Technical field
The present invention relates to a kind of auxiliary stands more particularly to a kind of rupture water pipe to install auxiliary stand.
Background technique
Water pipe is the pipeline to supply water, and water pipe is divided into metal tube, moulds multiple metal tube and three kinds of plastic tube, and wherein plastic tube uses
Ratio it is wide, after pipe burst, in order to not influence using, need to be connected water pipe with connector sleeve, at present be usually
Glue is directly coated on water pipe by maintenance personal, then covers connector sleeve on water pipe, and water pipe is connected, in such water pipe
Remaining moisture readily flows to cause glue to fail on glue, and so as to cause connector sleeve loosening, and connector sleeve is easy to cover excessive lead
The connection of influence water pipe is caused, so maintenance personal can carry out mark with marking pen on water pipe, it is more troublesome in this way.
Summary of the invention
In order to overcome maintenance personal manually to connect water pipe, so connector sleeve is easy to cause to loosen, and connector sleeve holds
Easily cover excessive disadvantage, technical problem are as follows: a kind of avoidable connector sleeve is provided and loosened, be can avoid connector sleeve and be easy excessive broken of set
Split water pipe installation auxiliary stand.
Technical solution is: a kind of rupture water pipe installation auxiliary stand, includes pedestal, strut, compression cylinder, piston, connection
Block, sliding sleeve, slide bar, holding rod, air inlet pipe, escape pipe, one-way cock, bellows, gas tube, air bag, rubber band, sliding block, spring,
Support plate, support rod, big casing, major connector, small casing, connector bar, exhaust pipe, the first valve and rubber protective shell, bottom
Seat top left side is equipped with strut and compression cylinder, and strut is located at compression cylinder right, and piston, right side in compression cylinder are equipped in compression cylinder
Top is connected with link block, and sliding sleeve is equipped on the left of link block, and sliding sleeve inner sliding type is equipped with slide bar, and top end of sliding rod, which is equipped with, to be held
Bar, among slide bar bottom end and top land, compression cylinder left lower is connected with air inlet pipe, and compression cylinder lower right side is connected with outlet
It manages, one-way cock is mounted on escape pipe and air inlet pipe, is connect on rear side of escape pipe with strut forward upper, escape pipe right end connects
It is connected to bellows, bellows right end is connected with gas tube, and gas tube right end is connected with air bag, right side and gas tube right end in air bag
Between be connected with rubber band, be provided with sliding slot on the right side of base top, sliding slot inner sliding type is set there are two sliding block, on the right side of the sliding block on right side
Be connected with spring between right side in sliding slot, be connected with support plate on sliding block, be connected with support rod, support rod top at the top of support plate
It holds and big casing is installed, two sides are respectively connected with major connector up and down in big casing, and two major connectors all connect with gas tube left part
Connect, be connected with small casing on the right side of big casing, two sides are respectively connected with connector bar up and down in small casing, two connector bars all with fill
The connection of tracheae right part, escape pipe left upper portion are connected with exhaust pipe, and the first valve, connection on the right side of support plate are equipped on exhaust pipe
There is rubber protective shell, is connect on the right side of rubber protective shell with base top right side.
It further, further include limited position mechanism, position-limit mechanism includes square block, circular block, square sleeve, guide rod, leads
Set, fastening bolt and semicircular plate, strut top are connected with square block, are connected with circular block at the top of square block, cover on square block
There is square sleeve, guide rod is installed on the right side of square sleeve, guide rod is equipped with guide sleeve, is equipped with fastening bolt, guide sleeve bottom at the top of guide sleeve
Portion is connected with semicircular plate.
It further, further include having guide sleeve, iron block and arc panel, guide rod is equipped with guide sleeve, and guide sleeve is located at a guide sleeve left side
Side, guide sleeve top are connected with iron block, and guide sleeve bottom is connected with arc panel.
The present invention is moved to water pipe left by maintenance personal, and then connector sleeve covers on big casing, then pushes big set to the right
Pipe drives small casing to move right, and drives gas tube to move right by major connector and connector bar, thus drive air bag to
It moves right, also support rod and support plate is driven to move right while big casing moves right, sliding block moves right therewith, spring
It is compressed.When air bag is moved in water pipe and small casing covers on water pipe, maintenance personal stops pushing big casing to the right, then
Holding rod to be held to move up and down, band moving slide-bar moves up and down, thus moved up and down with piston, it is extraneous when piston moves up
Air by air inlet pipe inspiration compression cylinder, when piston moves down, in compression cylinder air by escape pipe, bellows and
Gas tube is discharged into air bag, expands air bag, and rubber band is stretched, and repeatedly, extraneous air can be made constantly to be delivered to gas
Intracapsular, when air bag is contacted with pipe inner wall, maintenance personal unclamps holding rod, and glue is then coated in pipe outer wall, after coating,
Maintenance personal moves right connector sleeve, connector sleeve and water pipe is connected, since air bag is contacted with pipe inner wall, so as to keep away
Exempt from remaining moisture in water pipe and flow on glue that glue is caused to fail, and then can avoid connector sleeve and loosen.After connecting, maintenance
Personnel open the first valve, and under the action of rubber band, air bag restores to the original state, and the air in air bag is discharged from exhaust pipe.Entirely
After portion's discharge, maintenance personal closes the first valve, then unclamps big casing, and sliding block resets to the left under the action of the spring, drives
Big casing resets to the left, and air bag resets to the left therewith.
Maintenance personal is moved to the left or right guide sleeve, drives semicircular plate to be moved to the left or right, connector sleeve is adjusted
The distance to move right, the connection for the excessive influence water pipe for avoiding connector sleeve from moving right.After regulating, maintenance personal stops
It is moved to the left or right guide sleeve, then tightens fastening bolt, guide sleeve is fixed.After water pipe connects, maintenance personal is to moving up
Dynamic square sleeve, is moved to square sleeve on circular block, then rotates square sleeve, drives guide rod and guide sleeve rotation, thus
Semicircular plate rotation is driven, semicircular plate is turned on.
If connector sleeve, which moves right, certain difficulty, maintenance personal stirs to the right iron block, drives guide sleeve and arc
Plate moves right, and when arc panel, which moves right, to be contacted with connector sleeve, maintenance personal stops the iron block that moves right, and then constantly strikes
Hammer block makes arc panel push connector sleeve, so that connector sleeve can preferably move right.When connector sleeve move right to
When suitable position, maintenance personal stops tapping iron block.
It has the beneficial effect that the present invention is contacted by air bag with pipe inner wall, can avoid remaining moisture in water pipe and flow to glue
It is waterborne that glue is caused to fail, it is loosened to can avoid connector sleeve;By position-limit mechanism can adjust that connector sleeve moves right away from
From the connection for the excessive influence water pipe for avoiding connector sleeve from moving right;Iron block can be also constantly tapped, arc panel is made to push connection
Set, so that connector sleeve can preferably move right.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the enlarged diagram of part A of the present invention.
Parts title and serial number in figure: 1 pedestal, 2 struts, 3 compression cylinders, 4 pistons, 5 link blocks, 6 sliding sleeves, 7
Slide bar, 8 holding rods, 9 air inlet pipe, 10 escape pipes, 11 one-way cocks, 12 bellowss, 13 gas tubes, 14 air bags, 15 rubbers
Rubber band, 16 sliding slots, 17 sliding blocks, 18 springs, 19 support plates, 20 support rods, 21 big casings, 22 major connectors, 23 is small
Casing, 24 connector bars, 25 exhaust pipes, 26 first valves, 261 rubber protective shells, 27 position-limit mechanisms, 271 square blocks,
272 circular blocks, 273 square sleeves, 274 guide rods, 275 guide sleeves, 276 fastening bolts, 277 semicircular plates, 28 guiding
Set, 29 iron blocks, 30 arc panels.
Specific embodiment
Technical solution of the present invention is described further with reference to the accompanying drawing.
Embodiment 1
A kind of rupture water pipe installation auxiliary stand includes as shown in Figs. 1-2 pedestal 1, strut 2, compression cylinder 3, piston 4, connection
Block 5, sliding sleeve 6, slide bar 7, holding rod 8, air inlet pipe 9, escape pipe 10, one-way cock 11, bellows 12, gas tube 13, air bag 14, rubber
Rubber band 15, sliding block 17, spring 18, support plate 19, support rod 20, big casing 21, major connector 22, small casing 23, connector bar
24, exhaust pipe 25, the first valve 26 and rubber protective shell 261,1 top left side of pedestal are equipped with strut 2 and compression cylinder 3, strut 2
Piston 4 is equipped in 3 right of compression cylinder, compression cylinder 3, right upper portion is connected with link block 5,5 left side of link block in compression cylinder 3
Sliding sleeve 6 is installed, 6 inner sliding type of sliding sleeve is equipped with slide bar 7, and 7 top of slide bar is equipped with holding rod 8,4 top of 7 bottom end of slide bar and piston
Centre, 3 left lower of compression cylinder are connected with air inlet pipe 9, and 3 lower right side of compression cylinder is connected with escape pipe 10, escape pipe 10 and into
One-way cock 11 is mounted on tracheae 9,10 rear side of escape pipe is connect with 2 forward upper of strut, and 10 right end of escape pipe is connected with
Bellows 12,12 right end of bellows are connected with gas tube 13, and 13 right end of gas tube is connected with air bag 14, in air bag 14 right side with fill
It is connected with rubber band 15 between 13 right end of tracheae, 1 top right side of pedestal is provided with sliding slot 16, and 16 inner sliding type of sliding slot sets that there are two sliding
Block 17 is connected with spring 18 between 17 right side of sliding block and the interior right side of sliding slot 16 on right side, support plate 19 is connected on sliding block 17, is propped up
Support rod 20 is connected at the top of fagging 19,20 top of support rod is equipped with big casing 21, and upper and lower two sides are all connected in big casing 21
There is major connector 22, two major connectors 22 are all connect with 13 left part of gas tube, and small casing 23 is connected on the right side of big casing 21, small
Two sides are respectively connected with connector bar 24 up and down in casing 23, and two connector bars 24 are all connect with 13 right part of gas tube, escape pipe
10 left upper portions are connected with exhaust pipe 25, and the first valve 26 is equipped on exhaust pipe 25, and rubber guarantor is connected on the right side of support plate 19
Protective case 261,261 right side of rubber protective shell are connect with 1 top right side of pedestal.
Embodiment 2
A kind of rupture water pipe installation auxiliary stand includes as shown in Figs. 1-2 pedestal 1, strut 2, compression cylinder 3, piston 4, connection
Block 5, sliding sleeve 6, slide bar 7, holding rod 8, air inlet pipe 9, escape pipe 10, one-way cock 11, bellows 12, gas tube 13, air bag 14, rubber
Rubber band 15, sliding block 17, spring 18, support plate 19, support rod 20, big casing 21, major connector 22, small casing 23, connector bar
24, exhaust pipe 25, the first valve 26 and rubber protective shell 261,1 top left side of pedestal are equipped with strut 2 and compression cylinder 3, strut 2
Piston 4 is equipped in 3 right of compression cylinder, compression cylinder 3, right upper portion is connected with link block 5,5 left side of link block in compression cylinder 3
Sliding sleeve 6 is installed, 6 inner sliding type of sliding sleeve is equipped with slide bar 7, and 7 top of slide bar is equipped with holding rod 8,4 top of 7 bottom end of slide bar and piston
Centre, 3 left lower of compression cylinder are connected with air inlet pipe 9, and 3 lower right side of compression cylinder is connected with escape pipe 10, escape pipe 10 and into
One-way cock 11 is mounted on tracheae 9,10 rear side of escape pipe is connect with 2 forward upper of strut, and 10 right end of escape pipe is connected with
Bellows 12,12 right end of bellows are connected with gas tube 13, and 13 right end of gas tube is connected with air bag 14, in air bag 14 right side with fill
It is connected with rubber band 15 between 13 right end of tracheae, 1 top right side of pedestal is provided with sliding slot 16, and 16 inner sliding type of sliding slot sets that there are two sliding
Block 17 is connected with spring 18 between 17 right side of sliding block and the interior right side of sliding slot 16 on right side, support plate 19 is connected on sliding block 17, is propped up
Support rod 20 is connected at the top of fagging 19,20 top of support rod is equipped with big casing 21, and upper and lower two sides are all connected in big casing 21
There is major connector 22, two major connectors 22 are all connect with 13 left part of gas tube, and small casing 23 is connected on the right side of big casing 21, small
Two sides are respectively connected with connector bar 24 up and down in casing 23, and two connector bars 24 are all connect with 13 right part of gas tube, escape pipe
10 left upper portions are connected with exhaust pipe 25, and the first valve 26 is equipped on exhaust pipe 25, and rubber guarantor is connected on the right side of support plate 19
Protective case 261,261 right side of rubber protective shell are connect with 1 top right side of pedestal.
It further include limited position mechanism 27, position-limit mechanism 27 includes square block 271, circular block 272, square sleeve 273, leads
Bar 274, guide sleeve 275, fastening bolt 276 and semicircular plate 277,2 top of strut are connected with square block 271,271 top of square block
It is connected with circular block 272, square sleeve 273 is cased on square block 271, guide rod 274, guide rod are installed on the right side of square sleeve 273
274 are equipped with guide sleeve 275, are equipped with fastening bolt 276 at the top of guide sleeve 275,275 bottom of guide sleeve is connected with semicircular plate 277.
Embodiment 3
A kind of rupture water pipe installation auxiliary stand includes as shown in Figs. 1-2 pedestal 1, strut 2, compression cylinder 3, piston 4, connection
Block 5, sliding sleeve 6, slide bar 7, holding rod 8, air inlet pipe 9, escape pipe 10, one-way cock 11, bellows 12, gas tube 13, air bag 14, rubber
Rubber band 15, sliding block 17, spring 18, support plate 19, support rod 20, big casing 21, major connector 22, small casing 23, connector bar
24, exhaust pipe 25, the first valve 26 and rubber protective shell 261,1 top left side of pedestal are equipped with strut 2 and compression cylinder 3, strut 2
Piston 4 is equipped in 3 right of compression cylinder, compression cylinder 3, right upper portion is connected with link block 5,5 left side of link block in compression cylinder 3
Sliding sleeve 6 is installed, 6 inner sliding type of sliding sleeve is equipped with slide bar 7, and 7 top of slide bar is equipped with holding rod 8,4 top of 7 bottom end of slide bar and piston
Centre, 3 left lower of compression cylinder are connected with air inlet pipe 9, and 3 lower right side of compression cylinder is connected with escape pipe 10, escape pipe 10 and into
One-way cock 11 is mounted on tracheae 9,10 rear side of escape pipe is connect with 2 forward upper of strut, and 10 right end of escape pipe is connected with
Bellows 12,12 right end of bellows are connected with gas tube 13, and 13 right end of gas tube is connected with air bag 14, in air bag 14 right side with fill
It is connected with rubber band 15 between 13 right end of tracheae, 1 top right side of pedestal is provided with sliding slot 16, and 16 inner sliding type of sliding slot sets that there are two sliding
Block 17 is connected with spring 18 between 17 right side of sliding block and the interior right side of sliding slot 16 on right side, support plate 19 is connected on sliding block 17, is propped up
Support rod 20 is connected at the top of fagging 19,20 top of support rod is equipped with big casing 21, and upper and lower two sides are all connected in big casing 21
There is major connector 22, two major connectors 22 are all connect with 13 left part of gas tube, and small casing 23 is connected on the right side of big casing 21, small
Two sides are respectively connected with connector bar 24 up and down in casing 23, and two connector bars 24 are all connect with 13 right part of gas tube, escape pipe
10 left upper portions are connected with exhaust pipe 25, and the first valve 26 is equipped on exhaust pipe 25, and rubber guarantor is connected on the right side of support plate 19
Protective case 261,261 right side of rubber protective shell are connect with 1 top right side of pedestal.
It further include limited position mechanism 27, position-limit mechanism 27 includes square block 271, circular block 272, square sleeve 273, leads
Bar 274, guide sleeve 275, fastening bolt 276 and semicircular plate 277,2 top of strut are connected with square block 271,271 top of square block
It is connected with circular block 272, square sleeve 273 is cased on square block 271, guide rod 274, guide rod are installed on the right side of square sleeve 273
274 are equipped with guide sleeve 275, are equipped with fastening bolt 276 at the top of guide sleeve 275,275 bottom of guide sleeve is connected with semicircular plate 277.
It further include having guide sleeve 28, iron block 29 and arc panel 30, guide rod 274 is equipped with guide sleeve 28, and guide sleeve 28 is located at
275 left of guide sleeve is connected with iron block 29 at the top of guide sleeve 28, and 28 bottom of guide sleeve is connected with arc panel 30.
The present invention is moved to water pipe left by maintenance personal, and then connector sleeve covers on big casing 21, then is pushed to the right big
Casing 21 drives small casing 23 to move right, and drives gas tube 13 to move right by major connector 22 and connector bar 24, from
And air bag 14 is driven to move right, also drive support rod 20 and support plate 19 to move right while big casing 21 moves right,
Sliding block 17 moves right therewith, and spring 18 is compressed.When air bag 14 is moved in water pipe and 23 sets of small casing on water pipe, dimension
It repairs personnel to stop pushing big casing 21 to the right, then holds holding rod 8 and move up and down, band moving slide-bar 7 moves up and down, to drive work
Plug 4 moves up and down, and when piston 4 moves up, extraneous air passes through in 9 inspiration compression cylinder 3 of air inlet pipe, when piston 4 is downward
When mobile, air is discharged into air bag 14 by escape pipe 10, bellows 12 and gas tube 13 in compression cylinder 3, expands air bag 14,
Rubber band 15 is stretched, and repeatedly, extraneous air can be made constantly to be delivered in air bag 14, when air bag 14 connects with pipe inner wall
When touching, maintenance personal unclamps holding rod 8, and glue is then coated in pipe outer wall, and after coating, maintenance personal moves right connection
Set, connector sleeve and water pipe are connected, since air bag 14 is contacted with pipe inner wall, to can avoid remaining moisture in water pipe
Flowing on glue causes glue to fail, and then can avoid connector sleeve and loosen.After connecting, maintenance personal opens the first valve
26, under the action of rubber band 15, air bag 14 restores to the original state, and the air in air bag 14 is discharged from exhaust pipe 25.All discharges
Afterwards, maintenance personal closes the first valve 26, then unclamps big casing 21, sliding block 17 resets to the left under the action of spring 18, band
It moves big casing 21 to reset to the left, air bag 14 resets to the left therewith.
Maintenance personal is moved to the left or right guide sleeve 275, drives semicircular plate 277 to be moved to the left or right, is adjusted
The distance that connector sleeve moves right, the connection for the excessive influence water pipe for avoiding connector sleeve from moving right.After regulating, people is repaired
Member stops being moved to the left or right guide sleeve 275, then tightens fastening bolt 276, and guide sleeve 275 is fixed.After water pipe connects,
Maintenance personal moves up square sleeve 273, is moved to square sleeve 273 on circular block 272, then rotates square sleeve
273, it drives guide rod 274 and guide sleeve 275 to rotate, so that semicircular plate 277 be driven to rotate, semicircular plate 277 is turned on.
If connector sleeve, which moves right, certain difficulty, maintenance personal stirs to the right iron block 29, drives 28 He of guide sleeve
Arc panel 30 moves right, and when arc panel 30, which moves right, to be contacted with connector sleeve, maintenance personal stops the iron block 29 that moves right,
Then iron block 29 is constantly tapped, so that arc panel 30 is pushed connector sleeve, so that connector sleeve can preferably move right.When even
When female connector moves right to suitable position, maintenance personal stops tapping iron block 29.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any