CN109409643A - A kind of city method for prewarning risk, prior-warning device and early warning system - Google Patents
A kind of city method for prewarning risk, prior-warning device and early warning system Download PDFInfo
- Publication number
- CN109409643A CN109409643A CN201811037030.4A CN201811037030A CN109409643A CN 109409643 A CN109409643 A CN 109409643A CN 201811037030 A CN201811037030 A CN 201811037030A CN 109409643 A CN109409643 A CN 109409643A
- Authority
- CN
- China
- Prior art keywords
- risk
- data
- warning
- distribution map
- class
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B31/00—Predictive alarm systems characterised by extrapolation or other computation using updated historic data
Abstract
The invention discloses a kind of city method for prewarning risk, comprising: acquisition risk data;The collected risk data of institute is analyzed and processed, determines risk class corresponding to the risk data;According to the risk data and the risk class, draw risk distribution map, and when determining that the risk class is more than or equal to default risk class, early warning information is generated in the corresponding position of the risk distribution map, and the risk distribution map and the early warning information are sent to corresponding application terminal, to carry out Risk-warning.The present invention passes through is sent to corresponding application terminal for the early warning information of generation and risk distribution map in time, to carry out timely early warning to risk, so that responsible person concerned can it is clear by risk distribution map, comprehensively understand risk distribution situation, in time, effectively handle to risk, the generation of major accident is avoided.The present invention also provides a kind of city risk prior-warning device and early warning systems.
Description
Technical field
The present invention relates to city management technical field more particularly to a kind of city method for prewarning risk, prior-warning device and pre-
Alert system.
Background technique
Town and country are the problem of current country pays much attention to safely, safe in order to improve town and country, then need stringent control three small
Building site, old house, the canned point of gas-jar, dangerous slopes, passenger station, hospital, kindergarten, gas station, low-lying is being built in place
Hold the various risk points in the various aspects such as flooded point, emergency materials, danger source is gone forward side by side to find existing risk situation in time
The corresponding early warning of row, to avoid major accident.
Thus, how to realize the timeliness of city Risk-warning, is those skilled in the art to prevent major accident
Member's urgent problem to be solved.
Summary of the invention
The embodiment of the invention provides a kind of city method for prewarning risk, prior-warning device and early warning systems, can be to city
Risk carries out effective monitoring, to realize the timeliness of city Risk-warning, to prevent the generation of major accident.
The embodiment of the present invention in a first aspect, providing a kind of city method for prewarning risk, comprising:
Acquire risk data;
The collected risk data of institute is analyzed and processed, determines risk corresponding to the risk data etc.
Grade;
According to the risk data and the risk class, risk distribution map is drawn, and is determining the risk class
When more than or equal to default risk class, early warning information is generated in the corresponding position of the risk distribution map, and by institute
It states risk distribution map and the early warning information is sent to corresponding application terminal, to carry out Risk-warning.
Further, after according to the risk data and the risk class, drawing risk distribution map, comprising:
The corresponding display color of the risk class is determined according to default corresponding relationship, and on the risk distribution map
The risk class is shown with the display color.
Preferably, after according to the risk data and the risk class, drawing risk distribution map, comprising:
It determines type identification corresponding to the risk classifications, and passes through the type mark on the risk distribution map
Know and indicates the risk classifications.
The second aspect of the embodiment of the present invention provides a kind of city risk prior-warning device, comprising:
Data acquisition module, for acquiring risk data;
Data processing module determines the risk number for being analyzed and processed to the collected risk data of institute
According to corresponding risk class;
Warning module, for drawing risk distribution map according to the risk data and the risk class, and in determination
When the risk class is more than or equal to default risk class, early warning is generated in the corresponding position of the risk distribution map
Message, and the risk distribution map and the early warning information are sent to corresponding application terminal, to carry out Risk-warning.
The third aspect of the embodiment of the present invention provides a kind of city Warning System, city Risk-warning system
System includes city risk prior-warning device and application terminal, and the city risk prior-warning device includes data acquisition module, at data
Module, warning module are managed, the application terminal includes map display module;
The data acquisition module is connect with each information system, for acquiring the risk in each information system
Data, and the collected risk data of institute is sent to the data processing module;
The data processing module, the risk data for sending to the data acquisition module carry out at analysis
Reason, with risk class corresponding to the determination risk data, and is sent to institute for the risk data and the risk class
State warning module;
The warning module is used for according to the risk data and the risk class, drafting risk distribution map, and
When determining that the risk class is more than or equal to default risk class, generated in the corresponding position of the risk distribution map
Early warning information, and the risk distribution map and the early warning information are sent to corresponding application terminal, it is pre- to carry out risk
It is alert;
The map display module, for receiving the risk distribution map and the early warning information, to pass through the wind
Dangerous distribution map shows risk distribution situation and Risk-warning situation.
Further, the warning module includes weather warning unit;
The data acquisition module, connect with met data system, for acquiring the meteorology in the met data system
Data, and the collected meteorological data of institute is sent to the data processing module;
The data processing module, for determining the meteorological data to the first wind of risk caused by the first predeterminable area
Dangerous grade, and judge whether first risk class reaches the first default risk class, when first risk class reaches
When the first default risk class, the meteorological data and first risk class are associated with first predeterminable area
It stores to the weather warning unit, will pass through the risk feelings that the risk distribution map checks first predeterminable area
Condition;
Wherein, first predeterminable area include low-lying easy flooded point, dangerous slopes, old house and in building building site extremely
It is one few.
Preferably, the warning module includes checking prewarning unit;
The data acquisition module, for acquiring the safety inspection data in the second predeterminable area, and institute is collected
Safety inspection data are sent to the data processing module;
The data processing module, corresponding to determining second predeterminable area according to the safety inspection data
Safety inspection situation, and when the safety inspection situation is unsatisfactory for default inspection requirements, by the safety inspection data and institute
The second predeterminable area associated storage is stated to the inspection prewarning unit, checks described second will pass through the risk distribution map
The risk situation of predeterminable area.
Optionally, the warning module includes hidden danger prewarning unit;
The data acquisition module, for acquiring the risk data in third predeterminable area, and by the collected risk of institute
Data are sent to the data processing module;
The data processing module, for being analyzed and processed to the risk data, with the determination risk data institute
Corresponding hidden danger content and hidden danger grade, and when the hidden danger content and hidden danger grade meet preset condition, by the risk
Data, the hidden danger content and the hidden danger grade and the third predeterminable area associated storage to the hidden danger prewarning unit,
Will pass through the risk situation that the risk distribution map checks the third predeterminable area.
Further, the warning module further includes equipment prewarning unit;
The data acquisition module, is connected with designated equipment, the alert data sent for receiving the designated equipment,
And received alert data is sent to the data processing module;
The data processing module, for determining the second risk class of the designated equipment according to the alert data,
And by the alert data and second risk class and the designated equipment associated storage to the equipment prewarning unit, with
It will pass through the risk situation that the risk distribution map checks the designated equipment.
Preferably, the data acquisition module is also used to acquire rescuing within the scope of the risk data pre-determined distance
Data are helped, and the collected rescue data of institute are sent to the map display module;
The map display module is also used to the corresponding position of the rescue data correlation to the risk distribution map
Place, will pass through the rescue distribution situation around risk data described in the risk distribution map denotation;
The city risk prior-warning device further includes early warning and monitoring module;
The early warning and monitoring module is small in the risk class for determining the risk data for monitoring the risk data
When the default risk class, generates early warning and eliminate message, and early warning elimination message is sent to described corresponding answer
Use terminal.
As can be seen from the above technical solutions, the embodiment of the present invention has the advantage that
It, can be by acquiring risk data in the embodiment of the present invention, and it can be by analyzing risk data, to determine wind
The corresponding risk class of dangerous data, so as to draw risk distribution map according to risk data and risk class, and is determining wind
When dangerous grade is more than or equal to default risk class, early warning information can be generated in the corresponding position of risk distribution map, and
Early warning information generated and risk distribution map are sent to corresponding application terminal in time, it is pre- in time to be carried out to risk
It is alert so that responsible person concerned can it is clear by risk distribution map, comprehensively understand risk distribution situation, to be carried out to risk and
When, effectively handle, avoid the generation of major accident.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the specific embodiment flow chart of a city method for prewarning risk in the embodiment of the present invention;
Fig. 2 is the specific embodiment structure chart of a city risk prior-warning device in the embodiment of the present invention;
Fig. 3 is the specific embodiment structure chart of a city Warning System in the embodiment of the present invention;
Fig. 4 is the schematic diagram for the terminal device that one embodiment of the invention provides.
Specific embodiment
The embodiment of the invention provides a kind of city method for prewarning risk, prior-warning device and early warning systems, for city
Risk carries out effective monitoring, to realize the timeliness of city Risk-warning, to prevent the generation of major accident.
In order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below in conjunction with the present invention
Attached drawing in embodiment, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that disclosed below
Embodiment be only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiments of the present invention, this field
Those of ordinary skill's all other embodiment obtained without making creative work, belongs to protection of the present invention
Range.
Referring to Fig. 1, the embodiment of the invention provides a kind of city method for prewarning risk, the city Risk-warning side
Method, comprising:
Step S101, risk data is acquired;
It is understood that the embodiment of the present invention, can carry out the acquisition of data by docking existing information system,
The acquisition of risk data is such as carried out by docking public safe risk source, dangerous point management system, or meteorological by docking
Data network carries out the acquisition of meteorological data.Wherein, risk data collected includes risk title, risk position, wind
Dangerous affiliated area, security level and risk situation etc..
Step S102, the collected risk data of institute is analyzed and processed, is determined corresponding to the risk data
Risk class;
Here, can be analyzed and processed to the risk data, after collecting corresponding risk data to determine this
Risk class corresponding to risk data, as by searching for security level in collected risk data determine the risk
Risk class corresponding to data.
Step S103, according to the risk data and the risk class, risk distribution map is drawn, and described in the determination
When risk class is more than or equal to default risk class, early warning is generated in the corresponding position of the risk distribution map and is disappeared
Breath, and the risk distribution map and the early warning information are sent to corresponding application terminal, to carry out Risk-warning.
It is understood that after obtaining the corresponding risk class of risk data, wind can be drawn in the embodiment of the present invention
Dangerous distribution map, and all risk data and risk class are mapped to risk distribution map with the flexible way of map overlay
In, so as to by risk distribution map come it is clear, legibly show risk distribution situation.
In addition, when the risk class for determining a certain risk data is more than or equal to default risk class, then it is believed that
There are corresponding danger for the risk data, early warning information can be generated in the corresponding position of risk distribution map, such as in risk
In distribution map, early warning information is generated at position corresponding to the risk data, and by risk distribution map generated and institute
Corresponding early warning information is sent to corresponding application terminal, clearly to be shown in corresponding application terminal by distribution map
Show risk distribution situation and Risk-warning situation, risk distribution map and corresponding early warning information are such as sent to responsible person concerned
Client, risk distribution situation and Risk-warning are shown by risk distribution map in the client of responsible person concerned
Situation, to carry out Risk-warning, facilitates responsible person concerned to carry out the place of risk in time to inform responsible person concerned's risk situation
Reason, avoids the generation of major accident.Here, default risk class can specifically be set according to the actual situation.
It should be noted that in the embodiment of the present invention, early warning information generated is in addition to can be on risk distribution map
Outside reminding in real time, responsible person concerned can also be notified by sending short message etc. in time, so that responsible person concerned carries out wind in time
The processing of danger.
Here, the early warning type of early warning information generated may include weather warning, check early warning, hidden danger early warning and
Equipment early warning etc..Wherein, weather warning refers to that current weather to low-lying easy flooded point, dangerous slopes, old house and may built
When danger is caused in the regions such as building site, the pre-alert notification that is carried out;Check that early warning refers to the place for needing to carry out safety inspection
And corresponding safety inspection is not carried out, or when the safety inspection that is carried out does not meet inspection requirements, the pre-alert notification carried out;
Hidden danger early warning refer to when according to collected risk data determine hidden danger content and hidden danger grade corresponding to the risk data
When meeting default early-warning conditions, the pre-alert notification that is carried out;Equipment early warning, which refers to work as, receives report transmitted by corresponding equipment
When alert message, the pre-alert notification that is carried out.
Further, in the embodiment of the present invention, the rescue number within the scope of risk data pre-determined distance can also be acquired
According to, and by collected rescue data correlation to the corresponding position of risk distribution map, such as according to the place of rescue data
Position will rescue data correlation into risk distribution map at corresponding position, will pass through risk distribution map denotation risk number
According to the rescue distribution situation of surrounding, so that when there are corresponding dangerous rescue command can be carried out convenient for responsible person concerned.
Preferably, in the embodiment of the present invention, with according to the risk data and the risk class, drawing risk distribution
It can also include: to determine the corresponding display color of the risk class according to presetting corresponding relationship, and in the risk after figure
The risk class is shown with the display color in distribution map.
For example, risk class can be divided into four levels in a certain concrete application, respectively with red, orange, yellow,
Blue four kinds of colors are shown, wherein red represents greatest risk, corresponding risk class is level Four, and blue represents risk
Minimum, corresponding risk class are level-one, thus, it, can be in risk point when the risk class of a certain risk data is level Four
It is shown in cloth map with red;It, can be in risk distribution map with orange when the risk class of a certain risk data is three-level
Color is shown, etc..
Optionally, in the embodiment of the present invention, with according to the risk data and the risk class, drawing risk distribution
After figure, type identification corresponding to the risk classifications can also be comprised determining that, and pass through on the risk distribution map
The type identification indicates the risk classifications.
Further, in the embodiment of the present invention, after sending early warning information, can also real-time monitoring risk data risk feelings
Condition, and when the risk class for determining risk data is less than default risk class, it can think corresponding to the risk data
Risk is processed to be finished, or is eliminated automatically, is then produced early warning at this time and is eliminated message, and message is eliminated in the early warning
It is sent to corresponding application terminal, to inform the elimination situation of responsible person concerned or associated user's risk in time.
It, can be by acquiring risk data in the embodiment of the present invention, and it can be by analyzing risk data, to determine wind
The corresponding risk class of dangerous data, so as to draw risk distribution map according to risk data and risk class, and is determining wind
When dangerous grade is more than or equal to default risk class, early warning information can be generated in the corresponding position of risk distribution map, and
Early warning information generated and risk distribution map are sent to corresponding application terminal in time, it is pre- in time to be carried out to risk
It is alert so that responsible person concerned can it is clear by risk distribution map, comprehensively understand risk distribution situation, to be carried out to risk and
When, effectively handle, avoid the generation of major accident.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
A kind of city method for prewarning risk is essentially described above, a kind of city risk prior-warning device will be carried out below detailed
Thin description.
Fig. 2 shows one embodiment structure charts of risk prior-warning device in city a kind of in the embodiment of the present invention.Such as Fig. 2 institute
Show, the city risk prior-warning device 20, comprising:
Data acquisition module 201, for acquiring risk data;
Data processing module 202 determines the risk for being analyzed and processed to the collected risk data of institute
Risk class corresponding to data;
Warning module 203 is used for according to the risk data and the risk class, drafting risk distribution map, and
When determining that the risk class is more than or equal to default risk class, generated in the corresponding position of the risk distribution map
Early warning information, and the risk distribution map and the early warning information are sent to corresponding application terminal, it is pre- to carry out risk
It is alert.
Further, the city risk prior-warning device 20, further includes:
Color determination module, for determining the corresponding display color of the risk class according to presetting corresponding relationship, and
The risk class is shown with the display color on the risk distribution map.
Preferably, the city risk prior-warning device 20, further includes:
Type identification determining module, for determining type identification corresponding to the risk classifications, and in the risk point
The risk classifications are indicated by the type identification on cloth map.
The city risk prior-warning device 20 can be desktop PC, notebook, palm PC and cloud server
Deng calculating equipment.In the embodiment of the present invention, the city risk prior-warning device 20 is preferably cloud server.
As shown in figure 3, the embodiment of the invention provides a kind of city Warning System, the city Warning System
Including city risk prior-warning device 20 and application terminal 30, the city risk prior-warning device 20 include data acquisition module 201,
Data processing module 202, warning module 203, the application terminal 30 include map display module 301;
The data acquisition module 201, connect with each information system, for acquiring the wind in each information system
Dangerous data, and the collected risk data of institute is sent to the data processing module 202;
The data processing module 202, the risk data for sending to the data acquisition module are analyzed
Processing, with risk class corresponding to the determination risk data, and the risk data and the risk class is sent to
The warning module 203;
The warning module 203, for drawing risk distribution map according to the risk data and the risk class,
And when determining that the risk class is more than or equal to default risk class, in the corresponding position of the risk distribution map
Early warning information is generated, and the risk distribution map and the early warning information are sent to corresponding application terminal 30, to carry out
Risk-warning;
The map display module 301, for receiving the risk distribution map and the early warning information, by described
Risk distribution map denotation risk distribution situation and Risk-warning situation.
Preferably, the warning module 203 includes weather warning unit;
The data acquisition module 201, connect with met data system, for acquiring the gas in the met data system
Image data, and the collected meteorological data of institute is sent to the data processing module 202;
The data processing module 202, for determining the meteorological data to of risk caused by the first predeterminable area
One risk class, and judge whether first risk class reaches the first default risk class, when first risk class
When reaching the first default risk class, by the meteorological data and first risk class and first predeterminable area
Associated storage is to the weather warning unit, will pass through the risk that the risk distribution map checks first predeterminable area
Situation;
Wherein, first predeterminable area include low-lying easy flooded point, dangerous slopes, old house and in building building site extremely
It is one few.
It is understood that the city Warning System can dock met data system, such as in the embodiment of the present invention
Data acquisition module 201 in the city Warning System can be connected to China Meteorological data network, in acquiring in real time
Meteorological data in state's meteorological data net, wherein meteorological data collected include temperature, humidity, wind speed, wind direction, precipitation,
Weather conditions (it is fine, negative, cloudy, overcast to cloudy, cloudy turn to overcast, the nether world is cloudy, cloudy yin, clear to cloudy, cloudy turn to fine, fine
Between cloudy, light rain, moderate rain, heavy rain, heavy rain, torrential rain etc.) etc., and the collected meteorological data of institute is sent to data processing mould
Block 202, data processing module 202 then can determine meteorological data pair according to the actual conditions of meteorological data and the first predeterminable area
First predeterminable area causes the first risk class of risk, to determine whether meteorological data is pre- to first according to the first risk class
If danger is caused in region, if if causing danger, meteorological data and the first risk class can be associated with the first predeterminable area
It stores to weather warning unit, in order to the detailed inauguration situation for checking the first predeterminable area by risk distribution map.
Such as then may be used for low-lying easy flooded point when the weather conditions in meteorological data are moderate rain, heavy rain, heavy rain, torrential rain
Determine that meteorological data can cause danger to low-lying easy flood point, at this point, can be by the risk class of low-lying easy flood point by original indigo plant
Color, yellow etc. are set as red level Four, and while sending early warning information to corresponding application terminal, can also be by meteorological number
According to, risk class (red) and low-lying easy flood point associated storage to weather warning unit, so that responsible person concerned can be in risk point
Detailed content corresponding to the early warning information, such as risk title, risk position, the affiliated area of risk are checked in cloth map
Domain, early warning time started and pre-warning content etc..
For another example, for dangerous slopes, when meteorological data be typhoon weather, earthquake or weather conditions be heavy rain, heavy rain,
When torrential rain, then can determine that meteorological data can cause danger to dangerous slopes, at this point, can by the risk class of dangerous slopes by
Blue, yellow originally etc. are set as red level Four, and while sending early warning information to corresponding application terminal, may be used also
By meteorological data, risk class (red) and dangerous slopes associated storage to weather warning unit, so that responsible person concerned can be
Detailed content corresponding to the early warning information, such as risk title, risk position, risk institute are checked in risk distribution map
Belong to region, early warning time started and pre-warning content etc..
It is understood that when the risk caused by further detection discovery meteorological data is eliminated, then it can be pre- by first
If the risk class in region restores to restore to its original grade to the risk class being arranged to before red, such as restore to original
Blue or yellow for coming etc..
Optionally, the warning module 203 includes checking prewarning unit;
The data acquisition module 201 for acquiring the safety inspection data in the second predeterminable area, and will be collected
Safety inspection data be sent to the data processing module 202;
The data processing module 202, for determining that the second predeterminable area institute is right according to the safety inspection data
The safety inspection situation answered, and when the safety inspection situation is unsatisfactory for default inspection requirements, by the safety inspection data
With the second predeterminable area associated storage to the inspection prewarning unit, with will pass through the risk distribution map check it is described
The risk situation of second predeterminable area.
Here, second predeterminable area is to need to carry out three small places of safety inspection etc..When the collected safety of institute
Check that data show that needing to carry out three small places of safety inspection etc. does not carry out safety inspection, or the safety inspection carried out
When being unsatisfactory for default inspection requirements, then can by safety inspection data and the second predeterminable area associated storage to checking prewarning unit,
Will pass through the risk situation that risk distribution map checks the second predeterminable area, that is, check the safety inspection in the second predeterminable area
Situation, such as whether having carried out safety inspection according to safety inspection regulation.
Further, the warning module 203 includes hidden danger prewarning unit;
The data acquisition module 201, for acquiring the risk data in third predeterminable area, and by the collected wind of institute
Dangerous data are sent to the data processing module 202;
The data processing module 202, for being analyzed and processed to the risk data, with the determination risk data
Corresponding hidden danger content and hidden danger grade, and when the hidden danger content and hidden danger grade meet preset condition, by the wind
Dangerous data, the hidden danger content and the hidden danger grade and the third predeterminable area associated storage to the hidden danger early warning list
Member, will pass through the risk situation that the risk distribution map checks the third predeterminable area.
Preferably, the warning module 203 further includes equipment prewarning unit;
The data acquisition module 201, is connected with designated equipment, the alarm number sent for receiving the designated equipment
According to, and received alert data is sent to the data processing module 202;
The data processing module 202, for determining the second risk etc. of the designated equipment according to the alert data
Grade, and by the alert data and second risk class and the designated equipment associated storage to the equipment early warning list
Member, will pass through the risk situation that the risk distribution map checks the designated equipment.
It is understood that the city Warning System is also docked with platform of internet of things in the embodiment of the present invention, and
Platform of internet of things is decorateeed for real-time detection gas-jar waits designated equipments with the presence or absence of danger, if it exists if danger, Internet of Things
Platform can alarm, and can also send corresponding alert data, the city risk to the city Warning System
Early warning system can then determine the second risk class of designated equipment according to the alert data, and by alert data and the second risk
Grade and designated equipment associated storage are to equipment prewarning unit, will pass through the wind that the risk distribution map checks designated equipment
Dangerous situation condition, such as check the title of the designated equipment of alarm, alarm place.
Optionally, the data acquisition module 201 is also used to acquire within the scope of the risk data pre-determined distance
Data are rescued, and the collected rescue data of institute are sent to the map display module;
The map display module is also used to the corresponding position of the rescue data correlation to the risk distribution map
Place, will pass through the rescue distribution situation around risk data described in the risk distribution map denotation, will pass through risk point
Rescue distribution situation around cloth map denotation risk data, so that responsible person concerned can be convenient for when there are corresponding dangerous
Carry out rescue command.
Further, the city risk prior-warning device 20 further includes early warning and monitoring module;
The early warning and monitoring module is small in the risk class for determining the risk data for monitoring the risk data
When the default risk class, generates early warning and eliminate message, and early warning elimination message is sent to described corresponding answer
Use terminal.
In the embodiment of the present invention, after the warning module 203 sends early warning information, the early warning and monitoring module can be real-time
The risk situation of risk data is monitored, and when the risk class for determining risk data is less than default risk class, it can recognize
It finishes for risk corresponding to the risk data is processed, or eliminates automatically, then produce early warning at this time and disappear
Breath, and early warning elimination message is sent to corresponding application terminal, to inform responsible person concerned or associated user's wind in time
The elimination situation of danger.
Fig. 4 is a kind of schematic diagram for terminal device that one embodiment of the invention provides.As shown in figure 4, the end of the embodiment
End equipment 4 includes: processor 40, memory 41 and is stored in the memory 41 and can run on the processor 40
Computer program 42, such as city Risk-warning program.The processor 40 is realized when executing the computer program 42
State the step in each city method for prewarning risk embodiment, such as step S101 shown in FIG. 1 to step S103.Alternatively, institute
The function that each module/unit in above-mentioned each Installation practice is realized when processor 40 executes the computer program 42 is stated, such as
Module 201 shown in Fig. 2 to module 203 function.
Illustratively, the computer program 42 can be divided into one or more module/units, it is one or
Multiple module/units are stored in the memory 41, and are executed by the processor 40, to complete the present invention.Described one
A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for
Implementation procedure of the computer program 42 in the terminal device 4 is described.For example, the computer program 42 can be divided
It is cut into data acquisition module, data processing module, warning module, each module concrete function is as follows:
Data acquisition module, for acquiring risk data;
Data processing module determines the risk number for being analyzed and processed to the collected risk data of institute
According to corresponding risk class;
Warning module, for drawing risk distribution map according to the risk data and the risk class, and in determination
When the risk class is more than or equal to default risk class, early warning is generated in the corresponding position of the risk distribution map
Message, and the risk distribution map and the early warning information are sent to corresponding application terminal, to carry out Risk-warning.
The terminal device 4 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The terminal device may include, but be not limited only to, processor 40, memory 41.It will be understood by those skilled in the art that Fig. 4
The only example of terminal device 4 does not constitute the restriction to terminal device 4, may include than illustrating more or fewer portions
Part perhaps combines certain components or different components, such as the terminal device can also include input-output equipment, net
Network access device, bus etc..
The processor 40 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 41 can be the internal storage unit of the terminal device 4, such as the hard disk or interior of terminal device 4
It deposits.The memory 41 is also possible to the External memory equipment of the terminal device 4, such as be equipped on the terminal device 4
Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card dodge
Deposit card (Flash Card) etc..Further, the memory 41 can also both include the storage inside list of the terminal device 4
Member also includes External memory equipment.The memory 41 is for storing needed for the computer program and the terminal device
Other programs and data.The memory 41 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that each embodiment described in conjunction with the examples disclosed in this document
Module, unit and/or method and step can be realized with the combination of electronic hardware or computer software and electronic hardware.This
A little functions are implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Specially
Industry technical staff can use different methods to achieve the described function each specific application, but this realization is not
It is considered as beyond the scope of this invention.
In several embodiments provided herein, it should be understood that disclosed system, device and method can be with
It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit
It divides, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components
It can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, it is shown or
The mutual coupling, direct-coupling or communication connection discussed can be through some interfaces, the indirect coupling of device or unit
It closes or communicates to connect, can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-described embodiment side
All or part of the process in method can also instruct relevant hardware to complete, the computer by computer program
Program can be stored in a computer readable storage medium, and the computer program is when being executed by processor, it can be achieved that above-mentioned each
The step of a embodiment of the method.Wherein, the computer program includes computer program code, and the computer program code can
Think source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium can be with
It include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic disk, light that can carry the computer program code
Disk, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random
Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that the computer
The content that readable medium includes can carry out increase and decrease appropriate according to the requirement made laws in jurisdiction with patent practice, such as
It does not include electric carrier signal and telecommunication signal according to legislation and patent practice, computer-readable medium in certain jurisdictions.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although referring to before
Stating embodiment, invention is explained in detail, those skilled in the art should understand that: it still can be to preceding
Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these
It modifies or replaces, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of city method for prewarning risk characterized by comprising
Acquire risk data;
The collected risk data of institute is analyzed and processed, determines risk class corresponding to the risk data;
According to the risk data and the risk class, risk distribution map is drawn, and determining that the risk class is greater than
Or when being equal to default risk class, early warning information is generated in the corresponding position of the risk distribution map, and by the wind
Dangerous distribution map and the early warning information are sent to corresponding application terminal, to carry out Risk-warning.
2. city method for prewarning risk according to claim 1, which is characterized in that according to the risk data and described
Risk class, draw risk distribution map after, comprising:
The corresponding display color of the risk class is determined according to default corresponding relationship, and with institute on the risk distribution map
It states display color and shows the risk class.
3. city method for prewarning risk according to claim 1 or 2, which is characterized in that according to the risk data
With the risk class, draw risk distribution map after, comprising:
It determines type identification corresponding to the risk classifications, and passes through the type identification mark on the risk distribution map
Show the risk classifications.
4. a kind of city risk prior-warning device characterized by comprising
Data acquisition module, for acquiring risk data;
Data processing module determines the risk data institute for being analyzed and processed to the collected risk data of institute
Corresponding risk class;
Warning module, for according to the risk data and the risk class, drawing risk distribution map, and described in the determination
When risk class is more than or equal to default risk class, early warning is generated in the corresponding position of the risk distribution map and is disappeared
Breath, and the risk distribution map and the early warning information are sent to corresponding application terminal, to carry out Risk-warning.
5. a kind of city Warning System, which is characterized in that the city Warning System includes city Risk-warning dress
It sets and application terminal, the city risk prior-warning device includes data acquisition module, data processing module, warning module, described
Application terminal includes map display module;
The data acquisition module is connect with each information system, for acquiring the risk data in each information system,
And the collected risk data of institute is sent to the data processing module;
The data processing module, the risk data for sending to the data acquisition module are analyzed and processed, with
It determines risk class corresponding to the risk data, and the risk data and the risk class is sent to the early warning
Module;
The warning module, for drawing risk distribution map according to the risk data and the risk class, and in determination
When the risk class is more than or equal to default risk class, early warning is generated in the corresponding position of the risk distribution map
Message, and the risk distribution map and the early warning information are sent to corresponding application terminal, to carry out Risk-warning;
The map display module, for receiving the risk distribution map and the early warning information, to pass through the risk point
Cloth map denotation risk distribution situation and Risk-warning situation.
6. city Warning System according to claim 5, which is characterized in that the warning module includes weather warning
Unit;
The data acquisition module, connect with met data system, for acquiring the meteorological data in the met data system,
And the collected meteorological data of institute is sent to the data processing module;
The data processing module, for determining the meteorological data to the first risk etc. of risk caused by the first predeterminable area
Grade, and judge whether first risk class reaches the first default risk class, when first risk class reaches described
When the first default risk class, by the meteorological data and first risk class and the first predeterminable area associated storage
To the weather warning unit, will pass through the risk situation that the risk distribution map checks first predeterminable area;
Wherein, first predeterminable area includes low-lying easy flooded point, dangerous slopes, old house and at least one built in building site
It is a.
7. city Warning System according to claim 5, it is characterised in that the warning module includes checking early warning
Unit;
The data acquisition module, for acquiring the safety inspection data in the second predeterminable area, and by the collected safety of institute
Check that data are sent to the data processing module;
The data processing module, for according to the safety inspection data determine second predeterminable area corresponding to safety
Situation is checked, and when the safety inspection situation is unsatisfactory for default inspection requirements, by the safety inspection data and described the
Two predeterminable area associated storages check that described second is default to the inspection prewarning unit will pass through the risk distribution map
The risk situation in region.
8. city Warning System according to claim 5, which is characterized in that the warning module includes hidden danger early warning
Unit;
The data acquisition module, for acquiring the risk data in third predeterminable area, and by the collected risk data of institute
It is sent to the data processing module;
The data processing module, for being analyzed and processed to the risk data, corresponding to the determination risk data
Hidden danger content and hidden danger grade, and when the hidden danger content and hidden danger grade meet preset condition, by the risk data,
The hidden danger content and the hidden danger grade and the third predeterminable area associated storage are to the hidden danger prewarning unit, to lead to
Cross the risk situation that the risk distribution map checks the third predeterminable area.
9. city Warning System according to claim 5, which is characterized in that the warning module further includes that equipment is pre-
Alert unit;
The data acquisition module, is connected with designated equipment, the alert data sent for receiving the designated equipment, and will
Received alert data is sent to the data processing module;
The data processing module, for determining the second risk class of the designated equipment according to the alert data, and will
The alert data and second risk class and the designated equipment associated storage are to the equipment prewarning unit, to lead to
Cross the risk situation that the risk distribution map checks the designated equipment.
10. the city Warning System according to any one of claim 5 to 9, which is characterized in that the data acquisition
Module, is also used to acquire the rescue data within the scope of the risk data pre-determined distance, and by the collected rescue number of institute
According to being sent to the map display module;
The map display module is also used to the rescue data correlation to the corresponding position of the risk distribution map,
Will pass through the rescue distribution situation around risk data described in the risk distribution map denotation;
The city risk prior-warning device further includes early warning and monitoring module;
The early warning and monitoring module is less than institute in the risk class for determining the risk data for monitoring the risk data
When stating default risk class, generates early warning and eliminate message, and early warning elimination message is sent to the corresponding application eventually
End.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811037030.4A CN109409643A (en) | 2018-09-06 | 2018-09-06 | A kind of city method for prewarning risk, prior-warning device and early warning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811037030.4A CN109409643A (en) | 2018-09-06 | 2018-09-06 | A kind of city method for prewarning risk, prior-warning device and early warning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109409643A true CN109409643A (en) | 2019-03-01 |
Family
ID=65463915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811037030.4A Pending CN109409643A (en) | 2018-09-06 | 2018-09-06 | A kind of city method for prewarning risk, prior-warning device and early warning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109409643A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109948932A (en) * | 2019-03-20 | 2019-06-28 | 杭州虹晟信息科技有限公司 | Risk monitoring and control analysis system based on big data |
CN110162565A (en) * | 2019-04-04 | 2019-08-23 | 深圳奇迹智慧网络有限公司 | Early warning display method, device and terminal device |
CN111815105A (en) * | 2020-05-18 | 2020-10-23 | 深圳市第一反应信息科技有限公司 | Method and equipment for providing risk assessment map information |
CN111950911A (en) * | 2020-08-14 | 2020-11-17 | 河南理工大学 | Chemical industry thermal runaway risk early warning system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493845A (en) * | 2011-11-24 | 2012-06-13 | 广州市地下铁道总公司 | Monitoring and prewarning system for urban rail transit operating tunnel based on GIS (Geographic Information System) |
CN103456136A (en) * | 2013-09-18 | 2013-12-18 | 戴会超 | Internet of Things framework type system for monitoring and early warning of major accident potential safety hazards of water conservancy and hydropower project |
CN105005827A (en) * | 2015-07-28 | 2015-10-28 | 济南创智电气科技有限公司 | Emergency response warning method based on electricity emergency |
WO2017159946A1 (en) * | 2016-03-17 | 2017-09-21 | 주식회사 지에스아이엘 | Safety management system for worker at tunnel construction site |
CN107229745A (en) * | 2017-06-22 | 2017-10-03 | 安徽山鼎信息科技有限公司 | Geological disaster emergency commading system based on GIS |
CN107993001A (en) * | 2017-11-29 | 2018-05-04 | 华勤通讯技术有限公司 | A kind of method for visualizing of risk assessment, device and storage medium |
-
2018
- 2018-09-06 CN CN201811037030.4A patent/CN109409643A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493845A (en) * | 2011-11-24 | 2012-06-13 | 广州市地下铁道总公司 | Monitoring and prewarning system for urban rail transit operating tunnel based on GIS (Geographic Information System) |
CN103456136A (en) * | 2013-09-18 | 2013-12-18 | 戴会超 | Internet of Things framework type system for monitoring and early warning of major accident potential safety hazards of water conservancy and hydropower project |
CN105005827A (en) * | 2015-07-28 | 2015-10-28 | 济南创智电气科技有限公司 | Emergency response warning method based on electricity emergency |
WO2017159946A1 (en) * | 2016-03-17 | 2017-09-21 | 주식회사 지에스아이엘 | Safety management system for worker at tunnel construction site |
CN107229745A (en) * | 2017-06-22 | 2017-10-03 | 安徽山鼎信息科技有限公司 | Geological disaster emergency commading system based on GIS |
CN107993001A (en) * | 2017-11-29 | 2018-05-04 | 华勤通讯技术有限公司 | A kind of method for visualizing of risk assessment, device and storage medium |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109948932A (en) * | 2019-03-20 | 2019-06-28 | 杭州虹晟信息科技有限公司 | Risk monitoring and control analysis system based on big data |
CN110162565A (en) * | 2019-04-04 | 2019-08-23 | 深圳奇迹智慧网络有限公司 | Early warning display method, device and terminal device |
CN110162565B (en) * | 2019-04-04 | 2021-12-24 | 深圳奇迹智慧网络有限公司 | Early warning display method and device and terminal equipment |
CN111815105A (en) * | 2020-05-18 | 2020-10-23 | 深圳市第一反应信息科技有限公司 | Method and equipment for providing risk assessment map information |
CN111950911A (en) * | 2020-08-14 | 2020-11-17 | 河南理工大学 | Chemical industry thermal runaway risk early warning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109409643A (en) | A kind of city method for prewarning risk, prior-warning device and early warning system | |
CN107154008B (en) | Method and system for processing emergency based on digital source plan | |
CN104469305B (en) | The fault detection method and device of power network video monitoring device | |
CN105069558A (en) | Warning and analyzing method for power facility damage based on meteorological data | |
CN108629963A (en) | Traffic accident report method based on convolutional neural networks and system, car-mounted terminal | |
CN109460744B (en) | Video monitoring system based on deep learning | |
CN103280059A (en) | Intelligent monitoring system for submarine cable running maintenance | |
CN104408892B (en) | Safety-protection system and emergency system and dispensing device and reception device and method | |
CN111310330B (en) | Method, system, storage medium and computer equipment for designing digital parameters of safety emergency plan | |
CN104796667A (en) | Campus night-vision three-dimensional virtual monitoring system and method | |
CN111127849B (en) | Accident early warning method comprehensively considering meteorological and chemical plant peripheral area | |
CN113793234A (en) | Wisdom garden platform based on digit twin technique | |
CN113554540A (en) | Emergency handling method and system for marine dangerous chemical substance sudden accident | |
CN113905215A (en) | Bus safe driving monitoring system | |
CN113569718A (en) | Reminding method, device, equipment, system and storage medium | |
CN113970627A (en) | Water quality monitoring and early warning method and system | |
CN114979585A (en) | Filling station intelligent safety system based on edge calculation | |
CN108961703A (en) | A kind of surface gathered water monitoring and pre-alarming method, apparatus and system | |
WO2020037929A1 (en) | Method and device for community management and electronic apparatus | |
CN114418816A (en) | Municipal affair safety precaution and emergent scheduling platform | |
CN104574729A (en) | Alarming method, device and system | |
CN109829833A (en) | Power distribution network alarm method and system, electronic equipment and computer readable storage medium | |
CN206301463U (en) | Traffic safety supervisory systems | |
CN106034222A (en) | Stereometric object capturing method, apparatus and system thereof | |
CN116740617A (en) | Data processing method, device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190301 |