CN109403913A - A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect - Google Patents

A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect Download PDF

Info

Publication number
CN109403913A
CN109403913A CN201811171743.XA CN201811171743A CN109403913A CN 109403913 A CN109403913 A CN 109403913A CN 201811171743 A CN201811171743 A CN 201811171743A CN 109403913 A CN109403913 A CN 109403913A
Authority
CN
China
Prior art keywords
liquid
repetition
seam
man
diverting agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811171743.XA
Other languages
Chinese (zh)
Inventor
王飞
陆红军
齐银
李向平
卜军
汪澜
李转红
杨军侠
达引朋
黄婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201811171743.XA priority Critical patent/CN109403913A/en
Publication of CN109403913A publication Critical patent/CN109403913A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/50Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls
    • C09K8/504Compositions based on water or polar solvents
    • C09K8/506Compositions based on water or polar solvents containing organic compounds
    • C09K8/508Compositions based on water or polar solvents containing organic compounds macromolecular compounds
    • C09K8/512Compositions based on water or polar solvents containing organic compounds macromolecular compounds containing cross-linking agents
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08FMACROMOLECULAR COMPOUNDS OBTAINED BY REACTIONS ONLY INVOLVING CARBON-TO-CARBON UNSATURATED BONDS
    • C08F265/00Macromolecular compounds obtained by polymerising monomers on to polymers of unsaturated monocarboxylic acids or derivatives thereof as defined in group C08F20/00
    • C08F265/10Macromolecular compounds obtained by polymerising monomers on to polymers of unsaturated monocarboxylic acids or derivatives thereof as defined in group C08F20/00 on to polymers of amides or imides
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/60Compositions for stimulating production by acting on the underground formation
    • C09K8/84Compositions based on water or polar solvents
    • C09K8/86Compositions based on water or polar solvents containing organic compounds
    • C09K8/88Compositions based on water or polar solvents containing organic compounds macromolecular compounds
    • C09K8/887Compositions based on water or polar solvents containing organic compounds macromolecular compounds containing cross-linking agents
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping

Abstract

The present invention provides a kind of repetition remodeling methods for promoting seam end and temporarily blocking up effect, liquid temporary plugging technique and mixing water volume fracturing technology are combined, first is that by having the characteristics that resistance to compression, temperature resistance, anti-shearing, plastic and the controllable liquid gum plug diverting agent of gel breaking time to target zone injection, it is set to reach the end of first man-made fracture, Hou Ning forms the blocking of frozen glue shape, crack is inhibited to extend along first man-made fracture, control critical eigenvalue belt length;Second is that under the plugging action of liquid gum plug diverting agent, slippery water is injected with huge discharge, make to stitch interior net pressure and is promoted to 5MPa or more, open the lateral new seam of first man-made fracture, the lateral new seam opened using 40-70 mesh quartz sandfilling is recycled the first man-made fracture of 20-40 mesh quartz sandfilling, restores its flow conductivity, the fracture network system having compared with high flow conductivity is formed, realizes the purpose employed and manually stitch remaining oil in the ineffective fine pore of lateral water drive or matrix for the first time.

Description

A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect
Technical field
The invention belongs to In Oil Field Exploration And Development underground work technical fields, and in particular to effect is temporarily blocked up at a kind of promotion seam end Repeat remodeling method.
Background technique
In recent years, people pass through a variety of sides such as inspection shaft analysis, remaining oil test, waterflooding development feature and numerical simulation Method studies Ordos Basin different type oil reservoir Remaining Oil Distribution, the results showed that is influenced by dynamic seam, water drive involves Volume reduces, and remaining oil is mainly distributed in crack two sides 80-100m range in continuous strip.Take conventional refracturing, crack Easily along first fracture extension, crack bandwidth mainly in 40m or so, can not effectively employ the lateral remaining oil in old crack.
For this purpose, having carried out solid diverting agent old well seam end temporarily blocks up mixing water volume fracturing, which is to utilize fiber fracturing Liquid carries solid diverting agent and migrates to fracture tip formation bridge blinding, promotes net pressure in stitching, it is laterally new to open first man-made fracture Seam expands drainage area.But since the easy dispersing and settling of solid diverting agent, the temporary stifled unstable and site operation that boosts have sand plug wind The problems such as dangerous, cannot provide enough net pressures to open lateral new seam, can not effectively employ lateral remaining oil, influence to repeat to change Make effect.Therefore, it is necessary to carry out new seam end temporary plugging technique research and experiment to promote seam end and temporarily block up effect.
Summary of the invention
The purpose of the present invention is to provide a kind of repetition remodeling methods for promoting seam end and temporarily blocking up effect, overcome in the prior art The existing above problem.
Technical solution provided by the invention is as follows:
A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect, comprising the following steps:
Step 1) prepares 20-30m3Liquid gum plug diverting agent;
Step 2 is with 0.5-2.0m3/ min injects 10-15m3Active water is low to replace and set;
Step 3) is with 2.0-3.0m3/ min injects 20-30m to target zone3Slippery water;
Step 4) is with 2.0-3.0m3/ min injects 20-30m to target zone3Liquid gum plug diverting agent, then with 2.0-3.0m3/ min note Enter 25-35m3Guanidine matrix liquid all replaces liquid gum plug diverting agent into stratum, and termination of pumping 4 hours;
Step 5) is with 3.0-4.0m3/ min injects 10-20m to target zone3Slippery water, make to stitch interior net pressure be increased to 5MPa with On;
Step 6) is with 3.0-4.0m3/ min injects load fluid to target zone, and load fluid fills group by slippery water and 40-70 mesh quartz sand At slippery water 100-150m3, sand concentration is 130-200 g/cm3
Step 7) is with 3.0-4.0m3/ min injects 250-300m to target zone3The guanidine gum fracturing fluid of crosslinking is according to 230-550g/cm3 Sand concentration carry 20-40 mesh quartz sand;
Step 8) is with 3.0-4.0m3/ min is replaced to the active water of flow line volume amount under target zone injection well;
After step 9) interval of interest has been constructed, the row of returning after closing well 72 hours;
The complete well of step 10) sand washing, operation.
The liquid gum plug diverting agent is formed by the substance of following mass percent by cross-linked polymeric: water 81.9-93%, Amphiprotic polyacrylamide 0.3-1%, initiator 0.02-0.06%, anionic monomer 1-5%, crosslinking agent 0.02-0.06%, cation Monomer 6-12%.
Slippery water described in step 3) opens first man-made fracture as prepad fluid.
The liquid of guanidine matrix described in step 4) crosses replacement, so that liquid gum plug diverting agent is migrated to first man-made fracture end, stops Pump 4 hours makes liquid gum plug diverting agent form the blocking of frozen glue shape at seam end.
Net pressure is increased to 5MPa or more in seam described in step 5), to open the lateral new seam of first man-made fracture.
Load fluid described in step 6) fills the lateral new seam of first man-made fracture.
It carries out returning in step 9) draining into and returns drain viscosity less than 5mPa.s.
The cationic monomer is dimethyl diallyl ammonium chloride, acryloyloxyethyl trimethyl ammonium chloride, methyl-prop One or more of alkene acyloxyethyl trimethyl ammonia chloride amine, the anionic monomer are acrylamide, Methacrylamide, third One or more of alkene nitrile, sodium acrylate, acrylic acid, methacrylic acid, acrylamido methyl propane sulfonic acid, the both sexes are poly- The relative molecular weight of acrylamide be 500-1400 ten thousand, the initiator be sodium thiosulfate, potassium thiosulfate, ammonium persulfate, One or more of sodium peroxydisulfate, potassium peroxydisulfate, hydrogen peroxide, the crosslinking agent are PEI resin, C10-30 alkyl Sour rouge or NN- methylene-bisacrylamide.
The preparation process of the liquid gum plug diverting agent the following steps are included:
Step 1, base fluid is prepared: the amphiprotic polyacrylamide of formula ratio is added while stirring in water, adds after stirring 15-20min Enter the cationic monomer of formula ratio, standing be swelling to liquid viscosity after mixing evenly is 15mPas;
Step 2, the crosslinking agent of formula ratio, initiator are added water and stirred respectively and prepares crosslinked fluid, initiator liquid;
Step 3, crosslinked fluid, initiator liquid are added in base fluid respectively, are stirred evenly to obtain the final product.
The beneficial effects of the present invention are:
The present invention makes it reach the end of first man-made fracture, Hou Ning first is that by injecting liquid gum plug diverting agent to target zone The blocking of frozen glue shape is formed, inhibits crack to extend along first man-made fracture, control critical eigenvalue belt length;Second is that in liquid gum plug diverting agent Under plugging action, slippery water is injected with huge discharge, makes to stitch interior net pressure and is promoted to 5MPa or more, it is lateral to open first man-made fracture New seam, using 40-70 mesh quartz sandfilling open lateral new seam, recycle 20-40 mesh quartz sandfilling manually split for the first time Seam restores its flow conductivity, forms the fracture network system having compared with high flow conductivity, and realization is employed manually stitches lateral water for the first time Drive the purpose of remaining oil in ineffective fine pore or matrix.
It will be described in further details below.
Specific embodiment
Embodiment 1:
Present embodiments provide a kind of repetition remodeling method for promoting seam end and temporarily blocking up effect, comprising the following steps:
Step 1) prepares 20-30m3Liquid gum plug diverting agent;
Step 2 is with 0.5-2.0m3/ min injects 10-15m3Active water is low to replace and set;
Step 3) is with 2.0-3.0m3/ min injects 20-30m to target zone3Slippery water;
Step 4) is with 2.0-3.0m3/ min injects 20-30m to target zone3Liquid gum plug diverting agent, then with 2.0-3.0m3/ min note Enter 25-35m3Guanidine matrix liquid all replaces liquid gum plug diverting agent into stratum, and termination of pumping 4 hours;
Step 5) is with 3.0-4.0m3/ min injects 10-20m to target zone3Slippery water, make to stitch interior net pressure be increased to 5MPa with On;
Step 6) is with 3.0-4.0m3/ min injects load fluid to target zone, and load fluid fills group by slippery water and 40-70 mesh quartz sand At slippery water 100-150m3, sand concentration is 130-200 g/cm3
Step 7) is with 3.0-4.0m3/ min injects 250-300m to target zone3The guanidine gum fracturing fluid of crosslinking is according to 230-550g/cm3 Sand concentration carry 20-40 mesh quartz sand;
Step 8) is with 3.0-4.0m3/ min is replaced to the active water of flow line volume amount under target zone injection well;
After step 9) interval of interest has been constructed, the row of returning after closing well 72 hours;
The complete well of step 10) sand washing, operation.
The present embodiment combines liquid temporary plugging technique and mixing water volume fracturing technology, is primarily adapted for use in and had been carried out often Advise fracturing reform, the faster oil well of production decline.It proposes by the way that liquid gum plug diverting agent is migrated to first man-made fracture end Portion's Hou Ning plastic promotes the method for stitching interior net pressure, and the easy dispersing and settling of emphasis solution solid blocking agent, temporarily stifled boosting is stable and constructs The problems such as there are sand plug risks under the plugging action of liquid gum plug diverting agent, then by mixing water volume fracturing, is promoted in seam Net pressure opens lateral new seam, restores first man-made fracture flow conductivity, form the complex fracture system having compared with high flow conductivity System, expands the development degree of lateral remaining oil, achieves preferable effect.
On the basis of embodiment 1, following embodiment is by taking Ordos Basin ultralow permeable reservoir and Oil in Super-low Permeability oil reservoir as an example, The present invention will be further described.
Ordos Basin ultralow permeable reservoir and Oil in Super-low Permeability oil reservoir are influenced during exploitation by dynamic seam, water drive wave And volume reduces, remaining oil is mainly distributed in crack two sides 80-100m range in continuous strip.Take conventional refracturing, nothing Method effectively employs the lateral remaining oil in old crack, temporarily blocks up mixing water volume fracturing technology using solid diverting agent old well seam end, although Can control crack belt length, increase crack bandwidth, but due to solid diverting agent during temporary stifled easy dispersing and settling, boost not Stablize, there is the risk of sand plug.
Embodiment 2:
In order to make up the deficiency of solid diverting agent, this example provides this repetition remodeling method for promoting seam end and temporarily blocking up effect, Include the following steps:
Step 1) prepares 20 m3Liquid gum plug diverting agent;
Step 2 is with 0.5-2.0m3/ min injects 10 m3Active water is low to replace and set;
Step 3) is carried out to target zone with 2.0m3/ min injects 20 m3Slippery water opens first man-made fracture as prepad fluid, And leak-off is to reservoir matrix hole and natural microcrack;
Step 4) is carried out to interval of interest with 2.0m3/ min injects 20m3Liquid gum plug diverting agent, then with 2.0-3.0m3/ min note Enter 30m3Guanidine matrix liquid all replaces liquid gum plug diverting agent into stratum, migrates to liquid gum plug diverting agent first artificial Fracture tip termination of pumping 4 hours, makes liquid gum plug diverting agent form the blocking of frozen glue shape at seam end, realizes the mesh of control critical eigenvalue belt length 's;
Step 5) is carried out to interval of interest with 3.0m3/ min injects 15m3Slippery water, in the plugging action of liquid gum plug diverting agent Under, make to stitch interior net pressure and be increased to 5MPa or more, opens the lateral new seam of first man-made fracture;
Step 6) is carried out to target zone with 3.0m3/ min injects 100m3Slippery water is according to 130-200 g/cm3Sand concentration carry The lateral new seam of the first man-made fracture of 40-70 mesh quartz sandfilling, realizes the complex fracture net for being formed and being had compared with high flow conductivity The purpose of network system;
Step 7) is carried out to target zone with 3.0m3/ min injects 250m3The guanidine gum fracturing fluid of crosslinking is according to 230-550g/cm3Sand Concentration carries 20-40 mesh quartz sand, fills to major fracture, realizes the purpose for restoring first man-made fracture flow conductivity;
Step 8) is with 3.0m3/ min injects 5.4m3Active water replaces;
After step 9) interval of interest has been constructed, the row of returning after closing well 72 hours, so that liquid gum plug and fracturing fluid fully degraded, the row of returning Fluid viscosity is less than 5mPa.s;
The complete well of step 10) sand washing, operation.
In the present embodiment, the liquid gum plug diverting agent passes through cross-linked polymeric shape by the substance of following mass percent At: water 81.9-93%, amphiprotic polyacrylamide 0.3-1%, initiator 0.02-0.06%, anionic monomer 1-5%, crosslinking agent 0.02-0.06%, cationic monomer 6-12%.
The cationic monomer is dimethyl diallyl ammonium chloride, acryloyloxyethyl trimethyl ammonium chloride, methyl-prop One or more of alkene acyloxyethyl trimethyl ammonia chloride amine, the anionic monomer are acrylamide, Methacrylamide, third One or more of alkene nitrile, sodium acrylate, acrylic acid, methacrylic acid, acrylamido methyl propane sulfonic acid, the both sexes are poly- The relative molecular weight of acrylamide be 500-1400 ten thousand, the initiator be sodium thiosulfate, potassium thiosulfate, ammonium persulfate, One or more of sodium peroxydisulfate, potassium peroxydisulfate, hydrogen peroxide, the crosslinking agent are PEI resin, C10-30 alkyl Sour rouge or NN- methylene-bisacrylamide.
Embodiment 3:
A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect, comprising the following steps:
Step 1) prepares 30m3Liquid gum plug diverting agent;
Step 2 is with 0.5-2.0m3/ min injects 10m3Active water is low to replace and set;
Step 3) is carried out to target zone with 3.0m3/ min injects 30m3Slippery water opens first man-made fracture as prepad fluid, and Quick leak-off;
Step 4) is carried out to interval of interest with 3.0m3/ min injects 30m3Liquid gum plug diverting agent, then with 3.0m3/ min injection 35m3Guanidine matrix liquid crosses replacement, so that liquid gum plug diverting agent is migrated to first man-made fracture end, termination of pumping 4 hours, makes liquid glue It fills in diverting agent and forms the blocking of frozen glue shape at seam end, realize the purpose of control critical eigenvalue belt length;
Step 5) is carried out to interval of interest with 4.0m3/ min injects 20m3Slippery water, in the plugging action of liquid gum plug diverting agent Under, make to stitch interior net pressure and be increased to 5MPa or more, opens the lateral new seam of first man-made fracture;
Step 6) is carried out to target zone with 4.0m3/ min injects 140m3Slippery water is according to 130-200 g/cm3Sand concentration carry The lateral new seam of the first man-made fracture of 40-70 mesh quartz sandfilling, realizes the complex fracture net for being formed and being had compared with high flow conductivity The purpose of network system;
Step 7) is carried out to target zone with 4.0m3/ min injects 300m3The guanidine gum fracturing fluid of crosslinking is according to 230-550g/cm3Sand Concentration carries 20-40 mesh quartz sand, fills to major fracture, realizes the purpose for restoring first man-made fracture flow conductivity;
Step 8) is with 4.0m3/ min injects 7.8m3Active water replaces;
After step 9) interval of interest has been constructed, the row of returning after closing well 72 hours, so that liquid gum plug and fracturing fluid fully degraded, the row of returning Fluid viscosity is less than 5mPa.s;
The complete well of step 10) sand washing, operation.
10 mouthfuls of wells of field conduct, pressure bomb test show the temporarily stifled 4MPa or more that boosts, and stitch interior net pressure and reach 5MPa or more, The mechanical condition opened and laterally newly stitched is reached.Test well well yield is increased to 2.0t or more by the 0.6t before measure, is containing Under conditions of water is stablized, oil well output and ultimate recovery are effectively raised.The process is simple and easy, temporarily stifled to rise Pressure is stablized, and construction risk is low, and measure effect is preferable.
Wherein, the liquid gum plug diverting agent in four mouthfuls of wells is formed by the substance of following mass percent by cross-linked polymeric: water 88.3%, amphiprotic polyacrylamide 0.6%, initiator 0.05%, anionic monomer 1%, crosslinking agent 0.05%, cationic monomer 10%. Viscosity is 15mPa.s.
There is the liquid gum plug diverting agent in three mouthfuls of wells to be formed by the substance of following mass percent by cross-linked polymeric: water 88.12%, amphiprotic polyacrylamide 0.8%, initiator 0.05%, anionic monomer 1%, crosslinking agent 0.03%, cationic monomer 10%. Viscosity is 36mPa.s.
There is the liquid gum plug diverting agent in three mouthfuls of wells to be formed by the substance of following mass percent by cross-linked polymeric: water 90.14%, amphiprotic polyacrylamide 0.8%, initiator 0.03%, anionic monomer 1%, crosslinking agent 0.03%, cationic monomer 8%. Viscosity is 36mPa.s.
The preparation process of the liquid gum plug diverting agent the following steps are included:
Step 1, base fluid is prepared: the amphiprotic polyacrylamide of formula ratio is added while stirring in water, adds after stirring 15-20min Enter the cationic monomer of formula ratio, standing be swelling to liquid viscosity after mixing evenly is 15mPas;
Step 2, the crosslinking agent of formula ratio, initiator are added water and stirred respectively and prepares crosslinked fluid, initiator liquid;
Step 3, crosslinked fluid, initiator liquid are added in base fluid respectively, are stirred evenly to obtain the final product.
Liquid gum plug diverting agent starts to viscosify in 12-20min, and plastic deforms later, alternately non-deformable after 50min.Glue Plug can be acted on broken glue, breaking glue solution viscosity automatically by gel breaker and be less than 5mpa.s, and to reservoir damage less than 15%, compression strength is big It the use of temperature is 20-70 DEG C in 15MPa.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all It is within being all belonged to the scope of protection of the present invention with the same or similar design of the present invention.The component that embodiment does not describe in detail With the well-known components and common structure or conventional means of the structure category industry, do not describe one by one here.

Claims (9)

1. a kind of repetition remodeling method for promoting seam end and temporarily blocking up effect, which comprises the following steps:
Step 1) prepares 20-30m3Liquid gum plug diverting agent;
Step 2 is with 0.5-2.0m3/ min injects 10-15m3Active water is low to replace and set;
Step 3) is with 2.0-3.0m3/ min injects 20-30m to target zone3Slippery water;
Step 4) is with 2.0-3.0m3/ min injects 20-30m to target zone3Liquid gum plug diverting agent, then with 2.0-3.0m3/ min note Enter 25-35m3Guanidine matrix liquid all replaces liquid gum plug diverting agent into stratum, and termination of pumping 4 hours;
Step 5) is with 3.0-4.0m3/ min injects 10-20m to target zone3Slippery water, makes to stitch interior net pressure and is increased to 5MPa or more;
Step 6) is with 3.0-4.0m3/ min injects load fluid to target zone, and load fluid fills group by slippery water and 40-70 mesh quartz sand At slippery water 100-150m3, sand concentration is 130-200 g/cm3
Step 7) is with 3.0-4.0m3/ min injects 250-300m to target zone3The guanidine gum fracturing fluid of crosslinking is according to 230-550g/cm3 Sand concentration carry 20-40 mesh quartz sand;
Step 8) is with 3.0-4.0m3/ min is replaced to the active water of flow line volume amount under target zone injection well;
After step 9) interval of interest has been constructed, the row of returning after closing well 72 hours;
The complete well of step 10) sand washing, operation.
2. a kind of repetition remodeling method for promoting seam end and temporarily blocking up effect according to claim 1, it is characterised in that: the liquid Body rubber plug diverting agent is formed by the substance of following mass percent by cross-linked polymeric: water 81.9-93%, amphiprotic polyacrylamide 0.3-1%, initiator 0.02-0.06%, anionic monomer 1-5%, crosslinking agent 0.02-0.06%, cationic monomer 6-12%.
3. according to a kind of repetition remodeling method for promoting seam end and temporarily blocking up effect described in claim 1, it is characterised in that: in step 3) The slippery water opens first man-made fracture as prepad fluid.
4. according to a kind of repetition remodeling method for promoting seam end and temporarily blocking up effect described in claim 1, it is characterised in that: in step 4) The guanidine matrix liquid crosses replacement, so that liquid gum plug diverting agent is migrated to first man-made fracture end, termination of pumping 4 hours, makes liquid glue It fills in diverting agent and forms the blocking of frozen glue shape at seam end.
5. according to a kind of repetition remodeling method for promoting seam end and temporarily blocking up effect described in claim 1, it is characterised in that: in step 5) Net pressure is increased to 5MPa or more in the seam, to open the lateral new seam of first man-made fracture.
6. temporarily blocking up the repetition remodeling method of effect according to a kind of promotion seam end described in claim 5, it is characterised in that: in step 6) The load fluid fills the lateral new seam of first man-made fracture.
7. temporarily blocking up the repetition remodeling method of effect according to a kind of promotion seam end described in claim 5, it is characterised in that: in step 9) Return draining into and returns drain viscosity less than 5mPa.s.
8. according to it is as claimed in claim 2 it is a kind of promoted seam end temporarily block up effect repetition remodeling method, it is characterised in that: it is described sun from Sub- monomer is dimethyl diallyl ammonium chloride, acryloyloxyethyl trimethyl ammonium chloride, methylacryoyloxyethyl trimethyl One or more of ammonium chloride, the anionic monomer are acrylamide, Methacrylamide, acrylonitrile, sodium acrylate, third One or more of olefin(e) acid, methacrylic acid, acrylamido methyl propane sulfonic acid, opposite point of the amphiprotic polyacrylamide Son amount is 500-1400 ten thousand, and the initiator is sodium thiosulfate, potassium thiosulfate, ammonium persulfate, sodium peroxydisulfate, persulfuric acid One or more of potassium, hydrogen peroxide, the crosslinking agent are PEI resin, C10-30 alkyl acrylic rouge or NN- methylene Base bisacrylamide.
9. according to a kind of repetition remodeling method for promoting seam end and temporarily blocking up effect as claimed in claim 2, which is characterized in that the liquid The preparation process of rubber plug diverting agent the following steps are included:
Step 1, base fluid is prepared: the amphiprotic polyacrylamide of formula ratio is added while stirring in water, adds after stirring 15-20min Enter the cationic monomer of formula ratio, standing be swelling to liquid viscosity after mixing evenly is 15mPas;
Step 2, the crosslinking agent of formula ratio, initiator are added water and stirred respectively and prepares crosslinked fluid, initiator liquid;
Step 3, crosslinked fluid, initiator liquid are added in base fluid respectively, are stirred evenly to obtain the final product.
CN201811171743.XA 2018-10-09 2018-10-09 A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect Pending CN109403913A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811171743.XA CN109403913A (en) 2018-10-09 2018-10-09 A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811171743.XA CN109403913A (en) 2018-10-09 2018-10-09 A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect

Publications (1)

Publication Number Publication Date
CN109403913A true CN109403913A (en) 2019-03-01

Family

ID=65466202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811171743.XA Pending CN109403913A (en) 2018-10-09 2018-10-09 A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect

Country Status (1)

Country Link
CN (1) CN109403913A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552675A (en) * 2019-08-26 2019-12-10 中国石油天然气股份有限公司 non-crack type water-breakthrough oil well repeated transformation method
CN111561300A (en) * 2020-05-26 2020-08-21 中国石油天然气股份有限公司 Method for improving water drive effect of water injection well of ultra-low permeability fractured reservoir
CN111577198A (en) * 2020-05-28 2020-08-25 中国石油天然气股份有限公司 Plugging and pressure increasing integrated repeated transformation method for controlling water and increasing oil by utilizing stratum pre-crosslinked gel plugging agent
CN111927385A (en) * 2020-07-15 2020-11-13 陕西明德石油科技有限公司 Gel foam temporary plugging and shunting fracturing method for ultra-low permeability reservoir
CN112253041A (en) * 2020-10-26 2021-01-22 中国石油天然气股份有限公司 Multi-section modification fracturing method for compact reservoir in advanced water injection development area
CN112392455A (en) * 2020-11-19 2021-02-23 中国石油天然气股份有限公司 Repeated transformation method for improving crack plugging effect
CN112574734A (en) * 2020-11-20 2021-03-30 西安力勘石油能源科技有限公司 Self-generating thermal fracturing fluid and preparation and pumping method thereof
CN113898327A (en) * 2020-06-22 2022-01-07 中国石油化工股份有限公司 Method for repeated acid pressing of deep carbonate rock multiple liquid rubber plugs and application

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3815681A (en) * 1972-05-24 1974-06-11 Shell Oil Co Temporarily plugging an earth formation with a transiently gelling aqueous liquid
CN102061152A (en) * 2009-11-11 2011-05-18 中国石油天然气股份有限公司 High-strength controllable gelout chemical temporary plugging liquid rubber stopper
CN105041289A (en) * 2015-07-13 2015-11-11 中国石油大学(北京) Method for forming multiple fractures by forced planar diverting of fracture opening being temporarily plugged
CN105089603A (en) * 2015-07-13 2015-11-25 中国石油大学(北京) Reservoir modifying method through forming crack network by temporary plugging turning in cracks
CN106917619A (en) * 2017-03-21 2017-07-04 中国石油天然气股份有限公司 The temporary stall of slit formation carbonate reservoir to fracture support integration remodeling method
CN107558981A (en) * 2017-07-18 2018-01-09 中国石油天然气股份有限公司 A kind of more the scope of grain size grading temporarily block up the fracturing technology for realizing complex fracture
CN107859508A (en) * 2016-09-22 2018-03-30 北京九尊能源技术股份有限公司 A kind of low temperature coal bed gas well fracturing fracture forward method
CN108505982A (en) * 2018-02-27 2018-09-07 中国石油天然气股份有限公司 It is a kind of using liquid gum plug realize temporary stall to old well refracturing method for increasing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3815681A (en) * 1972-05-24 1974-06-11 Shell Oil Co Temporarily plugging an earth formation with a transiently gelling aqueous liquid
CN102061152A (en) * 2009-11-11 2011-05-18 中国石油天然气股份有限公司 High-strength controllable gelout chemical temporary plugging liquid rubber stopper
CN105041289A (en) * 2015-07-13 2015-11-11 中国石油大学(北京) Method for forming multiple fractures by forced planar diverting of fracture opening being temporarily plugged
CN105089603A (en) * 2015-07-13 2015-11-25 中国石油大学(北京) Reservoir modifying method through forming crack network by temporary plugging turning in cracks
CN107859508A (en) * 2016-09-22 2018-03-30 北京九尊能源技术股份有限公司 A kind of low temperature coal bed gas well fracturing fracture forward method
CN106917619A (en) * 2017-03-21 2017-07-04 中国石油天然气股份有限公司 The temporary stall of slit formation carbonate reservoir to fracture support integration remodeling method
CN107558981A (en) * 2017-07-18 2018-01-09 中国石油天然气股份有限公司 A kind of more the scope of grain size grading temporarily block up the fracturing technology for realizing complex fracture
CN108505982A (en) * 2018-02-27 2018-09-07 中国石油天然气股份有限公司 It is a kind of using liquid gum plug realize temporary stall to old well refracturing method for increasing

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552675A (en) * 2019-08-26 2019-12-10 中国石油天然气股份有限公司 non-crack type water-breakthrough oil well repeated transformation method
CN111561300A (en) * 2020-05-26 2020-08-21 中国石油天然气股份有限公司 Method for improving water drive effect of water injection well of ultra-low permeability fractured reservoir
CN111577198A (en) * 2020-05-28 2020-08-25 中国石油天然气股份有限公司 Plugging and pressure increasing integrated repeated transformation method for controlling water and increasing oil by utilizing stratum pre-crosslinked gel plugging agent
CN113898327A (en) * 2020-06-22 2022-01-07 中国石油化工股份有限公司 Method for repeated acid pressing of deep carbonate rock multiple liquid rubber plugs and application
CN113898327B (en) * 2020-06-22 2024-03-08 中国石油化工股份有限公司 Repeated acid fracturing method and application of multiple liquid rubber plugs of deep carbonate rock
CN111927385A (en) * 2020-07-15 2020-11-13 陕西明德石油科技有限公司 Gel foam temporary plugging and shunting fracturing method for ultra-low permeability reservoir
CN112253041A (en) * 2020-10-26 2021-01-22 中国石油天然气股份有限公司 Multi-section modification fracturing method for compact reservoir in advanced water injection development area
CN112392455A (en) * 2020-11-19 2021-02-23 中国石油天然气股份有限公司 Repeated transformation method for improving crack plugging effect
CN112392455B (en) * 2020-11-19 2023-06-30 中国石油天然气股份有限公司 Repeated transformation method for improving crack plugging effect
CN112574734A (en) * 2020-11-20 2021-03-30 西安力勘石油能源科技有限公司 Self-generating thermal fracturing fluid and preparation and pumping method thereof

Similar Documents

Publication Publication Date Title
CN109403913A (en) A kind of repetition remodeling method for promoting seam end and temporarily blocking up effect
CN101787864B (en) Method for plugging water from oil reservoir fractured water logging oil well developed by injecting water into low-permeable reservoir stratum
CN106567702A (en) Method for improving complexity index of deep shale gas fracture
CN104178102B (en) Cross-linkable high-temperature-resistant residue-free multi-component copolymerization type fracturing fluid and preparation method thereof
WO2016000090A1 (en) Oil extraction method of suppressing escape in co2 flooding process in low-permeability fractured oil reservoir by means of two-stage plugging
CN110183579B (en) Temperature-sensitive hydrogel plugging agent and preparation method and application thereof
CN107629774A (en) A kind of temporarily stifled diversion agent and preparation method thereof
CN104388066B (en) Preparation method of plugging agent for drilling fluid
CN109971451B (en) Graphene oxide nano cross-linking agent for fracturing fluid and preparation method thereof
CA2821129A1 (en) Improved fluid loss compositions and methods of use for subterranean operations
CN102533240B (en) High-temperature oil reservoir composite modifying and flooding agent and preparing method and application thereof
CN110173251A (en) Compact oil reservoir CO2Auxiliary energy-storage imbibition fracturing process
CN101086210A (en) Profile control and water plugging technology for coal bed gas
CN105658760B (en) Well treatment fluid and its application method comprising zirconium crosslink agent
CN111484578A (en) Water-soluble AA-AM-NVP-NGD quadripolymer temporary plugging agent for fracturing and synthesis method thereof
CN106958438B (en) A kind of method for removing blockage of polymer flooding blocking well
CN105085839B (en) Water-soluble AM AA modified Nanos SiO2The preparation method of function monomer terpolymer oil displacement agent
CN105924575A (en) Composite drag reducer special for shale gas and preparation method thereof
CN109751033A (en) A kind of fracturing process for tight sandstone reservoir
CN103670359A (en) Method for nondegradable gel breaking of vegetable gelatin fracturing fluid
CN109915093A (en) A kind of method that " stifled/tune/drive " integration improves oil recovery
CN106749921A (en) A kind of transfer drive grafting polymer microballoon and preparation method thereof
CN106337676A (en) Method of fracturing coal-bed gas reservoir
CN114940895A (en) Clean high-performance carbon dioxide foam fracturing fluid and preparation method thereof
RU2540713C1 (en) Method of oil pool development

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301

RJ01 Rejection of invention patent application after publication