CN109387805A - A kind of terminal box of three-level metering device series wiring band scene series connection verifying function - Google Patents

A kind of terminal box of three-level metering device series wiring band scene series connection verifying function Download PDF

Info

Publication number
CN109387805A
CN109387805A CN201811242936.XA CN201811242936A CN109387805A CN 109387805 A CN109387805 A CN 109387805A CN 201811242936 A CN201811242936 A CN 201811242936A CN 109387805 A CN109387805 A CN 109387805A
Authority
CN
China
Prior art keywords
electric energy
energy meter
information acquisition
power information
metering device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811242936.XA
Other languages
Chinese (zh)
Inventor
王忠阳
李军
盛海港
徐志强
王治超
杨刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haiyang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Haiyang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haiyang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Haiyang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201811242936.XA priority Critical patent/CN109387805A/en
Publication of CN109387805A publication Critical patent/CN109387805A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to technical field of electricity, specifically a kind of terminal box of three-level metering device series wiring band scene series connection verifying function, it is characterized in that by wiring copper post, crimping bolt, wire jumper, insulator foot, upper cover composition, access the electric energy meter of the present apparatus, power information acquisition terminal, loop state logging three-level metering device, which is adopted, to be connected serially, pass through the combination settings of wire jumper, electric energy meter, power information acquisition terminal, loop state logging three-level metering device UVW three-phase voltage can be controlled separately, electric energy meter can be with independent operating, when replacing power information acquisition terminal or loop state logging, electric energy meter metering is not influenced, with series connection calibration connection function, when carrying out electric energy meter field test or changing table, each electrical equipment of metering units is not influenced to work normally, upper cover screw tightening with holes, it can be with It installs seal additional, there is anti-stealing electricity function.

Description

A kind of terminal box of three-level metering device series wiring band scene series connection verifying function
Technical field
The present invention relates to technical field of electricity, specifically a kind of to have three-level metering device series wiring and scene string Join verifying function, the terminal box suitable for phase three-wire three or the metering device secondary circuit of three-phase and four-line power supply system.
Background technique
Electric energy meter is the instrument for measuring electric flux, and the circuit that electric energy meter is used by it can be divided into direct current energy meter and friendship Electric energy meter is flowed, AC energy meter can be divided into single-phase electric energy meter, three-phase three-wire electric energy meter and three-phase and four-line electric energy meter by its phase line again.
Power information acquisition terminal is that remote data acquisition, management, forwarding, transmission electric energy meter number are realized based on communication network According to or execute control command intelligent terminal.
Loop state logging can be monitored measurement loop operating status, while can be with acquisition main website or hand-held The equipment of equipment progress data exchange.
With scientific technological advance, modern multifunctional electric energy meter other than having the function of the active and reactive electric flux of metering, Also have the function of information storage and processing, real-time monitoring, automatic control, information exchange etc..In recent years, wireless communication network technology Fast development, power information acquisition terminal are also used widely.Electric energy meter and power information acquisition terminal use series wiring Mode adds reactive energy-meter joint connection identical, still continues to use traditional two-stage metering device with traditional active electric energy meter Series-connected terminal box.Since function is not powerful enough in terms of measurement loop status monitoring for electric energy meter and power information acquisition terminal, meter Amount circuit is broken down and cannot be discovered and ruled out in time, and electric energy meter counts electric flux less, causes power supply unit huge economic losses, supplies Electric unit promotes and applies loop state logging intentionally.On the basis of electric energy meter and power information acquisition terminal joint wiring, Install loop state logging additional again, existing two-stage metering device series-connected terminal box can no longer meet application, can only use two Two-stage metering device series-connected terminal box joint wiring, or largely carry out wire jumper and connection using fly line, when carrying out electric energy performance When field tests or changes table, each electrical equipment cisco unity malfunction of metering units.
Summary of the invention
To solve the above-mentioned problems, the invention proposes a kind of new solution, there is the series connection of three-level metering device Line and scene series connection verifying function.It is characterized in that by wiring copper post, crimping bolt, wire jumper, insulator foot, transparent upper cover group At accessing the electric energy meter of this terminal box, use suitable for phase three-wire three or the metering device secondary circuit of three-phase and four-line power supply system Power information acquisition terminal, loop state logging three-level metering device are adopted and are connected serially, by the combination settings of wire jumper, Electric energy meter, power information acquisition terminal, loop state logging three-level metering device UVW three-phase voltage can be controlled separately, electricity Electric energy meter+power information acquisition terminal, electric energy meter+loop state logging, electric energy can also may be implemented with independent operating in energy table Table+power information acquisition terminal+loop state logging combined running mode replaces power information acquisition terminal or circuit shape When state logging, electric energy meter metering is not influenced, and there is series connection calibration connection function, when carrying out electric energy meter field test or changing table, It does not influence each electrical equipment of metering units to work normally, upper cover screw tightening with holes can install seal additional, have thief-proof electric work Energy.
Detailed description of the invention
Below in conjunction with attached drawing, the invention will be described in further detail.
Attached drawing 1 is that a kind of junction box body of three-level metering device series wiring band scene series connection verifying function of the present invention shows It is intended to.
Attached drawing 2 is that a kind of upper cover of connecting box of three-level metering device series wiring band scene series connection verifying function of the present invention shows It is intended to
Attached drawing 3 is a kind of terminal box line bank of three-level metering device series wiring band scene series connection verifying function of the present invention Functional areas schematic diagram.
Attached drawing 4 is that a kind of terminal box U of three-level metering device series wiring band scene series connection verifying function of the present invention connects Line schematic diagram
Appended drawing reference: insulator foot 1-0, fixation hole 1-1, fixation hole 1-2, transparent upper cover fixed screw holes 2-1, transparent It is upper cover fixed screw holes 2-2, crimping bolt 3-1, wire jumper 4-1, transparent upper cover 5-0, transparent upper cover fixed screw holes 5-1, transparent Upper cover fixed screw holes 5-2, wiring copper post 6-1.
Specific embodiment
The present invention will be further described below with reference to the drawings.
As shown in Figure 1, the present invention proposes a kind of wiring of three-level metering device series wiring band scene series connection verifying function Box, mainly by insulator foot 1-0, wiring copper post 6-1 (see Fig. 3), the composition such as crimping bolt 3-1, wire jumper 4-1, insulator foot 1-0 On have fixation hole 1-1, fixation hole 1-2, the terminal box can be fixed in ammeter box, be had on transparent on insulator foot 1-0 Lid fixed screw holes 2-1, transparent upper cover fixed screw holes 2-2, can fix transparent upper cover 5-0 (see Fig. 2).
As shown in Fig. 2, a kind of terminal box of three-level metering device series wiring band scene series connection verifying function of the present invention is saturating Whether bright upper cover uses transparent material, correct convenient for observation terminal box crimping bolt and wire jumper setting.Have on transparent upper cover transparent Upper cover fixed screw holes 5-1, transparent upper cover fixed screw holes 5-2, are fixed with transparent upper cover fixed screw holes 2-1, transparent upper cover Screw hole 2-2 vertically through, bolt is screwed into screw hole, bolt outer end is with holes, can penetrate Sealed wire carry out seal, rise have it is anti- Robber's effect.
As shown in figure 3, a kind of terminal box of three-level metering device series wiring band scene series connection verifying function of the present invention, has Three connection function areas of UVW three-phase and neutral conductor functional areas.UVW three-phase connection function area principle is identical, wiring copper post, crimping spiral shell Bolt, wire jumper are identical, the not set wire jumper of the neutral conductor.
As shown in figure 3, a kind of terminal box U phase of three-level metering device series wiring band scene series connection verifying function of the present invention Wiring schematic diagram,
UO connects U phase power supply;
U1 connects electric energy meter U phase voltage input terminal;
U2 connects power information acquisition terminal U phase voltage input terminal;
U3 takes back line state logging U phase voltage input terminal;
UKO wire jumper controls electric energy meter U phase voltage input terminal on/off;
UK1 wire jumper controls power information acquisition terminal U phase voltage input terminal on/off;
UK2 wire jumper control loop status checkout instrument U phase voltage input terminal on/off;
US0 connects U phase current circuit inlet terminals, if measured using current transformer, it is defeated that US0 connects U phase current mutual inductor Outlet S1;
US1 connects electric energy meter U phase current inlet terminals;
US2 connects electric energy meter U phase current outlet terminal;
US3 connects power information acquisition terminal U phase current inlet terminals;
US4 connects power information acquisition terminal U phase current outlet terminal;
US5 takes back line state logging U phase current inlet terminals;
US6 takes back line state logging U phase current outlet terminal;
US9 connects U phase current circuit exit terminal, if measured using current transformer, US9 connects U phase current mutual inductor Output end S2.
Mode one: wire jumper UK3, UK4, UK6 access, US0 and US9 short circuit.At this point, metering device is shielded, if using Current transformer metering, Current Transformer Secondary short circuit, can be in electric energy meter, power information acquisition terminal, loop state inspection Electric energy meter, power information acquisition terminal, loop state logging are operated or replaced on instrument circuit.
Mode two: wire jumper UK3 is exited, wire jumper UK4, UK6 are accessed.At this point, electric energy meter works, can be acquired in power information Power information acquisition terminal, loop state logging are operated or replaced in terminal, loop state logging circuit.
Mode three: wire jumper UK3, UK4 are exited, wire jumper UK5, UK6 access.At this point, electric energy meter, power information acquisition terminal work Make, can operate or replace loop state logging on loop state logging circuit.
Mode four: wire jumper UK3, UK4, UK5 are exited, wire jumper UK6 access.At this point, electric energy meter, power information acquisition terminal, Loop state logging works.
Mode five: wire jumper UK3, UK4, UK5, UK6 are exited.At this point, terminal box is in series connection calibration mode, US7, US8 are connect Enter on-site calibration device and carries out calibration.

Claims (3)

1. a kind of terminal box of three-level metering device series wiring band scene series connection verifying function, which is characterized in that by wiring copper Column, crimping bolt, wire jumper, insulator foot, upper cover composition access the electric energy meter of the terminal box, power information acquisition terminal, return Line state logging three-level metering device, which is adopted, to be connected serially.
2. by the combination settings of wire jumper, electric energy meter, power information acquisition terminal, loop state logging three-level metering device UVW three-phase voltage can be controlled separately, electric energy meter can with independent operating, also may be implemented electric energy meter+power information acquisition terminal, Electric energy meter+loop state logging, electric energy meter+power information acquisition terminal+loop state logging combined running mode, more When using power information acquisition terminal or loop state logging instead, electric energy meter metering is not influenced.
3. have series connection calibration connection function, electric energy meter field test is carried out or when changing table, do not influence that metering units are each electrically to be set Standby to work normally, upper cover screw tightening with holes can install seal additional, have anti-stealing electricity function.
CN201811242936.XA 2018-10-24 2018-10-24 A kind of terminal box of three-level metering device series wiring band scene series connection verifying function Pending CN109387805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811242936.XA CN109387805A (en) 2018-10-24 2018-10-24 A kind of terminal box of three-level metering device series wiring band scene series connection verifying function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811242936.XA CN109387805A (en) 2018-10-24 2018-10-24 A kind of terminal box of three-level metering device series wiring band scene series connection verifying function

Publications (1)

Publication Number Publication Date
CN109387805A true CN109387805A (en) 2019-02-26

Family

ID=65427909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811242936.XA Pending CN109387805A (en) 2018-10-24 2018-10-24 A kind of terminal box of three-level metering device series wiring band scene series connection verifying function

Country Status (1)

Country Link
CN (1) CN109387805A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113608160A (en) * 2021-08-02 2021-11-05 中国电力科学研究院有限公司 Joint junction box for metering gateway electric energy meter
CN114280342A (en) * 2021-12-23 2022-04-05 广东电网有限责任公司 Test junction box and method for replacing electric energy metering device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7199572B1 (en) * 2005-03-01 2007-04-03 Greg May Method and system for improving the operational safety, reliability, and functionality of electrical power consumption monitoring devices
CN201066365Y (en) * 2007-08-14 2008-05-28 周兆强 A connection box of power measuring device
CN105487039A (en) * 2015-11-19 2016-04-13 国家电网公司 Conjunction box without power loss during replacement
CN206114771U (en) * 2016-08-17 2017-04-19 北京新源绿网节能科技有限公司 Appearance is patrolled and examined to secondary circuit state
CN206193035U (en) * 2016-09-30 2017-05-24 国家电网公司 Terminal box is united to integral type of measurement smart meter and acquisition terminal sharing
CN106786265A (en) * 2017-02-14 2017-05-31 邹文峰 Multifunctional combined terminal box
CN206517008U (en) * 2017-02-14 2017-09-22 邹文峰 Multifunctional combined terminal box
CN107910835A (en) * 2017-05-12 2018-04-13 国网浙江省电力公司湖州供电公司 Phase sequence combined connection box easy to adjust and phase sequence method of adjustment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7199572B1 (en) * 2005-03-01 2007-04-03 Greg May Method and system for improving the operational safety, reliability, and functionality of electrical power consumption monitoring devices
CN201066365Y (en) * 2007-08-14 2008-05-28 周兆强 A connection box of power measuring device
CN105487039A (en) * 2015-11-19 2016-04-13 国家电网公司 Conjunction box without power loss during replacement
CN206114771U (en) * 2016-08-17 2017-04-19 北京新源绿网节能科技有限公司 Appearance is patrolled and examined to secondary circuit state
CN206193035U (en) * 2016-09-30 2017-05-24 国家电网公司 Terminal box is united to integral type of measurement smart meter and acquisition terminal sharing
CN106786265A (en) * 2017-02-14 2017-05-31 邹文峰 Multifunctional combined terminal box
CN206517008U (en) * 2017-02-14 2017-09-22 邹文峰 Multifunctional combined terminal box
CN107910835A (en) * 2017-05-12 2018-04-13 国网浙江省电力公司湖州供电公司 Phase sequence combined connection box easy to adjust and phase sequence method of adjustment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李俊 等: "电能计量装置二次回路试验接线盒的正确使用", 《江西电力职业技术学院学报》 *
袁旺: "《装表接线》", 28 February 2013, 中国电力出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113608160A (en) * 2021-08-02 2021-11-05 中国电力科学研究院有限公司 Joint junction box for metering gateway electric energy meter
CN114280342A (en) * 2021-12-23 2022-04-05 广东电网有限责任公司 Test junction box and method for replacing electric energy metering device
CN114280342B (en) * 2021-12-23 2023-08-11 广东电网有限责任公司 Test junction box and method for replacing electric energy metering device

Similar Documents

Publication Publication Date Title
US20150066210A1 (en) Remote Wireless Communication Control System for Submerged Arc Furnace Reactive Compensation
CN106841735A (en) Power acquirer and its energy-consumption monitoring method
CN107247195B (en) Handheld phase checking instrument applied to intelligent substation and phase checking method
CN109387805A (en) A kind of terminal box of three-level metering device series wiring band scene series connection verifying function
CN108957292A (en) A kind of common type of power module testing circuit, system and test method
CN201555891U (en) Nine-current and four-voltage measuring device
CN207114629U (en) Power acquirer
CN207601164U (en) Electric safety system residual current monitoring module
CN220526215U (en) Function expansion module of special transformer acquisition terminal
CN207181531U (en) A kind of three phase capacitance electric inductance measuring-testing instrument
CN111650435B (en) Electric energy metering chip system
CN102904260A (en) Low-voltage capacitor equipment, reactive compensation control system and reactive compensation control method
CN207516534U (en) A kind of transformer station direct current system punching current transformer, which does not have a power failure, replaces capacity checking device
CN206727443U (en) A kind of device of inside switch cabinet temperature rise monitoring
CN113884759A (en) Electric energy quality monitoring device
CN212845553U (en) Single-phase cost control intelligent electric energy meter based on Bluetooth function
CN205265259U (en) Intelligent integration power condenser
CN204214965U (en) Motor protector auxiliary detection device
CN204668953U (en) A kind of Intelligent power saving system based on filtering harmonic wave
CN108459238A (en) A kind of distributed energy storage electric network state sensing device
CN205453135U (en) Modified SVG reactive power compensator
CN205453136U (en) SVG reactive power compensator
CN102255249A (en) Compact intelligent ring main unit
CN109884568A (en) A kind of intelligent substation main transformer sample-synchronous calibration equipment and test method
CN220105268U (en) Internet of things three-phase electric energy monitoring terminal supporting remote verification

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190226

WD01 Invention patent application deemed withdrawn after publication