glass tube when heated is 150 revs/min, and the heating time of inside and outside layer glass tube is 8 seconds, internal layer glass
Glass pipe is heated to 750 DEG C, and outer layer glass tube is heated to 500 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 300
Rev/min, centrifugal action is generated, it is for 3 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is moved
It moves and welds therewith.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, a variety of different realities
Applying can also be combined between mode, as long as it equally should be considered as the present invention without prejudice to the thought of the embodiment of the present invention
Embodiment disclosure of that, those skilled in the art can according to need after reading this specification and make to the present embodiment
There is no the modification of creative contribution, but as long as all by the protection of Patent Law in scope of the presently claimed invention.
Claims (10)
1. a kind of Double Layer Circular glassware circumference seal welding technique, which is characterized in that specific steps include:
Step 1: being clamped in the inside and outside layer glass tube of the double-layer glass vessel to be processed on slewing, it is made to synchronize rotation
Turn;
Step 2: the oral area of the heating inside and outside layer glass tube to be welded softens;
Step 3: the block for preventing outer layer glass tube from moving radially, inside and outside layer glass tube are set in glass outer pipe outer wall
Accelerate rotation, under the action of the centrifugal force, inner layer glass spout part softening part outer-facing layer glass inside pipe wall direction is mobile and therewith
Welding;
Step 4: the oral area to inside and outside layer glass tube reaches the welded condition of setting, stops heating, stops rotating, will process
Double-layer glass vessel removed from slewing.
2. a kind of Double Layer Circular glassware circumference seal welding technique according to claim 1, which is characterized in that described
55~100mm of inner layer glass pipe outside diameter, 62~106mm of the glass outer pipe outside diameter, the wall thickness of the inside and outside layer glass tube are
1.5~4mm, the inner layer glass pipe outside diameter in Double Layer Circular glassware are less than glass outer bore.
3. a kind of Double Layer Circular glassware circumference seal welding technique according to claim 1, which is characterized in that step
In two, the revolving speed of inside and outside layer glass tube when heated is 80~150 revs/min, and the heating time of inside and outside layer glass tube is 5~15
Second, the inner layer glass tube is heated to 750~850 DEG C, and the outer layer glass tube is heated to 500~650 DEG C.
4. a kind of Double Layer Circular glassware circumference seal welding technique according to claim 1, which is characterized in that step
In three, inside and outside layer glass tube accelerates rotation to 300~400 revs/min of generation centrifugal actions, and the centrifugal action time is 3~10 seconds.
5. a kind of according to claim 1 or 2 or 3 or 4 described in any item Double Layer Circular glassware circumference seal welding techniques,
It is characterized in that, inner layer glass pipe outside diameter 55mm, wall thickness 1.5mm, glass outer pipe outside diameter 62mm, wall thickness 1.5mm;In step 2
In, the revolving speed of inside and outside layer glass tube when heated is 80 revs/min, and the heating time of inside and outside layer glass tube is 5 seconds, inner layer glass
Pipe is heated to 750 DEG C, and outer layer glass tube is heated to 500 DEG C;In step 3, inside and outside layer glass tube accelerate rotation to 300 turns/
Point, centrifugal action is generated, it is for 3 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is mobile
And it welds therewith.
6. a kind of according to claim 1 or 2 or 3 or 4 described in any item Double Layer Circular glassware circumference seal welding techniques,
It is characterized in that, inner layer glass pipe outside diameter 62mm, wall thickness 2mm, glass outer pipe outside diameter 70mm, wall thickness 2mm;In step 2,
The revolving speed of inside and outside layer glass tube when heated is 100 revs/min, and the heating time of inside and outside layer glass tube is 8 seconds, inner layer glass tube
780 DEG C are heated to, outer layer glass tube is heated to 540 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 320 revs/min,
Generate centrifugal action, for 4 seconds so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube it is mobile and with
Welding.
7. a kind of according to claim 1 or 2 or 3 or 4 described in any item Double Layer Circular glassware circumference seal welding techniques,
It is characterized in that, inner layer glass pipe outside diameter 78mm, wall thickness 3mm, glass outer pipe outside diameter 85mm, wall thickness 3mm;In step 2,
The revolving speed of inside and outside layer glass tube when heated is 120 revs/min, and the heating time of inside and outside layer glass tube is 12 seconds, inner layer glass
Pipe is heated to 810 DEG C, and outer layer glass tube is heated to 580 DEG C;In step 3, inside and outside layer glass tube accelerate rotation to 340 turns/
Point, centrifugal action is generated, it is for 6 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is mobile
And it welds therewith.
8. a kind of according to claim 1 or 2 or 3 or 4 described in any item Double Layer Circular glassware circumference seal welding techniques,
It is characterized in that, inner layer glass pipe outside diameter 85mm, wall thickness 4mm, glass outer pipe outside diameter 96mm, wall thickness 4mm;In step 2,
The revolving speed of inside and outside layer glass tube when heated is 150 revs/min, and the heating time of inside and outside layer glass tube is 15 seconds, inner layer glass
Pipe is heated to 850 DEG C, and outer layer glass tube is heated to 650 DEG C;In step 3, inside and outside layer glass tube accelerate rotation to 400 turns/
Point, centrifugal action is generated, it is for 10 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is mobile
And it welds therewith.
9. a kind of according to claim 1 or 2 or 3 or 4 described in any item Double Layer Circular glassware circumference seal welding techniques,
It is characterized in that, inner layer glass pipe outside diameter 96mm, wall thickness 1.5mm, glass outer pipe outside diameter 106mm, wall thickness 1.5mm;In step
In two, the revolving speed of inside and outside layer glass tube when heated is 150 revs/min, and the heating time of inside and outside layer glass tube is 8 seconds, internal layer
For glass tube heating to 750 DEG C, outer layer glass tube is heated to 500 DEG C;In step 3, inside and outside layer glass tube accelerates rotation to 300
Rev/min, centrifugal action is generated, it is for 3 seconds, so that the quick outer-facing layer glass inside pipe wall direction of the heating oral area of inner layer glass tube is moved
It moves and welds therewith.
10. a kind of Double Layer Circular glassware circumference seal welding equipment, which is characterized in that including workbench, outer fixture, inner clip
Tool, flame device, limiting device and power device;
The outer fixture includes the fixed station being fixedly arranged on workbench, is rotatably connected on the fixed station for clamping skin glass
The multi-jaw chuck of glass pipe, the multi-jaw chuck are driven by power device;
The interior fixture includes the device for spreading being rotatably connected to for clamping inner layer glass tube, and the device for spreading is filled by power
It sets driving and multi-jaw chuck rotates synchronously;
The flame device includes the nozzle boss being slideably positioned on workbench, and the nozzle boss is equipped with firn-jet head, the spray
Headstock is set to the lower section of outer fixture, interior fixture clamping end;
The limiting device includes the bracket being set on nozzle boss, the handle being articulated on bracket and is rotationally connected on handle
Cylindrical blocks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811355368.4A CN109437530A (en) | 2018-11-14 | 2018-11-14 | A kind of Double Layer Circular glassware circumference seal welding Processes and apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811355368.4A CN109437530A (en) | 2018-11-14 | 2018-11-14 | A kind of Double Layer Circular glassware circumference seal welding Processes and apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109437530A true CN109437530A (en) | 2019-03-08 |
Family
ID=65554297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811355368.4A Pending CN109437530A (en) | 2018-11-14 | 2018-11-14 | A kind of Double Layer Circular glassware circumference seal welding Processes and apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109437530A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU459434A1 (en) * | 1972-08-25 | 1975-02-05 | Предприятие П/Я А-1067 | Method for making double wall glass vessels |
JPS60131838A (en) * | 1983-12-17 | 1985-07-13 | Zojirushi Vacuum Bottle Co | Manufacture of double-mouthed double vacuum bottle |
CN203346260U (en) * | 2013-06-14 | 2013-12-18 | 程文胜 | Full-automatic dual-layer glass cup sealing machine |
CN204356224U (en) * | 2015-01-08 | 2015-05-27 | 陈伟明 | Double-layer glass sealing machine |
CN106116125A (en) * | 2016-06-24 | 2016-11-16 | 闻喜县宏伟玻璃器皿有限公司 | A kind of production method of double-layer glass vessel |
CN207877569U (en) * | 2018-01-15 | 2018-09-18 | 陈伟明 | Double-layer glass automatic sealing |
-
2018
- 2018-11-14 CN CN201811355368.4A patent/CN109437530A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU459434A1 (en) * | 1972-08-25 | 1975-02-05 | Предприятие П/Я А-1067 | Method for making double wall glass vessels |
JPS60131838A (en) * | 1983-12-17 | 1985-07-13 | Zojirushi Vacuum Bottle Co | Manufacture of double-mouthed double vacuum bottle |
CN203346260U (en) * | 2013-06-14 | 2013-12-18 | 程文胜 | Full-automatic dual-layer glass cup sealing machine |
CN204356224U (en) * | 2015-01-08 | 2015-05-27 | 陈伟明 | Double-layer glass sealing machine |
CN106116125A (en) * | 2016-06-24 | 2016-11-16 | 闻喜县宏伟玻璃器皿有限公司 | A kind of production method of double-layer glass vessel |
CN207877569U (en) * | 2018-01-15 | 2018-09-18 | 陈伟明 | Double-layer glass automatic sealing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10315946B2 (en) | Device and method for forming glass bodies | |
CN208099122U (en) | stainless steel pipe sealing machine | |
CN105417459A (en) | Machining device for bottleneck sealing metal cap | |
CN108383363A (en) | The rim of a cup sealing machine of double-layer glass | |
JP2020507478A (en) | Methods and devices for spin formation | |
CN104576264B (en) | bulb sealing machine | |
CN112157159B (en) | Gas cylinder spinning process method | |
CN109437530A (en) | A kind of Double Layer Circular glassware circumference seal welding Processes and apparatus | |
CN110654637A (en) | Intelligent production equipment based on automatic filling and tail sealing of hose | |
CN114985613A (en) | Metal tube sealing process | |
CN201245552Y (en) | Fluorescent spiral energy conservation lamp pin cut-off machine | |
CN107695607B (en) | Electronic rotation welding fixture | |
CN103611662A (en) | Autorotation paint spraying device adopting three-layer fixture | |
CN107253052B (en) | Drying bottle bottoming machine and its technique | |
JP2016049544A (en) | Closing work method of tube, and device of the same | |
CN109822180B (en) | Welding device and using method thereof | |
CN108637276A (en) | A kind of two-way facing attachment of conical bearing roller | |
CN211052792U (en) | Pipeline cutting and processing device | |
CN204711480U (en) | A kind of horizontal rotation platform | |
CN113000703B (en) | Combined necking-in inversion spinning method | |
JP2000317532A (en) | Method for forming tube end and device therefor | |
CN215547550U (en) | Glass steel flange shaping device | |
CN205394189U (en) | Tooth cover burring device | |
CN205838111U (en) | mechanical expansion shaft | |
CN207272592U (en) | A kind of automatic welding device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |