CN109387732A - A kind of adaptive in-situ protection method and system of small current grounding fault - Google Patents

A kind of adaptive in-situ protection method and system of small current grounding fault Download PDF

Info

Publication number
CN109387732A
CN109387732A CN201811573495.1A CN201811573495A CN109387732A CN 109387732 A CN109387732 A CN 109387732A CN 201811573495 A CN201811573495 A CN 201811573495A CN 109387732 A CN109387732 A CN 109387732A
Authority
CN
China
Prior art keywords
real
protective device
residual voltage
time
reactive power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811573495.1A
Other languages
Chinese (zh)
Inventor
王洪林
赵卫斌
王科
聂鼎
刘红文
徐肖伟
杨金东
李维
范藜涛
董涛
项恩新
宋忧乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Yunnan Power System Ltd filed Critical Electric Power Research Institute of Yunnan Power System Ltd
Priority to CN201811573495.1A priority Critical patent/CN109387732A/en
Publication of CN109387732A publication Critical patent/CN109387732A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/088Aspects of digital computing
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/16Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass
    • H02H3/162Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass for ac systems
    • H02H3/165Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass for ac systems for three-phase systems

Abstract

The invention discloses a kind of adaptive in-situ protection method and system of small current grounding fault; it include: that transient reactive power is calculated according to the real-time residual voltage of acquisition and real-time zero-sequence current; protective device present position is judged according to transient reactive power; if transient reactive power is less than zero; protective device is located at fault point upstream; judge whether starting protection device according to protective device position; if protective device is located at fault point upstream; starting protection device and protective device starts timing; if protective device timing is delayed more than deliberate action, trip command is issued.Guard method provided by the invention; the detection and protection of small current grounding fault are realized using the electrical quantity of test point local; the judgement of abort situation is realized using transient reactive power, is delayed according to network topology and power supply direction set action; the differential cooperation of switch the superior and the subordinate's time can be met; it not only invests small, but also acts fast good reliability.

Description

A kind of adaptive in-situ protection method and system of small current grounding fault
Technical field
The present invention relates to power supply technique field, in particular to the adaptive in-situ protection method of a kind of small current grounding fault and System.
Background technique
In China's small current neutral grounding system, singlephase earth fault is always the principal mode of distribution network failure, is accounted for about 80% or more, although singlephase earth fault does not influence three-phase load power supply, the operation of long-time tape jam point easily causes event Barrier extension increases people and animals' electric shock risk.Small current grounding fault protection is always the hot spot of power supply department research, is ground in recent years Study carefully and achieve certain development, such as there is scholar to propose the guard method of a kind of automatic circuit and residual voltage cooperation, but failure The processing time minute grade, will cause route in short-term blackout the problem of, reduce power supply reliability.Someone utilizes zero sequence The similar determining fault zone of current waveform, by quickly isolating fault zone by line feed terminals, the method, can dependent on communication It is lower by property.In short, current method is dependent on greatly communication and main website, not only investment is big, but also slow motion, poor reliability.
Summary of the invention
This application provides a kind of adaptive in-situ protection method and system of small current grounding fault, to solve the prior art In small current grounding fault guard method be dependent on communication and main website greatly, not only investment is big, but also slow motion, poor reliability Problem.
In order to solve the above-mentioned technical problem first aspect present invention provides a kind of small current grounding fault and adaptively protects on the spot Maintaining method, which comprises
Acquire the real-time residual voltage and real-time zero-sequence current of sampled point;
Transient reactive power is calculated according to the real-time residual voltage and the real-time zero-sequence current;
Protective device present position is judged according to the size of the transient reactive power, if the transient reactive power is small In zero, then the protective device is located at fault point upstream;
Judge whether starting protection device according to the protective device present position;
If the protective device is located at fault point upstream, starts the protective device and the protective device starts to count When;
Judge whether the protective device timing is more than deliberate action delay;
If the protective device timing is delayed more than deliberate action, trip command is issued.
Preferably, described according to the real-time residual voltage and before the real-time zero-sequence current calculates transient reactive power Further include;
Judge in the n continuous sampled points with the presence or absence of n-1 and the real-time residual voltage of the above sampled point Amplitude be greater than starting threshold value;
If there are n-1 and the width of the real-time residual voltage of the above sampled point in the n continuous sampled points Value is greater than starting threshold value, and it is idle to calculate transient state on the spot according to the real-time residual voltage of the sampled point and the real-time zero-sequence current Otherwise power continues the real-time residual voltage and real-time zero-sequence current of the acquisition sampled point.
Preferably, the calculation formula of the starting threshold value are as follows: Uop=KrelU0
It preferably, further include that calculating is described pre- before the real-time residual voltage and real-time zero-sequence current of the acquisition sampled point If action delay, calculation formula are as follows: tset=t0+(m-1)Δt。
Preferably, the calculation formula of the transient reactive power are as follows:
Corresponding to the embodiment of the present application in a first aspect, according to the second aspect of the embodiment of the present application, low current is provided and is connect The adaptive in-situ protection system of earth fault, comprising:
Acquisition unit, for acquiring the real-time residual voltage and real-time zero-sequence current of sampled point;
First computing unit, for calculating the idle function of transient state according to the real-time residual voltage and the real-time zero-sequence current Rate;
First judging unit, for judging protective device present position according to the size of the transient reactive power, if The transient reactive power is less than zero, then the protective device is located at fault point upstream;
Second judgment unit, for judging whether starting protection device according to the protective device present position;
First execution unit starts the protective device and institute if being located at fault point upstream for the protective device It states protective device and starts timing;
Third judging unit, for judging whether the protective device timing is more than deliberate action delay;
Second execution unit issues trip command if be delayed for the protective device timing more than deliberate action.
Preferably, the protection system further include: the 4th judging unit, for judging in the n continuous sampled points With the presence or absence of n-1 and the amplitude of the real-time residual voltage of sampled point described above is greater than starting threshold value;
Third execution unit, if for there are n-1 sampled points a and described above in the n continuous sampled points The amplitude of real-time residual voltage is greater than starting threshold value, according to the real-time residual voltage of the sampled point and the real-time zero-sequence current Transient reactive power is calculated on the spot, otherwise continues the real-time residual voltage and real-time zero-sequence current of the acquisition sampled point.
Preferably, the protection system further include: the second computing unit is calculated for calculating the deliberate action delay Formula are as follows: tset=t0+(m-1)Δt。
The adaptive in-situ protection method of small current grounding fault that the application first aspect provides includes: acquisition sampling first The real-time residual voltage and real-time zero-sequence current of point;Transient state is calculated according to the real-time residual voltage and the real-time zero-sequence current Reactive power;Protective device present position is judged according to the size of the transient reactive power, if the transient reactive power Less than zero, then the protective device is located at fault point upstream;Judge whether starting protection according to the protective device present position Device;If the protective device is located at fault point upstream, starts the protective device and the protective device starts timing;Sentence Whether the protective device timing of breaking is more than deliberate action delay;If the protective device timing is delayed more than deliberate action, Issue trip command.
The application second aspect provides a kind of adaptive in-situ protection system of small current grounding fault, above-mentioned for executing Guard method, the system comprises: acquisition unit, for acquiring the real-time residual voltage and real-time zero-sequence current of sampled point, the One computing unit, for calculating transient reactive power according to the real-time residual voltage and the real-time zero-sequence current, first sentences Disconnected unit, for judging protective device present position according to the size of the transient reactive power, if the idle function of the transient state Rate is less than zero, then the protective device is located at fault point upstream, and second judgment unit is used for the position according to locating for the protective device It sets and judges whether starting protection device, the first execution unit starts institute if being located at fault point upstream for the protective device It states protective device and the protective device starts timing, third judging unit, for judging whether the protective device timing surpasses Deliberate action delay is crossed, the second execution unit issues tripping if be delayed for the protective device timing more than deliberate action Instruction.
It is compared to the prior art, guard method provided by the invention and system, it is real using the electrical quantity of test point local The detection and protection of existing small current grounding fault realize the judgement of abort situation, according to network topology using transient reactive power Relationship and power supply direction set action delay, can meet the differential cooperation of switch the superior and the subordinate's time, not only invest small, but also act Fast good reliability.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the flow diagram of the adaptive in-situ protection method of small current grounding fault provided in an embodiment of the present invention;
Fig. 2 is the block diagram of the adaptive in-situ protection system of small current grounding fault provided in an embodiment of the present invention;
Fig. 3 is Single-ring network aerial construction schematic diagram provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Whole description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, being the process of the adaptive in-situ protection method of small current grounding fault provided in an embodiment of the present invention Schematic diagram.The described method includes:
Step S101 acquires the real-time residual voltage and real-time zero-sequence current of sampled point.
Specifically, in phase three-wire three circuit, the phasor of three-phase current and it is equal to zero, i.e. Ia+Ib+Ic=0.If three A current transformer is accessed in three line of phase, at this moment induced current is zero.When electric shock or leak current fault occur in circuit, circuit In there is leakage current to flow through, at this moment zero across the three-phase current phasor of mutual inductor and not etc., phasor and are as follows: Ia+Ib+Ic=I (leakage current, i.e. zero-sequence current).Just there is an induced current in mutual inductor secondary coil in this way, this voltage is added on detection part Electronic amplification circuit, with protection zone device predetermined action current value compared with, if more than action current, then make sensitive relay Movement acts on executive component tripping.Here the mutual inductor connect is known as zero sequence current mutual inductor, the phasor of three-phase current and not Equal to zero, generated electric current is zero-sequence current.Background monitoring in zero-sequence current and residual voltage distribution substation or substation Fault-signal is used as in software generally to handle, value is zero under normal circumstances, if there is failure, zero-sequence current and zero The value of sequence voltage is then not zero.
Step S102 calculates transient reactive power according to the real-time residual voltage and the real-time zero-sequence current.
Specifically, the calculation formula of the transient reactive power are as follows:
Wherein, QmFor the idle function of transient state of m point Rate;u0It (t) is m point transient zero-sequence voltage;For u0(t) Hilbert (Hilbert) transformation;T is transient process data Length.
Before calculating transient reactive power according to the real-time residual voltage and the real-time zero-sequence current, further include;
Judge in the n continuous sampled points with the presence or absence of n-1 and the real-time residual voltage of the above sampled point Amplitude be greater than starting threshold value;
If there are n-1 and the width of the real-time residual voltage of the above sampled point in the n continuous sampled points Value is greater than starting threshold value, and it is idle to calculate transient state on the spot according to the real-time residual voltage of the sampled point and the real-time zero-sequence current Otherwise power continues the real-time residual voltage and real-time zero-sequence current of the acquisition sampled point.By protective device (FTU) zero sequence electricity Pressure sampled value is compared with starting door threshold value, if having the n-1 a in a continuous sampled point of n (n > 3) and above sampled point Amplitude is greater than starting threshold value, protective device starting record fault message, and does the processing of next step;Otherwise do not start, continue to adopt Sample.
The calculation formula of the starting threshold value can be with are as follows: Uop=KrelU0.Wherein, KrelFor safety factor;U0To flow through this The residual voltage virtual value of protective device.
Step S103 judges protective device present position according to the size of the transient reactive power, if the transient state Reactive power is less than zero, then the protective device is located at fault point upstream.
Step S104 judges whether starting protection device according to the protective device present position.
Step S105 starts the protective device and the protection fills if the protective device is located at fault point upstream Set beginning timing.
Step S106 judges whether the protective device timing is more than deliberate action delay.
Step S107 issues trip command if the protective device timing is delayed more than deliberate action.
Wherein, a deliberate action delay is set, it can also be in the real-time residual voltage for acquiring sampled point and real-time zero sequence The deliberate action delay, calculation formula are as follows: t are calculated before electric currentset=t0+(m-1)Δt.Wherein, tsetSwitch protection movement The setting valve of time;t0For final distribution transformer or the operation time limit of switch ground protection;Δ t is the time difference;M is switch Number.
The protection act time limit direction and flows through switching device according to the location of switch and the adjusting of power supply direction, power supply Active power direction is identical;The operation time limit of final distribution transformer grounding protection is set as t0, the movement of other switch protections A time limit time differential Δ t (being selected as 0.5s) bigger than the maximum actuation time limit of downstream adjacent switch.If user's distribution becomes Depressor does not configure ground protection, then treats the conduct final stage protection of demarcation switch ground protection.
Fig. 2 is the block diagram of the adaptive in-situ protection system of small current grounding fault provided in an embodiment of the present invention, the system System includes:
Acquisition unit U1001, for acquiring the real-time residual voltage and real-time zero-sequence current of sampled point;
First computing unit U1002, for calculating transient state according to the real-time residual voltage and the real-time zero-sequence current Reactive power;
First judging unit U1003, for judging protective device present position according to the size of the transient reactive power, If the transient reactive power, less than zero, the protective device is located at fault point upstream;
Second judgment unit U1004, for judging whether starting protection device according to the protective device present position;
First execution unit U1005 starts the protective device if being located at fault point upstream for the protective device And the protective device starts timing;
Third judging unit U1006, for judging whether the protective device timing is more than deliberate action delay;
Second execution unit U1007 issues tripping and refers to if be delayed for the protective device timing more than deliberate action It enables.
The system can also include: the 4th judging unit, whether there is in the n continuous sampled points for judging The amplitude of the real-time residual voltage of n-1 sampled point a and described above is greater than starting threshold value;
Third execution unit, if for there are n-1 sampled points a and described above in the n continuous sampled points The amplitude of real-time residual voltage is greater than starting threshold value, according to the real-time residual voltage of the sampled point and the real-time zero-sequence current Transient reactive power is calculated on the spot, otherwise continues the real-time residual voltage and real-time zero-sequence current of the acquisition sampled point.
Second computing unit, for calculating the deliberate action delay, calculation formula are as follows: tset=t0+(m-1)Δt。
From the above technical scheme, it using the block switch and protective device (FTU) on distribution line, acquires on the spot Residual voltage and zero sequence current signal are mutated energy quick start according to residual voltage, by collected residual voltage and zero sequence The transient signal of electric current seeks transient reactive power, according to add up positive and negative judgement test point and the fault point of transient reactive power Relative position, when determining that fault point is located at test point downstream, start-up study protection algorism.According to network topology and power supply The delay of direction set action, sets power supply power supply direction as positive direction, operating time of protection is sequentially reduced, to ensure that small electricity The selectivity for flowing earth-fault protection, automatic to determine power supply direction when line topological changes, change acts definite value, protects The protection act nearest from fault point is demonstrate,proved, adaptive guard is realized.Small current grounding fault provided by the present application is adaptively The detection and protection of small current grounding fault are realized in ground guard method using the electrical quantity of test point local, utilize the idle function of transient state Rate realizes the judgement of abort situation, according to network topology and power supply direction set action delay, can meet switch the superior and the subordinate Time differential cooperation, not only invests small, but also acts fast good reliability.
Fig. 3 is Single-ring network aerial construction schematic diagram provided in an embodiment of the present invention, is embodiment provided by the present application, tool Body,
(1) protective device (FTU) action delay is set.
In Single-ring network overhead transmission line, under normal power supply state, interconnection switch be it is fixed, operate normally be in separating brake shape State is, it is specified that the power supply direction (active power direction) that each protective device of route (FTU) detects at this time is positive.Interconnection switch is Q3, switch installation direction are directed toward route by power supply and are positive, and the side M powers direction by QS1 → Q1 → Q2, the side N power direction by QS2 → Q5→Q4。
The action delay of each protective device (FTU) is set according to the location of switch and power supply direction:
The side the M → side N: QS1 → QS2 is followed successively by 7s, 6s, 5s, 4s, 3s, 2s, 1s, and Q6 and Q7 are set as 0.5s;
The side the N → side M: QS2 → QS1 is followed successively by 1s, 2s, 3s, 4s, 5s, 6s, 7s, and Q6 and Q7 are set as 0.5s;
(2) when small current grounding fault occurs for K1 point.
QS1, Q1, Q2 are mutated energy quick start according to residual voltage, calculate transient reactive power Q, Q < 0 judges failure Point is located at test point downstream.
(3) QS1, Q1, Q2 protection starting, starts timing.
QS1, Q1, Q2 are respectively 7s, 6s, 5s according to active power direction, tripping delay;
Q2 delay is shorter, and Q2 first trips isolated fault;
Interconnection switch Q3 detects that side has pressure, side without pressure, and starting is closed a floodgate;
After contact is closed a floodgate, Q3 detects that output power direction changes;
Q3, Q4, Q5 are respectively 4s, 5s, 6s according to active power direction, tripping delay;
Q3 delay is shorter, and Q3 first trips isolated fault;
Fault point K1 is isolated for Q2, Q3 tripping.
Those skilled in the art after considering the specification and implementing the invention disclosed here, will readily occur to of the invention its Its embodiment.This application is intended to cover any variations, uses, or adaptations of the invention, these modifications, purposes or Person's adaptive change follows general principle of the invention and including the undocumented common knowledge in the art of the present invention Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are by following Claim is pointed out.
It should be understood that the present invention is not limited to the precise structure already described above and shown in the accompanying drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is limited only by the attached claims.

Claims (8)

1. a kind of adaptive in-situ protection method of small current grounding fault, which is characterized in that the described method includes:
Acquire the real-time residual voltage and real-time zero-sequence current of sampled point;
Transient reactive power is calculated according to the real-time residual voltage and the real-time zero-sequence current;
Protective device present position is judged according to the size of the transient reactive power, if the transient reactive power is less than Zero, then the protective device is located at fault point upstream;
Judge whether starting protection device according to the protective device present position;
If the protective device is located at fault point upstream, starts the protective device and the protective device starts timing;
Judge whether the protective device timing is more than deliberate action delay;
If the protective device timing is delayed more than deliberate action, trip command is issued.
2. the adaptive in-situ protection method of small current grounding fault as described in claim 1, which is characterized in that described according to institute Further include before stating real-time residual voltage and the real-time zero-sequence current calculating transient reactive power;
Judge in the n continuous sampled points with the presence or absence of n-1 and the width of the real-time residual voltage of the above sampled point Value is greater than starting threshold value;
If in the n continuous sampled points, there are the amplitude of n-1 and the real-time residual voltage of the above sampled point are big In starting threshold value, the idle function of transient state is calculated according to the real-time residual voltage of the sampled point and the real-time zero-sequence current on the spot Otherwise rate continues the real-time residual voltage and real-time zero-sequence current of the acquisition sampled point.
3. the adaptive in-situ protection method of small current grounding fault as claimed in claim 2, which is characterized in that the actuation threshold The calculation formula of value are as follows: Uop=KrelU0
4. the adaptive in-situ protection method of small current grounding fault as described in claim 1, which is characterized in that described to adopt It further include calculating the deliberate action delay, calculation formula are as follows: t before the real-time residual voltage and real-time zero-sequence current of sampling pointset =t0+(m-1)Δt。
5. the adaptive in-situ protection method of small current grounding fault as described in claim 1, which is characterized in that the transient state without The calculation formula of function power are as follows:
6. a kind of adaptive in-situ protection system of small current grounding fault requires 1 to 5 any one right to want for perform claim Ask the guard method, which is characterized in that the system comprises:
Acquisition unit, for acquiring the real-time residual voltage and real-time zero-sequence current of sampled point;
First computing unit, for calculating transient reactive power according to the real-time residual voltage and the real-time zero-sequence current;
First judging unit, for judging protective device present position according to the size of the transient reactive power, if described Transient reactive power is less than zero, then the protective device is located at fault point upstream;
Second judgment unit, for judging whether starting protection device according to the protective device present position;
First execution unit starts the protective device and the guarantor if being located at fault point upstream for the protective device Protection unit starts timing;
Third judging unit, for judging whether the protective device timing is more than deliberate action delay;
Second execution unit issues trip command if be delayed for the protective device timing more than deliberate action.
7. the adaptive in-situ protection system of small current grounding fault as claimed in claim 6, which is characterized in that the protection system System further include: the 4th judging unit is adopted in the n continuous sampled points with the presence or absence of n-1 and the above for judging The amplitude of the real-time residual voltage of sampling point is greater than starting threshold value;
Third execution unit, if for there are the real-time of n-1 sampled point a and described above in the n continuous sampled points The amplitude of residual voltage is greater than starting threshold value, on the spot according to the real-time residual voltage of the sampled point and the real-time zero-sequence current Transient reactive power is calculated, the real-time residual voltage and real-time zero-sequence current of the acquisition sampled point are otherwise continued.
8. the adaptive in-situ protection system of small current grounding fault as claimed in claim 6, which is characterized in that the protection system System further include: the second computing unit, for calculating the deliberate action delay, calculation formula are as follows: tset=t0+(m-1)Δt。
CN201811573495.1A 2018-12-21 2018-12-21 A kind of adaptive in-situ protection method and system of small current grounding fault Pending CN109387732A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811573495.1A CN109387732A (en) 2018-12-21 2018-12-21 A kind of adaptive in-situ protection method and system of small current grounding fault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811573495.1A CN109387732A (en) 2018-12-21 2018-12-21 A kind of adaptive in-situ protection method and system of small current grounding fault

Publications (1)

Publication Number Publication Date
CN109387732A true CN109387732A (en) 2019-02-26

Family

ID=65430600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811573495.1A Pending CN109387732A (en) 2018-12-21 2018-12-21 A kind of adaptive in-situ protection method and system of small current grounding fault

Country Status (1)

Country Link
CN (1) CN109387732A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110308369A (en) * 2019-07-08 2019-10-08 北京三清互联科技有限公司 A kind of the power distribution network intelligence sensor and fault detection algorithm of Convergence gateway function
CN110632440A (en) * 2019-09-29 2019-12-31 上海思源弘瑞自动化有限公司 Transformer fault judgment method and device based on zero and negative sequence power directions
CN110873832A (en) * 2019-11-17 2020-03-10 云南电网有限责任公司临沧供电局 Power distribution network line selection method and system based on wavelet energy entropy
CN111426915A (en) * 2020-05-11 2020-07-17 云南电网有限责任公司电力科学研究院 Distributed small current ground fault positioning method
CN112491016A (en) * 2020-11-10 2021-03-12 深圳供电局有限公司 Selective small current self-adaptive protection method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696722A (en) * 2005-06-02 2005-11-16 昆明理工大学 Malfunction route selection method for resonant grounded system based on current decomposition and wattles detection
CN106908697A (en) * 2017-04-20 2017-06-30 广西电网有限责任公司电力科学研究院 A kind of synthetic power-frequency and the distribution network fault line selection method in transient reactive power direction
CN107465177A (en) * 2017-10-11 2017-12-12 山东理工大学 A kind of power distribution network low current grounding partition method based on regional agency
CN108957243A (en) * 2018-08-28 2018-12-07 云南电网有限责任公司电力科学研究院 A kind of method for locating single-phase ground fault and system applied to power distribution network
CN108963990A (en) * 2018-07-02 2018-12-07 广西电网有限责任公司电力科学研究院 Route small current grounding fault processing method hand in hand based on transient power direction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696722A (en) * 2005-06-02 2005-11-16 昆明理工大学 Malfunction route selection method for resonant grounded system based on current decomposition and wattles detection
CN106908697A (en) * 2017-04-20 2017-06-30 广西电网有限责任公司电力科学研究院 A kind of synthetic power-frequency and the distribution network fault line selection method in transient reactive power direction
CN107465177A (en) * 2017-10-11 2017-12-12 山东理工大学 A kind of power distribution network low current grounding partition method based on regional agency
CN108963990A (en) * 2018-07-02 2018-12-07 广西电网有限责任公司电力科学研究院 Route small current grounding fault processing method hand in hand based on transient power direction
CN108957243A (en) * 2018-08-28 2018-12-07 云南电网有限责任公司电力科学研究院 A kind of method for locating single-phase ground fault and system applied to power distribution network

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
国家电网公司武汉高压研究所: "《电力监测与故障诊断技术全书 (三)输配电线路卷 (下)》", 30 September 2005 *
薛永端 等: "基于暂态功率方向的小电流接地故障处理技术", 《供用电》 *
陈歆技: "《电力系统智能变电站综合自动化实验教程》", 31 March 2018, 南京:东南大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110308369A (en) * 2019-07-08 2019-10-08 北京三清互联科技有限公司 A kind of the power distribution network intelligence sensor and fault detection algorithm of Convergence gateway function
CN110632440A (en) * 2019-09-29 2019-12-31 上海思源弘瑞自动化有限公司 Transformer fault judgment method and device based on zero and negative sequence power directions
CN110873832A (en) * 2019-11-17 2020-03-10 云南电网有限责任公司临沧供电局 Power distribution network line selection method and system based on wavelet energy entropy
CN111426915A (en) * 2020-05-11 2020-07-17 云南电网有限责任公司电力科学研究院 Distributed small current ground fault positioning method
CN112491016A (en) * 2020-11-10 2021-03-12 深圳供电局有限公司 Selective small current self-adaptive protection method

Similar Documents

Publication Publication Date Title
CN109387732A (en) A kind of adaptive in-situ protection method and system of small current grounding fault
Schweitzer et al. Speed of line protection-can we break free of phasor limitations?
Jahn et al. Survey of methods for selective DC fault detection in MTDC grids
Zamani et al. A communication-assisted protection strategy for inverter-based medium-voltage microgrids
Li et al. A novel traveling-wave-based directional protection scheme for MTDC grid with inductive DC terminal
Apostolov et al. Superimposed components based sub-cycle protection of transmission lines
CN110190591B (en) Automatic processing method and system for single-phase earth fault
Descloux et al. Protection strategy for undersea MTDC grids
CN108957243A (en) A kind of method for locating single-phase ground fault and system applied to power distribution network
CN106199341A (en) Faulty line recognition methods under a kind of single-phase fault ground connection operating mode and device
Mohamed et al. A review on the proposed solutions to microgrid protection problems
CN105119251A (en) Method suitable for determining grounding resistance scheme of flexible direct-current power distribution system
Marvik et al. Communication-less fault detection in radial multi-terminal offshore HVDC grids
CN109638793A (en) A kind of singlephase earth fault processing method suitable for small current neutral grounding system
Maiola et al. A multi-agent system for protection coordination of radial systems in the presence of distributed generation
CN110907750B (en) Power distribution main station single-phase earth fault positioning method and system based on medium resistance method
Berdy Application of out-of-step blocking and tripping relays
CN104269833A (en) DG-included power distribution network protection scheme
CN104052033B (en) A kind of guard method based on zero-sequence current correlation coefficient identification fault branch
Rahman et al. Multi-agent approach for overcurrent protection coordination in low voltage microgrids
Kumar et al. Fault detection in a series compensated line during power swing using superimposed apparent power
Shekhar et al. Fault section identification of a three terminal line during power swing
Pan et al. Protection issues and solutions for protecting feeder with distributed generation
WO2003023425A1 (en) Crossover fault classification for power lines with parallel circuits
WO2003023426A1 (en) Crossover fault classification for power lines with parallel circuits

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190226