CN109409761A - A kind of anti-management method and device for going to the wrong way interval - Google Patents
A kind of anti-management method and device for going to the wrong way interval Download PDFInfo
- Publication number
- CN109409761A CN109409761A CN201811316461.4A CN201811316461A CN109409761A CN 109409761 A CN109409761 A CN 109409761A CN 201811316461 A CN201811316461 A CN 201811316461A CN 109409761 A CN109409761 A CN 109409761A
- Authority
- CN
- China
- Prior art keywords
- pending
- current pending
- director information
- task
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the present invention provides a kind of anti-management method and device for going to the wrong way interval, is related to work management field.The method is by determining current pending operation list;Wherein, current pending operation list includes P operating procedure of M operating procedure of current pending chemical sampling task, N number of operating procedure of current pending operating point validation task and current pending scaffold management role, and M, N, P are the integer more than or equal to 2;Then a plurality of director information corresponding with corresponding task is exported according to current pending operation list, so that user is based on a plurality of director information and completes corresponding task.In this programme, pending operation list includes different types of operating point, the pending operation list of each operating point can export corresponding director information, to which user can complete to operate according to corresponding director information, the convenience of operating point management is improved, while can also obtain the feedback that worker personnel carry out work in time.
Description
Technical field
The present invention relates to work management fields, in particular to a kind of anti-management method and device for going to the wrong way interval.
Background technique
In the engineering for being related to compared with multiple types operating point at one at present, it is mutually indepedent for being typically different the operating point of type
's.It tends not to different types of operating point carrying out Classification Management when carrying out operating point management, is easy implementing work
The situation to cause confusion during work.In addition, current operating point management is to each different operating point without more in detail
Thin director information, can not timely be worked feedback.
Summary of the invention
In view of this, the embodiment of the present invention is designed to provide a kind of anti-management method and device for going to the wrong way interval, with
Improve the above problem.
In a first aspect, the embodiment of the invention provides a kind of anti-management methods for going to the wrong way interval, which comprises determine
Current pending operation list;Wherein, the current pending operation list includes M operation of current pending chemical sampling task
The P of step, N number of operating procedure of current pending operating point validation task and current pending scaffold management role is a
Operating procedure, M, N, P are the integer more than or equal to 2;According to the current pending operation list output with it is described currently pending
Corresponding a plurality of first director information of chemical sampling task, so that user is based on working as described in a plurality of first director information completion
Preceding pending chemical sampling task;Appointed according to the current pending operation list output and the current pending operating point verifying
It is engaged in corresponding a plurality of second director information, so that user is based on a plurality of second director information and completes the current pending work
Make point validation task;It is corresponding with the current pending scaffold management role according to the current pending operation list output
A plurality of third director information so that user completes the current pending scaffold based on a plurality of third director information
Management role.
Further, it is determined that before current pending operation list, comprising: receive at least one pending chemical sampling task
Title, at least one pending operation list is called based on the title;Alternatively, identifying that at least one described pending chemistry takes
The corresponding two dimensional code of sample task calls at least one described pending operation list;Wherein, at least one described pending chemistry takes
Sample task includes the current pending chemical sampling task;Receive the work people of at least one pending operating point validation task
The job information of member, the job information based on the staff call at least one pending task;Alternatively, identification institute
The corresponding two dimensional code of at least one pending operating point validation task is stated, at least one described pending task is called;Its
In, at least one described pending operating point validation task includes the current pending operating point validation task;It receives at least
The status information of the scaffold of one pending scaffold management role, the status information based on the scaffold call at least one
A pending scaffold management role;Alternatively, the corresponding two dimensional code of at least one described pending scaffold management role of identification,
Call at least one described pending scaffold management role;Wherein, at least one described pending scaffold management role packet
Include the current pending scaffold management role.
Further, corresponding with the current pending chemical sampling task according to the current pending operation list output
A plurality of first director information so that user is based on a plurality of first director information and completes the current pending chemical sampling
Task, comprising: successively take i from 1 to M, corresponding i-th the first director information of i-th of operating procedure of output;It is used for when receiving
After characterizing the instruction that the user completes i-th of operating procedure based on i-th director information, current time is recorded,
And export corresponding the first director information of i+1 item of i+1 operating procedure.
Further, corresponding with the current pending chemical sampling task according to the current pending operation list output
A plurality of first director information so that user is based on a plurality of first director information and completes the current pending chemical sampling
Task, further includes: detect whether m-th operating procedure in the pending operation list is completed;When to be, determine described current
Pending operation list is to be completed that operation is single, detect whether to receive for characterize need to audit described in single careful of operation is completed
Core instruction, and upload single as operation is completed described in the pending operation list of target.
Further, according to the current pending operation list output and the current pending operating point validation task pair
A plurality of second director information answered, so that user is based on a plurality of second director information and completes the current pending operating point
Validation task, comprising: successively take j from 1 to N, corresponding the second director information of j-th strip of j-th of operating procedure of output;When receiving
After the instruction for completing j-th of operating procedure for characterizing the user based on second director information of j-th strip, record is worked as
The preceding time, and export+1 operating procedure of jth+1 the second director information of corresponding jth.
Further, according to the current pending operation list output and the current pending operating point validation task pair
A plurality of second director information answered, so that user is based on a plurality of second director information and completes the current pending operating point
Validation task, further includes: detect whether current pending operating point validation task described in the pending operation list is completed;
When to be, then label is completed to the current pending operating point validation task addition;When to be no, then to described current
Pending operating point validation task addition does not complete label.
Further, according to the current pending operation list output and the current pending scaffold management role
Corresponding a plurality of third director information, so that user completes the current pending foot based on a plurality of third director information
Hand cradle management role, comprising: successively take k from 1 to P, the corresponding kth third director information of k-th of operating procedure of output;When connecing
After receiving the instruction for completing k-th of operating procedure for characterizing the user based on the kth third director information, note
Current time is recorded, and exports+1 operating procedure of kth+1 third director information of corresponding kth.
Further, successively take k from 1 to P, the corresponding kth third director information of k-th of operating procedure of output, comprising:
Get the extension request of k-th of operating procedure;Judge whether the extension request is to agree to extension request;It is being yes
When, by it is described agreement extension request in the third director information be sent to the operational staff of k-th of operating procedure with
And the operational staff of described+1 operating procedure of kth.
Further, according to the current pending operation list output and the current pending scaffold management role
Corresponding a plurality of third director information, so that user completes the current pending foot based on a plurality of third director information
Hand cradle management role, further includes: detect whether k-th of operating procedure described in the pending operation list is completed;When to be,
Then send the operational staff that scaffold management role to+1 operating procedure of kth is completed in presently described k-th of step.
Second aspect, the embodiment of the present invention provide a kind of anti-managing device for going to the wrong way interval, and described device comprises determining that mould
Block, for determining current pending operation list;Wherein, the current pending operation list includes that current pending chemical sampling is appointed
M operating procedure of business, N number of operating procedure of current pending operating point validation task and current pending scaffold tube
P operating procedure of reason task, M, N, P are the integer more than or equal to 2;First guide module, for according to described currently wait hold
The single output of row operation a plurality of first director information corresponding with the current pending chemical sampling task, so that user is based on institute
It states a plurality of first director information and completes the current pending chemical sampling task;Second guides module, for working as according to
Preceding pending operation list output a plurality of second director information corresponding with the currently pending operating point validation task, to use
Family is based on a plurality of second director information and completes the current pending operating point validation task;Third guides module, is used for
A plurality of third corresponding with the currently pending scaffold management role is exported according to the current pending operation list to refer to
Fuse breath, so that user completes the current pending scaffold management role based on a plurality of third director information.
The third aspect, the embodiment of the present invention provide a kind of electronic equipment, including processor and memory, the memory
It is stored with computer-readable instruction fetch, when the computer-readable instruction fetch is executed by the processor, operation such as above-mentioned the
On the one hand the step in the method provided.
Fourth aspect, the embodiment of the present invention provide a kind of readable storage medium storing program for executing, are stored thereon with computer program, the meter
The step in the method that first aspect offer is as above provided is run when calculation machine program is executed by processor.
The embodiment of the present invention the utility model has the advantages that
The embodiment of the present invention provides a kind of anti-management method and device for going to the wrong way interval, the method by determine currently to
It is single to execute operation;Wherein, the current pending operation list include current pending chemical sampling task M operating procedure,
P operation of N number of operating procedure of current pending operating point validation task and current pending scaffold management role
Step, M, N, P are the integer more than or equal to 2;Then according to the current pending operation list output with it is described currently pending
Corresponding a plurality of first director information of chemical sampling task, so that user is based on working as described in a plurality of first director information completion
Preceding pending chemical sampling task;Then it is examined item by item according to the current pending operation list output with the current pending work
Corresponding a plurality of second director information of card task, so that user is described currently wait hold based on a plurality of second director information completion
Row operating point validation task;Finally according to the current pending operation list output and the current pending scaffold management
The corresponding a plurality of third director information of task, so that user is described current pending based on a plurality of third director information completion
Scaffold management role.In the present solution, pending operation list includes different types of operating point, each operating point wait hold
Row operation is single can to export corresponding director information, so that user can complete to operate according to corresponding director information, improve
The convenience of operating point management, while the feedback that worker personnel carry out work also can be obtained in time.
Other features and advantages of the present invention will be illustrated in subsequent specification, also, partly be become from specification
It is clear that by implementing understanding of the embodiment of the present invention.The objectives and other advantages of the invention can be by written theory
Specifically noted structure is achieved and obtained in bright book, claims and attached drawing.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural block diagram of a kind of electronic equipment provided in an embodiment of the present invention;
Fig. 2 is a kind of flow chart of anti-management method for going to the wrong way interval provided in an embodiment of the present invention;
Fig. 3 is a kind of first director information operating procedure flow chart provided in an embodiment of the present invention;
Fig. 4 is a kind of second director information operating procedure flow chart provided in an embodiment of the present invention;
Fig. 5 is a kind of third director information operating procedure flow chart provided in an embodiment of the present invention;
Fig. 6 is a kind of structural block diagram of anti-managing device for going to the wrong way interval provided in an embodiment of the present invention.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete
Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist
The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause
This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below
Range, but it is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not doing
Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile of the invention
In description, term " first ", " second " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
Fig. 1 is please referred to, Fig. 1 shows a kind of structural block diagram of electronic equipment 10 that can be applied in the embodiment of the present application.
Electronic equipment 10 may include the anti-managing device 100 for going to the wrong way interval, memory 101, storage control 102, processor 103,
Peripheral Interface 104, input-output unit 105, audio unit 106, display unit 107.
The memory 101, storage control 102, processor 103, Peripheral Interface 104, input-output unit 105, sound
Frequency unit 106, each element of display unit 107 are directly or indirectly electrically connected between each other, to realize the transmission or friendship of data
Mutually.It is electrically connected for example, these elements can be realized between each other by one or more communication bus or signal wire.It is described to prevent walking
The managing device 100 at mistake interval includes that at least one can be stored in the memory in the form of software or firmware (firmware)
In 101 or the software function that is solidificated in the operating system (operating system, OS) of the anti-managing device 100 for going to the wrong way interval
It can module.The processor 103 is for executing the executable module stored in memory 101, such as the anti-management for going to the wrong way interval
The software function module or computer program that device 100 includes.
Wherein, memory 101 may be, but not limited to, random access memory (Random Access Memory,
RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-
Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory,
EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory,
EEPROM) etc..Wherein, memory 101 is for storing program, and the processor 103 is after receiving and executing instruction, described in execution
Program, method performed by the server that the stream process that aforementioned any embodiment of the embodiment of the present invention discloses defines can be applied to
In processor 103, or realized by processor 103.
Processor 103 can be a kind of IC chip, the processing capacity with signal.Above-mentioned processor 103 can
To be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit
(Network Processor, abbreviation NP) etc.;Can also be digital signal processor (DSP), specific integrated circuit (ASIC),
Ready-made programmable gate array (FPGA) either other programmable logic device, discrete gate or transistor logic, discrete hard
Part component.It may be implemented or execute disclosed each method, step and the logic diagram in the embodiment of the present invention.General processor
It can be microprocessor or the processor 103 be also possible to any conventional processor etc..
Various input/output devices are couple processor 103 and memory 101 by the Peripheral Interface 104.Some
In embodiment, Peripheral Interface 104, processor 103 and storage control 102 can be realized in one single chip.Other one
In a little examples, they can be realized by independent chip respectively.
Input-output unit 105 realizes user and the server (or local terminal) for being supplied to user input data
Interaction.The input-output unit 105 may be, but not limited to, mouse and keyboard etc..
Audio unit 106 provides a user audio interface, may include one or more microphones, one or more raises
Sound device and voicefrequency circuit.
Display unit 107 provides an interactive interface (such as user's operation circle between the electronic equipment 10 and user
Face) or for display image data give user reference.In the present embodiment, the display unit 107 can be liquid crystal display
Or touch control display.It can be the capacitance type touch control screen or resistance of support single-point and multi-point touch operation if touch control display
Formula touch screen etc..Single-point and multi-point touch operation is supported to refer to that touch control display can sense on the touch control display one
Or at multiple positions simultaneously generate touch control operation, and the touch control operation that this is sensed transfer to processor 103 carry out calculate and
Processing.
Various input/output devices are couple processor 103 and memory 101 by the Peripheral Interface 104.Some
In embodiment, Peripheral Interface 104, processor 103 and storage control 102 can be realized in one single chip.Other one
In a little examples, they can be realized by independent chip respectively.
Input-output unit 105 is used to be supplied to the interaction that user input data realizes user and processing terminal.It is described defeated
Entering output unit 105 may be, but not limited to, mouse and keyboard etc..
It is appreciated that structure shown in FIG. 1 is only to illustrate, the electronic equipment 10 may also include more than shown in Fig. 1
Perhaps less component or with the configuration different from shown in Fig. 1.Each component shown in Fig. 1 can use hardware, software
Or combinations thereof realize.
Fig. 2 is please referred to, Fig. 2 is a kind of flow chart of anti-management method for going to the wrong way interval provided in an embodiment of the present invention.Institute
The anti-management method for going to the wrong way interval is stated to include the following steps:
Step S110: current pending operation list is determined.
Wherein, the current pending operation list includes the M operating procedure, currently of current pending chemical sampling task
P operating procedure of N number of operating procedure of pending operating point validation task and current pending scaffold management role,
M, N, P are the integer more than or equal to 2.
Current pending operation list may include multiple operating procedures of a variety of different types of pending tasks, for example,
In the embodiment of the present invention current pending operation list include pending chemical sampling task, pending operating point validation task and to
The scaffold management role of execution.Wherein, there is no limit for the quantity of the type of pending task.
Wherein it is determined that the mode of current pending operation list can be such that receiving at least one pending chemistry first takes
The title of sample task calls at least one pending operation list based on the title;Alternatively, at least one is pending described in identification
The corresponding two dimensional code of chemical sampling task calls at least one described pending operation list;It is wherein, described that at least one is pending
Chemical sampling task includes the current pending chemical sampling task.Then at least one pending operating point verifying is received to appoint
The job information of the staff of business, the job information based on the staff call at least one pending task;
Alternatively, the corresponding two dimensional code of at least one described pending operating point validation task of identification, call that described at least one is pending
Task;Wherein, at least one described pending operating point validation task includes that the current pending operating point verifying is appointed
Business.Finally receive the status information of the scaffold of at least one pending scaffold management role, the shape based on the scaffold
State information calls at least one pending scaffold management role;Alternatively, identifying at least one described pending scaffold management
The corresponding two dimensional code of task calls at least one described pending scaffold management role;It is wherein, described that at least one is pending
Scaffold management role includes the current pending scaffold management role.
Particularly, the acquisition pattern of the corresponding pending operation list of different types of pending task is different.It obtains
The corresponding pending operation list of pending chemical sampling task needs to obtain the title of pending chemical sampling task first, or
Person is by scanning the corresponding two dimensional code of the pending chemical sampling task or bar code.Obtain pending operating point validation task
Staff job information, and then pending task is obtained based on the job information of the staff, wherein
It can be by scanning the two-dimensional code or bar code to obtain takes pending task.For scaffold management role, elder generation is needed
The status information of scaffold is obtained, can be by way of corresponding two dimensional code or bar code on scanning scaffold, then root
Pending scaffold task is called according to the status information of the scaffold of acquisition.
Step S120: corresponding with the current pending chemical sampling task according to the current pending operation list output
A plurality of first director information so that user is based on a plurality of first director information and completes the current pending chemical sampling
Task.
Step S130: according to the current pending operation list output and the current pending operating point validation task pair
A plurality of second director information answered, so that user is based on a plurality of second director information and completes the current pending operating point
Validation task.
Step S140: according to the current pending operation list output and the current pending scaffold management role
Corresponding a plurality of third director information, so that user completes the current pending foot based on a plurality of third director information
Hand cradle management role.
Fig. 3 is please referred to, Fig. 3 is a kind of first director information operating procedure flow chart provided in an embodiment of the present invention.Specifically
Ground includes the following steps: in the step s 120
Step S121: successively taking i from 1 to M, corresponding i-th the first director information of i-th of operating procedure of output.
First director information takes with according to the current pending operation list output with the current pending chemistry
Sample task is corresponding, guides for the operation to user.For example, corresponding i-th first guide of i-th of operating procedure of output
Information, guidance user complete i-th of operating procedure.For example, take i be 1 when, output the 1st operating procedure it is 1st article first corresponding
Director information, the 1st article of the first director information require staff to open valve.When to take i be 2, it is corresponding to export the 2nd operating procedure
The 2nd article of the first director information, the 2nd article of the first director information require staff to be sampled operation.When to take i be 3, output the
Corresponding 3rd article of the first director information of 3 operating procedures, the 3rd article of the first director information require staff to close valve.
As an implementation, the 1st operating procedure of each current pending chemical sampling task is 1st article corresponding
First director information, guidance user complete the 1st operating procedure can be require staff carry out risk check.For example, one
In a current pending chemical sampling task, when taking i is 1, the corresponding 1st article of first guide letter of the 1st operating procedure of output
Breath, the 1st article of the first director information require staff's progress risk to check.Take i be 2 when, output the 2nd operating procedure it is corresponding
2nd article of the first director information, the 2nd article of the first director information require staff to open valve.Take i be 3 when, export the 3rd behaviour
Make corresponding 3rd article of the first director information of step, the 3rd article of the first director information requires staff to be sampled operation.Another
In outer one current pending chemical sampling task, when taking i is 1, corresponding 1st article of first finger of the 1st operating procedure of output
Fuse breath, the 1st article of the first director information require staff's progress risk to check.Take i be 2 when, export the 2nd operating procedure pair
The 2nd article of the first director information answered, the 2nd article of the first director information require staff to clean sampling instrument.Take i be 3 when, output
Corresponding 3rd article of the first director information of 3rd operating procedure, the 3rd article of the first director information require staff to be sampled behaviour
Make.
Step S122: i-th director information completion, i-th of the behaviour is based on for characterizing the user when receiving
After making the instruction of step, current time is recorded, and export corresponding the first director information of i+1 item of i+1 operating procedure.
For example, the 1st operating procedure is completed according to the 1st article of the first director information in staff, i.e., to sampling wind
After danger is checked, current time is recorded, X seconds when being such as denoted as X X month X day X, and it is corresponding to export the 2nd operating procedure
2nd article of the first director information requires staff to carry out the first director information of cleaning operation to sampling instrument.
As an implementation, in order to which the pending operation list all completed to all operations step carries out review operations,
It can also detect whether m-th operating procedure in the pending operation list is completed, if when m-th operating procedure is completed,
It determines the current pending operation list again to be completed and operating list, detects whether to receive for characterizing described in needs audit
The single audit instruction of operation is completed, and is uploaded single as operation is completed described in the pending operation list of target.
For example, m-th operating procedure is to arrange sampling instrument in pending operation list, detects and arrange sampling instrument step
After the completion, that the pending operation list is determined as being completed operation is single, at this point, if detect this is completed operation it is single into
The audit instruction of row audit, then operation single upload is completed as the pending operation list of target in this.
Fig. 4 is please referred to, Fig. 4 is a kind of second director information operating procedure flow chart provided in an embodiment of the present invention.Specifically
Ground includes the following steps: in step S130
Step S131: successively taking j from 1 to N, corresponding the second director information of j-th strip of j-th of operating procedure of output.
Second director information exports and the current pending operating point with according to the current pending operation list
Validation task is corresponding, guides for the operation to user.For example, the corresponding j-th strip second of j-th of operating procedure of output refers to
Fuse breath, guidance user complete j-th of operating procedure.For example, when to take j be 1, the 1st operating procedure of output is 1st article the corresponding
Two director informations, the 1st article of the second director information require staff to obtain the job information for having task.Take j be 2 when, it is defeated
Corresponding 2nd article of the second director information of 2nd operating procedure out, the 2nd article of the second director information require the work to staff
Information verify and remarks.When to take j be 3, corresponding 3rd article of the second director information of the 3rd operating procedure of output, the 3rd article the
Two director informations require whether the task of detection staff is completed.
Step S132: second director information of the j-th strip completion jth is based on for characterizing the user when receiving
After the instruction of a operating procedure, current time is recorded, and exports+1 second guide letter of the corresponding jth of+1 operating procedure of jth
Breath.
For example, the 1st operating procedure is completed according to the 1st article of the second director information in staff, that is, obtaining has work to appoint
After the job information of business, current time is recorded, X seconds when being such as denoted as X X month X day X, and it is corresponding to export the 2nd operating procedure
2nd article of the second director information verify simultaneously logging comment to the job information of staff.
As an implementation, further include following steps in step S130: detected in the pending operation list first
Whether the current pending operating point validation task is completed, right if current pending operating point validation task is completed
Label is completed in the current pending operating point validation task addition;If current pending operating point validation task does not complete,
Label then is not completed to the current pending operating point validation task addition.
Fig. 5 is please referred to, Fig. 5 is a kind of third director information operating procedure flow chart provided in an embodiment of the present invention.Specifically
Ground includes the following steps: in step S140
Step S141: successively taking k from 1 to P, the corresponding kth third director information of k-th of operating procedure of output.
The third director information exports and the current pending foot hand with according to the current pending operation list
Frame management role is corresponding, guides for the operation to user.For example, the corresponding kth third of k-th of operating procedure of output
Director information, guidance user complete k-th of operating procedure.For example, take k be 1 when, output the 1st operating procedure it is 1st article corresponding
Third director information, the 1st article of third director information require building personnel to build to scaffold and the scaffold is arranged
State be wait check and accept.When to take k be 2, the corresponding 2nd article of third director information of the 2nd operating procedure of output, the 2nd article of third refers to
Draw information requirements patch two dimensional code is carried out to the scaffold put up and goes forward side by side hand cradle Acceptance application of traveling far and wide.Take k be 3 when, export the 3rd
The corresponding 3rd article of third director information of operating procedure, the 3rd article of third director information require to carry out the scaffold for having Acceptance application
It checks and accepts, and the state of the scaffold is changed to check and accept.When to take k be 4, the corresponding 4th article of third of the 4th operating procedure of output refers to
Fuse breath, the 4th article of third director information require to carry out Inspection and maintenance to approved scaffold.Take k be 5 when, export the 5th behaviour
Make the corresponding 5th article of third director information of step, the 5th article of third director information requires to carry out the scaffold exceeded
It removes.
As an implementation, it exports in the corresponding kth third director information of k-th of operating procedure, third is guided
Information may include scaffold management role, and management role therein includes scaffold task to be built, the foot hand for building completion
Frame wait for examination task, examination pass through scaffold using task, the task to be removed of scaffold to be removed.Wherein each difference
Scaffold management role staff corresponding thereto match, for example, the corresponding work of scaffold task to be built
Making personnel can be Zhang San, and the scaffold for building completion waits for that the corresponding staff of examination task can be Li Si or king
Five.The sequence that scaffold management role occurs in the operating procedure in third director information is according to the concrete condition of working site
It is arranged, in addition, the time interval between each operating procedure can also be configured according to the concrete condition of working site.
For example, the scaffold that scaffold after the completion of the task of building, builds completion wait for examination task time limit can according to engineering into
Degree is arranged, and can also be arranged according to the schedule of staff.
Step S142: the kth third director information completion kth is based on for characterizing the user when receiving
After the instruction of a operating procedure, current time is recorded, and exports+1 third of the corresponding kth of+1 operating procedure of kth and guides letter
Breath.
For example, the 1st operating procedure, i.e. building personnel is completed according to the 1st article of third director information in staff
The state that the scaffold is built and be arranged to scaffold is to record current time after checking and accepting, be such as denoted as X X month X day
X seconds when X, and the corresponding 2nd article of third director information of the 2nd operating procedure is exported, that is, requires staff to putting up
Scaffold carry out patch two dimensional code go forward side by side travel far and wide hand cradle Acceptance application operation third director information.
As an implementation, further include following steps in step S140: getting k-th of operating procedure first
Extension request, then judge the extension request whether be agree to extension request, if the extension request be agree to extension Shen
Please when, the third director information in the agreement extension request is sent to the operational staff of k-th of operating procedure
And the operational staff of described+1 operating procedure of kth.
As an implementation, further include following steps in step S140: detected in the pending operation list first
Whether k-th of operating procedure is completed;When k-th of operating procedure is completed, then presently described k-th of step is sent
In the operational staff of scaffold management role to+1 operating procedure of kth is completed.
Fig. 6 is please referred to, Fig. 6 is a kind of structural block diagram of anti-managing device for going to the wrong way interval provided in an embodiment of the present invention.
It is described to prevent that the managing device 100 for going to the wrong way interval includes:
Determining module 110, for determining current pending operation list;Wherein, the current pending operation list includes working as
M operating procedure of preceding pending chemical sampling task, N number of operating procedure of current pending operating point validation task and work as
P operating procedure of preceding pending scaffold management role, M, N, P are the integer more than or equal to 2.
First guides module 120, for according to the current pending operation list output and the current pending chemistry
Corresponding a plurality of first director information of sampling task so that user be based on a plurality of first director information complete it is described currently to
Execute chemical sampling task.
Second guides module 130, for according to the current pending operation list output and the current pending work
Corresponding a plurality of second director information of point validation task, so that user is described current based on a plurality of second director information completion
Pending operating point validation task.
Third guides module 140, for according to the current pending operation list output and the current pending foot
The corresponding a plurality of third director information of hand cradle management role, so that user is based on working as described in a plurality of third director information completion
Preceding pending scaffold management role.
Specifically, the anti-managing device 100 for going to the wrong way interval further include:
Chemical sampling task call module is based on institute for receiving the title of at least one pending chemical sampling task
It states title and calls at least one pending operation list;Alternatively, identifying that at least one described pending chemical sampling task is corresponding
Two dimensional code calls at least one described pending operation list;Wherein, at least one described pending chemical sampling task includes institute
State current pending chemical sampling task.
Operating point validation task calling module, for receiving the staff of at least one pending operating point validation task
Job information, the job information based on the staff calls at least one pending task;Alternatively, described in identification
The corresponding two dimensional code of at least one pending operating point validation task calls at least one described pending task;Wherein,
At least one described pending operating point validation task includes the current pending operating point validation task.
Scaffold manages task call module, for receiving the scaffold of at least one pending scaffold management role
Status information, the status information based on the scaffold call at least one pending scaffold management role;Alternatively, identification institute
The corresponding two dimensional code of at least one pending scaffold management role is stated, at least one described pending scaffold management is called to appoint
Business;Wherein, at least one described pending scaffold management role includes the current pending scaffold management role
Specifically, the first guide module 120 includes:
First output unit, for successively taking i from 1 to M, the corresponding i-th first guide letter of i-th of operating procedure of output
Breath.
First processing units are based on i-th director information completion institute for characterizing the user for working as to receive
After the instruction for stating i-th of operating procedure, current time is recorded, and exports the corresponding i+1 item first of i+1 operating procedure and refers to
Fuse breath.
Particularly, first module 120 is guided further include:
First detection unit, for detecting whether m-th operating procedure in the pending operation list is completed.
First testing result judging unit, for determining the current pending operation when the first testing result, which is, is
It is single that operation is single to be completed, detect whether to receive for characterize need to audit described in the single audit of operation be completed instruct, and
It uploads single as operation is completed described in the pending operation list of target.
Specifically, the second guide module 130 includes:
Second output unit, for successively taking j from 1 to N, the corresponding j-th strip second of j-th of operating procedure of output guides letter
Breath.
The second processing unit, for complete based on second director information of j-th strip for characterizing the user when receiving
After instruction at j-th of operating procedure, current time is recorded, and exports the corresponding jth of+1 operating procedure of jth+1 article the
Two director informations.
Particularly, second module 130 is guided further include:
Second detection unit is for detecting current pending operating point validation task described in the pending operation list
It is no to be completed.
Second testing result judging unit, in the second testing result when to be, then to the current pending work
Make point validation task addition and label is completed.It is when to be no, then not complete to the current pending operating point validation task addition
At label.
Specifically, third guide module 140 includes:
Third output unit, for successively taking k from 1 to P, the corresponding kth third of k-th of operating procedure of output guides letter
Breath.
Third processing unit, for complete based on the kth third director information for characterizing the user when receiving
After instruction at k-th of operating procedure, current time is recorded, and exports the corresponding kth of+1 operating procedure of kth+1 article the
Three director informations.
Wherein include following subelement in third output unit:
Extension request acquiring unit, for getting the extension request of k-th of operating procedure.
Extension request judging unit, for judging whether the extension request is to agree to extension request.Sentence in extension request
Disconnected result is that the third director information in the agreement extension request is sent to k-th of operating procedure when being
The operational staff of+1 operating procedure of operational staff and the kth.
Particularly, third guides module 140 further include:
Third detection unit, for detecting whether k-th of operating procedure described in the pending operation list is completed.
Third testing result judging unit, for when to be, then sending presently described k-th of step in third testing result
The operational staff of scaffold management role to+1 operating procedure of kth is completed in rapid.
The embodiment of the present invention provides a kind of read/write memory medium, when the computer program is executed by processor, executes
Method process performed by electronic equipment in embodiment of the method as shown in Figure 2.
It is apparent to those skilled in the art that for convenience and simplicity of description, the device of foregoing description
Specific work process, no longer can excessively be repeated herein with reference to the corresponding process in preceding method.
In conclusion the embodiment of the present invention provides a kind of anti-management method and device for going to the wrong way interval, the method passes through
Determine current pending operation list;Wherein, the current pending operation list includes M of current pending chemical sampling task
Operating procedure, N number of operating procedure of current pending operating point validation task and current pending scaffold management role
P operating procedure, M, N, P are integer more than or equal to 2;Then worked as according to the current pending operation list output with described
Corresponding a plurality of first director information of preceding pending chemical sampling task, so as to be based on a plurality of first director information complete by user
At the current pending chemical sampling task;Then according to the current pending operation list output with it is described currently pending
Corresponding a plurality of second director information of operating point validation task, so that user is based on described in a plurality of second director information completion
Current pending operating point validation task;Finally according to the current pending operation list output and the current pending foot
The corresponding a plurality of third director information of hand cradle management role, so that user is based on working as described in a plurality of third director information completion
Preceding pending scaffold management role.In the present solution, pending operation list includes different types of operating point, each work
The pending operation list of point can export corresponding director information, so that user can complete to grasp according to corresponding director information
Make, improve the convenience of operating point management, while can also obtain the feedback that worker personnel carry out work in time.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through
Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and block diagram in attached drawing
Show the device of multiple embodiments according to the present invention, the architectural framework in the cards of method and computer program product,
Function and operation.In this regard, each box in flowchart or block diagram can represent the one of a module, section or code
Part, a part of the module, section or code, which includes that one or more is for implementing the specified logical function, to be held
Row instruction.It should also be noted that function marked in the box can also be to be different from some implementations as replacement
The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes
It can execute in the opposite order, this depends on the function involved.It is also noted that every in block diagram and or flow chart
The combination of box in a box and block diagram and or flow chart can use the dedicated base for executing defined function or movement
It realizes, or can realize using a combination of dedicated hardware and computer instructions in the system of hardware.
In addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation together
Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module
It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words
The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a
People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention.
And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access
The various media that can store program code such as memory (RAM, Random Access Memory), magnetic or disk.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should also be noted that similar label and letter exist
Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing
It is further defined and explained.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
Claims (10)
1. a kind of anti-management method for going to the wrong way interval, which is characterized in that the described method includes:
Determine current pending operation list;Wherein, the current pending operation list includes current pending chemical sampling task
M operating procedure, N number of operating procedure of current pending operating point validation task and current pending scaffold management
P operating procedure of task, M, N, P are the integer more than or equal to 2;
Referred to according to the current pending operation list output with the current pending chemical sampling task corresponding a plurality of first
Fuse breath, so that user is based on a plurality of first director information and completes the current pending chemical sampling task;
According to the current pending operation list output and the current pending operating point validation task corresponding a plurality of second
Director information, so that user is based on a plurality of second director information and completes the current pending operating point validation task;
According to the current pending operation list output corresponding with the currently pending scaffold management role a plurality of the
Three director informations are appointed so that user completes the current pending scaffold management based on a plurality of third director information
Business.
2. the anti-management method for going to the wrong way interval according to claim 1, which is characterized in that determine current pending operation list
Before, comprising:
The title for receiving at least one pending chemical sampling task calls at least one pending operation based on the title
It is single;Alternatively, the corresponding two dimensional code of at least one described pending chemical sampling task of identification, call that described at least one is pending
Operation is single;Wherein, at least one described pending chemical sampling task includes the current pending chemical sampling task;
Receive the job information of the staff of at least one pending operating point validation task, the work based on the staff
At least one pending task is called as information;Alternatively, identifying at least one described pending operating point validation task pair
The two dimensional code answered calls at least one described pending task;Wherein, at least one described pending operating point verifying is appointed
Business includes the current pending operating point validation task;
The status information for receiving the scaffold of at least one pending scaffold management role, the state letter based on the scaffold
Breath calls at least one pending scaffold management role;Alternatively, identifying at least one described pending scaffold management role
Corresponding two dimensional code calls at least one described pending scaffold management role;Wherein, at least one described pending foot hand
Frame management role includes the current pending scaffold management role.
3. the anti-management method for going to the wrong way interval according to claim 1, which is characterized in that according to the current pending behaviour
Make single output a plurality of first director information corresponding with the current pending chemical sampling task, so that user is based on described more
The first director information of item completes the current pending chemical sampling task, comprising:
Successively take i from 1 to M, corresponding i-th the first director information of i-th of operating procedure of output;
When receiving the instruction for completing i-th of operating procedure for characterizing the user based on i-th director information
Afterwards, current time is recorded, and exports corresponding the first director information of i+1 item of i+1 operating procedure.
4. the anti-management method for going to the wrong way interval according to claim 3, which is characterized in that according to the current pending behaviour
Make single output a plurality of first director information corresponding with the current pending chemical sampling task, so that user is based on described more
The first director information of item completes the current pending chemical sampling task, further includes:
Detect whether m-th operating procedure in the pending operation list is completed;
When to be, determine that the current pending operation list is that operation list is completed, detecting whether to receive needs for characterizing
The audit instruction that operation list is completed is audited, and uploads and operation is completed as described in the pending operation list of target
It is single.
5. the anti-management method for going to the wrong way interval according to claim 1, which is characterized in that according to the current pending behaviour
Make single output a plurality of second director information corresponding with the current pending operating point validation task, so that described in user is based on
A plurality of second director information completes the current pending operating point validation task, comprising:
Successively take j from 1 to N, corresponding the second director information of j-th strip of j-th of operating procedure of output;
J-th of operating procedure is completed based on second director information of j-th strip for characterizing the user when receiving
After instruction, current time is recorded, and export+1 operating procedure of jth+1 the second director information of corresponding jth.
6. the anti-management method for going to the wrong way interval according to claim 1, which is characterized in that according to the current pending behaviour
Make single output a plurality of second director information corresponding with the current pending operating point validation task, so that described in user is based on
A plurality of second director information completes the current pending operating point validation task, further includes:
Detect whether current pending operating point validation task described in the pending operation list is completed;
When to be, then label is completed to the current pending operating point validation task addition;
When to be no, then label is not completed to the current pending operating point validation task addition.
7. the anti-management method for going to the wrong way interval according to claim 1, which is characterized in that according to the current pending behaviour
Make single output a plurality of third director information corresponding with the currently pending scaffold management role, so that user is based on institute
It states a plurality of third director information and completes the current pending scaffold management role, comprising:
Successively take k from 1 to P, the corresponding kth third director information of k-th of operating procedure of output;
K-th of operating procedure is completed based on the kth third director information for characterizing the user when receiving
After instruction, current time is recorded, and export+1 operating procedure of kth+1 third director information of corresponding kth.
8. the anti-management method for going to the wrong way interval according to claim 7, which is characterized in that successively take k from 1 to P, output the
The corresponding kth third director information of k operating procedure, comprising:
Get the extension request of k-th of operating procedure;
Judge whether the extension request is to agree to extension request;
When to be, the third director information in the agreement extension request is sent to k-th of operating procedure
The operational staff of+1 operating procedure of operational staff and the kth.
9. the anti-management method for going to the wrong way interval according to claim 7, which is characterized in that according to the current pending behaviour
Make single output a plurality of third director information corresponding with the currently pending scaffold management role, so that user is based on institute
It states a plurality of third director information and completes the current pending scaffold management role, further includes:
Detect whether k-th of operating procedure described in the pending operation list is completed;
When to be, then sends and scaffold management role is completed in presently described k-th of step to+1 operating procedure of kth
Operational staff.
10. a kind of anti-managing device for going to the wrong way interval, which is characterized in that described device includes:
Determining module, for determining current pending operation list;Wherein, the current pending operation list includes current pending
M operating procedure of chemical sampling task, N number of operating procedure of current pending operating point validation task and current pending
Scaffold management role P operating procedure, M, N, P are integer more than or equal to 2;
First guides module, for according to the current pending operation list output and the current pending chemical sampling task
Corresponding a plurality of first director information, so that user is based on a plurality of first director information and completes the current pending chemistry
Sampling task;
Second guides module, for being appointed according to the current pending operation list output and the current pending operating point verifying
It is engaged in corresponding a plurality of second director information, so that user is based on a plurality of second director information and completes the current pending work
Make point validation task;
Third guides module, for according to the current pending operation list output and the current pending scaffold management
The corresponding a plurality of third director information of task, so that user is described current pending based on a plurality of third director information completion
Scaffold management role.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811316461.4A CN109409761A (en) | 2018-11-06 | 2018-11-06 | A kind of anti-management method and device for going to the wrong way interval |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811316461.4A CN109409761A (en) | 2018-11-06 | 2018-11-06 | A kind of anti-management method and device for going to the wrong way interval |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109409761A true CN109409761A (en) | 2019-03-01 |
Family
ID=65472036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811316461.4A Pending CN109409761A (en) | 2018-11-06 | 2018-11-06 | A kind of anti-management method and device for going to the wrong way interval |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109409761A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101893867A (en) * | 2010-07-27 | 2010-11-24 | 广东电网公司中山供电局 | Operation ticket management system and method |
CN106629277A (en) * | 2016-11-30 | 2017-05-10 | 广州日滨科技发展有限公司 | Method, device and system for debugging operation instruction of elevator |
-
2018
- 2018-11-06 CN CN201811316461.4A patent/CN109409761A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101893867A (en) * | 2010-07-27 | 2010-11-24 | 广东电网公司中山供电局 | Operation ticket management system and method |
CN106629277A (en) * | 2016-11-30 | 2017-05-10 | 广州日滨科技发展有限公司 | Method, device and system for debugging operation instruction of elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11843904B2 (en) | Automated combined display of measurement data | |
CN102257520B (en) | The performance evaluation of application | |
CN104160657B (en) | Intelligent basis facilities management user equipment | |
CN107704986A (en) | The management method and system of Good Laboratory control | |
CN109587008A (en) | Detect the method, apparatus and storage medium of abnormal flow data | |
CN106852177A (en) | The system and method for monitoring for data object based on pattern-recognition and controlled processing based on coherence measurement value | |
CN102879673A (en) | Test method and device for accuracy of touch screen | |
CN201935964U (en) | Automatic intelligent detection device for quartz oscillator instrument | |
CN110009012A (en) | A kind of risk specimen discerning method, apparatus and electronic equipment | |
CN107783890A (en) | Software defect data processing method and device | |
CN103412256B (en) | A kind of thin film switch AOI detector and AOI detection method thereof | |
CN107562040A (en) | The acquisition methods and system of fault diagnosis flow scheme | |
CN109916435A (en) | The acquisition method and system of laboratory testing data | |
CN102721878A (en) | Intelligentized automatic checkout device of quartz crystal oscillator instrument | |
CN109409761A (en) | A kind of anti-management method and device for going to the wrong way interval | |
CN109472375A (en) | A kind of scaffold management method and device | |
CN109858632A (en) | A kind of method and device of threshold value | |
CN104596578A (en) | Mobile terminal, inspection method and system for external connector based on the mobile terminal | |
CN104459516A (en) | Testing method used for SMT first article detection | |
CN109493002A (en) | A kind of verification method and device of workflow key point | |
CN112905722B (en) | Behavior recognition method and device and storage medium | |
CN110874521A (en) | Analyzer and its sample numbering method and storage medium | |
CN110084472A (en) | A kind of radiation environment detection work operation system and its method | |
CN117132174A (en) | Model training method and system applied to quality detection of industrial assembly line | |
CN117606480A (en) | Data center inspection method, device, equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190301 |
|
RJ01 | Rejection of invention patent application after publication |