CN109406837A - Power transformer high-potting multifunctional access wire clamp - Google Patents

Power transformer high-potting multifunctional access wire clamp Download PDF

Info

Publication number
CN109406837A
CN109406837A CN201811293647.2A CN201811293647A CN109406837A CN 109406837 A CN109406837 A CN 109406837A CN 201811293647 A CN201811293647 A CN 201811293647A CN 109406837 A CN109406837 A CN 109406837A
Authority
CN
China
Prior art keywords
potting
connect
lead wire
metal
shorting stub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811293647.2A
Other languages
Chinese (zh)
Inventor
章家其
洪卫华
杨辉
孟玲丹
包文俊
朱德亮
李传江
朱宁
夏宗杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811293647.2A priority Critical patent/CN109406837A/en
Publication of CN109406837A publication Critical patent/CN109406837A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • G01R1/0425Test clips, e.g. for IC's

Abstract

A kind of power transformer high-potting multifunctional access wire clamp of the present invention.The present invention includes shorting stub and the connecting part for connecting transformer and test apparatus, the connecting part includes the lead wire connecting with test apparatus and the binding clip ontology connecting with transformer, is additionally provided with the short interface being shorted with the shorting stub on the lead wire.Structure of the invention is reasonable and practical, and the wiring requirement of applicable Multitest in transformation high-potting, the connection and short connect function of different tests project can be met by not needing change test connection.The high altitude operation time can be saved, while reducing ascending operation-using safety risk when connecting bushing to avoid with using high-altitude operations tool when changing-over line.The connection of different tests and the requirement of short circuit can be completed with one group of binding clip, while saving the time of frequently replacement p-wire and shorting stub, greatly improve work efficiency, reduce power off time, meet the requirement leaned on now to power supply.

Description

Power transformer high-potting multifunctional access wire clamp
Technical field
The invention belongs to power system device high-potting fields, are specifically related to power transformer high-potting with more function It can binding clip.
Background technique
Transformer plays an important role during operation of power networks in electric system.Wherein the high-potting of transformer is The important means of transformer state is examined, the pilot project that can detect transformer includes Insulation test, D.C. resistance, dielectric loss With capacitance, no-load voltage ratio etc..Each pilot project due to test principle difference, it is then different for the mode of connection.This needs basis The instrument used is selected.Such as Insulation test is needed all to need three side casing of transformer to be shorted and be measured, D.C. resistance It needs three side casing of transformer individually connecing p-wire and measure, first three side casing of transformer is carried out when dielectric loss is tested short It connects and measures, also need to carry out independent measurement etc. to 110kV and the above high-pressure side casing.
From the point of view of above-mentioned test method, when replacing pilot project every time, require to re-start wiring.An and transformation Device needs to carry out in interruption maintenance test of many times project, and every transformer power failure pilot project in this way need to repeatedly carry out transformation survey It tries line.If all carrying out linear transformation when project of often carrying out a test, it is corresponding that testing crew also needs to remove wiring replacement Instrument line and check the correctness of new test wiring, this process very big waste entire interruption maintenance time.In addition existing Field requires personnel when transformation wiring every time and uses aerial platform since the height of transformer high-voltage bushing is higher Carry out thread-changing operation.High altitude operation is carried out when converting for the wiring of bushing, this adds increased security risk, is unfavorable for controlling The manufacturing time and site safety risk.A kind of binding clip for facilitating scene transformation wiring how is found, frequent changes are reduced The security risk that the waste of wiring bring time and high altitude operation are brought, to greatly improve the operating efficiency at scene, reduction stops The electric time meets now to the requirement of electrical stability, becomes a skill of urgent need to resolve during the examination of transformer interruption maintenance Art problem.
Summary of the invention
In order to solve the above technical problem, the present invention provides power transformer high-potting multifunctional access wire clamps.This is more Function binding clip has the advantages of test apparatuses a variety of suitable for transformer, while can be shorted on the ground, reduces more Setting up time is changed, ascending operation-using safety risk is reduced, reduces power off time, improves working efficiency.
In order to achieve the object of the present invention, the invention adopts the following technical scheme:
Power transformer high-potting multifunctional access wire clamp, including shorting stub and for connecting transformer and tester The connecting part of device, the connecting part include the lead wire connecting with test apparatus and the binding clip sheet connecting with transformer Body is additionally provided with the short interface being shorted with the shorting stub on the lead wire.
Further technical solution: the shorting stub both ends are respectively equipped with the second metal connect-disconnect plug, and second metal is inserted The outer diameter of plug and the internal diameter of the short interface coincide;The short interface includes outer insulation sleeve and is mounted on outer insulation sleeve Interior metal clips, the metal clips are disposed to extend along the short interface plugging direction, and the metal clips is into short interface The heart is recessed and forms cambered surface, the gold when the shorting stub is plugged in the short interface by the second metal connect-disconnect plug The cambered surface elastic reaction for belonging to elastic slice fixes the second metal connect-disconnect plug on the second metal connect-disconnect plug.
Further technical solution: the binding clip ontology includes metal connection pincers, and the metal connection pincers include jaw The handle end held and vice jaw part is unclamped, the handle end inside are equipped with the wiring point for connecting the lead wire, institute It states and is equipped with insulating protective layer outside handle end.
Further technical solution: the jaw of the vice jaw part is engaged in dentation and the jaw is equipped with and is convenient for and transformation The recess that set Pipeline clip on device is connected.
Further technical solution: described lead wire one end is connect with the wiring point, and the lead wire other end is equipped with The first metal connect-disconnect plug being connect with the test apparatus.
Further technical solution: the handle end is made of an auxiliary-handle, be respectively set in the handle wiring point with And it is connect with wiring point and the lead wire from being extended to form to handle end in handle.
Further technical solution: the lead wire, shorting stub inner lead are copper conductor, the copper conductor lateral surface Equipped with insulating protective layer.
The beneficial effects of the present invention are:
(1) for the present invention on the basis of conventional electric power transformation wiring, increasing can make a set of binding clip can with short connect function It is applicable in Multitest project.Binding clip ontology connects two lead wires, can meet the need that transformer directly hinders pressure-wire and current line It asks, while increasing by two short interfaces in a lead wire, realize short connect function for connecting shorting stub.Needing shorted transformer When three-phase casing, binding clip that testing crew only needs that three are connected on bushing shell for transformer with two shorting stubs it is short Interface is attached, and short connect function can be realized.
The step of needing replacing wiring the invention avoids different tests project, greatly reduces the time of field operation, The time required to reducing power failure, power supply reliability is substantially increased.Transformer high-voltage bushing is since height is generally at 5-8 meters simultaneously Left and right requires to carry out high altitude operation using aerial platform when replacing test connection every time, and the present invention can make to test people Member's primary connection, meets test of many times demand, and operation of ascending a height is not had to when replacing pilot project, can complete wiring on ground and become It changes, reduces ascending operation-using safety risk.
(2) jaw of jointing clamp of the present invention is dentation, is contacted This structure increases vice jaw part with transformer Formedness, the recess on the jaw are configured according to the wire clamp size on transformer, are also avoided that while facilitating clamping Jointing clamp falls off.In addition, the wiring point of the lead wire and jointing clamp, in the inside of jointing clamp handle end, which is reduced Lead wire junction pulls in live use process, that is, ensure that not will cause in long-time service lead wire and wiring point it Between occur falling off and loosen.
(3) connection of short interface of the present invention and shorting stub is connected using plug-in, facilitates the quick connection at scene, the gold Belonging to elastic slice ensures that short interface contact reliably with shorting stub, while avoiding that appearance is traditional to be shorted and possibility using bare copper wire Caused by poor contact consequence.In addition the connection of lead wire and test apparatus also uses plug-in to connect, which is suitable for The connection request of transformer test instrument at present, while testing crew quickly can carry out replacement test apparatus on ground, simple side Just.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Fig. 2 is jointing clamp structural schematic diagram.
Fig. 3 is short interface and shorting stub structural schematic diagram.
Fig. 4 is that short interface and shorting stub are shorted schematic diagram.
The meaning of label is as follows in diagram:
10- connecting part;11- lead wire;12- the first metal connect-disconnect plug;13- metal spring;14- wiring point;15- handle End;16- lead wire conducting wire;17- fixes metal;18- vice jaw part;19- recess;20- short interface;21- short interface conducting wire;22- gold Belong to elastic slice;23- outer insulation sleeve;30- shorting stub;31- the second metal connect-disconnect plug;32- shorting stub conducting wire;40- transformer;41- Casing;42- covers Pipeline clip.
Specific embodiment
More specific detail is made to technical solution of the present invention below with reference to embodiment:
As shown in Figure 1: power transformer high-potting of the present invention with multifunctional wire press from both sides include shorting stub 30 and For connecting the connecting part 10 of transformer 40 Yu test apparatus, the connecting part 10 includes drawing of connecting with test apparatus Wiring 11 and the binding clip ontology being connect with transformer 40, be additionally provided on the lead wire 11 carried out with the shorting stub 30 it is short 2 short interfaces 20 connect.
As shown in Figure 3: 30 both ends of shorting stub are respectively equipped with columned second metal connect-disconnect plug 31, second gold medal The internal diameter of the outer diameter and the short interface 20 that belong to connect-disconnect plug 31 coincide, the second metal connect-disconnect plug 31 at 30 both ends of shorting stub Between by shorting stub conducting wire 32 connect.The outer diameter of the second metal connect-disconnect plug 31 is 4mm, and 32 diameter of shorting stub conducting wire is 1.6mm。
The short interface 20 includes outer insulation sleeve 23 and the metal clips 22 being mounted in outer insulation sleeve 23, described Metal clips 22 is disposed to extend along 20 plugging direction of short interface, and the metal clips 22 is to 20 central concave of short interface and shape At cambered surface, the metal elastic when the shorting stub 30 is plugged in the short interface 20 by the second metal connect-disconnect plug 31 The cambered surface elastic reaction of piece 22 fixes the second metal connect-disconnect plug 31 on the second metal connect-disconnect plug 31.
As shown in Figure 2: the binding clip ontology includes metal connection pincers, metal connection pincers include vice jaw part 18 and So that the handle end 15 that vice jaw part 18 unclamps.In the initial state, the vice jaw part 18 is in clamps shape to the metal connection pincers State, when the handle end 15 is held with a firm grip, the vice jaw part 18 is in releasing orientation.
It is equipped with the wiring point 14 for connecting the lead wire 11 inside the handle end 15, is set outside the handle end 15 There is insulating protective layer.Described 11 one end of lead wire is connect with the wiring point 14, and 11 other end of lead wire passes through the first gold medal Belong to connect-disconnect plug 12 to connect with the test apparatus.
The handle end 15 is combined by two handles and is constituted, be respectively set in two handles wiring point 14 and with the wiring 14 connection of point and the lead wire 11 from being extended to form to handle end in handle.
The jaw of the vice jaw part 18 is engaged in dentation and the jaw is equipped with and is convenient for and the set pipeline on transformer 40 The recess 19 that folder 42 is connected.
The lead wire 11,30 inner lead of shorting stub are copper conductor, and the copper conductor lateral surface is equipped with insulating protection Layer, the insulating protective layer material are silicon rubber.
The present invention in actual use, carries out as follows: jointing clamp is connected to transformer 40 by vice jaw part 18 Set Pipeline clip 42 on, then the first metal connect-disconnect plug 12 is connected on test apparatus.It is connect if pilot project only needs one to draw , then only need to be by the 12 joint test instrument of the first metal connect-disconnect plug on the lead wire 11 when line 11, another lead wire 11 is hanging; If pilot project needs two lead wires 11, the first metal connect-disconnect plug 12 on two lead wires 11 is connected respectively to On test apparatus, to complete the pilot project wiring for not needing to be shorted.If pilot project needs to be shorted, such as Fig. 4 institute Show, the second metal connect-disconnect plug 31 of shorting stub 30 is inserted into short interface 20, short connect function can be realized.
Structure of the invention is reasonable and practical, and the wiring requirement of applicable Multitest, does not need in transformation high-potting Change test connection can meet the connection and short connect function of different tests project.It can be to avoid with changing when connecting bushing High-altitude operations tool is used when wiring, saves the high altitude operation time, while reducing ascending operation-using safety risk.It is connect with one group The connection of different tests and the requirement of short circuit can be completed in wire clamp, at the same save frequently replacement p-wire and shorting stub when Between, it greatly improves work efficiency, reduces power off time, meet the requirement leaned on now to power supply.

Claims (7)

1. power transformer high-potting multifunctional access wire clamp, it is characterised in that: including shorting stub (30) and for connecting The connecting part (10) of transformer (40) and test apparatus, the connecting part (10) includes the lead wire connecting with test apparatus (11) and with transformer (40) the binding clip ontology connecting, be additionally provided on the lead wire (11) with the shorting stub (30) into The short interface (20) that row is shorted.
2. power transformer high-potting multifunctional access wire clamp as described in claim 1, it is characterised in that: the shorting stub (30) both ends are respectively equipped with the second metal connect-disconnect plug (31), the outer diameter of the second metal connect-disconnect plug (31) and the short interface (20) internal diameter coincide;The short interface (20) includes outer insulation sleeve (23) and the gold that is mounted in outer insulation sleeve (23) Belong to elastic slice (22), the metal clips (22) is disposed to extend along the short interface (20) plugging direction, the metal clips (22) To short interface (20) central concave and cambered surface is formed, when the shorting stub (30) passes through the second metal connect-disconnect plug (31) grafting When the short interface (20) is interior, the cambered surface elastic reaction of the metal clips (22) is on the second metal connect-disconnect plug (31) with solid Fixed second metal connect-disconnect plug (31).
3. power transformer high-potting multifunctional access wire clamp as described in claim 1, it is characterised in that: the binding clip Ontology includes metal connection pincers, and the metal connection pincers include vice jaw part (18) and the handle end for making vice jaw part (18) release (15), the wiring point (14) for connecting the lead wire (11), the handle end (15) are equipped with inside the handle end (15) Outside is equipped with insulating protective layer.
4. power transformer high-potting multifunctional access wire clamp as claimed in claim 3, it is characterised in that: the vice jaw part (18) jaw is engaged in dentation and the jaw is equipped with convenient for being connected with the set Pipeline clip on transformer (40) Recess (19).
5. power transformer high-potting multifunctional access wire clamp as claimed in claim 3, it is characterised in that: the lead wire (11) one end is connect with the wiring point (14), and lead wire (11) other end is equipped with first connect with the test apparatus Metal connect-disconnect plug (12).
6. power transformer high-potting multifunctional access wire clamp as claimed in claim 3, it is characterised in that: the handle end (15) it is made of an auxiliary-handle, wiring point (14) is respectively set in the handle and connect and with wiring point (14) by handle The lead wire (11) extended to form to handle end.
7. power transformer high-potting multifunctional access wire clamp as claimed in claim 5, it is characterised in that: the lead wire (11), shorting stub (30) inner lead is copper conductor, and the copper conductor lateral surface is equipped with insulating protective layer.
CN201811293647.2A 2018-11-01 2018-11-01 Power transformer high-potting multifunctional access wire clamp Pending CN109406837A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811293647.2A CN109406837A (en) 2018-11-01 2018-11-01 Power transformer high-potting multifunctional access wire clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811293647.2A CN109406837A (en) 2018-11-01 2018-11-01 Power transformer high-potting multifunctional access wire clamp

Publications (1)

Publication Number Publication Date
CN109406837A true CN109406837A (en) 2019-03-01

Family

ID=65470830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811293647.2A Pending CN109406837A (en) 2018-11-01 2018-11-01 Power transformer high-potting multifunctional access wire clamp

Country Status (1)

Country Link
CN (1) CN109406837A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202057683U (en) * 2011-05-13 2011-11-30 河南省电力公司驻马店供电公司 Secondary short-link line used for insulation test
CN103337760A (en) * 2013-07-03 2013-10-02 国家电网公司 Secondary short circuiting line for CT and PT
CN103840280A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Pincer-like clamp used for high current tests of switch cabinet
CN104062623A (en) * 2014-07-03 2014-09-24 国家电网公司 Low-voltage-side short circuit device for high-voltage electric transformer
CN106324398A (en) * 2016-08-23 2017-01-11 国家电网公司 Transformer short-circuit grounding testing device
CN106645824A (en) * 2016-12-22 2017-05-10 国家电网公司 Three-point short wire for test and series set thereof
CN107271736A (en) * 2017-08-01 2017-10-20 国家电网公司 A kind of special short seal apparatus of transformer test
CN107871939A (en) * 2016-09-24 2018-04-03 国网辽宁省电力有限公司丹东供电公司 Downlead device for transformer fast-wiring
CN209590077U (en) * 2018-11-01 2019-11-05 国家电网有限公司 Power transformer high-potting multifunctional access wire clamp

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202057683U (en) * 2011-05-13 2011-11-30 河南省电力公司驻马店供电公司 Secondary short-link line used for insulation test
CN103337760A (en) * 2013-07-03 2013-10-02 国家电网公司 Secondary short circuiting line for CT and PT
CN103840280A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Pincer-like clamp used for high current tests of switch cabinet
CN104062623A (en) * 2014-07-03 2014-09-24 国家电网公司 Low-voltage-side short circuit device for high-voltage electric transformer
CN106324398A (en) * 2016-08-23 2017-01-11 国家电网公司 Transformer short-circuit grounding testing device
CN107871939A (en) * 2016-09-24 2018-04-03 国网辽宁省电力有限公司丹东供电公司 Downlead device for transformer fast-wiring
CN106645824A (en) * 2016-12-22 2017-05-10 国家电网公司 Three-point short wire for test and series set thereof
CN107271736A (en) * 2017-08-01 2017-10-20 国家电网公司 A kind of special short seal apparatus of transformer test
CN209590077U (en) * 2018-11-01 2019-11-05 国家电网有限公司 Power transformer high-potting multifunctional access wire clamp

Similar Documents

Publication Publication Date Title
CN206627567U (en) A kind of test device of electric connector contact contact resistance in swapping process
CN106291000A (en) Passenger train feeder cable Insulation monitoring plug special connecting line
CN101769961A (en) Method for testing direct current resistance of large transformer without disconnecting lead
CN209590077U (en) Power transformer high-potting multifunctional access wire clamp
CN206557360U (en) A kind of device for detecting light fixture aging
CN104965106A (en) Auxiliary measuring rod for converter valve conduction tests
CN201307691Y (en) Switching device and current transformer testing line
CN109406837A (en) Power transformer high-potting multifunctional access wire clamp
CN205720441U (en) A kind of electrical equipment resistance test auxiliary device
CN203481459U (en) Wiring conversion equipment for aviation plug
CN205157591U (en) A anticreep connector for measuring binding post
CN105490122A (en) Screen-top miniature bus bridging-connection cable
CN210015129U (en) Clamping device for tester
CN210863998U (en) 0.4kV line ground fault finder
CN208125876U (en) A kind of triode Kelvin test suite
CN208367094U (en) One kind crimping measuring contact resistance special vice with line ear for the big line of locomotive
CN209673892U (en) A kind of mutual inductor secondary winding directly hinders supplemental measurement tool
CN201859185U (en) Load lead probing detection forceps
CN105301298B (en) Separated time fixture for power transformer automatic detection
CN209104432U (en) A kind of wire and cable connector
CN212031707U (en) Ammeter clamping instrument
CN206945920U (en) A kind of power system storage battery discharge tester electrical discharge wire
CN219065554U (en) Terminal strip short-circuit plug
CN211905649U (en) Portable fault detection case of bell-type FTU
CN220983350U (en) Test main clamp for comprehensive test platform of transformer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination