CN109377412A - A kind of intensive artwork maintenance system of auxiliary tone and its maintaining method - Google Patents
A kind of intensive artwork maintenance system of auxiliary tone and its maintaining method Download PDFInfo
- Publication number
- CN109377412A CN109377412A CN201811472187.XA CN201811472187A CN109377412A CN 109377412 A CN109377412 A CN 109377412A CN 201811472187 A CN201811472187 A CN 201811472187A CN 109377412 A CN109377412 A CN 109377412A
- Authority
- CN
- China
- Prior art keywords
- artwork
- auxiliary tone
- dat2
- importing
- import
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The invention discloses a kind of intensive artwork maintenance system of auxiliary tone and its maintaining methods, including generalized information system and auxiliary tone intensification system, the artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system by generalized information system, manual intervention module before being provided with concurrent processing module, full-automatic import modul and final importing in auxiliary tone intensification system, concurrent processing module is used to handle multiple artwork maintenance requests of same period, full-automatic import modul automatically carries out artwork importing for program, and manual intervention module is used for when finally importing realistic model by manual examination and verification.Human cost is greatly saved by concurrent processing, full automatic importing in the present invention, manpower can be liberated and do more complicated monitoring work;Compared to other guiding flows, this method is brief and concise, and conditioning is clear, easy to implement, while complicated problem is decomposed integration.
Description
Technical field
The invention belongs to a kind of intensive artwork maintenance system technical fields of auxiliary tone, and in particular to a kind of intensive figure of auxiliary tone
Mould maintenance system and its maintaining method.
Background technique
Existing plant stand more than 160 in certain typical auxiliary tone intensification system, more than 1000 item of feeder line, feeder line picture 1100 is opened, is matched
Net looped network Figure 200 remaining.Above-mentioned figure is that artificial picture mode generates, after by PCS-9000 system fill out library generate distribution
Model, and as system subsequent acquisition, the basis of analysis, displaying.
Certain typical auxiliary tone intensification system imports GIS line chart 78 altogether and opens at present, and audit completes 78, and plan is real by the end of August
Now all line charts import online, and final scale is up to 1500 feeder lines.By taking the 4-5 month as an example, an area: 211 unusual fluctuations, two
Area: 322 unusual fluctuations, it is new to scheme: 138 feeder lines.So a large amount of unusual fluctuation is difficult to be handled with traditional approach, it is therefore desirable to full-automatic,
Parallelization processing, while manual intervention timely again, can complete such huge work.
Summary of the invention
Technical problem solved by the present invention is a kind of intensive artwork maintenance system of auxiliary tone and its maintaining method are provided, with
Solve above-mentioned problems of the prior art.
The technical scheme adopted by the invention is as follows: a kind of intensive artwork maintenance system of auxiliary tone, including generalized information system and with assembling
The artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system, is provided in auxiliary tone intensification system by reduction system, generalized information system
Manual intervention module before concurrent processing module, full-automatic import modul and final importing, concurrent processing module are same for handling
Multiple artwork maintenance requests of one period, full-automatic import modul automatically carry out artwork importing, manual intervention mould for program
Block is used for when finally importing realistic model by manual examination and verification.
Auxiliary tone intensification system uses PCS-9000.
A kind of maintaining method of the intensive artwork maintenance system of auxiliary tone, this method are as follows: generalized information system is by the figure of network distribution single line diagram
Mould (SVG file and CIM) is transmitted to auxiliary tone intensification system, and auxiliary tone intensification system is concurrently located by concurrent processing module
Reason, and carry out that trial importing work is performed fully automatic by full-automatic import modul, and by manual intervention before final import
The manpower intervention intervention of module, it is artificial to approve and formally import, do not approve, does not import.
A kind of maintaining method of the intensive artwork maintenance system of auxiliary tone, this method comprising the following specific steps
1) GIS import figure, model correctly, the specified folder in one area of arrival of batch, from an area storage artwork
Original document folder, copy all sub-folders to file A, and keep original bibliographic structure;
2) library red is imported in file A by the way of automatic flow, picture is imported, and form record list, in importing process
If alarm can be issued by encountering various importing problems, if no problem automatically imports the library red, while by all pictures imported
Form record list;
3) carry out all kinds of verification operations after import operation, including the verification of OID consistency desired result, null point breakpoint, sky hang it is standby
Verification, generalized information system ID and other systems ID consistency desired result, bearing the same name verifies;
4) dispatcher can log in means check the red-black figures of all unusual fluctuations, if desired manual intervention configures in configuration file, when
All figures that dispatcher's log in means imports before finding, and the figure newly imported, the graphics Web publishing in original system;
5) after a certain unusual fluctuation has been handled at the scene, when scheduling needs red figure to turn black figure, figure reality symbol is chosen from record list
Feeder line set;Manual intervention closes to an end, and subsequent operation goes successively to automatic flow;
6) these feeder lines are copied to file B from original document folder;Portion is redistributed from original document folder for file B
It uses;
7) according in step (4) original document folder, dispatcher and the garbled All Files folder of program are deleted;
8) in file B, dat2 is successively automatically imported according to former process;
9) Dat2 drags library to the library red.
When the artwork file of multiple feeder line figures enters auxiliary tone intensification system, auxiliary tone intensification system will be closed without association
Figure, the model of system carry out parallel import operation.
The operating procedure of full-automatic import modul: before starting guiding flow, firstly, dragging library to dat2, new model dat3
Dat2 is imported, while stamping red icon note on dat2, by picture OID and model checking tool, after being placed in dat2 importing, as a result
It shows on red-black figure.
If after manual intervention, artificial approval difference continues to import scadad logical base and verify, if scadad is verified
Failure drags library to restore dat2, and restores scadad logical base by dat3, if scadad is proved to be successful, dat2 is backed up to
dat3;If the artificial difference not approving red-black figure and showing, drags library to restore dat2 by dat3, and jump out process, stop holding
Row follow-up link.
Beneficial effects of the present invention: compared with prior art, effect of the invention is as follows:
(1) human cost is greatly saved by concurrent processing, full automatic importing in the present invention, manpower can be liberated and be done
More complicated monitoring work;
(2) other guiding flows are compared, this method is brief and concise, and conditioning is clear, and it is easy to implement, while complicated problem being decomposed
Integration;
(3) it is based on the intensive artwork maintenance process of auxiliary tone of the present invention, is the important link of paperless office, is matched what GIS was generated
Net line chart and the seamless importing auxiliary tone intensification system of model, and by artificial review operations, accomplish to ensure figure and mould
The availability and authority of type;
(4) " semiclosed loop " and " closed-loop " two kinds of control models: " semi-closure may be selected in the intensive artwork maintenance process of auxiliary tone of the present invention
Ring " refers to that every single stepping is carried out in next step by manual confirmation, and " closed-loop " refers to each ring of audit link in addition to must finally retain
Section does not need manual intervention;
(5) after the completion of importing, the intensive artwork maintenance process of auxiliary tone of the present invention can show that all import successfully is lost with importing
The route lost, and show failure cause.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
The present invention is described further below with reference to specific embodiment.
Embodiment 1: a kind of intensive artwork maintenance system of auxiliary tone, including generalized information system and auxiliary tone intensification system, GIS system
The artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system by system, be provided in auxiliary tone intensification system concurrent processing module,
Manual intervention module before full-automatic import modul and final importing, concurrent processing module are used to handle multiple figures of same period
Mould maintenance request, full-automatic import modul automatically carry out artwork importing for program, and manual intervention module is for finally leading
By manual examination and verification when entering realistic model.
Auxiliary tone intensification system uses PCS-9000.
Preferably, when the artwork file of multiple feeder line figures enters auxiliary tone intensification system, auxiliary tone intensification system in order to
It handles as early as possible, the figure of not incidence relation, model is subjected to parallel import operation.
Preferably, all operations below full automatic execution.Before starting guiding flow, in order to guarantee that dat2 and dat3 is applied
Library is consistent, drags library to dat2 dat3 first, and new model imports dat2, while red icon note is stamped on dat2, by picture OID
It is as a result shown on red-black figure after being placed in dat2 importing with model checking tool.
Preferably, if after manual intervention, artificial approval difference continues to import scadad logical base and verify, if
Scadad authentication failed drags library to restore dat2, and restores scadad logical base by dat3, if scadad is proved to be successful,
Dat2 backs up to dat3;If the artificial difference not approving red-black figure and showing, library is dragged to restore dat2 by dat3, and jump out stream
Journey stops executing follow-up link.
A kind of maintaining method specific implementation step of the intensive artwork maintenance system of auxiliary tone:
1) from the original document folder of area storage artwork, all sub-folders are copied to file A.The prerequisite of the operation is
GIS import figure, model correctly, the specified folder in one area of arrival of batch, i.e., above described in original document
In folder.Original contents are not influenced in order to which the subsequent additions and deletions for every artwork sub-folder change operation at this time, need first to copy one
Part original document is pressed from both sides into file A, and keeps original bibliographic structure, so as to subsequent operation;
2) it is imported by the way of automatic flow in file A the library red (the same dat of mode), imports picture, and form record column
Table.This step operation carries out to be automatic, if alarm can be issued by encountering various importing problems, if no problem automatically imports the library red.
All pictures imported are formed into record list to have something to base on when subsequent artefacts' intervention simultaneously;
3) all kinds of verifications such as picture OID consistency desired result.All kinds of verification operations is carried out after import operation, including but not limited to
OID consistency desired result, the verification of null point breakpoint, empty extension equipment verification, generalized information system ID and other systems ID consistency desired result are born the same name
Verification;
4) dispatcher can log in means check the red-black figures of all unusual fluctuations.At this point, if desired manual intervention, it can be in configuration file
Middle configuration, all figures imported before dispatcher's log in means can be found, and the figure, the original system that newly import
In graphics Web publishing etc.;
5) after a certain unusual fluctuation has been handled at the scene, when scheduling needs red figure to turn black figure, figure reality symbol is chosen from record list
Feeder line set.Manual intervention closes to an end at this time, and subsequent operation goes successively to automatic flow;
6) these feeder lines are copied to file B from original document folder by program.Since the route that manual intervention is chosen is not necessarily
All figures in file A, model before, it is therefore desirable to be redistributed from original document folder a for file B use;
7) in being pressed from both sides original document according to the 4th step, dispatcher and the garbled All Files folder of program are (comprising confirmation and no
Certainly) deletion.This step purpose is the route in order to be introduced only into manual intervention approval;
8) in file B, (dat2/3- > dscada) is successively automatically imported according to former process.This step remains as automation and leads
Enter, if there is error in each sub-process imported, error content can be showed in the form of log and alarm;
9) Dat2 drags library to the library red so as to next round dispatcher operation.This operation is in order to which the process of next round imports.
The practical practical examination example of process: enter assuming that having carried out 10 feeder line figures from generalized information system successively between 0 point to 12 points of one day
In original document folder:
1) from the original document folder of area storage artwork, this 10 sub-folders are copied into file A, and keep original catalogue
Structure;
2) it is successively imported by the way of automatic flow in file A the library red (the same dat of mode), imports picture, and form record
List.There are 10 new feeder line figures in the library red at that time, and also shows this 10 new feeder lines in record list;
3) the 11st feeder line enters in original document folder again at this time;
4) Sub_clause 11 feeder line is automatically admitted to file A, and is automatically imported;
5) all kinds of verifications such as picture OID consistency desired result are called after importing every time.If verification is not by refusing directly, if verification
By retaining this feeder line;
6) at 3 points in dispatcher afternoon, log in means check the red-black figure of all unusual fluctuations.At this point, dispatcher can find 11 feeder lines
Different condition;
7) dispatcher checks, it is found that the obvious unusual fluctuation of some feeder lines (such as feeder line 4,5) is wrong, be then marked in lists, this
When 11 feeder lines had that two (4,5) are selected, and think wrong;
8) after the completion of night site operation, dispatcher is connected to instruction, feeder line 7,8 can with power transmission, need with after unusual fluctuation figure,
Model imports actual system, switchs to actual model and is scheduled;
9) these feeder lines 7,8 are automatically copied to file B from original document folder by program.It is deleted in original document folder simultaneously
Feeder line 4,5.Only 1,2,3,6,9,10,11 this several feeder lines in original document folder at this time;
10) in file B, (dat2/3- > dscada) is successively automatically imported according to former process.This step remains as automation and leads
Enter, if there is error in each sub-process imported, error content can be showed in the form of log and alarm;
11) Dat2 drags library to the library red to import next time.
Example that the above description is merely a specific embodiment, scope of protection of the present invention is not limited thereto.It is ripe
It knows the those skilled in the art in the technical scope disclosed by the present invention, change or replacement mode can be easily found, these
It should be covered by the protection scope of the present invention.For this purpose, protection scope of the present invention should be with the protection model of the claim
Subject to enclosing.
Claims (7)
1. a kind of intensive artwork maintenance system of auxiliary tone, it is characterised in that: including generalized information system and auxiliary tone intensification system, GIS system
The artwork of network distribution single line diagram is transmitted to auxiliary tone intensification system by system, be provided in auxiliary tone intensification system concurrent processing module,
Manual intervention module before full-automatic import modul and final importing, concurrent processing module are used to handle multiple figures of same period
Mould maintenance request, full-automatic import modul automatically carry out artwork importing for program, and manual intervention module is for finally leading
By manual examination and verification when entering realistic model.
2. the intensive artwork maintenance system of a kind of auxiliary tone according to claim 2, it is characterised in that: auxiliary tone intensification system
Using PCS-9000.
3. a kind of maintaining method of the intensive artwork maintenance system of auxiliary tone according to claim 1 to 2, feature exist
In: this method are as follows: the artwork (SVG file and CIM) of network distribution single line diagram is transmitted to auxiliary tone intensification system, auxiliary tone by generalized information system
Intensification system carries out concurrent processing by concurrent processing module, and carries out that trial is performed fully automatic by full-automatic import modul
Work, and the manpower intervention intervention before final import by manual intervention module are imported, it is artificial to approve and formally import, no
Approval does not import then.
4. according to a kind of maintaining method of any intensive artwork maintenance system of auxiliary tone of claim 3, it is characterised in that:
This method comprising the following specific steps
1) GIS import figure, model correctly, the specified folder in one area of arrival of batch, from an area storage artwork
Original document folder, copy all sub-folders to file A, and keep original bibliographic structure;
2) library red is imported in file A by the way of automatic flow, picture is imported, and form record list, in importing process
If alarm can be issued by encountering various importing problems, if no problem automatically imports the library red, while by all pictures imported
Form record list;
3) carry out all kinds of verification operations after import operation, including the verification of OID consistency desired result, null point breakpoint, sky hang it is standby
Verification, generalized information system ID and other systems ID consistency desired result, bearing the same name verifies;
4) dispatcher can log in means check the red-black figures of all unusual fluctuations, if desired manual intervention configures in configuration file, when
All figures that dispatcher's log in means imports before finding, and the figure newly imported, the graphics Web publishing in original system;
5) after a certain unusual fluctuation has been handled at the scene, when scheduling needs red figure to turn black figure, figure reality symbol is chosen from record list
Feeder line set;Manual intervention closes to an end, and subsequent operation goes successively to automatic flow;
6) these feeder lines are copied to file B from original document folder;Portion is redistributed from original document folder for file B
It uses;
7) according in step (4) original document folder, dispatcher and the garbled All Files folder of program are deleted;
8) in file B, dat2 is successively automatically imported according to former process;
9) Dat2 drags library to the library red.
5. a kind of maintaining method of the intensive artwork maintenance system of auxiliary tone according to claim 3, it is characterised in that: when more
When the artwork file of a feeder line figure enters auxiliary tone intensification system, auxiliary tone intensification system is by the figure of not incidence relation, mould
Type carries out parallel import operation.
6. a kind of test method of the intensive artwork maintenance system of auxiliary tone according to claim 3, it is characterised in that: entirely certainly
The operating procedure of dynamic import modul: before starting guiding flow, firstly, dragging library to dat2 dat3, new model imports dat2, simultaneously
Red icon note is stamped on dat2, as a result picture OID and model checking tool are shown and schemed in red and black after being placed in dat2 importing
On.
7. a kind of test method of the intensive artwork maintenance system of auxiliary tone according to claim 3, it is characterised in that: if people
After work is intervened, artificial approval difference continues to import scadad logical base and verify, if scadad authentication failed, passes through
Dat3 drags library to restore dat2, and restores scadad logical base, if scadad is proved to be successful, dat2 backs up to dat3;If people
For the difference not approving red-black figure and showing, drag library to restore dat2 by dat3, and jump out process, stop executing subsequent ring
Section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811472187.XA CN109377412B (en) | 2018-12-04 | 2018-12-04 | Intensive distribution and debugging graph model maintenance system and maintenance method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811472187.XA CN109377412B (en) | 2018-12-04 | 2018-12-04 | Intensive distribution and debugging graph model maintenance system and maintenance method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109377412A true CN109377412A (en) | 2019-02-22 |
CN109377412B CN109377412B (en) | 2021-12-03 |
Family
ID=65375607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811472187.XA Active CN109377412B (en) | 2018-12-04 | 2018-12-04 | Intensive distribution and debugging graph model maintenance system and maintenance method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109377412B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110909101A (en) * | 2019-11-21 | 2020-03-24 | 贵州电网有限责任公司 | GIS import graph model quality monitoring and statistical method |
CN111090710A (en) * | 2019-11-15 | 2020-05-01 | 南京南瑞继保电气有限公司 | Distribution network multi-time scale graph-model abnormal automatic maintenance method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102185383A (en) * | 2011-05-16 | 2011-09-14 | 广东电网公司深圳供电局 | Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System) |
CN104361095A (en) * | 2014-11-20 | 2015-02-18 | 国电南瑞科技股份有限公司 | Dual-system-based graph-model data management method for power distribution network |
CN104572881A (en) * | 2014-12-23 | 2015-04-29 | 国家电网公司 | Method for importing distribution network graph model based on multi-task concurrency |
CN104951997A (en) * | 2015-05-21 | 2015-09-30 | 北京科东电力控制系统有限责任公司 | Multidimensional graphic and model quality analysis method facing power distribution network |
CN105184673A (en) * | 2015-08-31 | 2015-12-23 | 国家电网公司 | Power distribution network graph/ model file visualized offline checking method |
-
2018
- 2018-12-04 CN CN201811472187.XA patent/CN109377412B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102185383A (en) * | 2011-05-16 | 2011-09-14 | 广东电网公司深圳供电局 | Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System) |
CN104361095A (en) * | 2014-11-20 | 2015-02-18 | 国电南瑞科技股份有限公司 | Dual-system-based graph-model data management method for power distribution network |
CN104572881A (en) * | 2014-12-23 | 2015-04-29 | 国家电网公司 | Method for importing distribution network graph model based on multi-task concurrency |
CN104951997A (en) * | 2015-05-21 | 2015-09-30 | 北京科东电力控制系统有限责任公司 | Multidimensional graphic and model quality analysis method facing power distribution network |
CN105184673A (en) * | 2015-08-31 | 2015-12-23 | 国家电网公司 | Power distribution network graph/ model file visualized offline checking method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111090710A (en) * | 2019-11-15 | 2020-05-01 | 南京南瑞继保电气有限公司 | Distribution network multi-time scale graph-model abnormal automatic maintenance method |
CN110909101A (en) * | 2019-11-21 | 2020-03-24 | 贵州电网有限责任公司 | GIS import graph model quality monitoring and statistical method |
Also Published As
Publication number | Publication date |
---|---|
CN109377412B (en) | 2021-12-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20150127579A1 (en) | Method and apparatus to present an integrated process modeler | |
CN112395361B (en) | Electric power engineering construction block chain management system | |
CN105677465B (en) | The data processing method and device of batch processing are run applied to bank | |
CN109377412A (en) | A kind of intensive artwork maintenance system of auxiliary tone and its maintaining method | |
CN110162365A (en) | A kind of method and system being automatically brought into operation SAP business software | |
CN113258669A (en) | Networked intelligent scheduling method and terminal based on distribution network maintenance | |
CN113157336A (en) | C # language-based gripper configuration system, method, device and storage medium | |
CN107122338A (en) | A kind of method that functional diagram for digitizing I&C system is automatically converted into configuration file | |
CN104298761A (en) | Implementation method for master data matching between heterogeneous software systems | |
CN116860882B (en) | Cloud storage resource management and control method and system based on blockchain | |
CN106022580A (en) | Secondary system data control method covering whole process of intelligent substation | |
CN111242470B (en) | Manufacturing resource modeling and calling method based on intelligent contract | |
CN108847714A (en) | A kind of high voltage direct current transmission transient data wave recording device and control protective unit | |
CN111078951A (en) | Power graph model data management system and method | |
CN111026451A (en) | Parameter configuration method and configuration tool for transformer substation terminal interval | |
CN114443025B (en) | Modularized ETL task processing system and ETL task processing method for data management platform | |
CN205898994U (en) | Intelligent ammeter automated testing system | |
CN109240757A (en) | Configuration management system and method in a kind of big data component set | |
CN109840184B (en) | Scheduling method, system and equipment for operation display of power grid equipment | |
CN107577789A (en) | Province based on information interactive bus ground artwork interconnected method | |
CN113671920A (en) | Production flexibility control system | |
CN108875974B (en) | Method for automatically generating production plan by electric power station equipment | |
CN112580942A (en) | Substation operation ticket library configuration method and sequence control operation task generation method | |
CN111798199A (en) | Power grid multi-state graph closed-loop management method and system | |
Zhang et al. | Analysis of the advancement of rpa technology and its application in the financial field of electric power enterprises |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |