CN109391399A - Management method, device and the equipment of secondary cell - Google Patents
Management method, device and the equipment of secondary cell Download PDFInfo
- Publication number
- CN109391399A CN109391399A CN201710681145.6A CN201710681145A CN109391399A CN 109391399 A CN109391399 A CN 109391399A CN 201710681145 A CN201710681145 A CN 201710681145A CN 109391399 A CN109391399 A CN 109391399A
- Authority
- CN
- China
- Prior art keywords
- secondary cell
- user equipment
- management
- implementing result
- scell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0001—Arrangements for dividing the transmission path
- H04L5/0003—Two-dimensional division
- H04L5/0005—Time-frequency
- H04L5/0007—Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
- H04L5/001—Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/02—Arrangements for optimising operational condition
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/10—Scheduling measurement reports ; Arrangements for measurement reports
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention provides a kind of management method of secondary cell, device and equipment, one of them includes: that user equipment executes the operation for managing secondary cell, obtain implementing result;Implementing result is reported to base station by user equipment.Through the invention, the technical issues of cannot being managed in the related technology to secondary cell in the carrier aggregation scene for being introduced into the cell after wave beam is solved.
Description
Technical field
The present invention relates to the communications fields, in particular to a kind of management method of secondary cell, device and equipment.
Background technique
4G (4Generation, forth generation) in the related art or LTE (Long Term Evolution, for a long time
Evolution) in mobile communication system, wireless access network (Radio Access Network, RAN) includes evolution base station (evolved
Node B, eNB) and user equipment (User Equipment, UE), an eNB may include multiple cells (Cell).For Xiang Yidong
User provides higher data rate, and 4G system introduces carrier wave polymerization (CA, Carrier Aggregation) technology.Carrier wave
Polymerization is to be aggregating the component carrier (CC, Component Carriers) of two or more to support bigger transmission belt
It is wide.UE with carrier aggregation capacity, can simultaneously on multiple CC sending and receiving data.The CC that UE is initially accessed is principal component carrier wave
(PCC, Primary Component Carrier), base station can also be known as auxiliary point by the PCC of configuration change UE, other CC
Loading gage wave (SCC, Secondary Component Carrier), SCC are to be configured after UE enters connected state by base station.PCC
Corresponding serving cell (Serving Cell) is known as main plot (PCell, Primary Cell), the corresponding serving cell of SCC
Referred to as secondary cell (SCell, Secondary Cell).Base station is only that each UE distributes a Cell Radio Network Temporary Identifier/Identity, Cell-RNTI
(C-RNTI, Cell Radio Network Temporary Identifier), i.e. C- of the UE in each serving cell of distribution
RNTI is identical.The each serving cell for distributing to UE (user equipment) has the mark of a configuration, referred to as serving cell
Mark, the serving cell that the serving cell mark of PCell is fixed as 0, SCell identify the number consecutively since 1.
In 5G system in the related art, base station and UE can do great evolution.The base station 5G is known as gNB (Next
Generation Node B, next-generation base station), a gNB may include multiple cells, and a cell may include multiple wave beams
(Beam), the schematic diagram of cell and wave beam is the schematic diagram of present invention cell and wave beam in the related technology referring to Fig. 1, Fig. 1.5G system
In system, carrier aggregation technology will be used, and support duplication (Duplication) transmission in carrier wave polymerization, at this time, one
PDCP (Packet Data Convergence Protocol, Packet Data Convergence Protocol) entity corresponds to two or more RLC
(Radio LinkControl, wireless spread-spectrum technology) entity, each RLC entity transmit on different serving cells same respectively
Data.
However the carrier wave of the cell after introducing wave beam is polymerize, particularly with the management of secondary cell, not yet find at present
Effective solution scheme.
Summary of the invention
The embodiment of the invention provides a kind of management method of secondary cell, device and equipment, at least to solve the relevant technologies
In the technical issues of secondary cell cannot being managed in the carrier aggregation scene for being introduced into the cell after wave beam.
According to one embodiment of present invention, a kind of management method of secondary cell is provided, comprising: user equipment executes pipe
The operation for managing secondary cell, obtains implementing result;The implementing result is reported to base station by the user equipment.
According to one embodiment of present invention, the management method of another secondary cell is provided, comprising: base station receives user
The implementing result that equipment reports, wherein the implementing result is that the user equipment obtains after the operation for executing management secondary cell
The result arrived;According to the implementing result, the base station executes the operation of management secondary cell.
According to another embodiment of the invention, a kind of managing device of secondary cell is provided, comprising: execution module is used
In the operation for executing management secondary cell, implementing result is obtained;Reporting module, for the implementing result to be reported to base station.
According to another embodiment of the invention, the managing device of another secondary cell is provided, comprising: receiving module,
For receiving the implementing result of user equipment to report, wherein the implementing result is that the user equipment is auxiliary small in execution management
It is obtained after the operation in area;Execution module, for executing the operation of management secondary cell according to the implementing result.
According to still another embodiment of the invention, a kind of storage medium is additionally provided.The storage medium is set as storage and uses
In the program code for executing following steps:
The operation for executing management secondary cell, obtains implementing result;
The implementing result is reported to base station.
By the invention it is possible to preferably carry out secondary cell under the carrier aggregation scene for introducing the cell after wave beam
Management, to reduce interference.Solving in the related technology cannot be to auxiliary small in the carrier aggregation scene for being introduced into the cell after wave beam
The technical issues of area is managed.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair
Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of cell and wave beam in the related technology of the invention;
Fig. 2 is a kind of flow chart of the management method of secondary cell according to an embodiment of the present invention;
Fig. 3 is the flow chart of the management method of another secondary cell according to an embodiment of the present invention;
Fig. 4 is a kind of structural block diagram of the managing device of secondary cell according to an embodiment of the present invention;
Fig. 5 is the structural block diagram of the managing device of another secondary cell according to an embodiment of the present invention;
Fig. 6 is a kind of structural block diagram of the management system of secondary cell according to an embodiment of the present invention;
Fig. 7 is the flow chart of embodiment of the present invention 1 to 4.
Specific embodiment
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and in combination with Examples.It should be noted that not conflicting
In the case of, the features in the embodiments and the embodiments of the present application can be combined with each other.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.
Embodiment 1
A kind of management method of secondary cell is provided in the present embodiment, and Fig. 2 is that one kind according to an embodiment of the present invention is auxiliary
The flow chart of the management method of cell, as shown in Fig. 2, the process includes the following steps:
Step S202, user equipment execute the operation of management secondary cell, obtain implementing result;
Implementing result is reported to base station by step S204, user equipment.
Through the above steps, secondary cell can preferably be carried out under the carrier aggregation scene for introducing the cell after wave beam
Management, with reduce interference.Solving in the related technology cannot be to auxiliary in the carrier aggregation scene for being introduced into the cell after wave beam
The technical issues of cell is managed.
Optionally, the executing subject user equipment of above-mentioned steps can be terminal, such as mobile phone, but not limited to this.
Optionally, management secondary cell includes following one: deactivating secondary cell, hangs up all uplink behaviors of secondary cell.
In the present embodiment, implementing result is that user equipment executes the information generated after the operation for managing secondary cell.
In the optional embodiment of the present embodiment, the operation that user equipment executes management secondary cell includes following one:
S11, user equipment execute the operation of management secondary cell according to configuration information;The configuration information can be base station transmission
To user equipment;
S12, user equipment decide the operation for executing management secondary cell in its sole discretion.
Optionally, before user equipment executes the operation of management secondary cell according to configuration information, method further include: user
Equipment receives the configuration information that base station is sent.
In the present embodiment, configuration information includes the instruction information of at least one of: user equipment being allowed to decide in its sole discretion
Deactivation secondary cell or all uplink behaviors of hang-up secondary cell, user equipment deactivate auxiliary when the wave beam of secondary cell restores failure
Cell or all uplink behaviors of hang-up secondary cell, user equipment unsuccessfully reach maximum time in the wireless spread-spectrum technology re-transmission of secondary cell
Secondary cell is deactivated when number or hangs up all uplink behaviors of secondary cell.
According to different scenes, the operation that user equipment executes management secondary cell includes following one:
User equipment executes the operation of management secondary cell when the wave beam of secondary cell restores unsuccessfully to indicate;
User equipment is in copy transmissions when the wireless spread-spectrum technology re-transmission of secondary cell unsuccessfully reaches maximum times
Execute the operation of management secondary cell.
The management method of another secondary cell is provided in the present embodiment, and Fig. 3 is according to an embodiment of the present invention another
The flow chart of the management method of kind secondary cell, as shown in figure 3, the process includes the following steps:
Step S302, base station receive the implementing result of user equipment to report, wherein implementing result is that user equipment is executing
Manage the result obtained after the operation of secondary cell;
Step S304, according to implementing result, base station executes the operation of management secondary cell.
Optionally, the executing subject base station of above-mentioned steps can be the various forms of base stations for including secondary cell, such as gNB
Deng, but not limited to this.
Optionally, management secondary cell includes following one: deactivating secondary cell, hangs up all uplink behaviors of secondary cell.
Optionally, before the implementing result that base station receives user equipment to report, method further include: send and configure to terminal
Information, wherein configuration information is used to indicate the condition that terminal executes the operation of management secondary cell.
Optionally, configuration information includes the instruction information of at least one of: user equipment being allowed to decide deactivation in its sole discretion
Secondary cell or hang up all uplink behaviors of secondary cell, user equipment deactivated when the wave beam of secondary cell restores failure secondary cell or
Hang up all uplink behaviors of secondary cell, user equipment is gone when the wireless spread-spectrum technology re-transmission of secondary cell unsuccessfully reaches maximum times
It activates secondary cell or hangs up all uplink behaviors of secondary cell.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-mentioned implementation
The method of example can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but it is very much
In the case of the former be more preferably embodiment.Based on this understanding, technical solution of the present invention is substantially in other words to existing
The part that technology contributes can be embodied in the form of software products, which is stored in a storage
In medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal device (can be mobile phone, calculate
Machine, server or network equipment etc.) execute method described in each embodiment of the present invention.
Embodiment 2
Managing device, the system of a kind of secondary cell are additionally provided in the present embodiment, and the device is for realizing above-mentioned implementation
Example and preferred embodiment, the descriptions that have already been made will not be repeated.As used below, term " module " may be implemented pre-
Determine the combination of the software and/or hardware of function.Although device described in following embodiment is preferably realized with software,
The realization of the combination of hardware or software and hardware is also that may and be contemplated.
Fig. 4 is a kind of structural block diagram of the managing device of secondary cell according to an embodiment of the present invention, as shown in figure 4, using
In user equipment, which includes:
Execution module 40 obtains implementing result for executing the operation of management secondary cell;
Reporting module 42, for implementing result to be reported to base station.
Fig. 5 is the structural block diagram of the managing device of another secondary cell according to an embodiment of the present invention, as shown in figure 5, answering
Used in base station, which includes:
Receiving module 50, for receiving the implementing result of user equipment to report, wherein implementing result is that user equipment is being held
The result obtained after the operation of row management secondary cell;
Execution module 52, according to implementing result, for executing the operation of management secondary cell.
Fig. 6 is a kind of structural block diagram of the management system of secondary cell according to an embodiment of the present invention, as shown in Figure 6, comprising:
User equipment 60, base station 62,
User equipment 60 includes: the first execution module 600, for executing the operation of management secondary cell, obtains implementing result;
Reporting module 602, for implementing result to be reported to base station;
Base station 62 includes: receiving module 620, for receiving the implementing result of user equipment to report;Second execution module
622, for executing the operation of management secondary cell.
Optionally, management secondary cell includes following one: deactivating secondary cell, hangs up all uplink behaviors of secondary cell.
It should be noted that above-mentioned modules can be realized by software or hardware, for the latter, Ke Yitong
Following manner realization is crossed, but not limited to this: above-mentioned module is respectively positioned in same processor;Alternatively, above-mentioned modules are with any
Combined form is located in different processors.
Embodiment 3
For the carrier wave polymerization of the cell after introducing wave beam in 5G system, how to carry out the management of secondary cell is institute of the present invention
The content to be described.The present invention provides the method for secondary cell management when a kind of polymerization of carrier wave, the present embodiment skills to be solved
Art problem is: the management of secondary cell how is carried out under the carrier aggregation scene for introducing the cell after wave beam.
The present embodiment includes:
UE is according to configuration information or decides deactivation (Deactivate) SCell in its sole discretion or hangs up (Suspend) SCell institute
There is uplink (Uplink) behavior.
When UE uplink behavior all according to configuration information deactivation SCell or hang-up SCell, UE is also received before this
The configuration information of base station.
UE, which deactivates SCell or hangs up all uplink behaviors of SCell, may also include that UE will deactivate SCell or extension later
The information reporting of all uplink behaviors of SCell is played to base station.
Base station may also include that base station after the information for receiving UE deactivation SCell or hang-up all uplink behaviors of SCell
It deactivates SCell or hangs up all downlinks of SCell (Downlink) behavior.
The configuration information that the UE receives base station includes at least one of: allowing UE to decide in its sole discretion and deactivates SCell
Hang up all uplink behaviors of SCell, UE SCell is deactivated when the wave beam of SCell restores failure or hang up SCell it is all on
Every trade is, UE deactivates SCell when the RLC re-transmission of SCell unsuccessfully reaches maximum times or hangs up all upper every trades of SCell
For.
It includes at least one of that the UE, which deactivates SCell or hangs up all uplink behaviors of SCell: UE is in SCell
Wave beam restore unsuccessfully indicate when deactivate SCell or hang up all uplink behaviors of SCell;UE is at duplication (Duplication)
SCell is deactivated in the case of transmission when the RLC re-transmission of SCell unsuccessfully reaches maximum times or hangs up all upper every trades of SCell
For.
Embodiment 1
Fig. 7 is the flow chart of embodiment of the present invention 1 to 4, comprising:
Step 1, UE receive the configuration information of base station, including at least one of: allowing UE to decide in its sole discretion and deactivate SCell
Hang up all uplink behaviors of SCell, UE SCell is deactivated when the wave beam of SCell restores failure or hang up SCell it is all on
Every trade is, UE deactivates SCell when the RLC re-transmission of SCell unsuccessfully reaches maximum times or hangs up all upper every trades of SCell
For.
Step 2, UE are such as " to allow UE to decide in its sole discretion and deactivate SCell or hang-up in configuration information according to configuration information
When all uplink behaviors of SCell ", UE is when the wave beam of SCell restores failure or in copy transmissions SCell's
RLC re-transmission deactivates SCell or hangs up all uplink behaviors of SCell when unsuccessfully reaching maximum times;It is such as " UE in configuration information
SCell is deactivated when the wave beam of SCell restores failure or hangs up all uplink behaviors of SCell " when, wave beam of the UE in SCell
Restore to deactivate SCell when failure or hangs up all uplink behaviors of SCell;It is such as " RLC weight of the UE in SCell in configuration information
Biography deactivates SCell or hangs up all uplink behaviors of SCell when unsuccessfully reaching maximum times " when, UE is in copy transmissions
SCell is deactivated when the RLC re-transmission of SCell unsuccessfully reaches maximum times or hangs up all uplink behaviors of SCell.
Step 3, UE will deactivate SCell or hang up the information reporting of all uplink behaviors of SCell to base station.
Step 4, base station deactivate SCell or hang up all downlink behaviors of SCell.
Embodiment 2
Step 1, UE are decided in its sole discretion, as UE in the case that SCell wave beam restore failure when or in copy transmissions
The RLC re-transmission of SCell deactivates SCell or hangs up all uplink behaviors of SCell when unsuccessfully reaching maximum times.
Step 2, UE will deactivate SCell or hang up the information reporting of all uplink behaviors of SCell to base station.
Step 3, base station deactivate SCell or hang up all downlink behaviors of SCell.
Embodiment 3
Step 1, UE receive the configuration information of base station, including at least one of: allowing UE to decide in its sole discretion and deactivate SCell
Hang up all uplink behaviors of SCell, UE SCell is deactivated when the wave beam of SCell restores failure or hang up SCell it is all on
Every trade is, UE deactivates SCell when the RLC re-transmission of SCell unsuccessfully reaches maximum times or hangs up all upper every trades of SCell
For.
Step 2, UE are such as " to allow UE to decide in its sole discretion and deactivate SCell or hang-up in configuration information according to configuration information
When all uplink behaviors of SCell ", UE is when the wave beam of SCell restores failure or in copy transmissions SCell's
RLC re-transmission deactivates SCell or hangs up all uplink behaviors of SCell when unsuccessfully reaching maximum times;It is such as " UE in configuration information
SCell is deactivated when the wave beam of SCell restores failure or hangs up all uplink behaviors of SCell " when, wave beam of the UE in SCell
Restore to deactivate SCell when failure or hangs up all uplink behaviors of SCell;It is such as " RLC weight of the UE in SCell in configuration information
Biography deactivates SCell or hangs up all uplink behaviors of SCell when unsuccessfully reaching maximum times " when, UE is in copy transmissions
SCell is deactivated when the RLC re-transmission of SCell unsuccessfully reaches maximum times or hangs up all uplink behaviors of SCell.
Embodiment 4
Step 1, UE are decided in its sole discretion, as UE in the case that SCell wave beam restore failure when or in copy transmissions
The RLC re-transmission of SCell deactivates SCell or hangs up all uplink behaviors of SCell when unsuccessfully reaching maximum times.
Using the method for the present embodiment, can preferably be carried out under the carrier aggregation scene for introducing the cell after wave beam
The management of secondary cell, to reduce interference.
Embodiment 4
The embodiments of the present invention also provide a kind of storage mediums.Optionally, in the present embodiment, above-mentioned storage medium can
To be arranged to store the program code for executing following steps:
S1 executes the operation of management secondary cell, obtains implementing result;
Implementing result is reported to base station by S2.
Optionally, in the present embodiment, above-mentioned storage medium can include but is not limited to: USB flash disk, read-only memory (ROM,
Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or
The various media that can store program code such as CD.
Optionally, in the present embodiment, processor executes management according to program code stored in storage medium
The operation of secondary cell, obtains implementing result;
Optionally, in the present embodiment, processor will execute knot according to program code stored in storage medium execution
Fruit is reported to base station.
The embodiments of the present invention also provide a kind of management equipments of secondary cell, comprising: memory, and with the storage
The processor of device coupling, the processor is for running program, wherein the program generation of following steps is executed when described program is run
Code:
S1 executes the operation of management secondary cell, obtains implementing result;
Implementing result is reported to base station by S2.
Optionally, the specific example in the present embodiment can be with reference to described in above-described embodiment and optional embodiment
Example, details are not described herein for the present embodiment.
Obviously, those skilled in the art should be understood that each module of the above invention or each step can be with general
Computing device realize that they can be concentrated on a single computing device, or be distributed in multiple computing devices and formed
Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored
It is performed by computing device in the storage device, and in some cases, it can be to be different from shown in sequence execution herein
Out or description the step of, perhaps they are fabricated to each integrated circuit modules or by them multiple modules or
Step is fabricated to single integrated circuit module to realize.In this way, the present invention is not limited to any specific hardware and softwares to combine.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (16)
1. a kind of management method of secondary cell characterized by comprising
User equipment executes the operation of management secondary cell, obtains implementing result;
The implementing result is reported to base station by the user equipment.
2. the method according to claim 1, wherein the management secondary cell includes following one: deactivating auxiliary
Cell hangs up all uplink behaviors of secondary cell.
3. the method according to claim 1, wherein the operation that the user equipment executes management secondary cell includes
Following one:
The user equipment executes the operation of management secondary cell according to configuration information;
The user equipment decides the operation for executing management secondary cell in its sole discretion.
4. according to the method described in claim 3, it is characterized in that, executing management secondary cell according to configuration information in user equipment
Operation before, the method also includes:
The user equipment receives the configuration information that the base station is sent.
5. according to the method described in claim 4, it is characterized in that, the configuration information includes the instruction letter of at least one of
Breath: allow user equipment to decide in its sole discretion and deactivate secondary cell or hang up all uplink behaviors of secondary cell, user equipment in secondary cell
Wave beam restore to deactivate secondary cell when failure or hang up all uplink behaviors of secondary cell, user equipment secondary cell radio chains
Road control, which retransmits, deactivates secondary cell or hang-up all uplink behaviors of secondary cell when unsuccessfully reaching maximum times.
6. the method according to claim 1, wherein the operation that user equipment executes management secondary cell includes following
One of:
User equipment executes the operation of management secondary cell when the wave beam of secondary cell restores unsuccessfully to indicate;
User equipment execution when the wireless spread-spectrum technology re-transmission of secondary cell unsuccessfully reaches maximum times in copy transmissions
Manage the operation of secondary cell.
7. a kind of management method of secondary cell characterized by comprising
The implementing result of base station reception user equipment to report, wherein the implementing result is that the user equipment is executing management
The result obtained after the operation of secondary cell;
According to the implementing result, the base station executes the operation of management secondary cell.
8. the method according to the description of claim 7 is characterized in that management secondary cell includes following one: secondary cell is deactivated,
Hang up all uplink behaviors of secondary cell.
9. the method according to the description of claim 7 is characterized in that base station receive user equipment to report implementing result it
Before, the method also includes:
Configuration information is sent to terminal, wherein the configuration information is used to indicate the operation that the terminal executes management secondary cell
Condition.
10. according to the method described in claim 9, it is characterized in that, the configuration information includes the instruction of at least one of
Information: allow user equipment to decide in its sole discretion and deactivate secondary cell or hang up all uplink behaviors of secondary cell, user equipment auxiliary small
The wave beam in area restores to deactivate secondary cell when failure or hangs up all uplink behaviors of secondary cell, user equipment in the wireless of secondary cell
Link control, which retransmits, deactivates secondary cell or hang-up all uplink behaviors of secondary cell when unsuccessfully reaching maximum times.
11. a kind of managing device of secondary cell characterized by comprising
Execution module obtains implementing result for executing the operation of management secondary cell;
Reporting module, for the implementing result to be reported to base station.
12. device according to claim 11, which is characterized in that management secondary cell includes following one: being deactivated auxiliary small
Area hangs up all uplink behaviors of secondary cell.
13. a kind of managing device of secondary cell characterized by comprising
Receiving module, for receiving the implementing result of user equipment to report, wherein the implementing result is that the user equipment exists
It is obtained after the operation of execution management secondary cell;
Execution module, for executing the operation of management secondary cell according to the implementing result.
14. device according to claim 13, which is characterized in that management secondary cell includes following one: being deactivated auxiliary small
Area hangs up all uplink behaviors of secondary cell.
15. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein when described program is run
Method described in any one of perform claim requirement 1 to 10.
16. a kind of management equipment of secondary cell characterized by comprising memory, and the processing with memory coupling
Device, the processor is for running program, wherein perform claim requires described in any one of 1 to 10 when described program is run
Method.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710681145.6A CN109391399B (en) | 2017-08-10 | 2017-08-10 | Management method, device and equipment of secondary cell |
PCT/CN2018/099919 WO2019029692A1 (en) | 2017-08-10 | 2018-08-10 | Auxiliary cell management method, apparatus and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710681145.6A CN109391399B (en) | 2017-08-10 | 2017-08-10 | Management method, device and equipment of secondary cell |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109391399A true CN109391399A (en) | 2019-02-26 |
CN109391399B CN109391399B (en) | 2022-04-19 |
Family
ID=65271000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710681145.6A Active CN109391399B (en) | 2017-08-10 | 2017-08-10 | Management method, device and equipment of secondary cell |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN109391399B (en) |
WO (1) | WO2019029692A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021007826A1 (en) * | 2019-07-17 | 2021-01-21 | Oppo广东移动通信有限公司 | Wireless communication method, terminal device and network device |
CN112822728A (en) * | 2019-11-15 | 2021-05-18 | 中国移动通信有限公司研究院 | Information reporting and receiving method, terminal and network equipment |
WO2022120744A1 (en) * | 2020-12-10 | 2022-06-16 | 华为技术有限公司 | Data transmission processing method and related apparatus |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015017997A1 (en) * | 2013-08-07 | 2015-02-12 | 华为技术有限公司 | Method, apparatus and host for configuring secondary cell |
CN102223730B (en) * | 2010-04-14 | 2015-04-22 | 电信科学技术研究院 | Method and device for processing random access failure of auxiliary carrier |
CN104770032A (en) * | 2013-10-31 | 2015-07-08 | 华为技术有限公司 | Dual connection mode resource request method and terminal, and master eNB and secondary eNB |
CN105120475A (en) * | 2015-07-17 | 2015-12-02 | 中国联合网络通信集团有限公司 | Method and device for managing secondary serving cell |
CN105247941A (en) * | 2013-12-30 | 2016-01-13 | 华为技术有限公司 | Method and device for activating secondary cell, communication system, base station, and user equipment |
US20160037579A1 (en) * | 2013-04-05 | 2016-02-04 | Pantech Co., Ltd. | Method and apparatus for wireless link control in wireless communication system supporting dual connectivity |
US20160128003A1 (en) * | 2013-05-20 | 2016-05-05 | Broadcom Corporation | Method and apparatus for enhanced secondary cell activation and deactivation |
CN105722096A (en) * | 2014-12-02 | 2016-06-29 | 电信科学技术研究院 | Service data transmission method and apparatus |
US20160212752A1 (en) * | 2013-09-12 | 2016-07-21 | Sony Corporation | Nct scc activation control device and method, management method and base station device |
CN106304281A (en) * | 2015-05-14 | 2017-01-04 | 普天信息技术有限公司 | The activation of a kind of secondary cell and anti-activating method and system |
US20170019232A1 (en) * | 2012-09-26 | 2017-01-19 | Lg Electronics Inc. | Method and apparatus for receiving ack/nack in wireless communication system |
CN106797536A (en) * | 2014-10-07 | 2017-05-31 | 瑞典爱立信有限公司 | mobility in dense network |
CN107017970A (en) * | 2011-04-05 | 2017-08-04 | 三星电子株式会社 | Terminal and base station and its method in carrier aggregation system |
-
2017
- 2017-08-10 CN CN201710681145.6A patent/CN109391399B/en active Active
-
2018
- 2018-08-10 WO PCT/CN2018/099919 patent/WO2019029692A1/en active Application Filing
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102223730B (en) * | 2010-04-14 | 2015-04-22 | 电信科学技术研究院 | Method and device for processing random access failure of auxiliary carrier |
CN107017970A (en) * | 2011-04-05 | 2017-08-04 | 三星电子株式会社 | Terminal and base station and its method in carrier aggregation system |
US20170019232A1 (en) * | 2012-09-26 | 2017-01-19 | Lg Electronics Inc. | Method and apparatus for receiving ack/nack in wireless communication system |
US20160037579A1 (en) * | 2013-04-05 | 2016-02-04 | Pantech Co., Ltd. | Method and apparatus for wireless link control in wireless communication system supporting dual connectivity |
US20160128003A1 (en) * | 2013-05-20 | 2016-05-05 | Broadcom Corporation | Method and apparatus for enhanced secondary cell activation and deactivation |
WO2015017997A1 (en) * | 2013-08-07 | 2015-02-12 | 华为技术有限公司 | Method, apparatus and host for configuring secondary cell |
US20160212752A1 (en) * | 2013-09-12 | 2016-07-21 | Sony Corporation | Nct scc activation control device and method, management method and base station device |
CN104770032A (en) * | 2013-10-31 | 2015-07-08 | 华为技术有限公司 | Dual connection mode resource request method and terminal, and master eNB and secondary eNB |
CN105247941A (en) * | 2013-12-30 | 2016-01-13 | 华为技术有限公司 | Method and device for activating secondary cell, communication system, base station, and user equipment |
CN106797536A (en) * | 2014-10-07 | 2017-05-31 | 瑞典爱立信有限公司 | mobility in dense network |
CN105722096A (en) * | 2014-12-02 | 2016-06-29 | 电信科学技术研究院 | Service data transmission method and apparatus |
CN106304281A (en) * | 2015-05-14 | 2017-01-04 | 普天信息技术有限公司 | The activation of a kind of secondary cell and anti-activating method and system |
CN105120475A (en) * | 2015-07-17 | 2015-12-02 | 中国联合网络通信集团有限公司 | Method and device for managing secondary serving cell |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021007826A1 (en) * | 2019-07-17 | 2021-01-21 | Oppo广东移动通信有限公司 | Wireless communication method, terminal device and network device |
CN112822728A (en) * | 2019-11-15 | 2021-05-18 | 中国移动通信有限公司研究院 | Information reporting and receiving method, terminal and network equipment |
WO2022120744A1 (en) * | 2020-12-10 | 2022-06-16 | 华为技术有限公司 | Data transmission processing method and related apparatus |
Also Published As
Publication number | Publication date |
---|---|
WO2019029692A1 (en) | 2019-02-14 |
CN109391399B (en) | 2022-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9173122B2 (en) | Method, terminal and network device for configuring measurement gap | |
CN101547477B (en) | Method and device for controlling carrier frequency of multi-carrier/subdistrict system | |
CN106105307B (en) | User apparatus and uplink data sending method | |
KR20210025597A (en) | Information transmission method and device | |
CN105050189A (en) | Wireless resource scheduling method and relevant equipment | |
EP3595219B1 (en) | Method of multi-link retransmission under multiple connections, base station and storage medium | |
CN102083154A (en) | Method for processing secondary cell allocation during switching and device thereof | |
CN104350798A (en) | Random access channel enhancements for LTE devices | |
CN105490789A (en) | Data transmission method and device | |
JP2021503786A (en) | Methods and devices for sending or receiving information | |
CN102892209A (en) | Method of handling random access response | |
CN103139781A (en) | Method of handling resource allocation for MTC and related communication device | |
CN102014515B (en) | Random access method, equipment and system | |
US20190150131A1 (en) | Base station, user equipment and communication method used in wireless communication system | |
CN102802252A (en) | Method of handling power headroom reporting for activated serving cell and associated communication device | |
CN110495216B (en) | Method and apparatus for performing handover in communication system | |
CN109391399A (en) | Management method, device and the equipment of secondary cell | |
CN103959879A (en) | Wireless resource administration unit | |
CN108632893A (en) | The device and method that processing is returned for the buffer status of data duplicate | |
US20170055251A1 (en) | Resource scheduling method, apparatus, and system | |
EP3346784B1 (en) | Carrier selection method and device in carrier aggregation technology | |
CN103369663A (en) | Method of preventing random access response collision | |
CN109151897A (en) | Communication means and device | |
WO2020192785A1 (en) | Method and device for sending uplink transmission, method and apparatus for scheduling uplink transmission, electronic device, and storage medium | |
CN113630224B (en) | Beam indication method and device and computer readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |