CN109378537A - A kind of battery 6, which fills 5, puts pulse formation technique - Google Patents

A kind of battery 6, which fills 5, puts pulse formation technique Download PDF

Info

Publication number
CN109378537A
CN109378537A CN201811456111.8A CN201811456111A CN109378537A CN 109378537 A CN109378537 A CN 109378537A CN 201811456111 A CN201811456111 A CN 201811456111A CN 109378537 A CN109378537 A CN 109378537A
Authority
CN
China
Prior art keywords
battery
current
carried out
minutes
charge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811456111.8A
Other languages
Chinese (zh)
Other versions
CN109378537B (en
Inventor
钦晓峰
陈林
陈瑛
汪章杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianneng Battery Wuhu Co Ltd
Original Assignee
Tianneng Battery Wuhu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianneng Battery Wuhu Co Ltd filed Critical Tianneng Battery Wuhu Co Ltd
Priority to CN201811456111.8A priority Critical patent/CN109378537B/en
Publication of CN109378537A publication Critical patent/CN109378537A/en
Application granted granted Critical
Publication of CN109378537B publication Critical patent/CN109378537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • H01M10/446Initial charging measures
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Secondary Cells (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

5, which are filled, the object of the present invention is to provide a kind of battery 6 puts pulse formation technique, by on constant current Process ba- sis, using partial pulse charging model, to reduce battery polarization, achieve the purpose that increase formation efficiency, and battery production production capacity can be significantly increased within 48h in total time control, solve the problems, such as that battery polarization is higher, formation efficiency is lower and the time is longer when constant current chemical synthesis technology works.

Description

A kind of battery 6, which fills 5, puts pulse formation technique
Technical field
5, which are filled, the present invention relates to battery manufacturing field more particularly to a kind of battery 6 puts pulse formation technique.
Background technique
At present in battery manufacturing field, when manufacturing battery, need to carry out battery the chemical conversion of charging and discharging Process, to guarantee the normal use of battery.And the chemical conversion treatment that battery is carried out at present, usually use constant current Electric current carries out charging and discharging, but aforesaid way is during the work time, and battery polarization is higher, and formation efficiency is lower, and when Between it is longer, influence the production quantity of product.Therefore, battery polarization is higher when solving the work of constant current chemical synthesis technology, formation efficiency compared with The low and time, longer problem was just particularly important.
Summary of the invention
In view of the above-mentioned problems of the prior art, filling 5 the object of the present invention is to provide a kind of battery 6 puts pulse formation Technique, by using partial pulse charging model, to reduce battery polarization, reaching increase chemical conversion effect on constant current Process ba- sis The purpose of rate, and battery production production capacity can be significantly increased within 48h in total time control.
The present invention, which provides a kind of battery 6 and fills 5, puts pulse formation technique, and steps are as follows for the chemical synthesis technology:
Step 1: battery is carried out constant-current charge 6 minutes with the positive current of 1A;
Step 2: battery is carried out constant-current charge 18 minutes with the positive current of 2A;
Step 3: battery is carried out constant-current charge 30 minutes with the positive current of 4A;
Step 4: battery is carried out constant-current charge 30 minutes with the positive current of 5.6A;
Step 5: battery is carried out constant-current charge 30 minutes with the positive current of 6.8A;
Step 6: battery is carried out constant-current charge 6 hours with the positive current of 8A;
Step 7: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 8A, -8A;
Step 8: electric discharge 48 minutes is carried out with the negative current of -10A to battery;
Step 9: electric discharge 48 minutes is carried out with the negative current of -6A to battery;
Step 10: battery is carried out constant-current charge 30 minutes 1 hour with the positive current of 10A;
Step 11: battery is carried out pulse charge and discharge 42 minutes 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 12: electric discharge 12 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 13: electric discharge 30 minutes is carried out with the negative current of -6A to battery;
Step 14: battery is carried out constant-current charge 30 minutes 1 hour with the positive current of 10A;
Step 15: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 10 six: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 9A, -9A;
Step 10 seven: electric discharge 30 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 10 eight: electric discharge 30 minutes is carried out with the negative current of -6A to battery;
Step 10 nine: battery is carried out constant-current charge 36 minutes 1 hour with the positive current of 10A;
Step 2 ten: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 2 11: battery is carried out pulse charge and discharge 6 minutes 3 hours with the negative current of the positive current of 9A, -9A;
Step 2 12: battery is carried out constant-current charge 30 minutes with the positive current of 1.8A;
Step 2 13: electric discharge 36 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 2 14: electric discharge 36 minutes is carried out with the negative current of -6A to battery;
Step 2 15: battery is carried out constant-current charge 45 minutes 1 hour with the positive current of 10A;
Step 2 16: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 2 17: battery is carried out pulse charge and discharge 2 hours with the negative current of the positive current of 9A, -9A;
Step 2 18: battery is carried out pulse charge and discharge 15 minutes 3 hours with the negative current of the positive current of 8.6A, -9A;
Step 2 19: battery is carried out constant-current charge 30 minutes with the positive current of 1.8A;
Step 3 ten: electric discharge 40 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 3 11: electric discharge 18 minutes is carried out with the negative current of -10A to battery;
Step 3 12: battery is carried out constant-current charge 45 minutes 1 hour with the positive current of 10A;
Step 3 13: battery is carried out pulse charge and discharge 30 minutes with the negative current of the positive current of 9A, -9A;
Step 3 14: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 8.6A, -9A;
Step 3 15: battery is carried out constant-current charge 1 hour with the positive current of 1.6A;
Step 3 16: battery is carried out constant-current charge 2 hours with the positive current of 0.4A, completes chemical synthesis technology.
Further improvement lies in that: voltage in the step 7 is 6.8V, and the voltage in step 8 is 11V, in step 9 Voltage be 8V, the voltage in step 12 is 11V, and the voltage in step 13 is 8V, and the voltage in step 10 seven is 10.8V, the voltage in step 10 eight are 8V, and the voltage in step 2 13 is 11V, and the voltage in step 2 14 is 8V, step Voltage in rapid 30 is 11V, and the voltage in step 3 11 is 10.1V.
Further improvement lies in that: it carries out carrying out taking out acid while constant-current charge in the step 3 16.
The beneficial effects of the present invention are: by constant current Process ba- sis, using partial pulse charging model, to reduce electricity Pond polarization achievees the purpose that increase formation efficiency, and battery production production capacity can be significantly increased within 48h in total time control, Solve the problems, such as that battery polarization is higher, formation efficiency is lower and the time is longer when constant current chemical synthesis technology works.
Specific embodiment
In order to deepen the understanding of the present invention, the present invention will be described in further detail with reference to the examples below, the embodiment For explaining only the invention, it is not intended to limit the scope of the present invention..
5 are filled the present embodiment provides a kind of battery 6 and puts pulse formation technique, and steps are as follows for the chemical synthesis technology:
Step 1: battery is carried out constant-current charge 6 minutes with the positive current of 1A;
Step 2: battery is carried out constant-current charge 18 minutes with the positive current of 2A;
Step 3: battery is carried out constant-current charge 30 minutes with the positive current of 4A;
Step 4: battery is carried out constant-current charge 30 minutes with the positive current of 5.6A;
Step 5: battery is carried out constant-current charge 30 minutes with the positive current of 6.8A;
Step 6: battery is carried out constant-current charge 6 hours with the positive current of 8A;
Step 7: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 8A, -8A;
Step 8: electric discharge 48 minutes is carried out with the negative current of -10A to battery;
Step 9: electric discharge 48 minutes is carried out with the negative current of -6A to battery;
Step 10: battery is carried out constant-current charge 30 minutes 1 hour with the positive current of 10A;
Step 11: battery is carried out pulse charge and discharge 42 minutes 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 12: electric discharge 12 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 13: electric discharge 30 minutes is carried out with the negative current of -6A to battery;
Step 14: battery is carried out constant-current charge 30 minutes 1 hour with the positive current of 10A;
Step 15: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 10 six: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 9A, -9A;
Step 10 seven: electric discharge 30 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 10 eight: electric discharge 30 minutes is carried out with the negative current of -6A to battery;
Step 10 nine: battery is carried out constant-current charge 36 minutes 1 hour with the positive current of 10A;
Step 2 ten: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 2 11: battery is carried out pulse charge and discharge 6 minutes 3 hours with the negative current of the positive current of 9A, -9A;
Step 2 12: battery is carried out constant-current charge 30 minutes with the positive current of 1.8A;
Step 2 13: electric discharge 36 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 2 14: electric discharge 36 minutes is carried out with the negative current of -6A to battery;
Step 2 15: battery is carried out constant-current charge 45 minutes 1 hour with the positive current of 10A;
Step 2 16: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 2 17: battery is carried out pulse charge and discharge 2 hours with the negative current of the positive current of 9A, -9A;
Step 2 18: battery is carried out pulse charge and discharge 15 minutes 3 hours with the negative current of the positive current of 8.6A, -9A;
Step 2 19: battery is carried out constant-current charge 30 minutes with the positive current of 1.8A;
Step 3 ten: electric discharge 40 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 3 11: electric discharge 18 minutes is carried out with the negative current of -10A to battery;
Step 3 12: battery is carried out constant-current charge 45 minutes 1 hour with the positive current of 10A;
Step 3 13: battery is carried out pulse charge and discharge 30 minutes with the negative current of the positive current of 9A, -9A;
Step 3 14: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 8.6A, -9A;
Step 3 15: battery is carried out constant-current charge 1 hour with the positive current of 1.6A;
Step 3 16: battery is carried out constant-current charge 2 hours with the positive current of 0.4A, completes chemical synthesis technology.
Voltage in the step 7 is 6.8V, and the voltage in step 8 is 11V, and the voltage in step 9 is 8V, step Voltage in 12 is 11V, and the voltage in step 13 is 8V, and the voltage in step 10 seven is 10.8V, the electricity in step 10 eight Pressure is 8V, and the voltage in step 2 13 is 11V, and the voltage in step 2 14 is 8V, and the voltage in step 3 ten is 11V, Voltage in step 3 11 is 10.1V.It carries out carrying out taking out acid while constant-current charge in the step 3 16.By in perseverance It flows on Process ba- sis, using partial pulse charging model, to reduce battery polarization, achievees the purpose that increase formation efficiency, and total Time controls within 48h, and battery production production capacity can be significantly increased.

Claims (3)

1. a kind of battery 6, which fills 5, puts pulse formation technique, it is characterised in that: steps are as follows for the chemical synthesis technology:
Step 1: battery is carried out constant-current charge 6 minutes with the positive current of 1A;
Step 2: battery is carried out constant-current charge 18 minutes with the positive current of 2A;
Step 3: battery is carried out constant-current charge 30 minutes with the positive current of 4A;
Step 4: battery is carried out constant-current charge 30 minutes with the positive current of 5.6A;
Step 5: battery is carried out constant-current charge 30 minutes with the positive current of 6.8A;
Step 6: battery is carried out constant-current charge 6 hours with the positive current of 8A;
Step 7: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 8A, -8A;
Step 8: electric discharge 48 minutes is carried out with the negative current of -10A to battery;
Step 9: electric discharge 48 minutes is carried out with the negative current of -6A to battery;
Step 10: battery is carried out constant-current charge 30 minutes 1 hour with the positive current of 10A;
Step 11: battery is carried out pulse charge and discharge 42 minutes 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 12: electric discharge 12 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 13: electric discharge 30 minutes is carried out with the negative current of -6A to battery;
Step 14: battery is carried out constant-current charge 30 minutes 1 hour with the positive current of 10A;
Step 15: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 10 six: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 9A, -9A;
Step 10 seven: electric discharge 30 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 10 eight: electric discharge 30 minutes is carried out with the negative current of -6A to battery;
Step 10 nine: battery is carried out constant-current charge 36 minutes 1 hour with the positive current of 10A;
Step 2 ten: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 2 11: battery is carried out pulse charge and discharge 6 minutes 3 hours with the negative current of the positive current of 9A, -9A;
Step 2 12: battery is carried out constant-current charge 30 minutes with the positive current of 1.8A;
Step 2 13: electric discharge 36 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 2 14: electric discharge 36 minutes is carried out with the negative current of -6A to battery;
Step 2 15: battery is carried out constant-current charge 45 minutes 1 hour with the positive current of 10A;
Step 2 16: battery is carried out pulse charge and discharge 1 hour with the negative current of the positive current of 9.4A, -9A;
Step 2 17: battery is carried out pulse charge and discharge 2 hours with the negative current of the positive current of 9A, -9A;
Step 2 18: battery is carried out pulse charge and discharge 15 minutes 3 hours with the negative current of the positive current of 8.6A, -9A;
Step 2 19: battery is carried out constant-current charge 30 minutes with the positive current of 1.8A;
Step 3 ten: electric discharge 40 minutes 1 hour is carried out with the negative current of -10A to battery;
Step 3 11: electric discharge 18 minutes is carried out with the negative current of -10A to battery;
Step 3 12: battery is carried out constant-current charge 45 minutes 1 hour with the positive current of 10A;
Step 3 13: battery is carried out pulse charge and discharge 30 minutes with the negative current of the positive current of 9A, -9A;
Step 3 14: battery is carried out pulse charge and discharge 30 minutes 1 hour with the negative current of the positive current of 8.6A, -9A;
Step 3 15: battery is carried out constant-current charge 1 hour with the positive current of 1.6A;
Step 3 16: battery is carried out constant-current charge 2 hours with the positive current of 0.4A, completes chemical synthesis technology.
2. a kind of battery 6 as described in claim 1, which fills 5, puts pulse formation technique, it is characterised in that: in the step 7 Voltage is 6.8V, and the voltage in step 8 is 11V, and the voltage in step 9 is 8V, and the voltage in step 12 is 11V, step Voltage in 13 is 8V, and the voltage in step 10 seven is 10.8V, and the voltage in step 10 eight is 8V, in step 2 13 Voltage is 11V, and the voltage in step 2 14 is 8V, and the voltage in step 3 ten is 11V, and the voltage in step 3 11 is 10.1V。
3. a kind of battery 6 as described in claim 1, which fills 5, puts pulse formation technique, it is characterised in that: the step 3 16 It carries out taking out acid while middle progress constant-current charge.
CN201811456111.8A 2018-11-30 2018-11-30 6-charging and 5-discharging pulse formation process for storage battery Active CN109378537B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811456111.8A CN109378537B (en) 2018-11-30 2018-11-30 6-charging and 5-discharging pulse formation process for storage battery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811456111.8A CN109378537B (en) 2018-11-30 2018-11-30 6-charging and 5-discharging pulse formation process for storage battery

Publications (2)

Publication Number Publication Date
CN109378537A true CN109378537A (en) 2019-02-22
CN109378537B CN109378537B (en) 2021-02-02

Family

ID=65375171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811456111.8A Active CN109378537B (en) 2018-11-30 2018-11-30 6-charging and 5-discharging pulse formation process for storage battery

Country Status (1)

Country Link
CN (1) CN109378537B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111082159A (en) * 2019-12-19 2020-04-28 江西新威动力能源科技有限公司 Formation method of lead-acid storage battery

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014109271A1 (en) * 2013-01-14 2014-07-17 Semiconductor Energy Laboratory Co., Ltd. Electrochemical device
CN104134826A (en) * 2014-07-09 2014-11-05 天能电池(芜湖)有限公司 Internal formation charging process using eighth charging and seventh discharging for accumulation battery
CN106058347A (en) * 2016-06-30 2016-10-26 济源市万洋绿色能源有限公司 Container formation pulse charging method for lead-acid storage battery

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014109271A1 (en) * 2013-01-14 2014-07-17 Semiconductor Energy Laboratory Co., Ltd. Electrochemical device
CN104134826A (en) * 2014-07-09 2014-11-05 天能电池(芜湖)有限公司 Internal formation charging process using eighth charging and seventh discharging for accumulation battery
CN106058347A (en) * 2016-06-30 2016-10-26 济源市万洋绿色能源有限公司 Container formation pulse charging method for lead-acid storage battery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111082159A (en) * 2019-12-19 2020-04-28 江西新威动力能源科技有限公司 Formation method of lead-acid storage battery

Also Published As

Publication number Publication date
CN109378537B (en) 2021-02-02

Similar Documents

Publication Publication Date Title
CN107742749B (en) A kind of acid-adding method of valve-control sealed lead acid battery
CN108598581A (en) A kind of chemical synthesizing method of soft bag lithium ionic cell
CN102945987B (en) Grading constant current charging method with voltage-controlled pulse
CN103579686A (en) Formation method of lead-acid storage battery
CN103384021A (en) Storage battery container formation charging process
CN102403536A (en) Formation method for cylindrical lithium battery
CN104134826B (en) A kind of accumulator eight is filled seven and is put and be internalized into charge technology
CN106785052A (en) A kind of chemical synthesizing method of lithium titanate battery
CN106972214B (en) A kind of internal formation process of lead-acid battery
CN102315417A (en) Novel liquid injection and activation process for lithium ion batteries
CN104638311B (en) Water system lithium iron battery chemical synthesizing method
CN110176638A (en) 20Ah battery reduces by two days charge technologies of charging energy consumption
CN102347516B (en) Inner forming process of tubular lead-acid storage battery
CN106711508A (en) Capacity grading method of high-voltage lithium ion battery
CN109616702B (en) Alternating pulse formation charging process
CN107369854A (en) A kind of fast battery pulse formation charging method
CN104377387A (en) Lead-acid storage battery multi-stage charging and discharging internalization process
CN104300179A (en) Container formation process for valve-regulated lead storage battery
CN102780046B (en) A kind of chemical synthesizing method of lead-acid battery
CN104134827A (en) Free-standing internal formation charging process for storage battery
CN104577217B (en) Internal formation process of lead-acid storage battery for energy storage
CN109378537A (en) A kind of battery 6, which fills 5, puts pulse formation technique
CN109616693B (en) 6-charging-5-discharging rapid formation process for storage battery
CN108270044A (en) A kind of industrial battery internal formation process
CN206250833U (en) The backup circuit of intelligent electric meter and its real-time clock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant