CN109403984A - Long distance curved pipe jacking automatic guiding system - Google Patents

Long distance curved pipe jacking automatic guiding system Download PDF

Info

Publication number
CN109403984A
CN109403984A CN201811413995.9A CN201811413995A CN109403984A CN 109403984 A CN109403984 A CN 109403984A CN 201811413995 A CN201811413995 A CN 201811413995A CN 109403984 A CN109403984 A CN 109403984A
Authority
CN
China
Prior art keywords
total station
long distance
push
tunnel
curved pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811413995.9A
Other languages
Chinese (zh)
Other versions
CN109403984B (en
Inventor
郑庆坂
焦义
覃永杰
张玉龙
冯金勇
李毅
王科
杨龙斐
张晨
李金水
王鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Sichu Co Ltd
Original Assignee
China Railway Tunnel Group Sichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Sichu Co Ltd filed Critical China Railway Tunnel Group Sichu Co Ltd
Priority to CN201811413995.9A priority Critical patent/CN109403984B/en
Publication of CN109403984A publication Critical patent/CN109403984A/en
Application granted granted Critical
Publication of CN109403984B publication Critical patent/CN109403984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of long distance curved pipe jacking automatic guiding systems, comprising: push-bench is set in tunnel, and the push-bench head is equipped with laser target;Initial total station, which is provided with the first prism, and the initial total station is set on the bracket that tunnel originates in well head;Multiple secondary total stations, are equipped with the second prism on each total station, multiple secondary total stations be sequentially arranged at laser target between initial total station with advancing together with push-bench and can not be on the tunnel duct piece of intervisibility;Rearscope is mounted on tunnel and originates on the wall of well head;Wherein, the initial total station, multiple secondary total stations are connect with a computer communication.Long distance curved pipe jacking automatic guiding system of the invention, it may be implemented to instruct the tunneling construction of push-bench to the automatic measurement of push-bench posture in long distance curved pipe jacking tunnel, have system structure simply easy to use, the advantages that measurement accuracy is high, and guide effect is good.

Description

Long distance curved pipe jacking automatic guiding system
Technical field
The present invention relates to push pipe guiding technique fields, it is more particularly related to which a kind of long distance curved pipe jacking is certainly Action-oriented system.
Background technique
Pipe jacking tunnel driving technology is a kind of engineering construction technology of underground tunneling, is with modern underground engineering, traffic What the development of transport, urban construction and electrical communications facility got up manages in water conservancy water delivery, water supply and engineering irrigation The new technology that road is laid with, can not have to open cut with pipe-jacking technology, in the construction process to road when pipeline passes through road, river Traffic, river aerial drainage do not have any impact, with the fast advantage of high degree of automation, saving manpower, speed of application, and It can control ground sedimentation when excavation, while the influence to above ground structure can be reduced, it will not shadow when in addition excavating under water The traffic of Xiangshui County face.Generally, tunnel axis is longer, in the biggish situation of buried depth, using pipe-jacking technology more economical rationality.
Jacking construction is a kind of piping laying construction technology do not excavated or excavated less, be exactly in working pit by means of The top power that jacking device generates, overcomes the frictional force of pipeline and surrounding soil, pipeline is headed into soil by the gradient of design, and will The earthwork is transported, and section pipe completion heads into soil layer and then lower second section pipe continues jacking, and principle is by means of main top oil The thrusts such as cylinder and pipeline enclosure, relay well pass through tool pipe or development machine out of active well soil layer and are advanced in received well always It slings, after pipeline follows tool pipe or development machine closely, is embedded between two holes.
What is involved is being excavated using few, i.e., active well will excavate jacking construction with received well, and not excavate, i.e., pipeline is not Excavation technology carries out the laying or replacement of underground utilities, top tube diameter DN800-4500.Inbuilt pipe is wanted by active well handle Son heads into soil, and the pipe in an active well can walk 1500 meters or more in underground, and can also curve walk, to get around one A little underground utilities or barrier, jacking construction China coast developed area be widely used in Urban Underground water supply and sewerage pipeline, The non-excavation laying of the various pipelines such as natural gas petroleum pipeline, communication cable.It can highway crossing, railway, bridge, high mountain, river Stream, any building in straits and ground.It is constructed using the technology, a large number of earth clearance expense can be saved, reduced to environment dirt The blocking of dye and road has significant economic benefit and social benefit.
Pipe-jacking technology has had evolved to very mature stage, ventilating system, reducing friction through injecting slurry technology, deslagging skill at present Art, knife cutting system, propulsion system, transportation system of being unearthed, power supply hydraulic system etc. have all obtained sufficient development and perfect, The breakthrough of relay well technology solves the problems, such as the thrust of long distance curved pipe jacking, be able to achieve distance greater than 2500 meters length away from From jacking construction.
Although these technologies of push pipe are highly developed, underground pipe-driving survey is oriented to the application of not new technology, long In the jacking construction of distance, measurement work occupies a large amount of time, seriously affects the progress and its economic benefit of jacking construction, mesh The measurement guiding technique of preceding jacking construction includes following several:
1, traditional measurement method: installing prism on push-bench, carries out (i.e. out of starting well) from the beginning to the end each time Measurement, calculates prism coordinate on push-bench, goes out head centre coordinate further according to prism coordinate transformation.But work as with construction not Disconnected to carry out, tunnel is increasingly longer, and the time measured is also increasingly longer, is not able to satisfy the requirement of construction.Utilize traditional survey Amount method another disadvantage is that measurement work can only stop driving in the case where carry out, machine during driving In " blindness " state.Therefore any deviation occurred during machine driving carries out manual measurement after can only waiting, and It determines that the position of machine can be just repaired later, not can be carried out instant remedial measure.
2, manual measurement: before tube coupling jacking, position and the posture of push-bench are measured by conventional measurement means, manually Deviation is calculated, push-bench opertions engineering teacher tunnels next ring according to the deviation that survey engineer gives.During the domain tunnels Opertions engineering Shi Wufa learns the position and attitude of current push-bench, according only to experience and feels to be judged, cannot achieve push pipe Construction survey is oriented to the requirement of real-time, and in addition after jacking certain distance, survey engineer measures push-bench and needs from work The position of coordinate basis pilot measurement to push-bench is measured push-bench position and posture needs a large amount of time, be unable to satisfy top by well Pipe construction requires the requirement of measurement precise and high efficiency.
3, laser transit is oriented to: being installed target on push-bench, is installed laser transit, laser transit in active well Emit laser beam, forms red hot spot on target, it is sharp on target in advance by laser beam and design axis trimming to parallel The change in location of hot spot is the change in location of push-bench, which can intuitively become to the position of opertions engineering's teacher push-bench Change, also have the real-time of data, but have the defects that as follows: 1. measurement data cannot save;2. be only used for jacking away from From the straight line pipe-jacking project less than 400 meters;3. not being capable of measuring the attitude angle of push-bench;More than there is a problem of, Bu Nengman The measurement demand for the long distance curved pipe jacking engineering that foot develops at present.
4, robot measurement is oriented to: installing robot measurement in well head, reflecting prism is installed on push-bench, works out engineering Software control robot measurement measures the coordinate of the reflecting prism on push-bench, calculates position and the deviation and real-time of push-bench It has been shown that, this kind of method can also increase robot measurement between active well and push-bench, reach the purpose of coordinate basis transmitting, with Just it is applied to the Curve Pipe Jacking engineering of long range.The technology has real-time property, but there is following ask through field application Topic: 1. due in pipe jacking tunnel there are serious Atmosphere Refraction, when robot measurement at a distance from push-bench more than 100 meters when, Measurement vertical error is too big, and the data precision cannot be met the requirements;2. if increasing measurement machine between active well and push-bench People, to reduce the influence of Atmosphere Refraction, the transmission error of plane coordinates (X, Y) is too big at this time, and the consistency of data compared with Difference cannot reach the target of measurement guiding, in addition increase robot measurement, increased cost is too big.
There are many problems in the above various measurement guiding techniques, be not suitable for the measurement in long distance curved pipe jacking tunnel.
Summary of the invention
It is an object of the invention to solve at least the above problems, and provide the advantages of at least will be described later.
It is a still further object of the present invention to provide a kind of long distance curved pipe jacking automatic guiding system, may be implemented it is long away from From, to the automatic measurement of push-bench posture, the tunneling construction of push-bench is instructed in Curve Pipe Jacking tunnel, have system structure simple It is easy to use, the advantages that measurement accuracy is high, and guide effect is good.
In order to realize these purposes and other advantages according to the present invention, provides a kind of long distance curved pipe jacking and lead automatically To system, comprising:
Push-bench is set in tunnel, and the push-bench head is equipped with laser target;
Initial total station, which is provided with the first prism, and the initial total station is set to tunnel and originates bracket in well head On;
Multiple secondary total stations are each equipped with the second prism on time total station, and multiple secondary total stations are sequentially arranged at laser Target between initial total station with advancing together with push-bench and can not be on the tunnel duct piece of intervisibility;
Rearscope is mounted on tunnel and originates on the wall of well head;
Wherein, the initial total station, multiple secondary total stations are connect with a computer communication;
Wherein, the bracket includes:
Sleeve is vertically arranged, and slide bar is arranged in the sleeve, and the slide bar can be slided along sleeve axis direction, institute It states slide bar and is provided along its length multiple grooves, the sleeve periphery is equipped with multiple through-holes, the through-hole and the groove one One is corresponding, spring is equipped in each groove, a positioning column one end passes through through-hole, groove and is connected with spring, when spring pressure When being reduced to minimum point, one end of positioning column is located in groove, when spring in the raw when, the other end of positioning column is located at logical Outside hole, the initial total station is installed on top end of sliding rod.
Preferably, the long distance curved pipe jacking automatic guiding system, it is fixed that the top end of sliding rod level is equipped with one Plate, the dead plate upper end face are equipped with an inverted T-shaped sliding slot along its length, its lower end of a sliding block is equipped with one and the T shape sliding slot Compatible protrusion, the sliding block are slidably connected the sliding slot by protrusion, and the initial total station is installed on upper end of slide block.
Preferably, the long distance curved pipe jacking automatic guiding system, the upper end of slide block are equipped with a shaft, a base Its lower end surface of seat, which corresponds to, is equipped with a mounting hole at shaft, the shaft protrudes into mounting hole, and the pedestal can rotate around the axis, institute It states initial total station and is installed on pedestal upper end.
Preferably, the long distance curved pipe jacking automatic guiding system, tunneltron corresponding to each total station Circumferentially arranged with multiple reflecting prisms in front of wall.
Preferably, the long distance curved pipe jacking automatic guiding system, reflecting prism are located at corresponding to time total station Tunnel tube wall in front of 20~50m, the quantity of the reflecting prism is no less than 3.
Preferably, the lower end of the long distance curved pipe jacking automatic guiding system, the sleeve connects a hydraulic air The piston rod of cylinder.
Preferably, the long distance curved pipe jacking automatic guiding system, the pedestal is cylindrical, outside the pedestal Week be equipped with a fixed block, the fixed block be equipped with location hole, the upper end of slide block face be located at except shaft be circumferentially with it is multiple Locating slot, a positioning rod may pass through location hole and protrude into locating slot, so that pedestal is fixed.
The present invention is include at least the following beneficial effects:
1, long distance curved pipe jacking automatic guiding system of the invention, it is right in long distance curved pipe jacking tunnel to may be implemented The automatic measurement of push-bench posture instructs the tunneling construction of push-bench, has system structure simply easy to use, measurement accuracy The advantages that height, guide effect is good.And initial total station is rack-mount, by bracket may be implemented initially to total station above and below The installation site of left and right is adjusted.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the one of technical solution of long distance curved pipe jacking automatic guiding system of the invention;
Fig. 2 is the scheme of installation of multiple secondary total stations in one of technical solution of the invention;
Fig. 3 is the scheme of installation of reflecting prism in one of technical solution of the invention;
Fig. 4 is the structural schematic diagram of bracket in one of technical solution of the invention;
Fig. 5 is the side view of fixed plate in one of technical solution of the invention.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text Word can be implemented accordingly.
It should be noted that in the description of the present invention, term " transverse direction ", " longitudinal direction ", "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, and is not the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to limit of the invention System.
As shown in Fig. 1~5, a kind of long distance curved pipe jacking automatic guiding system, comprising:
Push-bench 1 is set in tunnel 2, and 1 head of push-bench is equipped with laser target 11;
Initial total station 3, which is provided with the first prism, the initial total station 3 is set to tunnel and originates in well head 21 On bracket;
Multiple secondary total stations 4 are each equipped with the second prism on time total station 4, and multiple secondary total stations 4 are sequentially arranged at sharp Light target 11 between initial total station 3 with push-bench together with advance and can not be on the tunnel duct piece of intervisibility;
Rearscope 22 is mounted on tunnel and originates on the wall of well head 21;
Wherein, the initial total station 3, multiple secondary total stations 4 are connect with a computer communication;
Wherein, the bracket includes:
Sleeve 61, is vertically arranged, and slide bar 62 is arranged in the sleeve 61, and the slide bar 62 can be along sleeve axis direction Sliding, the slide bar 62 are provided along its length multiple grooves 63, and 61 periphery of sleeve is equipped with multiple through-holes, the through-hole It is corresponded with the groove 63, spring 65 is equipped in each groove 63,64 one end of a positioning column passes through through-hole, groove 63 And be connected with spring 65, when spring 65 is compressed to minimum point, one end of positioning column 64 is located in groove 63, when spring 65 is in When nature, the other end of positioning column 64 is located at outside through-hole, and the initial total station 3 is installed on 62 top of slide bar.
Long distance curved pipe jacking automatic guiding system of the invention, initial total station 3, secondary total station 4 are existing whole station Instrument, for example can be then U.S. Tian Bao total station originates in use, installing laser target 11 on the push-bench 1 in tunnel in tunnel Rearscope 22 is installed on the wall of well head 21, is originated in tunnel and initial total station 3 is installed in well head 21, first with computer It controls initial total station 3 and from tunnel originates well head and first measure rearscope and carry out orientation by backsight, then measure the coordinate of laser target 11 To calculate the position of push-bench 1, compared with designed lines, the mileage at this time of push-bench 1 and deviation are found out;When initial whole station When laser target 11 is not measured in instrument 3, laser target 11 between initial total station 3 with push-bench together with the tunnel duct piece that advances First total station 4 of upper installation controls initial total station 3 by computer and measures the progress orientation by backsight of rearscope 22, then survey One total station 4 of flow control calculates its coordinate, makes first total station 4 weight on the basis of the measurement data of initial total station 3 It is new to carry out orientation by backsight, the coordinate of laser target is measured to calculate the position of push-bench 1 by first total station 4, and is set Meter route compares, and finds out push-bench mileage at this time and deviation;With the driving of push-bench 1, when initial total station 3 is not measured Increase by second on tunnel duct piece when first total station 4, then between first total station 4 and initial total station 3 Secondary total station 4 controls initial total station 3 by computer and first measures rearscope progress orientation by backsight, then measures second time entirely Instrument 4 of standing calculates its coordinate, so that second total station 4 is re-started backsight on the basis of the measurement data of initial total station 3 fixed To;The coordinate that second time total station 4 measures first total station 4 is controlled by computer, makes first total station 4 with the Orientation by backsight is re-started on the basis of the measurement data of two total stations 4, then laser target 11 is measured by first total station 4 Coordinate to calculate the position of push-bench 1, compared with designed lines, find out the mileage at this time of push-bench 1 and deviation;So Analogize and successively increases multiple secondary total stations 4 and constantly find out the new mileage of push-bench and deviation.The installation of above-mentioned multiple secondary total stations 4 Position as shown in Fig. 2, i.e. multiple secondary total stations 4 be sequentially arranged between laser target 11 and initial total station 3 with push-bench one With advancing and can not be on the tunnel duct piece of intervisibility, multiple secondary total stations 4 be located in a straight line.Above-mentioned initial total station 3 It is rack-mount, so that spring 65 is compressed into minimum point by pressing positioning column 64, then up or slide downward slide bar 62, After unclamping positioning column 64, positioning column 64 is stuck in through-hole (not shown) and then fixed slip bar 62, in this way can be upper and lower The mounting height of initial total station 3 is adjusted, to adapt to the tunnel of different height.
In another technical solution, the long distance curved pipe jacking automatic guiding system, the 62 top water of slide bar Flat to be equipped with a fixed plate 7,7 upper surface of fixed plate is equipped with an inverted T-shaped sliding slot 71 along its length, its lower end of sliding block 8 is set There is a protrusion compatible with the T shape sliding slot 71, the sliding block 8 is slidably connected the sliding slot 71 by protrusion, described initial Total station 3 is installed on 8 upper end of sliding block.In the technical scheme, the protrusion on sliding block 8 can horizontally slip along T shape sliding slot 71, and Initial total station 3 is mounted in sliding, the installation site of initial total station 3 adjustable in the horizontal direction in this way.
In another technical solution, the long distance curved pipe jacking automatic guiding system, 8 upper end of sliding block is equipped with One shaft 81, its lower end surface of pedestal 9, which corresponds to, is equipped with a mounting hole (not shown) at shaft 81, the shaft 81 protrudes into mounting hole Interior, the pedestal 9 81 rotation, the initial total station 3 can be installed on pedestal upper end around the shaft.In the technical scheme, pass through 81 rotation around the shaft of pedestal 9 can further adjust the angle of initial total station 3 so that initial total station 3 be made to rotate in this way.
In another technical solution, the long distance curved pipe jacking automatic guiding system, each total station 4 pair Circumferentially arranged with multiple reflecting prisms 5 in front of the tunnel tube wall answered.In the technical scheme, it is fitted by multiple reflecting prisms 5 The circular shape of the conduit section, if COMPUTER DETECTION changes to the circular center location of the section, this illustrates that this is disconnected Deformation has occurred in face, plays the role of detection.
In another technical solution, the long distance curved pipe jacking automatic guiding system, reflecting prism 5 is located at secondary complete Stand 20~50m of the front of tunnel tube wall corresponding to instrument 4, and the quantity of the reflecting prism is no less than 3.
In another technical solution, the long distance curved pipe jacking automatic guiding system, the lower end of the sleeve 61 Connect the piston rod of a hydraulic cylinder.In the technical scheme, sleeve 61 is connected on the piston rod of hydraulic cylinder, passes through work Stretching for stopper rod, further adjusts the mounting height of initial total station 3.
In another technical solution, the long distance curved pipe jacking automatic guiding system, the pedestal 9 is cylinder Shape, 9 periphery of pedestal are equipped with a fixed block 91, and the fixed block 91 is equipped with location hole, and 8 upper surface of sliding block, which is located at, to be turned Multiple locating slots 82 are circumferentially with except axis, a positioning rod 92 may pass through location hole and protrude into locating slot 82, so that pedestal 9 is solid It is fixed.In the technical scheme, it is then inserted into locating slot 82 by locating rod 92 so that base by 91 rotating base 9 of fixed block Seat 9 is fixed.
Number of devices and treatment scale described herein are for simplifying explanation of the invention.To application of the invention, Modifications and variations will be readily apparent to persons skilled in the art.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (7)

1. long distance curved pipe jacking automatic guiding system characterized by comprising
Push-bench is set in tunnel, and the push-bench head is equipped with laser target;
Initial total station, which is provided with the first prism, and the initial total station is set on the bracket that tunnel originates in well head;
Multiple secondary total stations, are equipped with the second prism on each total station, multiple secondary total stations be sequentially arranged at laser target with Between initial total station advance together with push-bench and can not be on the tunnel duct piece of intervisibility;
Rearscope is mounted on tunnel and originates on the wall of well head;
Wherein, the initial total station, multiple secondary total stations are connect with a computer communication;
Wherein, the bracket includes:
Sleeve is vertically arranged, and slide bar is arranged in the sleeve, and the slide bar can be slided along sleeve axis direction, the cunning Bar is provided along its length multiple grooves, and the sleeve periphery is equipped with multiple through-holes, and the through-hole and the groove one are a pair of Answer, be equipped with spring in each groove, a positioning column one end passes through through-hole, groove and is connected with spring, when spring-compressed extremely When minimum point, one end of positioning column is located in groove, when spring in the raw when, the other end of positioning column is located at through-hole Outside, the initial total station is installed on top end of sliding rod.
2. long distance curved pipe jacking automatic guiding system as described in claim 1, which is characterized in that the top end of sliding rod is horizontal Equipped with a fixed plate, the dead plate upper end face is equipped with an inverted T-shaped sliding slot along its length, its lower end of a sliding block is equipped with one and institute State the compatible protrusion of T shape sliding slot, the sliding block is slidably connected the sliding slot by protrusion, and the initial total station is installed on cunning Block upper end.
3. long distance curved pipe jacking automatic guiding system as claimed in claim 2, which is characterized in that the upper end of slide block is equipped with One shaft, its lower end surface of a pedestal, which corresponds to, is equipped with a mounting hole at shaft, the shaft protrudes into mounting hole, and the pedestal can be around Shaft rotation, the initial total station are installed on pedestal upper end.
4. long distance curved pipe jacking automatic guiding system as described in claim 1, which is characterized in that each time total station institute is right Circumferentially arranged with multiple reflecting prisms in front of the tunnel tube wall answered.
5. long distance curved pipe jacking automatic guiding system as claimed in claim 4, which is characterized in that reflecting prism is located at secondary complete Stand 20~50m of the front of tunnel tube wall corresponding to instrument, and the quantity of the reflecting prism is no less than 3.
6. long distance curved pipe jacking automatic guiding system as claimed in claim 2, which is characterized in that the lower end of the sleeve connects Connect the piston rod of a hydraulic cylinder.
7. long distance curved pipe jacking automatic guiding system as claimed in claim 3, which is characterized in that the pedestal is cylinder Shape, the pedestal periphery are equipped with a fixed block, and the fixed block is equipped with location hole, and the upper end of slide block face is located at except shaft Multiple locating slots are circumferentially with, a positioning rod may pass through location hole and protrude into locating slot, so that pedestal is fixed.
CN201811413995.9A 2018-11-26 2018-11-26 Automatic guiding system for long-distance curve jacking pipe Active CN109403984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811413995.9A CN109403984B (en) 2018-11-26 2018-11-26 Automatic guiding system for long-distance curve jacking pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811413995.9A CN109403984B (en) 2018-11-26 2018-11-26 Automatic guiding system for long-distance curve jacking pipe

Publications (2)

Publication Number Publication Date
CN109403984A true CN109403984A (en) 2019-03-01
CN109403984B CN109403984B (en) 2024-02-09

Family

ID=65455431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811413995.9A Active CN109403984B (en) 2018-11-26 2018-11-26 Automatic guiding system for long-distance curve jacking pipe

Country Status (1)

Country Link
CN (1) CN109403984B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253844A (en) * 2020-09-29 2021-01-22 北京政平建设投资集团有限公司 Self-monitoring guide rail
CN112902845A (en) * 2021-03-04 2021-06-04 黄河勘测规划设计研究院有限公司 Track type automatic pipe jacking guiding method
CN113216985A (en) * 2021-06-03 2021-08-06 中建安装集团南京建设有限公司 Real-time intelligent monitoring system for long-distance curve jacking pipe
CN116857432A (en) * 2023-06-21 2023-10-10 金中天水利建设有限公司 Pipe jacking device and pipe jacking construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1123271A (en) * 1997-07-01 1999-01-29 Okumura Corp Method for measuring pipe-jacking
JP2003214090A (en) * 2002-01-28 2003-07-30 Asaharagumi Co Ltd Automatic tracking system for jacking machine in curved jack
JP2004138422A (en) * 2002-10-16 2004-05-13 Nishimatsu Constr Co Ltd Method of surveying in tunnel hole and system of surveying in tunnel hole
CN102937437A (en) * 2012-11-21 2013-02-20 中国铁建重工集团有限公司 Total station prism group, tube push bench guide system for tunnel construction and guide method of tube push bench guide system
CN206736644U (en) * 2017-04-28 2017-12-12 苏州中宇建筑安装有限公司 A kind of mobile holder for total powerstation
CN207036109U (en) * 2017-06-23 2018-02-23 天津府宁建筑工程有限公司 A kind of semi-automatic leveling total powerstation and tripod thereon
CN207540549U (en) * 2017-12-11 2018-06-26 江苏大洲工程项目管理有限公司 A kind of total powerstation connection structure
CN207975417U (en) * 2018-01-17 2018-10-16 重庆首页工程设计咨询有限责任公司 A kind of total powerstation holder
CN209413903U (en) * 2018-11-26 2019-09-20 中铁隧道集团四处有限公司 Long distance curved pipe jacking automatic guiding system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1123271A (en) * 1997-07-01 1999-01-29 Okumura Corp Method for measuring pipe-jacking
JP2003214090A (en) * 2002-01-28 2003-07-30 Asaharagumi Co Ltd Automatic tracking system for jacking machine in curved jack
JP2004138422A (en) * 2002-10-16 2004-05-13 Nishimatsu Constr Co Ltd Method of surveying in tunnel hole and system of surveying in tunnel hole
CN102937437A (en) * 2012-11-21 2013-02-20 中国铁建重工集团有限公司 Total station prism group, tube push bench guide system for tunnel construction and guide method of tube push bench guide system
CN206736644U (en) * 2017-04-28 2017-12-12 苏州中宇建筑安装有限公司 A kind of mobile holder for total powerstation
CN207036109U (en) * 2017-06-23 2018-02-23 天津府宁建筑工程有限公司 A kind of semi-automatic leveling total powerstation and tripod thereon
CN207540549U (en) * 2017-12-11 2018-06-26 江苏大洲工程项目管理有限公司 A kind of total powerstation connection structure
CN207975417U (en) * 2018-01-17 2018-10-16 重庆首页工程设计咨询有限责任公司 A kind of total powerstation holder
CN209413903U (en) * 2018-11-26 2019-09-20 中铁隧道集团四处有限公司 Long distance curved pipe jacking automatic guiding system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王铁生;马开锋;张冰;: "盾构隧道导向系统的设计与开发", 铁道建筑, no. 09, pages 56 - 58 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253844A (en) * 2020-09-29 2021-01-22 北京政平建设投资集团有限公司 Self-monitoring guide rail
CN112902845A (en) * 2021-03-04 2021-06-04 黄河勘测规划设计研究院有限公司 Track type automatic pipe jacking guiding method
CN112902845B (en) * 2021-03-04 2022-07-08 黄河勘测规划设计研究院有限公司 Track type pipe jacking automatic guiding method
CN113216985A (en) * 2021-06-03 2021-08-06 中建安装集团南京建设有限公司 Real-time intelligent monitoring system for long-distance curve jacking pipe
CN116857432A (en) * 2023-06-21 2023-10-10 金中天水利建设有限公司 Pipe jacking device and pipe jacking construction method thereof

Also Published As

Publication number Publication date
CN109403984B (en) 2024-02-09

Similar Documents

Publication Publication Date Title
CN103322989A (en) Measuring device and method of dynamic real-time measurement of position and posture of pipe pushing jack
CN109403984A (en) Long distance curved pipe jacking automatic guiding system
CN203422091U (en) Device for dynamically measuring positions and attitudes of push bench in real time
CN106123776B (en) A kind of push pipe intelligence jacking measuring system and measurement method
CN202834381U (en) Three-dimensional hyperbolic curve steel pushing pipe rectifying device
CN109653755B (en) Construction method for large-diameter slurry shield to pass through ballastless track roadbed without settlement
CN109372532A (en) Jacking construction engineering method under multiplexed address environment
CN104712339A (en) Annular pipe jacking machine
CN105091852A (en) Pipe-jacking excavation laser-guiding measurement construction method
CN104251688A (en) Method for linear directional measurement by utilizing laser in pipe jacking engineering
CN209413903U (en) Long distance curved pipe jacking automatic guiding system
CN110513116A (en) A kind of monitoring device and monitoring method of tunnel jacking construction guiding
CN102995615A (en) Real-time monitoring method for displacement of underground deep-layer soil body
CN105865416A (en) Leveling rod suspended leveling method for settlement monitoring
CN206223091U (en) A kind of push pipe intelligence jacking measuring system
CN103983148B (en) Tunnel photoface exploision full-automatic big gun hole setting out method
CN111173502A (en) Pipe jacking excavation laser guiding measurement construction method for municipal engineering
CN102623931A (en) Method and special equipment for laying underground pipelines at corridor
CN103899251A (en) Drill bit of non-excavation drilling machine and positioning method of drill bit
CN105606001A (en) Tunnel face blast working system and method
CN112503248A (en) Long-distance concrete culvert pipe curve jacking pipe installation method
CN211201968U (en) Monitoring device for tunnel jacking construction guide
CN211121185U (en) Airport runway settlement monitoring system
CN203905814U (en) Drilling bit of trenchless drilling machine
CN107687595A (en) A kind of construction method of road in airport road face light transformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 29 Park Avenue XiXiangTang District, Nanning city 530007 the Guangxi Zhuang Autonomous Region

Applicant after: China Railway Tunnel Bureau Group Construction Co.,Ltd.

Address before: No. 29 Park Avenue XiXiangTang District, Nanning city 530007 the Guangxi Zhuang Autonomous Region

Applicant before: SICHU CO., LTD. OF CHINA RAILWAY TUNNEL Group

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Jiao Yi

Inventor after: Li Jinshui

Inventor after: Wang Pengfei

Inventor after: Zheng Qingban

Inventor after: Yong Jie Qin

Inventor after: Zhang Yulong

Inventor after: Feng Jinyong

Inventor after: Li Yi

Inventor after: Wang Ke

Inventor after: Yang Longfei

Inventor after: Zhang Chen

Inventor before: Zheng Qingban

Inventor before: Li Jinshui

Inventor before: Wang Pengfei

Inventor before: Jiao Yi

Inventor before: Yong Jie Qin

Inventor before: Zhang Yulong

Inventor before: Feng Jinyong

Inventor before: Li Yi

Inventor before: Wang Ke

Inventor before: Yang Longfei

Inventor before: Zhang Chen

GR01 Patent grant
GR01 Patent grant