CN109365949A - Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system - Google Patents

Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system Download PDF

Info

Publication number
CN109365949A
CN109365949A CN201811578846.8A CN201811578846A CN109365949A CN 109365949 A CN109365949 A CN 109365949A CN 201811578846 A CN201811578846 A CN 201811578846A CN 109365949 A CN109365949 A CN 109365949A
Authority
CN
China
Prior art keywords
copper pipe
pipeline
nitrogen
brazed
protection against
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811578846.8A
Other languages
Chinese (zh)
Inventor
邵智明
贾同友
樊庆钟
尤洪涛
安鲁宁
陈涛
李仑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Construction Group Nuclear Power Engineering Co Ltd
Original Assignee
China Electric Construction Group Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Construction Group Nuclear Power Engineering Co Ltd filed Critical China Electric Construction Group Nuclear Power Engineering Co Ltd
Priority to CN201811578846.8A priority Critical patent/CN109365949A/en
Publication of CN109365949A publication Critical patent/CN109365949A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K3/00Tools, devices, or special appurtenances for soldering, e.g. brazing, or unsoldering, not specially adapted for particular methods
    • B23K3/08Auxiliary devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Abstract

The present invention provides a kind of multi-pipeline copper pipes to be brazed nitrogen charging protection against oxidation system, is related to pipeline welding anti-oxidation equipment technical field.Multi-pipeline copper pipe soldering nitrogen charging protection against oxidation system includes that sequentially connected gas cylinder, main connecting line part, multi-pipeline branch transition part, secondary connecting line part and nitrogen filled protection rise plug portion;Gas cylinder is for providing anti-oxidation required nitrogen and pressure, and multi-pipeline branch transition part is for separating each branch path, and secondary connecting line part includes multiple branch paths, and multiple branch paths are set side by side;Rise plug portion and copper pipe of nitrogen filled protection is to be detachably connected, and is blocked for copper pipe when will be in nitrogen charging state.It solves in the prior art, using the technical problem that traditional anti-oxidation mode scope of application is small, poor operability and service efficiency are low.The nitrogen filled protection of the invention plug portion that rises is detachably connected with copper pipe, applied widely, strong operability.

Description

Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system
Technical field
The present invention relates to pipelines to weld anti-oxidation equipment technical field, is brazed nitrogen charging more particularly, to a kind of multi-pipeline copper pipe Protection against oxidation system.
Background technique
Copper tube is widely used in industry and civil air conditioner, the air-treatment unit and outdoor pressure of industry and civil air conditioner Contracting unit is connected by copper tube, and for the pipeline of other materials, copper tube compression resistance is high, not perishable, uses the longevity Life length;Refrigerant tubing is connect with evaporator and compressor, relative to the pipeline of other materials, the heating conduction of refrigeration copper tube Height, heat transfer effect is good, and welding performance and mechanical strength are good, installs again suitable for air-conditioning telephone-moving.But because of the fusing point of copper pipe Low, copper pipe welding mostly uses soldering, but finds during soldering, due to the metallic character of copper, under heating conditions It is easy to that oxidation reaction generation oxide layer (CuO occurs with oxygen2=2CuO), when soldering excessive oxide generation, reduce The lubricating action of refrigerant in air-conditioning refrigeration system, causes the insulating motor coil in compressor of air conditioner to be deteriorated, and aggravates The abrasion of all parts in compressor in compression chamber shortens air-conditioning service life, causes air-conditioning power consumption to rise, air-conditioning system Cold efficiency reduces, and will appear the blocking of the attachmentes such as pipeline, device for drying and filtering, electric expansion valve when serious, causes air-conditioning normal Operation.
The existing method for preventing air-conditioning copper pipe from aoxidizing in soldering is: after copper tube arrangement installation, in brazed portions Welding closure plate in distal end connects nitrogen cylinder later and is passed directly into nitrogen.Maintaining nitrogen charged pressure in the whole process is 0.2Mpa, Continue nitrogen charging terminates to welding, and copper tube is completely cooled, prevents the oxidation of copper tube;After nitrogen is filled with, closure plate is removed And it repeats the above steps and completes the soldering of subsequent copper pipe weld bond.
But there are some problems for the anti-oxidation method of existing nitrogen charging: needing in advance before being brazed copper pipe in copper pipe every time Closure plate is welded at great distance end, needs to cut off one section of copper pipe that polishing is connect with closure plate simultaneously after copper pipe soldering, cumbersome and cause The waste of copper pipe;It needs to select suitable closure plate according to the diameter of copper tube every time, a set of closure plate and nitrogen cylinder are only used for one The anti-oxidation soldering of road copper pipe nitrogen filled protection, the scope of application is smaller, is unable to satisfy more than ten road copper in large-scale air cooling compressed air conditioner Brazing requirements, service efficiency are low simultaneously for pipeline.
Summary of the invention
The purpose of the present invention is to provide a kind of multi-pipeline copper pipes to be brazed nitrogen charging protection against oxidation system, to solve existing skill Present in art, using the technical problem that traditional anti-oxidation mode scope of application is small, poor operability and service efficiency are low.
A kind of multi-pipeline copper pipe soldering nitrogen charging protection against oxidation system provided by the invention, including sequentially connected gas cylinder, Main connecting line part, multi-pipeline branch transition part, secondary connecting line part and nitrogen filled protection rise plug portion;
The gas cylinder is for providing anti-oxidation required nitrogen and pressure, and multi-pipeline branch transition part is for separating Each branch path, the secondary connecting line part includes multiple branch paths, and multiple branch paths are set side by side;The nitrogen filled protection rises plug Part is to be detachably connected with copper pipe, is blocked for copper pipe when will be in nitrogen charging state.
Further, multi-pipeline branch transition part includes connecting pipe;
One end of the connecting pipe is connected to main connecting line part, and the other end of the connecting pipe is equipped with connection Portion, the quantity of the interconnecting part be it is multiple, multiple interconnecting parts are set side by side, and each interconnecting part is correspondingly connected with each branch path.
Further, the connecting pipe includes the first connecting tube and the second connecting tube;
One end of first connecting tube is connected to main connecting line part, the other end and second of first connecting tube Connecting tube connection, the interconnecting part are located in second connecting tube.
Further, the interconnecting part includes communication port and valve ejector pin valve, and the communication port is connected to branch path, described Valve ejector pin valve is connected in communication port, separates each branch path for converting.
Further, multi-pipeline branch transition part further includes pressure gauge;
The pressure gauge is connected in the second connecting tube, the pressure of the gas for detecting multi-pipeline branch transition part.
Further, the nitrogen filled protection rise plug portion include the first binding clip, it is the second binding clip, rubber ring, tight Fixing bolt and outer silk short tube;
One end of the outer silk short tube connects the first binding clip, the rubber ring, the second binding clip and fastening bolt It is successively socketed on the other end of outer silk short tube from the bottom to top, is provided with external screw thread on the other end of the outer silk short tube, it is described Fastening bolt is connect with external screw thread.
Further, non-return valve is additionally provided on multi-pipeline branch transition part.
Further, the gas cylinder is nitrogen cylinder.
Further, the outlet end of the nitrogen cylinder is equipped with cylinder pressure gauge and valve.
Further, multi-pipeline branch transition part further includes support frame;
First connecting tube and the second connecting tube are set on the support frame.
Multi-pipeline copper pipe provided by the invention is brazed nitrogen charging protection against oxidation system, the gas cylinder, main connecting line part, Multi-pipeline branch transition part, secondary connecting line part and the nitrogen filled protection plug portion that rises are sequentially connected, and the gas cylinder is for providing Nitrogen is transmitted to multi-pipeline branch transition part, multitube by main connecting line part by anti-oxidation required nitrogen and pressure The separation to each branch path is realized in road branch transition part, is realized by secondary connecting line part nitrogen being transmitted to each branch Road is risen the connection of plug portion and copper pipe by nitrogen filled protection, the closure of copper pipe when realizing to nitrogen charging state;Nitrogen filled protection rises plug Part also meets different air-conditioning copper pipe calibers to connection while solving the problems, such as that the attended operation of traditional copper pipe closure plate is poor It is required that substantially increasing the service efficiency that copper pipe is brazed anti-oxidation system;Relative to traditional closure plate for anti-oxidation method, Closure plate welding and disassembly are avoided, the waste of air-conditioning copper pipe is reduced while reducing the duration, saves the totle drilling cost of construction.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram that multi-pipeline copper pipe provided in an embodiment of the present invention is brazed nitrogen charging protection against oxidation system;
Fig. 2 is the multi-pipeline branch turn that multi-pipeline copper pipe provided in an embodiment of the present invention is brazed nitrogen charging protection against oxidation system Change the main view of part;
Fig. 3 is the multi-pipeline branch turn that multi-pipeline copper pipe provided in an embodiment of the present invention is brazed nitrogen charging protection against oxidation system Change the top view of part;
Fig. 4 is that multi-pipeline copper pipe provided in an embodiment of the present invention is brazed the nitrogen filled protection of nitrogen charging protection against oxidation system and rises plug Partial structural schematic diagram.
Icon: 100- gas cylinder;The main connecting line part 200-;300- multi-pipeline branch transition part;400- connecting tube Road part;500- nitrogen filled protection rises plug portion;101- cylinder pressure gauge;102- valve;401- branch path;301- connecting pipe; The first connecting tube of 302-;The second connecting tube of 303-;304- interconnecting part;305- communication port;306- valve ejector pin valve;307- pressure Table;308- support frame;The first binding clip of 501-;The second binding clip of 502-;503- rubber ring;504- fastening bolt;505- Outer silk short tube.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that such as occur term " center ", "upper", "lower", "left", "right", The orientation or positional relationship of the instructions such as "vertical", "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, Be merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.In addition, such as there is term " One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " peace such as occur Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
The present invention provides a kind of multi-pipeline copper pipes to be brazed nitrogen charging protection against oxidation system, and the multi-pipeline copper pipe soldering is filled Nitrogen protection against oxidation system includes sequentially connected gas cylinder 100, main connecting line part 200, multi-pipeline branch transition part 300, secondary connecting line part 400 and nitrogen filled protection rise plug portion 500;The gas cylinder 100 is for providing anti-oxidation required nitrogen Gas and pressure, multi-pipeline branch transition part 300 are wrapped for separating each branch path 401, the secondary connecting line part 400 Multiple branch paths 401 are included, multiple branch paths 401 are set side by side;Rise plug portion 500 and copper pipe of the nitrogen filled protection is detachably to connect It connects, is blocked for copper pipe when will be in nitrogen charging state.
As shown in Figure 1, a kind of multi-pipeline copper pipe provided by the invention is brazed nitrogen charging protection against oxidation system, gas cylinder 100, master Connecting line part 200, multi-pipeline branch transition part 300, secondary connecting line part 400 and nitrogen filled protection rise plug portion 500 Be sequentially connected, the main connecting line part 200 be connecting tube, the gas cylinder 100 for provide anti-oxidation required nitrogen and Nitrogen is transmitted to multi-pipeline branch transition part 300, multi-pipeline branch transition portion by main connecting line part 200 by pressure Divide separation of 300 realizations to each branch path 401, is realized by secondary connecting line part 400 and nitrogen is transmitted to each branch path 401, it is connect by the nitrogen filled protection plug portion 500 that rises with copper pipe, the closure of copper pipe when realizing to nitrogen charging state;Nitrogen filled protection rises Plug portion 500 also meets different air-conditioning copper pipe calibers pair while solving the problems, such as that the attended operation of traditional copper pipe closure plate is poor The requirement of connection substantially increases the service efficiency that copper pipe is brazed anti-oxidation system;The side anti-oxidation relative to traditional closure plate For method, closure plate welding and disassembly are avoided, the waste of air-conditioning copper pipe is reduced while reducing the duration, saves construction Totle drilling cost.
Further, multi-pipeline branch transition part 300 includes connecting pipe 301;The one of the connecting pipe 301 End is connected to main connecting line part 200, and the other end of the connecting pipe 301 is equipped with interconnecting part 304, the interconnecting part 304 quantity be it is multiple, multiple interconnecting parts 304 are set side by side, and each interconnecting part 304 is correspondingly connected with each branch path 401.
As shown in Figure 1-3, the front end of the connecting pipe 301 is connected to main connecting line part 200, the connecting pipe 301 rear end is equipped with interconnecting part 304, the quantity of the interconnecting part 304 be it is multiple, multiple interconnecting parts 304 are set side by side, each Interconnecting part 304 is correspondingly connected with each branch path 401;The connection of connection respective numbers can be selected according to the quantity of branch path 401 Portion 304 guarantees to carry out the anti-oxidation operation of nitrogen charging to multiple air-conditioning copper tubes simultaneously, applied widely.
Further, the connecting pipe 301 includes the first connecting tube 302 and the second connecting tube 303;First connection One end of pipe 302 is connected to main connecting line part 200, and the other end of first connecting tube 302 and the second connecting tube 303 connect Logical, the interconnecting part 304 is located in second connecting tube 303.
As shown in Figure 1-3, the front end of first connecting tube 302 is connected to main connecting line part 200, described first connects The rear end of adapter tube 302 is connected to the second connecting tube 303, and second connecting tube 303 is equipped with interconnecting part 304, realizes main connection Conversion and connection of the pipeline portions 200 to secondary connecting line part 400.
It should be noted that preferably, second connecting tube 303 is perpendicular to the first connecting tube 302, so that being passed into The nitrogen of one connecting tube 302 can be equably passed into each branch path 401, meanwhile, the first connecting tube 302 is connect with second Pipe 303 is vertically arranged, and setting is convenient.
Further, the interconnecting part 304 includes communication port 305 and valve ejector pin valve 306, the communication port 305 with point Branch 401 is connected to, and the valve ejector pin valve 306 is connected in communication port 305, separates each branch path 401 for converting.
As shown in Figure 1-3, the communication port 305 is located in the second connecting tube 303, the branch path 401 passes through communication port 305 are connected to the second connecting tube 303, and the valve ejector pin valve 306 is connected in communication port 305, when the pressure of gas reaches one Fixed amount, valve ejector pin valve 306 are automatically closed, and avoid nitrogen from continuing to input the branch path 401, so that gas is passed into others In branch path 401, and then realize that the conversion to each branch path 401 separates, and time connecting line part is removed at the end of soldering It is automatically closed after 400.
Further, multi-pipeline branch transition part 300 further includes pressure gauge 307;The pressure gauge 307 is connected to In second connecting tube 303, the pressure of the gas for detecting multi-pipeline branch transition part 300.
As shown in Figure 1-3, the right end of second connecting tube 303 is equipped with pressure gauge 307, pressure gauge 307 can be to multitube The pressure of the gas of road branch transition part 300 is recorded, and observation and record are facilitated, the situation that reply occurs in time.
Further, the nitrogen filled protection rise plug portion 500 include the first binding clip 501, the second binding clip 502, Rubber ring 503, fastening bolt 504 and outer silk short tube 505;One end of the outer silk short tube 505 connects the first binding clip 501, The rubber ring 503, the second binding clip 502 are successively socketed in the another of outer silk short tube 505 with fastening bolt 504 from the bottom to top On end, external screw thread is provided on the other end of the outer silk short tube 505, the fastening bolt 504 is connect with external screw thread.
As shown in figure 4, the lower end of the outer silk short tube 505 connects the first binding clip 501, the rubber ring 503, second Binding clip 502 and fastening bolt 504 are sequentially connected the upper end of silk short tube 505 outside from top to bottom, the outer silk short tube 505 The outside of upper end is equipped with external screw thread, and the fastening bolt 504 is connect with external screw thread, the lower end of the outer silk short tube 505 and company Port 305 connects;By adjusting, fastening bolt 504 controls the first binding clip 501 and the second binding clip 502 clamps rubber ring 503, rubber ring 503 is contacted by compression swelling with air-conditioning copper pipe tube wall, realizes the sealing to air-conditioning copper pipe, is realized during nitrogen charging Closure to air-conditioning copper pipe;Fastening nut is unclamped after the completion of soldering remove nitrogen filled protection rise plug portion 500, disassembly and peace Dress is convenient, avoids the oxidation of copper pipe during the brazing process;Meanwhile the first binding clip 501 and the are controlled by adjusting fastening bolt 504 The clamping degree of two binding clips 502 realizes the control to 503 compression degree of rubber ring, can be suitable for various sizes of copper Pipe, it is applied widely;The mode anti-oxidation relative to traditional closure plate avoids the welding and dismounting of closure plate, assembling and disassembling side Just, construction cost can be reduced with cycle applications.
Further, non-return valve is additionally provided on multi-pipeline branch transition part 300.
Multi-pipeline branch transition part 300 is equipped with non-return valve, avoids the refluence of gas.
Further, the gas cylinder 100 is nitrogen cylinder.
The gas cylinder 100 is nitrogen cylinder, prevents the oxidation of copper pipe during the brazing process.
Further, the outlet end of the nitrogen cylinder is equipped with cylinder pressure gauge 101 and valve 102.
As shown in Figure 1, the outlet end of the nitrogen cylinder is equipped with cylinder pressure gauge 101 and valve 102, it is convenient in nitrogen cylinder Pressure adjusting and nitrogen charging.
Further, multi-pipeline branch transition part 300 further includes support frame 308;First connecting tube 302 with Second connecting tube 303 is located on support frame 308.
As shown in figure 1-3, first connecting tube 302 and the second connecting tube 303 are located on support frame 308, convenient to more The support of line branching conversion portion 300, the convenient connection with follow up device.
Multi-pipeline copper pipe provided by the invention is brazed nitrogen charging protection against oxidation system, and the gas cylinder 100 passes through main connecting tube Road part 200 is connect with multi-pipeline branch transition part 300, and nitrogen cylinder provides anti-oxidation required nitrogen and pressure, main connection Nitrogen is transported to multi-pipeline branch transition part 300 by pipeline portions 200, and gas is equipped on multi-pipeline branch transition part 300 Door ejector pin valve 306 and pressure gauge 307, for separating multiple-limb road 401 and detection branches pressure;Through multi-pipeline branch transition part Multichannel nitrogen after 300 conversions is connect by the nitrogen filled protection plug portion 500 that rises with air-conditioning copper pipe through time connecting line part 400, It realizes anti-oxidation when being brazed to air-conditioning copper pipe;Connect nitrogen filled protection rise plug portion 500 when, tighten fastening bolt 504, first Binding clip 501 and the second binding clip 502 act on rubber ring 503, and the compression of rubber ring 503 is contacted with copper pipe tube wall, in copper After the completion of pipe soldering, fastening bolt 504 is unclamped, nitrogen filled protection is removed and rises plug portion 500;The nitrogen filled protection plug portion 500 that rises is solving Certainly while the problem of traditional copper pipe closure plate attended operation difference, also meet requirement of the different air-conditioning copper pipe calibers to connection, greatly The service efficiency that copper pipe is brazed anti-oxidation system is improved greatly;Relative to traditional closure plate for anti-oxidation method, avoid Closure plate welding and disassembly, the waste of air-conditioning copper pipe is reduced while reducing the duration, saves the totle drilling cost of construction.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system, which is characterized in that including sequentially connected gas cylinder, main company Pipeline portions, multi-pipeline branch transition part, secondary connecting line part and nitrogen filled protection is connect to rise plug portion;
The gas cylinder is for providing anti-oxidation required nitrogen and pressure, and multi-pipeline branch transition part is for separating each point Branch, the secondary connecting line part includes multiple branch paths, and multiple branch paths are set side by side;The nitrogen filled protection rises plug portion It is to be detachably connected with copper pipe, is blocked for copper pipe when will be in nitrogen charging state.
2. multi-pipeline copper pipe according to claim 1 is brazed nitrogen charging protection against oxidation system, which is characterized in that the multitube Road branch transition part includes connecting pipe;
One end of the connecting pipe is connected to main connecting line part, and the other end of the connecting pipe is equipped with interconnecting part, The quantity of the interconnecting part be it is multiple, multiple interconnecting parts are set side by side, and each interconnecting part is correspondingly connected with each branch path.
3. multi-pipeline copper pipe according to claim 2 is brazed nitrogen charging protection against oxidation system, which is characterized in that the connection Pipe fitting includes the first connecting tube and the second connecting tube;
One end of first connecting tube is connected to main connecting line part, and the other end of first connecting tube is connect with second Pipe connection, the interconnecting part are located in second connecting tube.
4. multi-pipeline copper pipe according to claim 3 is brazed nitrogen charging protection against oxidation system, which is characterized in that the connection Portion includes communication port and valve ejector pin valve, and the communication port is connected to branch path, and the valve ejector pin valve is connected in communication port, Each branch path is separated for converting.
5. multi-pipeline copper pipe according to claim 4 is brazed nitrogen charging protection against oxidation system, which is characterized in that the multitube Road branch transition part further includes pressure gauge;
The pressure gauge is connected in the second connecting tube, the pressure of the gas for detecting multi-pipeline branch transition part.
6. multi-pipeline copper pipe according to claim 1 is brazed nitrogen charging protection against oxidation system, which is characterized in that the nitrogen charging Protecting the plug portion that rises includes the first binding clip, the second binding clip, rubber ring, fastening bolt and outer silk short tube;
One end of the outer silk short tube connects the first binding clip, and the rubber ring, the second binding clip and fastening bolt are under On the supreme other end for being successively socketed in outer silk short tube, external screw thread, the fastening are provided on the other end of the outer silk short tube Bolt is connect with external screw thread.
7. multi-pipeline copper pipe according to claim 1 is brazed nitrogen charging protection against oxidation system, which is characterized in that the multitube Road is additionally provided with non-return valve on branch transition part.
8. multi-pipeline copper pipe according to claim 1 is brazed nitrogen charging protection against oxidation system, which is characterized in that the gas cylinder For nitrogen cylinder.
9. multi-pipeline copper pipe according to claim 8 is brazed nitrogen charging protection against oxidation system, which is characterized in that the nitrogen The outlet end of bottle is equipped with cylinder pressure gauge and valve.
10. multi-pipeline copper pipe according to claim 3 is brazed nitrogen charging protection against oxidation system, which is characterized in that described more Line branching conversion portion further includes support frame;
First connecting tube and the second connecting tube are set on the support frame.
CN201811578846.8A 2018-12-21 2018-12-21 Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system Pending CN109365949A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811578846.8A CN109365949A (en) 2018-12-21 2018-12-21 Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811578846.8A CN109365949A (en) 2018-12-21 2018-12-21 Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system

Publications (1)

Publication Number Publication Date
CN109365949A true CN109365949A (en) 2019-02-22

Family

ID=65371606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811578846.8A Pending CN109365949A (en) 2018-12-21 2018-12-21 Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system

Country Status (1)

Country Link
CN (1) CN109365949A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB513225A (en) * 1938-04-01 1939-10-06 George Reginald Montague Jenni Improvements in expanding pipe-stoppers
CN202037395U (en) * 2011-03-23 2011-11-16 宁波奥克斯空调有限公司 Protective nitrogen filling device for evaporator or condenser brazing
CN202484517U (en) * 2012-01-12 2012-10-10 中国海洋石油总公司 Pipeline sealer
CN202884364U (en) * 2012-10-26 2013-04-17 苏州辛帝斯燃气密封材料有限公司 Gas pipeline first-aid repair plugging assembly
CN104816109A (en) * 2015-05-11 2015-08-05 合肥锦利丰机械有限公司 Automatic rotation nitrogen-filled welding device
CN205437423U (en) * 2016-03-21 2016-08-10 南通华信中央空调有限公司 Central air conditioning copper knockout welding frock
CN107178674A (en) * 2017-07-03 2017-09-19 中化二建集团有限公司 Pipeline combines plugging device and repair method
CN207757129U (en) * 2018-01-24 2018-08-24 固安冰川制冷设备有限公司 Inflated with nitrogen jig
CN208743881U (en) * 2018-07-04 2019-04-16 中国电建集团核电工程有限公司 Copper pipe is brazed oxygen-proof protecting device
CN209850062U (en) * 2018-12-21 2019-12-27 中国电建集团核电工程有限公司 Multi-pipeline copper pipe brazing nitrogen-filling anti-oxidation protection system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB513225A (en) * 1938-04-01 1939-10-06 George Reginald Montague Jenni Improvements in expanding pipe-stoppers
CN202037395U (en) * 2011-03-23 2011-11-16 宁波奥克斯空调有限公司 Protective nitrogen filling device for evaporator or condenser brazing
CN202484517U (en) * 2012-01-12 2012-10-10 中国海洋石油总公司 Pipeline sealer
CN202884364U (en) * 2012-10-26 2013-04-17 苏州辛帝斯燃气密封材料有限公司 Gas pipeline first-aid repair plugging assembly
CN104816109A (en) * 2015-05-11 2015-08-05 合肥锦利丰机械有限公司 Automatic rotation nitrogen-filled welding device
CN205437423U (en) * 2016-03-21 2016-08-10 南通华信中央空调有限公司 Central air conditioning copper knockout welding frock
CN107178674A (en) * 2017-07-03 2017-09-19 中化二建集团有限公司 Pipeline combines plugging device and repair method
CN207757129U (en) * 2018-01-24 2018-08-24 固安冰川制冷设备有限公司 Inflated with nitrogen jig
CN208743881U (en) * 2018-07-04 2019-04-16 中国电建集团核电工程有限公司 Copper pipe is brazed oxygen-proof protecting device
CN209850062U (en) * 2018-12-21 2019-12-27 中国电建集团核电工程有限公司 Multi-pipeline copper pipe brazing nitrogen-filling anti-oxidation protection system

Similar Documents

Publication Publication Date Title
CN102679464B (en) For connecting the structure of refrigerant pipe and method and there is the air-conditioning of this structure
US5431189A (en) Flow control manifold and gauge
KR100677265B1 (en) Service valve assembly with serial dual port, air conditioner with serial dual port and elimination method of moisture and small fragments thereof
CN102962633A (en) Assembling technology of liquid storage device and compressor
CN102962632A (en) Connection method for air inlet pipe of compressor and compressor
CN109365949A (en) Multi-pipeline copper pipe is brazed nitrogen charging protection against oxidation system
CN102763056B (en) Floating coil heat exchanger
CN209850062U (en) Multi-pipeline copper pipe brazing nitrogen-filling anti-oxidation protection system
CN203216167U (en) Device for adjustment and installation of capillary tubes
CN104708164B (en) A kind of connector and the nitrogen charging weld connection device using the connector
CN202166245U (en) Matching test device for air-conditioner capillary
JP3218368U (en) Driving type branch pipe
CN101878404B (en) Heat exchanger coupling blocking plug
CN201314419Y (en) Pipe joint for coolant side of plate-type heat exchanger
CN207112174U (en) Train air conditioner refrigerating Quick connector for pipeline
CN208743881U (en) Copper pipe is brazed oxygen-proof protecting device
CN106425339B (en) A kind of heavy caliber low-temperature filter and production method
CN203744617U (en) Connection type check valve assembly of split heat pump air conditioner
CN105889663A (en) Air conditioner part-to-part pipeline connecting device
JP2000310460A (en) Service valve with sealing mechanism for air conditioner
US5607291A (en) Closed compressor
CN208228237U (en) Ice cream extrusion device
JP2001241814A (en) Air conditioner and refrigerant filling method
KR100978680B1 (en) A valve block, an air-conditioning and heating equipment having the same and a method thereof
CN216815168U (en) Sealing structure of chemical condenser

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination