CN109384068A - Supercalender and its unwinding device - Google Patents

Supercalender and its unwinding device Download PDF

Info

Publication number
CN109384068A
CN109384068A CN201710659007.8A CN201710659007A CN109384068A CN 109384068 A CN109384068 A CN 109384068A CN 201710659007 A CN201710659007 A CN 201710659007A CN 109384068 A CN109384068 A CN 109384068A
Authority
CN
China
Prior art keywords
roll
current
paper web
connect
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710659007.8A
Other languages
Chinese (zh)
Inventor
陈清坤
黄伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gold East Paper Jiangsu Co Ltd
Original Assignee
Gold East Paper Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold East Paper Jiangsu Co Ltd filed Critical Gold East Paper Jiangsu Co Ltd
Priority to CN201710659007.8A priority Critical patent/CN109384068A/en
Publication of CN109384068A publication Critical patent/CN109384068A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/10Changing the web roll in unwinding mechanisms or in connection with unwinding operations
    • B65H19/12Lifting, transporting, or inserting the web roll; Removing empty core
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H16/00Unwinding, paying-out webs
    • B65H16/10Arrangements for effecting positive rotation of web roll
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/10Changing the web roll in unwinding mechanisms or in connection with unwinding operations
    • B65H19/18Attaching, e.g. pasting, the replacement web to the expiring web
    • B65H19/1805Flying splicing, i.e. the expiring web moving during splicing contact
    • B65H19/181Flying splicing, i.e. the expiring web moving during splicing contact taking place on the replacement roll
    • B65H19/1815Flying splicing, i.e. the expiring web moving during splicing contact taking place on the replacement roll the replacement web being stationary prior to splicing contact
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/10Changing the web roll in unwinding mechanisms or in connection with unwinding operations
    • B65H19/20Cutting-off the expiring web
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/10Handled articles or webs
    • B65H2701/11Dimensional aspect of article or web
    • B65H2701/113Size
    • B65H2701/1133Size of webs

Landscapes

  • Replacement Of Web Rolls (AREA)

Abstract

The present invention provides a kind of supercalender and its unwinding device, unwinding device includes unreeling station, intermediate station, unreel driving mechanism, first unreels carrying mechanism, unreel winged connection mechanism and control system, winged connection mechanism being unreeled by control system control, the paper web that current let off roll is discharged is Nian Jie with wait fly to connect preset flying connecting joint on let off roll, and the paper web that current let off roll is discharged is cut off after the paper web and flying connecting joint that current let off roll is discharged are bonded, reel change is carried out in non-stop-machine situation to realize, the change of lap time can be shortened, improve change of lap efficiency, and high degree of automation.

Description

Supercalender and its unwinding device
Technical field
The present invention relates to papermaking equipment technical field, in particular to a kind of supercalender and its unwinding device.
Background technique
In the production procedure for producing A grade coated paper, coating paper roll carries out supercalenderman to paper using supercalender Skill processing, to obtain the paper performance for printing required gloss, smoothness, thickness etc..The change of lap mode of supercalender mostly uses Stop the paper injection and manual splicing under supercalender.It is long using the time consumed in paper injection or manual splicing change of lap, often It is secondary to need time-consuming about 20 minutes, can not continuous production, seriously affect the production efficiency of supercalender.
Summary of the invention
The present invention provides a kind of supercalender and its unwinding device, and change of lap can be carried out in non-stop-machine situation, solves Certainly in the prior art supercalender change of lap inefficiency the problem of.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: a kind of putting for supercalender is provided Winding apparatus, including unreeling station and for placing the first intermediate station wait fly to connect let off roll for place current let off roll;It puts Winding apparatus further comprises unreeling driving mechanism, first unreeling carrying mechanism, unreel winged connection mechanism and control system, wherein controlling System control processed unreels driving mechanism and current let off roll is driven to be rotated in course of normal operation, and then to work normally speed Degree discharges the paper web on current let off roll, when the length of paper web remaining on current let off roll is less than or equal to preset length, puts It rolls up driving mechanism and disconnects driving to current let off roll, and further control first unreels carrying mechanism for current let off roll from putting Volume station is moved away from so that current let off roll unwinding device downstream be used to collect paper web that current let off roll is discharged batch dress It is rotated under the drive set;Control system further control unreel driving mechanism driving from the first intermediate station enter unreel station wait fly It connects let off roll to be rotated, and control unreels winged connection mechanism and presses to the paper web that current let off roll is discharged wait fly to connect let off roll, So that the paper web that is discharged of current let off roll with carry out be bonded wait fly to connect preset flying connecting joint on let off roll, and put currently The paper web and flying connecting joint that winding up roller is discharged cut off the paper web that current let off roll is discharged after being bonded.
An embodiment according to the present invention, unwinding device include for detecting paper web that current let off roll is discharged and flying to connect The detection device whether head is bonded.
An embodiment according to the present invention unreels cutting through for the paper web that winged connection mechanism is further discharged in current let off roll Purge gas is carried out in journey, to blow away paper scrap caused by cutting process.
An embodiment according to the present invention, when the length of paper web remaining on current let off roll is less than or equal to preset length, The coiling speed for unreeling speed and devices for taking-up of unwinding device is flown to connect speed from working normally speed and be switched to by control system, Wherein fly to connect speed less than normal work speed.
An embodiment according to the present invention, flying to connect the tension on the paper web that the current let off roll under speed is discharged is normal work Make the 20%-40% of the tension on the paper web that the current let off roll under speed is discharged.
An embodiment according to the present invention, unwinding device further comprise that will be transported to wait fly to connect let off roll from the first intermediate station Unreel station second unreels carrying mechanism.
In order to solve the above technical problems, another technical solution used in the present invention is: providing a kind of supercalender, wrap Include above-mentioned unwinding device, above-mentioned devices for taking-up and calendering device, the paper web that wherein calendering device discharges current let off roll Press polish is carried out, devices for taking-up is for collecting the paper web after press polish.
An embodiment according to the present invention, devices for taking-up include standing and for placing batching for current work beam for placing Wait fly to connect the second intermediate station of work beam;Devices for taking-up further comprises first batching driving mechanism, first batching carrying mechanism And winged connection mechanism is batched, wherein control system control first, which is batched driving mechanism and driven in course of normal operation, currently batches Roller rotation, and then the paper web after press polish is collected to work normally speed, the length of remaining paper web is less than on current let off roll Or when being equal to preset length, further control first is batched carrying mechanism and is engaged with current work beam, and first batches driving mechanism Driving to current work beam is disconnected, so that first batches carrying mechanism and move away from current work beam from station is batched, while current Work beam is batched first to be rotated under the second driving for batching driving mechanism being arranged on carrying mechanism;Control system is further controlled System first, which is batched driving mechanism driving and entered from the second intermediate station, batches being rotated wait fly to connect work beam for station, and controls and batch Fly connection mechanism to press to paper web to be collected wait fly to connect work beam, and cut off paper web to be collected, so that wait fly to connect work beam Subsequent paper web can be received.
An embodiment according to the present invention, batching winged connection mechanism will be to by blowing method after the paper web wait collect is cut off The paper web collected is pressed on wait fly to connect on work beam.
An embodiment according to the present invention, devices for taking-up further comprise that will be transported to wait fly to connect work beam from the second intermediate station Batch station second batches carrying mechanism.
The beneficial effects of the present invention are: being in contrast to the prior art, supercalender provided by the invention is unreeled Device, including unreel station, intermediate station, unreel driving mechanism, first unreel carrying mechanism, unreel winged connection mechanism and control system, Wherein, control system control unreels the current let off roll of driving mechanism driving and rotates in course of normal operation and to work normally speed It is disconnected to unreel driving mechanism when the length of the remaining paper web on current let off roll is less than or equal to preset length for degree release paper web The driving to current let off roll is opened, control system control first unreels carrying mechanism and moves away from current let off roll from station is unreeled, makes Devices for taking-up drives current let off roll rotation;Control system, which further controls, unreels driving mechanism driving from the entrance of the first intermediate station Unreel station wait fly to connect let off roll rotation, and control unreels winged connection mechanism and presses to the paper web that current let off roll is discharged wait fly to connect Let off roll keeps it Nian Jie with wait fly to connect preset flying connecting joint on let off roll, the paper web that current let off roll is discharged with fly to connect Connector cuts off the paper web that current let off roll is discharged after being bonded, therefore, the unwinding device of calender of the invention automates Degree is high, and change of lap can be carried out in non-stop-machine situation, shortens the change of lap time, improves the change of lap efficiency of supercalender.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is the structural schematic diagram of supercalender provided in an embodiment of the present invention;
Fig. 2 is the partial enlargement structural representation of the unwinding device of supercalender shown in Fig. 1;
Fig. 3 is the partial enlargement structural representation of the devices for taking-up of supercalender shown in Fig. 1.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that the described embodiments are merely a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Also referring to Fig. 1 to Fig. 3, the embodiment of the present invention provides a kind of supercalender, which includes putting Winding apparatus 10, calendering device 20 and devices for taking-up 30, unwinding device 10 are arranged for placing paper roll to be calendered, calendering device 20 In the downstream of unwinding device 10, the paper web for being discharged to current let off roll carries out press polish, and devices for taking-up 30 is set to press polish The downstream of device 20, for collecting the paper web after press polish.
Specifically, please referring to Fig. 2, Fig. 2 is the partial enlargement structure of the unwinding device of supercalender shown in Fig. 1 Schematic diagram.As shown in Fig. 2, in embodiments of the present invention, unwinding device 10 includes unreeling station 101, the first intermediate station 102, unreel Driving mechanism 103, first unreel carrying mechanism 104, unreel winged connection mechanism 107 and control system (not shown), control system point Not with unreel driving mechanism 103, first unreel carrying mechanism 104 and unreel winged connection mechanism 107 and connect, unreel driving for controlling Mechanism 103, first unreel carrying mechanism 104 and unreel winged connection mechanism 107.
Wherein, station 101 is unreeled for placing current let off roll, the first intermediate station 102 for placing wait fly to connect let off roll, the One intermediate station 102 can be set it is multiple, it is multiple wait fly to connect let off roll for storing, station 101 is unreeled shown in Fig. 2 and is placed with and currently puts It is placed on winding up roller and the first intermediate station 102 wait fly to connect let off roll.During reel change, control system control unreels driving Mechanism 103 drives in course of normal operation to be rotated positioned at the current let off roll for unreeling station 101, so that currently unreeling Roller discharges paper web on current let off roll to work normally speed, and the length of remaining paper web is less than or waits on current let off roll When preset length, when such as the length of current let off roll residue paper web is less than or equal to 1000 meters, it is disconnected to unreel driving mechanism 103 Open the driving to current let off roll, control system further controls first and unreels carrying mechanism 104 for current let off roll from unreeling It stands and 101 moves away from, and make the devices for taking-up 30 positioned at 10 downstream of unwinding device that current let off roll be driven to continue to rotate, so as to batch dress 30 are set to continue to collect the paper web that current let off roll is discharged.
Wait fly to connect let off roll from the first intermediate station 102 into station 101 is unreeled, control system further controls and unreels driving machine Structure 103 be driven into after unreeling station 101 wait fly to connect let off roll rotation, and control and unreel winged connection mechanism 107 for current let off roll The paper web discharged is pressed to wait fly to connect let off roll so that the paper web that is discharged of current let off roll with it is preset on let off roll wait fly to connect Flying connecting joint is bonded, and is controlled to unreel after the paper web that current let off roll is discharged is bonded with flying connecting joint and flown to pick Structure 107 cuts off the paper web that current let off roll is discharged.
Therefore, the unwinding device 10 of the supercalender 1 of the present embodiment will can glue automatically wait fly to connect the paper web on let off roll It is connected on the paper web that current let off roll is discharged, to realize the automatic change of lap in non-stop-machine situation, improves production efficiency.
Further, unwinding device 10 further includes detection device 106, and detection device 106 can unreel carrying close to first Mechanism 104 unreels the winged setting of connection mechanism 107, for detecting the paper web discharged on current let off roll and wait fly to connect let off roll Whether preset flying connecting joint is bonded success.
Further, winged connection mechanism 107 is unreeled also to be blown in the cutting process for the paper web that current let off roll is discharged Scavenging body avoids paper scrap from entering calendering device 20, influences the calendaring effect to blow away generated paper scrap in cutting process.
Further, in the present embodiment, the length of remaining paper web is less than or equal to preset length on current let off roll When, the coiling speed for unreeling speed and devices for taking-up 30 of control system control unwinding device 10 is switched to from speed is worked normally Fly to connect speed, wherein fly to connect speed less than speed is worked normally, the speed like flying that connects can be 40 ms/min, work normally speed It can reach 1500 ms/min, also, in the case where the tension for flying to connect the discharged paper web of current let off roll under speed is normal operating rate The 20%-40% of tension on the discharged paper web of current let off roll.
Further, unwinding device 10 further includes second unreeling and carrying carrying mechanism 105, for will wait fly to connect let off roll from First intermediate station 102, which is transported to, unreels station 101.
Therefore, the unwinding device 10 of the supercalender 1 of the present embodiment, can be in non-stop-machine situation by wait fly to connect Preset flying connecting joint on let off roll, so will will be Nian Jie with current let off roll wait fly to connect let off roll using flying connecting joint, thus reality Now automatic change of lap shortens the change of lap time, and high degree of automation improves the running efficiency of supercalender 1.
Please further referring to Fig. 3, Fig. 3 is that the partial enlargement structure of the devices for taking-up of supercalender shown in Fig. 1 is shown It is intended to.As shown in figure 3, devices for taking-up 30 includes batching station 301, the second intermediate station 302, first batching driving mechanism 303, second Batch driving mechanism (not shown), first batch carrying mechanism 304 and batch winged connection mechanism 307, control system further with First batches driving mechanism 303, second batches driving mechanism, first batches carrying mechanism 304 and batch winged connection mechanism 307 and connect Connect, for control respectively first batch driving mechanism 303, second batch driving mechanism, first batch carrying mechanism 304 and volume Take winged connection mechanism 307.Wherein, station 301 is batched for placing current work beam, and the second intermediate station 302 is for placing wait fly to connect volume Roller is taken, control system control first batches driving mechanism 303 and current work beam is driven to rotate in course of normal operation, and then with It works normally speed and collects the paper web after press polish, when paper web remaining on current let off roll is less than or equal to preset length, control System processed, which further controls first, batches carrying mechanism 304 and engages with current work beam, and first, which batches driving mechanism 303, disconnects pair The driving of current work beam, so that first batches carrying mechanism 304 and move away from current work beam from station 301 is batched, while current Work beam is batched first to be rotated under the second driving for batching driving mechanism being arranged on carrying mechanism 304.
Wait fly to connect work beam from the second intermediate station 302 into station 301 is batched, control system further controls first and batches drive Motivation structure 303 is driven into being rotated after batching station 301 wait fly to connect work beam, and control batch winged connection mechanism 307 will be to The paper web collected is pressed to wait fly to connect work beam, and cuts off paper web to be collected so that wait fly to connect work beam can receive it is subsequent Paper web.
Further, batching winged connection mechanism 307 will be to be collected by blowing method after the paper web wait collect is cut off Paper web is pressed on wait fly to connect on work beam.
Further, devices for taking-up 30 further includes second batching carrying mechanism 305, for will be wait fly to connect work beam from second Intermediate station 302, which is transported to, batches station 301.
Therefore, supercalender 1 of the invention mentions, it can be achieved that achieve the purpose that automatic change of lap in non-stop-machine situation High efficiency.
With continued reference to shown in Fig. 1-Fig. 3, the supercalender 1 of a specific embodiment of the invention illustrated below is moved certainly The course of work of volume.
Supercalender 1 includes unwinding device 10, calendering device 20 and devices for taking-up 30, and unwinding device 10 is set to super The upstream of calender 1, for placing paper roll to be calendered;Calendering device 20 is set to the downstream of unwinding device 10, for putting The paper web that current let off roll is discharged on winding apparatus 10 carries out press polish;Devices for taking-up 30 is set to the downstream of calendering device 20, uses In collecting the paper web after press polish.
Specifically, unwinding device 10 may include unreeling station 101, the first intermediate station 102, unreeling driving mechanism 103, first put Volume carrying mechanism 104, second unreel carrying mechanism 105, detection device 106, unreel winged connection mechanism 107 and control system etc..Its In, unreeling driving mechanism 103 can be to unreel shaft coupling, and first to unreel carrying mechanism 104 can be to unreel lift lever, and second puts Rolling up carrying mechanism 105 can be to transport trolley, and detection device 106 can be light eye inductor, and unreeling winged connection mechanism 107 can be Cutting, which is blown, to fly to connect roller, and control system can be PLC (Programmable Logic Controller;Programmable logical controller Device) controller.Control system unreels driving mechanism 103 for control respectively, first unreels carrying mechanism 104, second unreels and remove It transports mechanism 105, detection device 106 and unreels winged connection mechanism 107.
As shown in Fig. 2, in the present embodiment, the upstream that trolley is set to unwinding device 10 is transported, for transporting wait fly to connect Let off roll, in addition, transporting trolley can also be used to transport empty roller core.
Further, unwinding device 10 further includes unreeling rack 111 and the first guide rail 108, unreels rack 111 and is set to fortune The downstream of trolley is sent, the first guide rail 108, which is supported in, to be unreeled in rack 111.First intermediate station 102 is set on the first guide rail 108, For receive transport trolley be conveyed through come wait fly to connect let off roll.Wherein, the first guide rail 108 can be inclined to set, and make wait fly to connect Let off roll can freely move right, such as the first guide rail rolls to the right with 5 degree of angle tilt wait fly to connect let off roll It is dynamic.In other embodiments, it is also provided with damping off-position device (not shown) on the first intermediate station 102, is unreeled with treating to fly to connect Roller is limited.
Further, unwinding device 10 further includes unreeling main support shaft (figure do not indicate), unreels main support shaft and is set to and puts The downstream for rolling up rack 111, unreels shaft coupling and is supported in and unreel in main support shaft, and unreels station 101 also locking is set to and unreels In main support shaft, station 101 is unreeled for placing current let off roll.In the present embodiment, can be made by the transmission of the first guide rail 108 Station 101 is unreeled wait fly to connect let off roll to be rolled by the first intermediate station 102.In other embodiments, unreeling driving mechanism 103 can also wrap Drive motor (not shown) is included, drive motor is connect with shaft coupling is unreeled, and unreels currently unreeling on station 101 for driving to be located at Roller is rotated, and the output torque of drive motor can be sent to current let off roll when needed by unreeling shaft coupling.
Further, unwinding device 10 further includes unreeling sky roll bracket 109, unreels sky roll bracket 109 and is set to first The side of guide rail 108 comprising stand and crossbearer, stand are vertically arranged, and crossbearer is settable more on the top of stand, crossbearer A sky roller position 110 for storing multiple empty roller cores, such as is provided with 2 empty roller positions 110 on crossbearer shown in Fig. 2, crossbearer can It is inclined to set, so that roller core of having leisure can be automatically moved to the left, such as crossbearer has 5~10 degree of angle tilt in order to sky Roller core rolls to the left.Damping off-position device is also provided in some other embodiment, on crossbearer to limit to empty roller core.
It unreels lift lever and is set to the downstream for unreeling main support shaft, for the current let off roll unreeled on station 101 will to be located at It is promoted on the crossbearer for unreeling sky roll bracket, in the present embodiment, unreels and be additionally provided with locking device on lift lever, locking device For compressing paper roll, to keep the tension of paper web.
Cutting air blowing flies to connect roller and light eye inductor is all set in and unreels on lift lever, and cutting, which is blown, flies to connect roller for flying The paper web that current let off roll is discharged is pressed to wait fly to connect let off roll in termination process, the paper web for discharging current let off roll with to Fly to connect preset flying connecting joint on let off roll to be bonded.Light eye inductor is for detecting flying connecting joint.Wherein cutting, which is blown, flies Connecing roller may include cutter and gas blow pipe, detect the paper web that current let off roll is discharged in light eye inductor and wait fly to connect let off roll After upper preset flying connecting joint bonding, cutter cuts off the paper web for being discharged current let off roll, and gas blow pipe will currently be put Generated paper scrap purges in the cutting process for the paper web that winding up roller is discharged, and avoiding paper scrap from entering calendering device 20 influences press polish Effect.
As shown in Figure 1, calendering device 20 is set to the downstream of unwinding device 10, specifically, calendering device 20, which is set to, to be put The downstream of lift lever is rolled up, calendering device 20 includes that the roller of multiple groups pairing operation forms a series of pressure areas and multiple with the defeated of cylinder Band is sent, paper web passes through each roller from top to bottom or from the bottom up and is close to each roller, and under the cylinder drive, conveyer belt is pressed in rotation Roll surface, by roll surface with turning, so that paper web to be calendered is via this series of pressure area to reaching ideal the calendaring effect.
Further, as shown in figure 3, devices for taking-up 30 may include batching station 301, the second intermediate station 302, first batching drive Motivation structure 303, second batch driving mechanism, first batch carrying mechanism 304, second batch carrying mechanism 305, sensor module 306 and batch winged connection mechanism 307 etc..Wherein, first to batch driving mechanism 303 can be to batch shaft coupling, and second batches drive Motivation structure can be secondary drive shaft coupling, and first batches carrying mechanism 304 can be for double hook pull rod, and second batches carrying mechanism 305 can be to batch lift lever, and batching winged connection mechanism 307 can be the sheet feeding with cutter.Control system is also used Driving mechanism 303 is batched in control first respectively, second driving mechanism is batched, first batches carrying mechanism 304, second batches and remove It transports mechanism 305, sensor module 306 and batches winged connection mechanism 307.
In the present embodiment, devices for taking-up 30 is set to the downstream of calendering device 20, and devices for taking-up 30 further includes batching master Support shaft batches the downstream that main support shaft is set to calendering device 20, batches shaft coupling and is supported in and batch in main support shaft, simultaneously Batching station 301, also locking is set to and batches in main support shaft, batches station 301 for placing current work beam, to collect through press polish Paper web afterwards.In some other embodiment, first, which batches driving mechanism 303, may also include drive motor, drive motor and volume Take shaft coupling to connect, for drive be located at batch station 301 current work beam rotated, batch shaft coupling can when needed by The output torque of drive motor sends current work beam to.
Wherein, sensor module 306, which is set to, batches station 301 or batches in main support shaft, for detecting paper to be collected Whether width has been bonded with wait fly to connect work beam.
Sheet feeding, which is set to, to be batched in main support shaft or close to batching the setting of main support shaft, for will be to be collected Paper web is pressed to wait fly to connect work beam.Wherein, sheet feeding also includes gas blow pipe and cutter, is examined in sensor module 306 It measures the paper web wait collect to be bonded with after flying to connect work beam, cutter cuts off paper web to be collected, so that wait fly to connect work beam Subsequent paper web can be received, while paper web to be collected being pressed in the way of air blowing by gas blow pipe and is batched wait fly to connect On roller.
Double hook pull rod is set to the downstream for batching main support shaft, double hook pull rod can in the coiling process of paper roll adaptability it is horizontal To mobile roller core, secondary drive shaft coupling is set on double hook pull rod.
Further, devices for taking-up 30 further includes batching to deposit roller frame 310, is set to the side of double hook pull rod, batches and deposit Roller frame 310 includes stand and crossbearer, and stand is vertically arranged, and crossbearer is set to the top of stand, is provided in multiple second on crossbearer Between stand 302, be used to store multiple has 3 to batch wait fly to connect wait fly to connect storage on work beam, such as crossbearer shown in Fig. 3 Roller is optionally also provided with damping off-position device to treat and fly to connect work beam and limited on the second intermediate station 302.It batches and mentions Rising stem, which is articulated in, batches the front end for depositing roller frame, can specifically be articulated in the front end of crossbearer, for will be wait fly to connect work beam by second Between station 302 be transported to and batch station 301.
Further, devices for taking-up 30 further includes batching rack 311 and the second guide rail 309, batch rack 311 be set to it is double The downstream of hook pull rod, the second guide rail 309, which is supported in, to be batched in rack 311, wherein settable multiple storages on the second guide rail 309 It stands 312, for storing the paper roll for having batched and having finished, such as is provided with 2 storage sites 312 on the second guide rail shown in Fig. 3.Wherein, Second guide rail 309 can also be inclined to set, for example, with 10 degree angle tilt in order to be located at storage sites 312 on roller core to Right rolling.Double hook pull rod can will be located at the current work beam for batching station 301 and be carried to storage sites 312.
Further, devices for taking-up 30 further includes that third batches carrying mechanism 308, and third batches carrying mechanism 308 can be with For conveying carrier, it is set to the downstream for batching rack 311, for transporting the paper roll batched.
Its reel change process is as follows:
S11:: being ready in roller frame 310 wait fly to connect work beam batching to deposit in advance, such as can be once deposited in roller frame batching to deposit Put it is multiple wait fly to connect work beam or connect work beam wait fly toward batching to deposit roller frame and increase by one by interval of preset time value, herein not It is restricted.
S12: it is ready on unwinding device 10 wait fly to connect let off roll, i.e., on the first intermediate station 102 of unwinding device 10 Preparation pre-sets flying connecting joint wait fly to connect let off roll on the paper web wait fly to connect let off roll, usually can be used 50mm's Water-soluble double-sided adhesive manufactures flying connecting joint on the paper web wait fly to connect let off roll.Wherein, using transport trolley when default Between transport wait fly to connect let off roll to the first intermediate station 102, so that the connection of supercalender 1 carries out change of lap calendering operation.
S13: it is less than or equal in the length for detecting the remaining paper web on the current let off roll for unreeling and placing on station 101 pre- If when length, when such as the length of the remaining paper web of current let off roll is 1000 meters, unreeling shaft coupling and disconnecting to current let off roll Driving so that current let off roll by the automatic reduction of speed of normal work speed to flying to connect speed, fly to connect speed to be 40 ms/min, together When control the paper web that the tension on the paper web that current let off roll is discharged discharges by the current let off roll under normal operating rate On tension 20%-40%, meanwhile, control system control unreels lift lever decline, current let off roll is held up.
S14: control system, which further controls, unreels shaft coupling opening, so that devices for taking-up 30 drives current let off roll to be released The paper web put continues to rotate, also, utilization unreels the tension that the locking device on lift lever keeps the paper web of current let off roll.
Meanwhile the double hook pull rod that batches of devices for taking-up 30 is moved along to batching station 301, it is secondary on double hook pull rod Transmission coupling closure makes to batch the current work beam on station 301 to fly to connect speed rotation, even if batching current on station 301 Work beam is rotated with 40 ms/min of speed.
S15: it after unreeling lift lever and holding up current let off roll, is put wait fly to connect let off roll to be rolled by the first intermediate station 102 Volume station 101.After flying to connect let off roll and rolling into and unreel station 101, unreel shaft coupling closure, with drive be located at unreel station 101 to Fly to connect the paper web of let off roll to fly to connect speed rotation, that is, unreel shaft coupling drive enter unreel station 101 wait fly to connect let off roll with 40 ms/min of speed rotation.
When sensor module 306 detects that the speed of the secondary drive shaft coupling of devices for taking-up 30 also reaches 40 ms/min When, batch shaft coupling opening, double hook pull rod will be located at batch station 301 current work beam toward post-tensioning, will be on current work beam It is sent in accumulator plant 312.
S16: unreeling cutting and blow and fly to connect roller and press to the paper web that current let off roll is reserved wait fly to connect let off roll, when light eye sense The double-sided adhesive flying connecting joint for answering device to detect wait fly to connect let off roll has been bonded to the reserved paper of currently running current let off roll After on width, unreels the cutter that cutting air blowing flies to connect on roller and cut off the paper web of current let off roll, while unreeling cutting and blowing and flying to connect Gas blow pipe opening on roller is blown, and the paper scrap generated in cutting process is avoided to enter press polish area.So far, wait fly to connect let off roll On paper web initially enter calendering device carry out press polish.
Meanwhile batching lift lever and will batch station 301 wait fly to connect work beam to be put into from the second intermediate station 302, batch shaft coupling Device closure drives and connects speed operation wait fly to connect work beam with the winged of 40 points/minute.
S17: the sheet feeding with cutter is opened, and toward Forward, the paper web on current work beam is pressed to wait fly Work beam is connect, and the cutter on sheet feeding cuts off the paper web on current work beam, while on sheet feeding Gas blow pipe is pressed on the paper web on current work beam wait fly to connect on work beam.
S18: unreeling lift lever and unreel on sky roll bracket 109 having unreeled the empty roller finished and put into, with will be empty by driving Roller is hung away.
Meanwhile the big paper roll on current work beam is moved to next work station by the double hook pull rod of devices for taking-up 30.
So far, entirely flying to connect reel change automatically terminates.
In conclusion it should be readily apparent to one skilled in the art that supercalender provided by the invention, by being put wait fly to connect Flying connecting joint is made on winding up roller, when the length of the remaining paper web of current let off roll is less than or equal to preset length, using flying to connect Connector will be wait fly to connect the paper that let off roll is Nian Jie with current let off roll, and the current let off roll of row cutting is discharged again after being bonded successfully Width makes wait fly to connect let off roll automatically into calender progress press polish, and realization carries out change of lap in non-stop-machine situation, automates journey Degree is high, can be shortened the change of lap time, improves the change of lap efficiency of supercalender.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of unwinding device of supercalender, which is characterized in that the unwinding device includes for placing current let off roll Unreel station and for placing the first intermediate station wait fly to connect let off roll;The unwinding device further comprises unreeling driving machine Structure, first unreel carrying mechanism, unreel winged connection mechanism and control system, wherein unreeling driving described in control system control Mechanism drives the current let off roll to be rotated in course of normal operation, and then described current to work normally speed release Paper web on let off roll, it is described to unreel when the length of paper web remaining on the current let off roll is less than or equal to preset length Driving mechanism disconnects driving to the current let off roll, and further control described first unreel carrying mechanism will it is described currently Let off roll is moved away from from the station that unreels, so that the current let off roll is in the described current for collecting of the unwinding device downstream It is rotated under the drive of the devices for taking-up for the paper web that let off roll is discharged;
The control system further control described in unreel driving mechanism driving from first intermediate station enter described in unreel station It is described rotated wait fly to connect let off roll, and unreel the paper web that winged connection mechanism is discharged the current let off roll described in controlling Wait fly to connect let off roll described in pressing to, so that the paper web that the current let off roll is discharged is preset on let off roll with described wait fly to connect Flying connecting joint be bonded, and cut off after the paper web that the current let off roll is discharged is bonded with the flying connecting joint The paper web that the current let off roll is discharged.
2. unwinding device according to claim 1, which is characterized in that the unwinding device includes described current for detecting The paper web that let off roll the is discharged detection device whether be bonded with the flying connecting joint.
3. unwinding device according to claim 1, which is characterized in that described to unreel winged connection mechanism further described current Purge gas is carried out in the cutting process for the paper web that let off roll is discharged, to blow away paper scrap caused by cutting process.
4. unwinding device according to claim 1, which is characterized in that the length of remaining paper web on the current let off roll When less than or equal to preset length, the control system unreels batching for speed and the devices for taking-up for the unwinding device Speed is switched to from the normal work speed to fly to connect speed, wherein described fly to connect speed less than the normal work speed.
5. unwinding device according to claim 4, which is characterized in that the current let off roll institute flown to connect under speed The tension on paper web that tension on the paper web of release is discharged by the current let off roll under the normal work speed 20%-40%.
6. unwinding device according to claim 1, which is characterized in that the unwinding device further comprises by described wait fly It connects let off roll and is transported to from first intermediate station and described unreel the second of station and unreel carrying mechanism.
7. a kind of supercalender, which is characterized in that the supercalender include the unwinding device, the devices for taking-up with And calendering device, wherein the paper web that the calendering device discharges the current let off roll carries out press polish, the devices for taking-up For collecting the paper web after press polish.
8. supercalender according to claim 7, which is characterized in that the devices for taking-up includes for placing current volume Take roller batches station and for placing the second intermediate station wait fly to connect work beam;
The devices for taking-up further comprises first batching driving mechanism, first batching carrying mechanism and batch winged connection mechanism, Wherein the control system control described first batches driving mechanism and drives the current work beam rotation in course of normal operation Turn, and then collects the paper web after press polish to work normally speed, the length of remaining paper web on the current let off roll When less than or equal to preset length, further controls described first and batch carrying mechanism and engaged with the current work beam, it is described First, which batches driving mechanism, disconnects driving to the current work beam so that described first batch carrying mechanism will it is described currently Work beam is moved away from from the station of batching, while the current work beam batches the volume Two being arranged on carrying mechanism described first It takes and is rotated under the driving of driving mechanism;
The control system, which further controls described first and batches driving mechanism and drive from second intermediate station, enters the volume Take the described of station to be rotated wait fly to connect work beam, and batch described in controlling winged connection mechanism by paper web to be collected press to it is described to Fly to connect work beam, and cut off the paper web to be collected, so that described can receive the subsequent paper wait fly to connect work beam Width.
9. supercalender according to claim 8, which is characterized in that described to batch winged connection mechanism described to be collected The paper web to be collected is pressed on described wait fly to connect on work beam by paper web by blowing method after being cut off.
10. supercalender according to claim 8, which is characterized in that the devices for taking-up further comprises will be described It is transported to from second intermediate station wait flying to connect work beam and described batch the second of station and batch carrying mechanism.
CN201710659007.8A 2017-08-03 2017-08-03 Supercalender and its unwinding device Pending CN109384068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710659007.8A CN109384068A (en) 2017-08-03 2017-08-03 Supercalender and its unwinding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710659007.8A CN109384068A (en) 2017-08-03 2017-08-03 Supercalender and its unwinding device

Publications (1)

Publication Number Publication Date
CN109384068A true CN109384068A (en) 2019-02-26

Family

ID=65413256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710659007.8A Pending CN109384068A (en) 2017-08-03 2017-08-03 Supercalender and its unwinding device

Country Status (1)

Country Link
CN (1) CN109384068A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4721266A (en) * 1985-09-17 1988-01-26 Oy Wartsila Ab Continuously running rewinder with pressure roller
CN1232779A (en) * 1998-04-20 1999-10-27 瓦尔梅特-卡尔斯塔德公司 Reel-up
CN2452974Y (en) * 2000-12-15 2001-10-10 湖北沙市轻工机械股份有限公司 Rocking arm type high speed paper unwinding frame
CN2452975Y (en) * 2000-12-15 2001-10-10 湖北沙市轻工机械股份有限公司 High speed and automatic reel changing type paper winding machine
US20040118964A1 (en) * 2002-12-20 2004-06-24 Kimberly-Clark Worldwide, Inc. Unwind system with flying-splice roll changing
CN202346467U (en) * 2011-11-30 2012-07-25 李金光 Rolling-up machine capable of automatically conducting material stop and lap alternation
CN102917968A (en) * 2010-03-16 2013-02-06 亚赛利纸业设备股份公司 Machine and method for winding reels of web material
CN203306793U (en) * 2013-06-17 2013-11-27 张磊 High-speed fully-automatic paper winding machine
CN205347882U (en) * 2016-01-13 2016-06-29 嘉兴市丰莱桑达贝纸业有限公司 Supercalender

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4721266A (en) * 1985-09-17 1988-01-26 Oy Wartsila Ab Continuously running rewinder with pressure roller
CN1232779A (en) * 1998-04-20 1999-10-27 瓦尔梅特-卡尔斯塔德公司 Reel-up
CN2452974Y (en) * 2000-12-15 2001-10-10 湖北沙市轻工机械股份有限公司 Rocking arm type high speed paper unwinding frame
CN2452975Y (en) * 2000-12-15 2001-10-10 湖北沙市轻工机械股份有限公司 High speed and automatic reel changing type paper winding machine
US20040118964A1 (en) * 2002-12-20 2004-06-24 Kimberly-Clark Worldwide, Inc. Unwind system with flying-splice roll changing
CN102917968A (en) * 2010-03-16 2013-02-06 亚赛利纸业设备股份公司 Machine and method for winding reels of web material
CN202346467U (en) * 2011-11-30 2012-07-25 李金光 Rolling-up machine capable of automatically conducting material stop and lap alternation
CN203306793U (en) * 2013-06-17 2013-11-27 张磊 High-speed fully-automatic paper winding machine
CN205347882U (en) * 2016-01-13 2016-06-29 嘉兴市丰莱桑达贝纸业有限公司 Supercalender

Similar Documents

Publication Publication Date Title
CN103014960B (en) Spinning machine and method for interrupting yarn production on a spinning machine
CN101827768B (en) Fiber web handling and/or production line and method in connection with fiber web handling and/or production line
CN110103032A (en) A kind of flying shear production line
CN101168419A (en) Method and device for preprocessing bobbin so as to compound-wound at an automatic cross-wound bobbin winder
US4134559A (en) Equipment for processing material in sheet or ribbon form
CN207325590U (en) A kind of positive waste product of coil of strip separates coiling system
CN212503144U (en) Automatic paper receiving machine
JP4478344B2 (en) A device that starts operation at the work site of a textile machine that produces cheese
CN109384068A (en) Supercalender and its unwinding device
CN205346440U (en) Coiling machine is cut to infantees
CN209975214U (en) Cloth inspecting machine capable of automatically adjusting cloth inspecting table
CN104803233B (en) The single removable disk system and method for low speed coiling unit
CN104973438A (en) Winding machine for winding fiber strips and method for winding fiber strips
CN206502440U (en) A kind of not stop unwinding machine
CN206244143U (en) A kind of horizontal volume to volume automatic deploying and retracting trigger
CN204817563U (en) Draw machine of rectifying to unreel and build a control system with rolling single action, linkage
CN105502057B (en) A kind of infantees cuts coiling machine
CN209009730U (en) A kind of paper unreels conveying device
KR101388171B1 (en) Surpass winder
CN106672707A (en) A method for correcting yarn movement at a working point of a textile machine producing cross wound bobbins
CN204823355U (en) Discharge apparatus of cutting machine
CN207192402U (en) Machine is rolled up again
CN206188074U (en) Wet winder suitable for non -weaving cloth cosmetic cotton water thorn production line
CN102815564A (en) Method in reeling of fiber webs and reel-up
CN1084401C (en) Device and method for automatically replacing feed lap packages and for preparing and joining relative edges in combing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190226