CN109377412A CN201811472187.XA CN201811472187A CN109377412A CN 109377412 A CN109377412 A CN 109377412A CN 201811472187 A CN201811472187 A CN 201811472187A CN 109377412 A CN109377412 A CN 109377412A
Authority
CN
China
Prior art keywords
artwork
auxiliary tone
dat2
importing
import
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811472187.XA
Other languages
Chinese (zh)
Other versions
CN109377412B (en
Inventor
任庭昊
卢颖
胡兵轩
覃禹铭
陈挺
毛杰
包义钊
代启璨
田家豪
张光余
郗新翔
陈杰
王海
熊讯
车询
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201811472187.XA priority Critical patent/CN109377412B/en
Publication of CN109377412A publication Critical patent/CN109377412A/en
Application granted granted Critical
Publication of CN109377412B publication Critical patent/CN109377412B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of intensive artwork maintenance system of auxiliary tone and its maintaining methods, including generalized information system and auxiliary tone intensification system, the artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system by generalized information system, manual intervention module before being provided with concurrent processing module, full-automatic import modul and final importing in auxiliary tone intensification system, concurrent processing module is used to handle multiple artwork maintenance requests of same period, full-automatic import modul automatically carries out artwork importing for program, and manual intervention module is used for when finally importing realistic model by manual examination and verification.Human cost is greatly saved by concurrent processing, full automatic importing in the present invention, manpower can be liberated and do more complicated monitoring work;Compared to other guiding flows, this method is brief and concise, and conditioning is clear, easy to implement, while complicated problem is decomposed integration.

Description

A kind of intensive artwork maintenance system of auxiliary tone and its maintaining method
Technical field
The invention belongs to a kind of intensive artwork maintenance system technical fields of auxiliary tone, and in particular to a kind of intensive figure of auxiliary tone Mould maintenance system and its maintaining method.
Background technique
Existing plant stand more than 160 in certain typical auxiliary tone intensification system, more than 1000 item of feeder line, feeder line picture 1100 is opened, is matched Net looped network Figure 200 remaining.Above-mentioned figure is that artificial picture mode generates, after by PCS-9000 system fill out library generate distribution Model, and as system subsequent acquisition, the basis of analysis, displaying.
Certain typical auxiliary tone intensification system imports GIS line chart 78 altogether and opens at present, and audit completes 78, and plan is real by the end of August Now all line charts import online, and final scale is up to 1500 feeder lines.By taking the 4-5 month as an example, an area: 211 unusual fluctuations, two Area: 322 unusual fluctuations, it is new to scheme: 138 feeder lines.So a large amount of unusual fluctuation is difficult to be handled with traditional approach, it is therefore desirable to full-automatic, Parallelization processing, while manual intervention timely again, can complete such huge work.
Summary of the invention
Technical problem solved by the present invention is a kind of intensive artwork maintenance system of auxiliary tone and its maintaining method are provided, with Solve above-mentioned problems of the prior art.
The technical scheme adopted by the invention is as follows: a kind of intensive artwork maintenance system of auxiliary tone, including generalized information system and with assembling The artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system, is provided in auxiliary tone intensification system by reduction system, generalized information system Manual intervention module before concurrent processing module, full-automatic import modul and final importing, concurrent processing module are same for handling Multiple artwork maintenance requests of one period, full-automatic import modul automatically carry out artwork importing, manual intervention mould for program Block is used for when finally importing realistic model by manual examination and verification.
Auxiliary tone intensification system uses PCS-9000.
A kind of maintaining method of the intensive artwork maintenance system of auxiliary tone, this method are as follows: generalized information system is by the figure of network distribution single line diagram Mould (SVG file and CIM) is transmitted to auxiliary tone intensification system, and auxiliary tone intensification system is concurrently located by concurrent processing module Reason, and carry out that trial importing work is performed fully automatic by full-automatic import modul, and by manual intervention before final import The manpower intervention intervention of module, it is artificial to approve and formally import, do not approve, does not import.
A kind of maintaining method of the intensive artwork maintenance system of auxiliary tone, this method comprising the following specific steps
1) GIS import figure, model correctly, the specified folder in one area of arrival of batch, from an area storage artwork Original document folder, copy all sub-folders to file A, and keep original bibliographic structure;
2) library red is imported in file A by the way of automatic flow, picture is imported, and form record list, in importing process If alarm can be issued by encountering various importing problems, if no problem automatically imports the library red, while by all pictures imported Form record list;
3) carry out all kinds of verification operations after import operation, including the verification of OID consistency desired result, null point breakpoint, sky hang it is standby Verification, generalized information system ID and other systems ID consistency desired result, bearing the same name verifies;
4) dispatcher can log in means check the red-black figures of all unusual fluctuations, if desired manual intervention configures in configuration file, when All figures that dispatcher's log in means imports before finding, and the figure newly imported, the graphics Web publishing in original system;
5) after a certain unusual fluctuation has been handled at the scene, when scheduling needs red figure to turn black figure, figure reality symbol is chosen from record list Feeder line set;Manual intervention closes to an end, and subsequent operation goes successively to automatic flow;
6) these feeder lines are copied to file B from original document folder;Portion is redistributed from original document folder for file B It uses;
7) according in step (4) original document folder, dispatcher and the garbled All Files folder of program are deleted;
8) in file B, dat2 is successively automatically imported according to former process;
9) Dat2 drags library to the library red.
When the artwork file of multiple feeder line figures enters auxiliary tone intensification system, auxiliary tone intensification system will be closed without association Figure, the model of system carry out parallel import operation.
The operating procedure of full-automatic import modul: before starting guiding flow, firstly, dragging library to dat2, new model dat3 Dat2 is imported, while stamping red icon note on dat2, by picture OID and model checking tool, after being placed in dat2 importing, as a result It shows on red-black figure.
If after manual intervention, artificial approval difference continues to import scadad logical base and verify, if scadad is verified Failure drags library to restore dat2, and restores scadad logical base by dat3, if scadad is proved to be successful, dat2 is backed up to dat3;If the artificial difference not approving red-black figure and showing, drags library to restore dat2 by dat3, and jump out process, stop holding Row follow-up link.
Beneficial effects of the present invention: compared with prior art, effect of the invention is as follows:
(1) human cost is greatly saved by concurrent processing, full automatic importing in the present invention, manpower can be liberated and be done More complicated monitoring work;
(2) other guiding flows are compared, this method is brief and concise, and conditioning is clear, and it is easy to implement, while complicated problem being decomposed Integration;
(3) it is based on the intensive artwork maintenance process of auxiliary tone of the present invention, is the important link of paperless office, is matched what GIS was generated Net line chart and the seamless importing auxiliary tone intensification system of model, and by artificial review operations, accomplish to ensure figure and mould The availability and authority of type;
(4) " semiclosed loop " and " closed-loop " two kinds of control models: " semi-closure may be selected in the intensive artwork maintenance process of auxiliary tone of the present invention Ring " refers to that every single stepping is carried out in next step by manual confirmation, and " closed-loop " refers to each ring of audit link in addition to must finally retain Section does not need manual intervention;
(5) after the completion of importing, the intensive artwork maintenance process of auxiliary tone of the present invention can show that all import successfully is lost with importing The route lost, and show failure cause.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
The present invention is described further below with reference to specific embodiment.
Embodiment 1: a kind of intensive artwork maintenance system of auxiliary tone, including generalized information system and auxiliary tone intensification system, GIS system The artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system by system, be provided in auxiliary tone intensification system concurrent processing module, Manual intervention module before full-automatic import modul and final importing, concurrent processing module are used to handle multiple figures of same period Mould maintenance request, full-automatic import modul automatically carry out artwork importing for program, and manual intervention module is for finally leading By manual examination and verification when entering realistic model.
Auxiliary tone intensification system uses PCS-9000.
Preferably, when the artwork file of multiple feeder line figures enters auxiliary tone intensification system, auxiliary tone intensification system in order to It handles as early as possible, the figure of not incidence relation, model is subjected to parallel import operation.
Preferably, all operations below full automatic execution.Before starting guiding flow, in order to guarantee that dat2 and dat3 is applied Library is consistent, drags library to dat2 dat3 first, and new model imports dat2, while red icon note is stamped on dat2, by picture OID It is as a result shown on red-black figure after being placed in dat2 importing with model checking tool.
Preferably, if after manual intervention, artificial approval difference continues to import scadad logical base and verify, if Scadad authentication failed drags library to restore dat2, and restores scadad logical base by dat3, if scadad is proved to be successful, Dat2 backs up to dat3;If the artificial difference not approving red-black figure and showing, library is dragged to restore dat2 by dat3, and jump out stream Journey stops executing follow-up link.
A kind of maintaining method specific implementation step of the intensive artwork maintenance system of auxiliary tone:
1) from the original document folder of area storage artwork, all sub-folders are copied to file A.The prerequisite of the operation is GIS import figure, model correctly, the specified folder in one area of arrival of batch, i.e., above described in original document In folder.Original contents are not influenced in order to which the subsequent additions and deletions for every artwork sub-folder change operation at this time, need first to copy one Part original document is pressed from both sides into file A, and keeps original bibliographic structure, so as to subsequent operation;
2) it is imported by the way of automatic flow in file A the library red (the same dat of mode), imports picture, and form record column Table.This step operation carries out to be automatic, if alarm can be issued by encountering various importing problems, if no problem automatically imports the library red. All pictures imported are formed into record list to have something to base on when subsequent artefacts' intervention simultaneously;
3) all kinds of verifications such as picture OID consistency desired result.All kinds of verification operations is carried out after import operation, including but not limited to OID consistency desired result, the verification of null point breakpoint, empty extension equipment verification, generalized information system ID and other systems ID consistency desired result are born the same name Verification;
4) dispatcher can log in means check the red-black figures of all unusual fluctuations.At this point, if desired manual intervention, it can be in configuration file Middle configuration, all figures imported before dispatcher's log in means can be found, and the figure, the original system that newly import In graphics Web publishing etc.;
5) after a certain unusual fluctuation has been handled at the scene, when scheduling needs red figure to turn black figure, figure reality symbol is chosen from record list Feeder line set.Manual intervention closes to an end at this time, and subsequent operation goes successively to automatic flow;
6) these feeder lines are copied to file B from original document folder by program.Since the route that manual intervention is chosen is not necessarily All figures in file A, model before, it is therefore desirable to be redistributed from original document folder a for file B use;
7) in being pressed from both sides original document according to the 4th step, dispatcher and the garbled All Files folder of program are (comprising confirmation and no Certainly) deletion.This step purpose is the route in order to be introduced only into manual intervention approval;
8) in file B, (dat2/3- > dscada) is successively automatically imported according to former process.This step remains as automation and leads Enter, if there is error in each sub-process imported, error content can be showed in the form of log and alarm;
9) Dat2 drags library to the library red so as to next round dispatcher operation.This operation is in order to which the process of next round imports.
The practical practical examination example of process: enter assuming that having carried out 10 feeder line figures from generalized information system successively between 0 point to 12 points of one day In original document folder:
1) from the original document folder of area storage artwork, this 10 sub-folders are copied into file A, and keep original catalogue Structure;
2) it is successively imported by the way of automatic flow in file A the library red (the same dat of mode), imports picture, and form record List.There are 10 new feeder line figures in the library red at that time, and also shows this 10 new feeder lines in record list;
3) the 11st feeder line enters in original document folder again at this time;
4) Sub_clause 11 feeder line is automatically admitted to file A, and is automatically imported;
5) all kinds of verifications such as picture OID consistency desired result are called after importing every time.If verification is not by refusing directly, if verification By retaining this feeder line;
6) at 3 points in dispatcher afternoon, log in means check the red-black figure of all unusual fluctuations.At this point, dispatcher can find 11 feeder lines Different condition;
7) dispatcher checks, it is found that the obvious unusual fluctuation of some feeder lines (such as feeder line 4,5) is wrong, be then marked in lists, this When 11 feeder lines had that two (4,5) are selected, and think wrong;
8) after the completion of night site operation, dispatcher is connected to instruction, feeder line 7,8 can with power transmission, need with after unusual fluctuation figure, Model imports actual system, switchs to actual model and is scheduled;
9) these feeder lines 7,8 are automatically copied to file B from original document folder by program.It is deleted in original document folder simultaneously Feeder line 4,5.Only 1,2,3,6,9,10,11 this several feeder lines in original document folder at this time;
10) in file B, (dat2/3- > dscada) is successively automatically imported according to former process.This step remains as automation and leads Enter, if there is error in each sub-process imported, error content can be showed in the form of log and alarm;
11) Dat2 drags library to the library red to import next time.
Example that the above description is merely a specific embodiment, scope of protection of the present invention is not limited thereto.It is ripe It knows the those skilled in the art in the technical scope disclosed by the present invention, change or replacement mode can be easily found, these It should be covered by the protection scope of the present invention.For this purpose, protection scope of the present invention should be with the protection model of the claim Subject to enclosing.

Claims (7)

1. a kind of intensive artwork maintenance system of auxiliary tone, it is characterised in that: including generalized information system and auxiliary tone intensification system, GIS system The artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system by system, be provided in auxiliary tone intensification system concurrent processing module, Manual intervention module before full-automatic import modul and final importing, concurrent processing module are used to handle multiple figures of same period Mould maintenance request, full-automatic import modul automatically carry out artwork importing for program, and manual intervention module is for finally leading By manual examination and verification when entering realistic model.
2. the intensive artwork maintenance system of a kind of auxiliary tone according to claim 2, it is characterised in that: auxiliary tone intensification system Using PCS-9000.
3. a kind of maintaining method of the intensive artwork maintenance system of auxiliary tone according to claim 1 to 2, feature exist In: this method are as follows: the artwork (SVG file and CIM) of network distribution single line diagram is transmitted to auxiliary tone intensification system, auxiliary tone by generalized information system Intensification system carries out concurrent processing by concurrent processing module, and carries out that trial is performed fully automatic by full-automatic import modul Work, and the manpower intervention intervention before final import by manual intervention module are imported, it is artificial to approve and formally import, no Approval does not import then.
4. according to a kind of maintaining method of any intensive artwork maintenance system of auxiliary tone of claim 3, it is characterised in that: This method comprising the following specific steps
1) GIS import figure, model correctly, the specified folder in one area of arrival of batch, from an area storage artwork Original document folder, copy all sub-folders to file A, and keep original bibliographic structure;
2) library red is imported in file A by the way of automatic flow, picture is imported, and form record list, in importing process If alarm can be issued by encountering various importing problems, if no problem automatically imports the library red, while by all pictures imported Form record list;
3) carry out all kinds of verification operations after import operation, including the verification of OID consistency desired result, null point breakpoint, sky hang it is standby Verification, generalized information system ID and other systems ID consistency desired result, bearing the same name verifies;
4) dispatcher can log in means check the red-black figures of all unusual fluctuations, if desired manual intervention configures in configuration file, when All figures that dispatcher's log in means imports before finding, and the figure newly imported, the graphics Web publishing in original system;
5) after a certain unusual fluctuation has been handled at the scene, when scheduling needs red figure to turn black figure, figure reality symbol is chosen from record list Feeder line set;Manual intervention closes to an end, and subsequent operation goes successively to automatic flow;
6) these feeder lines are copied to file B from original document folder;Portion is redistributed from original document folder for file B It uses;
7) according in step (4) original document folder, dispatcher and the garbled All Files folder of program are deleted;
8) in file B, dat2 is successively automatically imported according to former process;
9) Dat2 drags library to the library red.
5. a kind of maintaining method of the intensive artwork maintenance system of auxiliary tone according to claim 3, it is characterised in that: when more When the artwork file of a feeder line figure enters auxiliary tone intensification system, auxiliary tone intensification system is by the figure of not incidence relation, mould Type carries out parallel import operation.
6. a kind of test method of the intensive artwork maintenance system of auxiliary tone according to claim 3, it is characterised in that: entirely certainly The operating procedure of dynamic import modul: before starting guiding flow, firstly, dragging library to dat2 dat3, new model imports dat2, simultaneously Red icon note is stamped on dat2, as a result picture OID and model checking tool are shown and schemed in red and black after being placed in dat2 importing On.
7. a kind of test method of the intensive artwork maintenance system of auxiliary tone according to claim 3, it is characterised in that: if people After work is intervened, artificial approval difference continues to import scadad logical base and verify, if scadad authentication failed, passes through Dat3 drags library to restore dat2, and restores scadad logical base, if scadad is proved to be successful, dat2 backs up to dat3;If people For the difference not approving red-black figure and showing, drag library to restore dat2 by dat3, and jump out process, stop executing subsequent ring Section.
CN201811472187.XA 2018-12-04 2018-12-04 Intensive distribution and debugging graph model maintenance system and maintenance method thereof Active CN109377412B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811472187.XA CN109377412B (en) 2018-12-04 2018-12-04 Intensive distribution and debugging graph model maintenance system and maintenance method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811472187.XA CN109377412B (en) 2018-12-04 2018-12-04 Intensive distribution and debugging graph model maintenance system and maintenance method thereof

Publications (2)

Publication Number Publication Date
CN109377412A true CN109377412A (en) 2019-02-22
CN109377412B CN109377412B (en) 2021-12-03

Family

ID=65375607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811472187.XA Active CN109377412B (en) 2018-12-04 2018-12-04 Intensive distribution and debugging graph model maintenance system and maintenance method thereof

Country Status (1)

Country Link
CN (1) CN109377412B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110909101A (en) * 2019-11-21 2020-03-24 贵州电网有限责任公司 GIS import graph model quality monitoring and statistical method
CN111090710A (en) * 2019-11-15 2020-05-01 南京南瑞继保电气有限公司 Distribution network multi-time scale graph-model abnormal automatic maintenance method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102185383A (en) * 2011-05-16 2011-09-14 广东电网公司深圳供电局 Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System)
CN104361095A (en) * 2014-11-20 2015-02-18 国电南瑞科技股份有限公司 Dual-system-based graph-model data management method for power distribution network
CN104572881A (en) * 2014-12-23 2015-04-29 国家电网公司 Method for importing distribution network graph model based on multi-task concurrency
CN104951997A (en) * 2015-05-21 2015-09-30 北京科东电力控制系统有限责任公司 Multidimensional graphic and model quality analysis method facing power distribution network
CN105184673A (en) * 2015-08-31 2015-12-23 国家电网公司 Power distribution network graph/ model file visualized offline checking method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102185383A (en) * 2011-05-16 2011-09-14 广东电网公司深圳供电局 Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System)
CN104361095A (en) * 2014-11-20 2015-02-18 国电南瑞科技股份有限公司 Dual-system-based graph-model data management method for power distribution network
CN104572881A (en) * 2014-12-23 2015-04-29 国家电网公司 Method for importing distribution network graph model based on multi-task concurrency
CN104951997A (en) * 2015-05-21 2015-09-30 北京科东电力控制系统有限责任公司 Multidimensional graphic and model quality analysis method facing power distribution network
CN105184673A (en) * 2015-08-31 2015-12-23 国家电网公司 Power distribution network graph/ model file visualized offline checking method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111090710A (en) * 2019-11-15 2020-05-01 南京南瑞继保电气有限公司 Distribution network multi-time scale graph-model abnormal automatic maintenance method
CN110909101A (en) * 2019-11-21 2020-03-24 贵州电网有限责任公司 GIS import graph model quality monitoring and statistical method

Also Published As

Publication number Publication date
CN109377412B (en) 2021-12-03

Similar Documents

Publication Publication Date Title
US20150127579A1 (en) Method and apparatus to present an integrated process modeler
CN112395361B (en) Electric power engineering construction block chain management system
CN105677465B (en) The data processing method and device of batch processing are run applied to bank
CN109377412A (en) A kind of intensive artwork maintenance system of auxiliary tone and its maintaining method
CN110162365A (en) A kind of method and system being automatically brought into operation SAP business software
CN113258669A (en) Networked intelligent scheduling method and terminal based on distribution network maintenance
CN113157336A (en) C # language-based gripper configuration system, method, device and storage medium
CN107122338A (en) A kind of method that functional diagram for digitizing I&C system is automatically converted into configuration file
CN104298761A (en) Implementation method for master data matching between heterogeneous software systems
CN116860882B (en) Cloud storage resource management and control method and system based on blockchain
CN106022580A (en) Secondary system data control method covering whole process of intelligent substation
CN111242470B (en) Manufacturing resource modeling and calling method based on intelligent contract
CN108847714A (en) A kind of high voltage direct current transmission transient data wave recording device and control protective unit
CN111078951A (en) Power graph model data management system and method
CN111026451A (en) Parameter configuration method and configuration tool for transformer substation terminal interval
CN114443025B (en) Modularized ETL task processing system and ETL task processing method for data management platform
CN205898994U (en) Intelligent ammeter automated testing system
CN109240757A (en) Configuration management system and method in a kind of big data component set
CN109840184B (en) Scheduling method, system and equipment for operation display of power grid equipment
CN107577789A (en) Province based on information interactive bus ground artwork interconnected method
CN113671920A (en) Production flexibility control system
CN108875974B (en) Method for automatically generating production plan by electric power station equipment
CN112580942A (en) Substation operation ticket library configuration method and sequence control operation task generation method
CN111798199A (en) Power grid multi-state graph closed-loop management method and system
Zhang et al. Analysis of the advancement of rpa technology and its application in the financial field of electric power enterprises

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant