CN109373799A - A kind of control method of blower fan of cooling tower control system - Google Patents

A kind of control method of blower fan of cooling tower control system Download PDF

Info

Publication number
CN109373799A
CN109373799A CN201811565004.9A CN201811565004A CN109373799A CN 109373799 A CN109373799 A CN 109373799A CN 201811565004 A CN201811565004 A CN 201811565004A CN 109373799 A CN109373799 A CN 109373799A
Authority
CN
China
Prior art keywords
frequency converter
temperature
cooling tower
frequency
blower fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811565004.9A
Other languages
Chinese (zh)
Inventor
黄象永
林定多
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dao Ming Chemical Co Ltd
Original Assignee
Jiangsu Dao Ming Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Dao Ming Chemical Co Ltd filed Critical Jiangsu Dao Ming Chemical Co Ltd
Priority to CN201811565004.9A priority Critical patent/CN109373799A/en
Publication of CN109373799A publication Critical patent/CN109373799A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F27/00Control arrangements or safety devices specially adapted for heat-exchange or heat-transfer apparatus
    • F28F27/003Control arrangements or safety devices specially adapted for heat-exchange or heat-transfer apparatus specially adapted for cooling towers

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Feedback Control In General (AREA)

Abstract

The invention discloses a kind of control method of blower fan of cooling tower control system, the following steps are included: A, on the outlet conduit of cooling tower installing temperature transmitter;B, power supply is installed on the power of frequency converter;C, the temperature signal of temperature transmitter is converted on the AI of current signal access frequency converter;D, the simulation flow gain and deviation for adjusting frequency converter, keep the temperature shown on frequency converter consistent with the temperature of in-situ transducer;E, outlet duct temperature is set on the panel of frequency converter, start frequency converter, when outlet temperature is higher than 30 DEG C, the working frequency 50Hz of frequency converter, when nighttime ambient temperature reduces, recirculated water can be with natural heat dissipation, outlet duct temperature is lower than 30 DEG C, frequency converter gradually subtracts frequency operation, when outlet temperature is consistently less than 30 DEG C, frequency converter is run according to the frequency 0Hz of minimum setting, this method in the control loop of frequency converter by being added pid algorithm, it does not need manpower and removes manipulation frequency converter, when frequency converter does not need to come into operation, frequency converter can be run according to low-limit frequency automatically, reduce the consumption of electric energy, it plays an important role in energy-saving and emission-reduction.

Description

A kind of control method of blower fan of cooling tower control system
Technical field
The present invention relates to blower fan of cooling tower control technology field, specially a kind of controlling party of blower fan of cooling tower control system Method.
Background technique
Cooling tower is to use water as circulating coolant, heat dissipation is absorbed from a system into atmosphere, to reduce water temperature Device;It is to carry out cold and hot exchange after contacting using water with air flowing to generate steam that its is cold, and steam volatilization is taken away heat and reached The principles such as evaporative heat loss, convective heat transfer and radiant heat transfer reduce water temperature to disperse the waste heat generated in industrial or refrigeration air-conditioner Evaporating radiator, to guarantee the normal operation of system, device is generally tubbiness, and therefore named is cooling tower.
Cooling tower is collection aerodynamics, thermodynamics, fluidics, chemistry, biochemistry, materialogy, quiet, dynamic structure power It learns, the condensation products that a variety of subjects such as processing technology are integrated.Water quality is the function of multivariable, and cooling is even more multifactor, changeable The amount process comprehensive with manifold effect.
Blower fan of cooling tower is located at the top of cooling tower, and main function is empty the heat after heat exchange has been carried out in cooling tower Gas is extracted out from top, and guidance Cryogenic air enters from bottom coohng tower air inlet.Blower fan of cooling tower is the core of entire cooling tower, There is the normal operation of blower fan of cooling tower, guarantees that Cryogenic air and hot water carry out sufficient heat exchange on filler, guarantee cooling The cooling effect of tower.In the industrial production, the electric loop of blower fan of cooling tower uses the form of across-the-line starting and varying frequency starting.
Summary of the invention
The purpose of the present invention is to provide a kind of control methods of blower fan of cooling tower control system, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the invention provides the following technical scheme: it is a kind of reduce electric energy consumption, in energy-saving and emission-reduction The control method of the blower fan of cooling tower control system to play an important role, the following steps are included: a kind of blower fan of cooling tower control system Control method, the following steps are included:
A, temperature transmitter is installed on the outlet conduit of cooling tower;
B, power supply is installed on the power of frequency converter;
C, the temperature signal of temperature transmitter is converted on the AI of current signal access frequency converter;
D, the simulation flow gain and deviation for adjusting frequency converter, make the temperature shown on frequency converter and the temperature of in-situ transducer one It causes.
E, outlet duct temperature is set on the panel of frequency converter, starts frequency converter;
Preferably, temperature transmitter or thermal resistance are installed on the outlet conduit according to step A cooling tower, temperature transmitter Range is 0 ~ 100 DEG C.
Preferably, the power supply of 24V is installed on the power according to step B frequency converter.
Preferably, the temperature signal according to step C temperature transmitter is converted into 4 ~ 20mA.
Preferably, it is described according on step E frequency converter panel setting outlet pipe outlet pipe temperature be 30 DEG C.
Preferably, the feedback frequency signal range according to step E frequency converter temperature transmitter after frequency converter operation For 0-50Hz, the frequency converter includes closed loop control mode, operational order mode and binding mode, operational order mode when It waits, operational order mode setting keyboard is given, and binding mode when is set as VF process reversed polarity, the circuit of the frequency converter Middle addition pid algorithm.
Preferably, a kind of control method of blower fan of cooling tower control system: it is characterized by: the pid algorithm includes
Step a: setting variable, the subordinating degree function of variable, fuzzy reasoning method and anti fuzzy method method;
Step b: setting inference rule determines the value of e and ec, and exact value kp, ki, kd after obtaining PID output variable establish control Decision inquiry table processed;
Step c: by VB, writing pid algorithm, and creates frequency converter frequency conversion control.
Compared with prior art, the beneficial effects of the present invention are:
This method does not need manpower and removes manipulation frequency converter, in frequency converter by the way that pid algorithm is added in the control loop of frequency converter When not needing to come into operation, frequency converter can be run according to low-limit frequency automatically, reduce the consumption of electric energy, there is weight in energy-saving and emission-reduction It acts on.
Detailed description of the invention
Fig. 1 is cutting machine body construction schematic diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is please referred to, the present invention provides a kind of technical solution: a kind of control method of blower fan of cooling tower control system, packet Include following steps:
A, temperature transmitter is installed on the outlet conduit of cooling tower;
B, power supply is installed on the power of frequency converter;
C, the temperature signal of temperature transmitter is converted on the AI of current signal access frequency converter;
D, the simulation flow gain and deviation for adjusting frequency converter, make the temperature shown on frequency converter and the temperature of in-situ transducer one It causes;
E, outlet duct temperature is set on the panel of frequency converter, starts frequency converter.
Temperature transmitter is installed on the outlet conduit of cooling tower, installed on the outlet conduit of cooling tower temperature transmitter or Thermal resistance, the range of temperature transmitter are 0 ~ 100 DEG C, and the temperature signal of temperature transmitter is converted into 4 ~ 20mA.
Setting outlet pipe outlet pipe temperature is 30 DEG C on frequency converter panel, and frequency converter temperature transmitter is transported through frequency converter Feedback frequency signal range after calculation is 0-50Hz, the power supply of 24V is installed on the power of frequency converter, the frequency converter includes closed loop Control model, operational order mode and binding mode, when operational order mode, operational order mode setting keyboard is given Calmly, VF process reversed polarity is set as when binding mode.
It is 30 DEG C that outlet duct temperature is arranged on the panel of frequency converter, starts frequency converter, when outlet temperature is higher than 30 DEG C, The working frequency 50Hz of frequency converter, when nighttime ambient temperature reduces, recirculated water can be lower than 30 with natural heat dissipation, outlet duct temperature DEG C, frequency converter gradually subtract frequency operation, when outlet temperature is consistently less than 30 DEG C, frequency converter according to minimum setting frequency 0Hz Operation, frequency converter are run according to low-limit frequency automatically, reduce the consumption of electric energy.
Pid algorithm is added in the circuit of frequency converter, pid algorithm includes
Step a: setting variable, the subordinating degree function of variable, fuzzy reasoning method and anti fuzzy method method;
Step b: setting inference rule determines the value of e and ec, and exact value kp, ki, kd after obtaining PID output variable establish control Decision inquiry table processed;
Step c: by VB, writing pid algorithm, and creates frequency converter frequency conversion control.
This method does not need manpower and removes manipulation frequency converter, becoming by the way that pid algorithm is added in the control loop of frequency converter When frequency device does not need to come into operation, frequency converter can be run according to low-limit frequency automatically, the consumption of electric energy be reduced, in energy-saving and emission-reduction It plays an important role.
The beneficial effects of the present invention are:
This method does not need manpower and removes manipulation frequency converter, in frequency converter by the way that pid algorithm is added in the control loop of frequency converter When not needing to come into operation, frequency converter can be run according to low-limit frequency automatically, reduce the consumption of electric energy, there is weight in energy-saving and emission-reduction It acts on.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of control method of blower fan of cooling tower control system, it is characterised in that: the following steps are included:
A, temperature transmitter is installed on the outlet conduit of cooling tower;
B, power supply is installed on the power of frequency converter;
C, the temperature signal of temperature transmitter is converted on the AI of current signal access frequency converter;
D, the simulation flow gain and deviation for adjusting frequency converter, make the temperature shown on frequency converter and the temperature of in-situ transducer one It causes;
E, outlet duct temperature is set on the panel of frequency converter, starts frequency converter.
2. a kind of control method of blower fan of cooling tower control system according to claim 1: it is characterized by: the basis Temperature transmitter or thermal resistance are installed, the range of temperature transmitter is 0 ~ 100 DEG C on the outlet conduit of step A cooling tower.
3. a kind of control method of blower fan of cooling tower control system according to claim 1: it is characterized by: the basis The power supply of 24V is installed on the power of step B frequency converter.
4. a kind of control method of blower fan of cooling tower control system according to claim 1: it is characterized by: the basis The temperature signal of step C temperature transmitter is converted into 4 ~ 20mA.
5. a kind of control method of blower fan of cooling tower control system according to claim 1: it is characterized by: the basis Setting outlet pipe outlet pipe temperature is 30 DEG C on step E frequency converter panel.
6. a kind of control method of blower fan of cooling tower control system according to claim 1: it is characterized by: the basis Feedback frequency signal range of the step E frequency converter temperature transmitter after frequency converter operation is 0-50Hz, and the frequency converter includes Closed loop control mode, operational order mode and binding mode, when operational order mode, operational order mode setting keyboard Given, binding mode when, is set as VF process reversed polarity, and pid algorithm is added in the circuit of the frequency converter.
7. a kind of control method of blower fan of cooling tower control system according to claim 6: it is characterized by: the PID Algorithm includes
Step a: setting variable, the subordinating degree function of variable, fuzzy reasoning method and anti fuzzy method method;
Step b: setting inference rule determines the value of e and ec, and exact value kp, ki, kd after obtaining PID output variable establish control Decision inquiry table processed;
Step c: by VB, writing pid algorithm, and creates frequency converter frequency conversion control.
CN201811565004.9A 2018-12-20 2018-12-20 A kind of control method of blower fan of cooling tower control system Pending CN109373799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811565004.9A CN109373799A (en) 2018-12-20 2018-12-20 A kind of control method of blower fan of cooling tower control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811565004.9A CN109373799A (en) 2018-12-20 2018-12-20 A kind of control method of blower fan of cooling tower control system

Publications (1)

Publication Number Publication Date
CN109373799A true CN109373799A (en) 2019-02-22

Family

ID=65370998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811565004.9A Pending CN109373799A (en) 2018-12-20 2018-12-20 A kind of control method of blower fan of cooling tower control system

Country Status (1)

Country Link
CN (1) CN109373799A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12065018B2 (en) 2020-12-18 2024-08-20 Carrier Corporation Transport refrigeration systems

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0409989A1 (en) * 1988-06-20 1991-01-30 Kanto Seiki Co., Ltd. Method of controlling temperature of machine tool and apparatus for practicing same
CN102707617A (en) * 2012-06-20 2012-10-03 北京金自能源科技发展有限公司 Method for realizing fuzzy PID (Proportion Integration Differentiation) ActiveX control
CN204902662U (en) * 2015-08-25 2015-12-23 林尧林 Adaptive cooling tower fan controller
CN204963107U (en) * 2015-07-22 2016-01-13 向君 Central air conditioning efficiency intelligent control device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0409989A1 (en) * 1988-06-20 1991-01-30 Kanto Seiki Co., Ltd. Method of controlling temperature of machine tool and apparatus for practicing same
CN102707617A (en) * 2012-06-20 2012-10-03 北京金自能源科技发展有限公司 Method for realizing fuzzy PID (Proportion Integration Differentiation) ActiveX control
CN204963107U (en) * 2015-07-22 2016-01-13 向君 Central air conditioning efficiency intelligent control device
CN204902662U (en) * 2015-08-25 2015-12-23 林尧林 Adaptive cooling tower fan controller

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12065018B2 (en) 2020-12-18 2024-08-20 Carrier Corporation Transport refrigeration systems

Similar Documents

Publication Publication Date Title
CN105571073B (en) A kind of subway station air-conditioner water system frequency conversion control energy-saving method
CN101782261B (en) Nonlinear self-adapting energy-saving control method for heating ventilation air-conditioning system
CN107023966B (en) Method for optimizing set value of outlet water temperature of cooling water of air conditioner of subway station
CN105605753B (en) Fresh air air-supply temperature control system based on multi-connected machine and new blower fan composite air conditioner system
CN104534917A (en) Energy-saving control device and method for closed cooling circulation system
CN107270469A (en) A kind of method and device of communication machine room temperature control
CN102889650A (en) Integral combination type computer room air conditioning unit and control method thereof
CN202310410U (en) Air supply control system of machine room equipment
CN104613597B (en) Control method and control device for efficient energy-saving air conditioning unit and air conditioning unit
CN103922575A (en) Energy-saving system of cooling air hose of glass annealing kiln and cooling method of glass tape
CN109373799A (en) A kind of control method of blower fan of cooling tower control system
CN107763890B (en) High-temperature heat pump system based on high-pressure liquid storage tank control and control method
CN107065543A (en) A kind of optimal Water temperature control method of recirculating cooling water system
CN204438896U (en) A kind of enclosed cooling recirculation system energy-saving control device
CN210197585U (en) Low-temperature air supply pipeline system applied to fungus laboratory
CN215086048U (en) Energy-saving system for removing white slag from blast furnace granulated slag
CN110017560A (en) Severe cold area Subway Tunnel waste heat utilization system and its operation method
CN105423275A (en) Biomass direct combustion power plant flue gas waste heat utilization system and method
CN203922996U (en) A kind of lear cooling duct energy conserving system
CN115581056A (en) Energy-saving prediction control method and system suitable for water cooling system of data center
CN209901656U (en) Furniture coating intelligent environment construction system
CN204860466U (en) Closed cowshed environmental control system
CN104964577B (en) A kind of radiator cooler being applied in direct air cooling system and its control method
CN207422524U (en) The bypass type fresh air air-treatment unit of cooling condition thermal energy consumption again can be eliminated
CN209524736U (en) A kind of agricultural and sideline product bakery hydrofuge waste-heat recovery device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222