CN109386839A - A kind of online coal-fired monitoring management method and system based on technology of Internet of things - Google Patents
A kind of online coal-fired monitoring management method and system based on technology of Internet of things Download PDFInfo
- Publication number
- CN109386839A CN109386839A CN201811063519.9A CN201811063519A CN109386839A CN 109386839 A CN109386839 A CN 109386839A CN 201811063519 A CN201811063519 A CN 201811063519A CN 109386839 A CN109386839 A CN 109386839A
- Authority
- CN
- China
- Prior art keywords
- data
- boiler
- fired
- coal
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N5/00—Systems for controlling combustion
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Regulation And Control Of Combustion (AREA)
Abstract
The present invention relates to boiler fired coal administrative skill field, specially a kind of online coal-fired monitoring management method and system based on technology of Internet of things.A kind of online coal-fired monitoring management method based on technology of Internet of things, comprising the following steps: S1, the data of boiler different parts, different parameters when acquisition is coal-fired are simultaneously uploaded to management terminal;S2 is analyzed according to the data of acquisition and standard reference value database, obtains analysis result;S3 obtains regulation and control instruction based on the analysis results and carries out regulation and administration to boiler.The present invention using different location boiler temperature when multiple sensors monitoring boiler fired coal, container pressure, boiler oil, coal fire discharged amount data, upload to management terminal storage management, server is compared and analyzed with standard reference value database beyond the clouds, obtain analysis result after management terminal production regulation and control instruction to boiler carry out regulation and administration, it is analyzed without artificial detection, real-time data collection, on-line analysis simultaneously regulate and control boiler.
Description
Technical field
The present invention relates to boiler fired coal administrative skill field, specially a kind of online coal-fired monitoring based on technology of Internet of things
Management method and system.
Background technique
Boiler fired coal pollution is one of most important pollution sources of China's atmosphere pollution, and coal-fired energy-saving environment-friendly management is country
The important focus of work of Environmental Protection Agency.For the energy resource structure in China based on coal, energy waste phenomenon is serious.The industry combustion having a large capacity and a wide range
Coal burning boiler will consume a large amount of coal, while China is also main coal-smoke pollution source, can not effectively be managed, therefore,
The energy-saving management device that boiler fired coal management on-line monitoring control has been invented with technology of Internet of things, good control is played to it
Effect can help enterprise effectively to manage boiler fired coal energy conservation discharge.
Summary of the invention
The online coal-fired monitoring management method and system that the object of the present invention is to provide a kind of based on technology of Internet of things.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of online coal-fired monitoring management method based on technology of Internet of things, comprising the following steps:
S1, the data of boiler different parts, different parameters when acquisition is coal-fired are simultaneously uploaded to management terminal;
S2 is analyzed according to the data of acquisition and standard reference value database, obtains analysis result;
S3 obtains regulation and control instruction based on the analysis results and carries out regulation and administration to boiler.
As to of the invention preferred, include: before the step S1
S0 controls multiple sensors and opens acquisition datamation.
As to of the invention preferred, the step S1 includes:
S1.1, acquire boiler fired coal when boiler temperature, container pressure, boiler oil, coal fire discharged amount data;
S1.2 will acquire the data and be uploaded to the management terminal storage management.
As to of the invention preferred, the step S1.1 includes:
Three sensors for being set to the bottom of a pan acquire the data of Coal-fired capacity, heating temperature, both weight respectively;It is set to pot thorax one
Three sensors of side acquire breech pressure respectively, temperature, the data of thorax inner capacities in thorax;It is set to boiler chimney discharge outlet
Two sensors acquire the data of gas emissions, gas temperature respectively.
As to of the invention preferred, the step S2 includes:
S2.1 calls the data of the management terminal storage;
S2.2 is compared with standard reference value database, is analyzed, and obtains analysis result.
A kind of online coal-fired management system for monitoring based on technology of Internet of things, comprising:
Multiple sensors, the multiple sensor are set to the different location of boiler, for acquiring boiler difference portion when fire coal
Position, different parameters data and be uploaded to management terminal;
Cloud server obtains analysis knot for being analyzed according to the data and standard reference value database of acquisition
Fruit;
The management terminal for data described in storage management, and obtains regulation and control instruction based on the analysis results and carries out to boiler
Regulation and administration.
As to of the invention preferred, the multiple sensor includes:
Three sensors for being set to the bottom of a pan acquire the data of Coal-fired capacity, heating temperature, both weight respectively;
Three sensors for being set to pot thorax side acquire breech pressure respectively, temperature, the data of thorax inner capacities in thorax;
Two sensors for being set to boiler chimney discharge outlet acquire the data of gas emissions, gas temperature respectively.
As to of the invention preferred, the management terminal includes data management module, communication module, efficiency test mould
Block;
The data management module is for managing the collected data of the multiple sensor;
The communication module, which is used to communicate with the cloud server, obtains cloud data, obtains institute with the multiple sensor
Data are stated, is communicated with boiler and regulation and administration is carried out to boiler according to regulation and control instruction;
Efficiency module, for analyzing the efficiency energy consumption in coal-fired process according to configuration parameter.
As to preferred, the management terminal of the invention further include:
Sensor management module, for the multiple sensors to be managed with the operation for controlling the multiple sensors.
As to preferred, the management terminal of the invention further include:
System management module, for daily rights management, daily system using managing and provide auxiliary tool, wherein described auxiliary
Assistant engineer's tool is data dictionary, mechanism standard library, daily log.
The invention has the benefit that
Use different location boiler temperature, container pressure, boiler oil, coal-fired row during multiple sensors monitoring boiler fired coal
Data high-volume, upload to management terminal, data are being locally stored, cloud server obtains data from management terminal, with standard
Reference value database compares and analyzes, obtain analysis result after management terminal production regulation and control instruction to boiler carry out regulating tube
Reason, is analyzed without artificial detection, and real-time data collection, on-line analysis simultaneously regulates and controls boiler.
Detailed description of the invention
Fig. 1 is a kind of flow chart of the online coal-fired monitoring management method based on technology of Internet of things of the present invention;
Fig. 2 is the specific flow chart of step S1 of the present invention;
Fig. 3 is the specific flow chart of step S2 of the present invention;
Fig. 4 is a kind of block diagram of the online coal-fired management system for monitoring based on technology of Internet of things of the present invention;
Fig. 5 is the block diagram of management terminal of the present invention.
Specific embodiment
Following specific embodiments are only explanation of the invention, are not limitation of the present invention, art technology
Personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as
All by the protection of Patent Law in scope of the presently claimed invention.
Embodiment 1
As shown in Figure 1-3, a kind of online coal-fired monitoring management method based on technology of Internet of things, comprising the following steps:
S1, the data of boiler different parts, different parameters when acquisition is coal-fired are simultaneously uploaded to management terminal.
S2 is analyzed according to the data of acquisition and standard reference value database, obtains analysis result.
S3 obtains regulation and control instruction based on the analysis results and carries out regulation and administration to boiler.
With technology of Internet of things in sensing equipment managing device, import system method is monitored pipe to coal-fired data
Reason includes: boiler temperature, container pressure, boiler oil, coal fire discharged amount data monitoring, while management method is to access
Specific sensing device carries out data inputting operation, i.e., specific sensing device is controlled by on-line monitoring administration of energy conservation method.Once passing
After feeling equipment starting, management method can carry out data acquisition typing, and the data being entered into the system are read in 1 second
It takes, return, calling interface data management, manager can effectively adjust boiler fired coal administration of energy conservation means.
For example, in actual production, normal parameter is that pressure is 23.0MPa, and nominal outlet port temperature is 538 DEG C.If position
The collected data of sensor in pot thorax side are super critical boiler pressure parameters to be 27.0MPa, are located at boiler chimney and arrange
It is 590 DEG C that the collected data of sensor for putting mouth, which are nominal outlet port temperature, has exceeded normal parameter 4.0MPa, it is specified go out
Mouthful temperature exceeds 52 DEG C, influences coal-fired economic benefit, needs to adjust production decision, and on-line monitoring system can be in 1 second to adopting
The data of collection carry out analysis and arrangement, remind production division to provide optimal parameter according to data result and are regulated and controled.
Include: before the step S1
S0 controls multiple sensors and opens acquisition datamation.
Each sensor and shown management terminal data interchange, and the start and stop of management terminal control sensor.
The step S1 includes:
S1.1, acquire boiler fired coal when boiler temperature, container pressure, boiler oil, coal fire discharged amount data.
The step S1.1 includes:
Three sensors for being set to the bottom of a pan acquire the data of Coal-fired capacity, heating temperature, both weight respectively;It is set to pot thorax one
Three sensors of side acquire breech pressure respectively, temperature, the data of thorax inner capacities in thorax;It is set to boiler chimney discharge outlet
Two sensors acquire the data of gas emissions, gas temperature respectively.
S1.2 will acquire the data and be uploaded to the management terminal storage management.
Data storage is local in the management terminal (end PC), carries out the storage and management to data.
Further, including storage, export, the importing to the data, data query is provided.
The step S2 includes:
S2.1 calls the data of the management terminal storage.
S2.2 is compared with standard reference value database, is analyzed, and obtains analysis result.
System acquires data, progress operational analysis, according to collecting phase by TCP/IP transport protocol to cloud server
The optimal reference value of temperature, pressure, container volume, model parameter selection for closing boiler carries out on-line analysis.
S3 obtains regulation and control instruction based on the analysis results and carries out regulation and administration to boiler.
The management terminal obtains the analysis of cloud server as a result, generating regulation and control instruction online, and sends out to boiler
Instruction, boiler adjust self-operating situation according to regulation and control instruction, to achieve the effect that regulation, energy-saving and emission-reduction online.
Embodiment 2
As illustrated in figures 4-5, for based on the system in 1 method of embodiment.
Multiple sensors, the multiple sensor are set to the different location of boiler, not for boiler when acquiring fire coal
Same position, different parameters data and be uploaded to management terminal.
Cloud server obtains point for being analyzed according to the data and standard reference value database of acquisition
Analyse result.
The management terminal for data described in storage management, and obtains regulation and control instruction and to boiler based on the analysis results
Carry out regulation and administration.Wherein, the management terminal is generally PC computer end.
The multiple sensor includes:
Three sensors for being set to the bottom of a pan acquire the data of Coal-fired capacity, heating temperature, both weight respectively.
Three sensors for being set to pot thorax side acquire breech pressure respectively, temperature, the data of thorax inner capacities in thorax.
Two sensors for being set to boiler chimney discharge outlet acquire the data of gas emissions, gas temperature respectively.
Sensor set on each position monitors that data are different, and online timeliness monitoring.Each sensor with
The management terminal data interchange, the management terminal can obtain the collected data of each sensor in real time.
The management terminal includes data management module, communication module, efficiency test module;
The data management module is for managing the collected data of the multiple sensor;
The communication module, which is used to communicate with the cloud server, obtains cloud data, obtains institute with the multiple sensor
Data are stated, is communicated with boiler and regulation and administration is carried out to boiler according to regulation and control instruction;
Efficiency module, for analyzing the efficiency energy consumption in coal-fired process according to configuration parameter.
The management terminal further include:
Sensor management module, for the multiple sensors to be managed with the operation for controlling the multiple sensors.
The management terminal further include:
System management module, for daily rights management, daily system using managing and provide auxiliary tool, wherein described auxiliary
Assistant engineer's tool is data dictionary, mechanism standard library, daily log.
Further, the management terminal further include:
Management module is informed in construction, for the function to construction notification management, construction notification inquiry.
Claims (10)
1. a kind of online coal-fired monitoring management method based on technology of Internet of things, which comprises the following steps:
S1, the data of boiler different parts, different parameters when acquisition is coal-fired are simultaneously uploaded to management terminal;
S2 is analyzed according to the data of acquisition and standard reference value database, obtains analysis result;
S3 obtains regulation and control instruction based on the analysis results and carries out regulation and administration to boiler.
2. a kind of online coal-fired monitoring management method based on technology of Internet of things according to claim 1, which is characterized in that
Include: before the step S1
S0 controls multiple sensors and opens acquisition datamation.
3. a kind of online coal-fired monitoring management method based on technology of Internet of things according to claim 1, which is characterized in that
The step S1 includes:
S1.1, acquire boiler fired coal when boiler temperature, container pressure, boiler oil, coal fire discharged amount data;
S1.2 will acquire the data and be uploaded to the management terminal storage management.
4. a kind of online coal-fired monitoring management method based on technology of Internet of things according to claim 3, which is characterized in that
The step S1.1 includes:
Three sensors for being set to the bottom of a pan acquire the data of Coal-fired capacity, heating temperature, both weight respectively;It is set to pot thorax one
Three sensors of side acquire breech pressure respectively, temperature, the data of thorax inner capacities in thorax;It is set to boiler chimney discharge outlet
Two sensors acquire the data of gas emissions, gas temperature respectively.
5. a kind of online coal-fired monitoring management method based on technology of Internet of things according to claim 3, which is characterized in that
The step S2 includes:
S2.1 calls the data of the management terminal storage;
S2.2 is compared with standard reference value database, is analyzed, and obtains analysis result.
6. a kind of online coal-fired management system for monitoring based on technology of Internet of things characterized by comprising
Multiple sensors, the multiple sensor are set to the different location of boiler, for acquiring boiler difference portion when fire coal
Position, different parameters data and be uploaded to management terminal;
Cloud server obtains analysis knot for being analyzed according to the data and standard reference value database of acquisition
Fruit;
The management terminal for data described in storage management, and obtains regulation and control instruction based on the analysis results and carries out to boiler
Regulation and administration.
7. a kind of online coal-fired management system for monitoring based on technology of Internet of things according to claim 6, which is characterized in that
The multiple sensor includes:
Three sensors for being set to the bottom of a pan acquire the data of Coal-fired capacity, heating temperature, both weight respectively;
Three sensors for being set to pot thorax side acquire breech pressure respectively, temperature, the data of thorax inner capacities in thorax;
Two sensors for being set to boiler chimney discharge outlet acquire the data of gas emissions, gas temperature respectively.
8. a kind of online coal-fired management system for monitoring based on technology of Internet of things according to claim 6, which is characterized in that
The management terminal includes data management module, communication module, efficiency test module;
The data management module is for managing the collected data of the multiple sensor;
The communication module, which is used to communicate with the cloud server, obtains cloud data, obtains institute with the multiple sensor
Data are stated, is communicated with boiler and regulation and administration is carried out to boiler according to regulation and control instruction;
Efficiency module, for analyzing the efficiency energy consumption in coal-fired process according to configuration parameter.
9. a kind of online coal-fired management system for monitoring based on technology of Internet of things according to claim 6, which is characterized in that
The management terminal further include:
Sensor management module, for the multiple sensors to be managed with the operation for controlling the multiple sensors.
10. a kind of online coal-fired management system for monitoring based on technology of Internet of things according to claim 6, feature exist
In the management terminal further include:
System management module, for daily rights management, daily system using managing and provide auxiliary tool, wherein described auxiliary
Assistant engineer's tool is data dictionary, mechanism standard library, daily log.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811063519.9A CN109386839A (en) | 2018-09-12 | 2018-09-12 | A kind of online coal-fired monitoring management method and system based on technology of Internet of things |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811063519.9A CN109386839A (en) | 2018-09-12 | 2018-09-12 | A kind of online coal-fired monitoring management method and system based on technology of Internet of things |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109386839A true CN109386839A (en) | 2019-02-26 |
Family
ID=65417713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811063519.9A Pending CN109386839A (en) | 2018-09-12 | 2018-09-12 | A kind of online coal-fired monitoring management method and system based on technology of Internet of things |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109386839A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111911904A (en) * | 2020-07-23 | 2020-11-10 | 山西晋路同创信息技术有限公司 | New energy boiler Internet of things data acquisition control system and acquisition method thereof |
CN112965870A (en) * | 2021-01-26 | 2021-06-15 | 浙江吉利控股集团有限公司 | Compensation method and device, Internet of things equipment, terminal and storage medium |
CN113344468A (en) * | 2021-07-28 | 2021-09-03 | 厦门海晟融创信息技术有限公司 | Process quality control analysis platform based on industrial big data |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104750098A (en) * | 2015-02-09 | 2015-07-01 | 杭州市特种设备检测研究院 | Internet of things monitoring and diagnosis disposal system for universal boiler |
KR20150141162A (en) * | 2015-10-06 | 2015-12-17 | 전대연 | The method for informing and monitoring power ON/OFF status of smart device |
CN107741008A (en) * | 2017-09-08 | 2018-02-27 | 深圳市智物联网络有限公司 | A kind of monitoring boiler method and system based on Internet of Things |
-
2018
- 2018-09-12 CN CN201811063519.9A patent/CN109386839A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104750098A (en) * | 2015-02-09 | 2015-07-01 | 杭州市特种设备检测研究院 | Internet of things monitoring and diagnosis disposal system for universal boiler |
KR20150141162A (en) * | 2015-10-06 | 2015-12-17 | 전대연 | The method for informing and monitoring power ON/OFF status of smart device |
CN107741008A (en) * | 2017-09-08 | 2018-02-27 | 深圳市智物联网络有限公司 | A kind of monitoring boiler method and system based on Internet of Things |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111911904A (en) * | 2020-07-23 | 2020-11-10 | 山西晋路同创信息技术有限公司 | New energy boiler Internet of things data acquisition control system and acquisition method thereof |
CN111911904B (en) * | 2020-07-23 | 2022-09-13 | 山西晋路同创信息技术有限公司 | New energy boiler Internet of things data acquisition control system and acquisition method thereof |
CN112965870A (en) * | 2021-01-26 | 2021-06-15 | 浙江吉利控股集团有限公司 | Compensation method and device, Internet of things equipment, terminal and storage medium |
CN112965870B (en) * | 2021-01-26 | 2022-06-14 | 浙江吉利控股集团有限公司 | Compensation method and device, Internet of things equipment, terminal and storage medium |
CN113344468A (en) * | 2021-07-28 | 2021-09-03 | 厦门海晟融创信息技术有限公司 | Process quality control analysis platform based on industrial big data |
CN113344468B (en) * | 2021-07-28 | 2024-01-26 | 厦门海晟融创信息技术有限公司 | Industrial big data-based process quality control analysis platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109386839A (en) | A kind of online coal-fired monitoring management method and system based on technology of Internet of things | |
CN106302739A (en) | A kind of Industrial Boiler monitoring and analysis aid decision cloud platform system | |
CN201795518U (en) | Coal combustion economic analysis device | |
CN111367241A (en) | Enterprise comprehensive energy management and control system and method | |
CN111077869A (en) | Optimization control method and system for big data intelligent control bag-type dust collector | |
CN107741008A (en) | A kind of monitoring boiler method and system based on Internet of Things | |
CN104102211B (en) | Scheduling method, server and system of combined heat and power generation system of fire coal thermal power plant | |
CN108052007A (en) | Thermal power unit operation optimization method, device, equipment and computer storage media | |
CN109033511B (en) | A kind of quality coal in cement kiln systems heat consumption analysis method of combined data driving and data mining | |
CN109523180B (en) | Coal consumption and heat supply online monitoring system of thermal power plant | |
CN102944536A (en) | Oil fume detection system based on sensor network and multi-source information fusion | |
CN111623369B (en) | Control method for adjusting boiler fuel feeding quantity by using smoke oxygen content signal | |
CN102261671A (en) | Boiler combustion multi-constraint and multi-object optimization expert system and optimization method thereof | |
CN205388484U (en) | Continuous automatic monitoring system of boats and ships fume emission | |
CN108037748B (en) | The thermal power unit operation optimization method of full working scope, device, equipment | |
CN116186624A (en) | Boiler assessment method and system based on artificial intelligence | |
CN111897302A (en) | Cement firing control and optimization double-layer cooperative control system based on Internet of things | |
CN203101963U (en) | Heat conduction oil furnace cloud service remote monitoring system | |
CN1587820A (en) | Intelligent control system for boiler and its multiple type of coal control method | |
CN1651613A (en) | Control method of carbon anode roasting production system | |
JP2016537729A (en) | Method, system, and computer program product for analyzing generation processes and / or process engineering processes and / or process steps in a plant | |
CN101275811A (en) | Intelligent control method of clinker grid type cooling machine cooling procedure | |
JP6548862B2 (en) | Method and apparatus for managing power plant operation | |
CN111911904B (en) | New energy boiler Internet of things data acquisition control system and acquisition method thereof | |
CN112468560B (en) | Remote centralized control operation and maintenance platform for high-pressure thermal cracking system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190226 |
|
RJ01 | Rejection of invention patent application after publication |