CN109359855A - A kind of production scheduling method - Google Patents

A kind of production scheduling method Download PDF

Info

Publication number
CN109359855A
CN109359855A CN201811186980.3A CN201811186980A CN109359855A CN 109359855 A CN109359855 A CN 109359855A CN 201811186980 A CN201811186980 A CN 201811186980A CN 109359855 A CN109359855 A CN 109359855A
Authority
CN
China
Prior art keywords
teams
groups
flow chart
production
product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811186980.3A
Other languages
Chinese (zh)
Inventor
张洪辉
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI KONGBO INDUSTRIAL Co Ltd
Original Assignee
SHANGHAI KONGBO INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI KONGBO INDUSTRIAL Co Ltd filed Critical SHANGHAI KONGBO INDUSTRIAL Co Ltd
Priority to CN201811186980.3A priority Critical patent/CN109359855A/en
Publication of CN109359855A publication Critical patent/CN109359855A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The present invention relates to a kind of production scheduling methods, which comprises the following steps: generates job order;Generate system task list;Work flow is divided into different flow charts, adds flow chart in system task list;Judge whether the workload of each teams and groups has reached load;It is generated according to system task list to the job instruction of each teams and groups.The production process of entire product is divided into different flow charts according to processing step by the present invention, flow chart only includes the processing step title of operation, corresponding component is added under each flow chart again, it is more flexible motor-driven for existing production scheduling mode, suitable for customizing the production of part product.Also, the present invention carries out the adjustment of task according to the workload of operating personnel, more rationally, so that production management is more efficient.

Description

A kind of production scheduling method
Technical field
The present invention relates to a kind of production scheduling methods, for instructing worker to carry out production operation.
Background technique
Currently, more common production management software is the U8 software of UF, the defined production scheduling described in the software Method is that product to be produced is divided into different components, and corresponding production process is then set under each component, production Process includes the process operation and process operation parameter of processing step and each processing step.Therefore, U8 software is advised Fixed production scheduling method is suitable for the mass production of a certain product.If manufacturer is only the customized product of production, U8 is soft The production scheduling method of part defined can not be applicable in, and reason is: every customized product specific component composed by it is not phase With, just there is different production processes for different components.And amount required by customized product may be units, have A little customized products only may need to produce one.For administrative staff, every several products of production just need to match in detail Set the production process of corresponding component and corresponding component, it is clear that be it is very time-consuming, laborious, production efficiency is reduced instead, up to not To the purpose of production management software itself.
Summary of the invention
It is suitable for producing production scheduling method used in the producer of customized product the object of the present invention is to provide a kind of.
In order to achieve the above object, the technical solution of the present invention is to provide a kind of production scheduling methods, which is characterized in that The following steps are included:
The first step generates job order according to the Products Sales agreement signed with client using existing ERP system;
Second step after reading job order, adds product drawing, generates system task list;
The work flow of the product to be produced indicated in third step, analysis system job order, work flow is divided into Different flow charts adds flow chart in system task list, and component to be processed is added in flow chart, addition , different product or there are identical operation work in the starting date, completion date of current part and plan working hour under current work process Sequence, same flow chart are completed to produce by same teams and groups, and same teams and groups need to produce under corresponding flow chart different product not Same component, each component are a production task of current teams and groups;
4th step judges whether the workload of each teams and groups has reached load, readjusts life to the teams and groups for reaching load Production task regenerates system task list, for i-th of teams and groups:
If corresponding j-th of the flow chart of i-th of teams and groups, under j-th of flow chart, i-th of teams and groups has K production to appoint It is engaged in, then the workload of i-th of teams and groupsIn formula, TkFor k-th production task in K production task Plan working hour, DfkFor the completion date of k-th of production task in K production task, DskFor k-th of production in K production task The starting date of task, the peak load MAX=Worker × T, Worker of i-th of teams and groups are the operating personnel of i-th of teams and groups Sum, T are the daily working time, if W >=MAX, i-th of teams and groups reaches load, and otherwise i-th of teams and groups is not up to load;
5th step is generated according to the system task list that the 4th step obtains to the job instruction of each teams and groups, each teams and groups The operation that corresponding flow chart is carried out according to job instruction, for current one of flow chart, after teams and groups fulfil assignment, It transfers to quality inspection to be checked, after quality inspection passed examination, is carried out by the teams and groups of lower one of flow chart of current one of flow chart It signs for, only after completing to the signing for of upper one of flow chart, the operation of lower one of flow chart could be started.
Preferably, it in the second step, reads job order and obtains contract number, customer name, task odd numbers and product volume Code.
Preferably, in the second step, if the customer name and product coding in more parts of job orders are identical, by more parts Job order, which merges, generates a system task list.
Preferably, in the third step, remembered according to the operation of the product similar with current product to be produced of history Record is to generate the flow chart.
The production process of entire product is divided into different flow charts according to processing step by the present invention, and flow chart is only Processing step title comprising operation, then corresponding component is added under each flow chart, compared to existing production scheduling It is more flexible motor-driven for mode, suitable for customizing the production of part product.Also, the present invention according to the workload of operating personnel come The adjustment of carry out task, more rationally, so that production management is more efficient.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
The present invention provides a kind of production scheduling method the following steps are included:
The first step generates job order according to the Products Sales agreement signed with client using existing ERP system;
Second step reads job order, obtains contract number, customer name, task odd numbers and product coding, adds product figure Paper generates system task list, when generating system task list, if the customer name and product coding in more parts of job orders are identical, Then more parts of job orders are merged and generate a system task list;
The work flow of the product to be produced indicated in third step, analysis system job order, work flow is divided into Different flow charts adds flow chart in system task list, and component to be processed is added in flow chart, addition The starting date, completion date of current part and plan working hour under current work process, flow chart only includes the technique of operation Step title, different product or has identical flow chart, and same flow chart is completed to produce by same teams and groups, and same teams and groups need The different components of different product under corresponding flow chart are produced, each component is a production task of current teams and groups;
In this step, flow chart can be divided according to the experience of administrative staff, can also be by administrative staff The charge book of the completed historical product similar with current product to be produced is had access to generate;
4th step judges whether the workload of each teams and groups has reached load, readjusts life to the teams and groups for reaching load Production task regenerates system task list, for i-th of teams and groups:
If corresponding j-th of the flow chart of i-th of teams and groups, under j-th of flow chart, i-th of teams and groups has K production to appoint It is engaged in, then the workload of i-th of teams and groupsIn formula, TkFor k-th production task in K production task Plan working hour, DfkFor the completion date of k-th of production task in K production task, DskFor k-th of production in K production task The starting date of task, the peak load MAX=Worker × T, Worker of i-th of teams and groups are the operating personnel of i-th of teams and groups Sum, T are the daily working time, if W >=MAX, i-th of teams and groups reaches load, and otherwise i-th of teams and groups is not up to load;
5th step is generated according to the system task list that the 4th step obtains to the job instruction of each teams and groups, each teams and groups The operation that corresponding flow chart is carried out according to job instruction, for current one of flow chart, after teams and groups fulfil assignment, It transfers to quality inspection to be checked, after quality inspection passed examination, is carried out by the teams and groups of lower one of flow chart of current one of flow chart It signs for, only after completing to the signing for of upper one of flow chart, the operation of lower one of flow chart could be started.

Claims (4)

1. a kind of production scheduling method, which comprises the following steps:
The first step generates job order according to the Products Sales agreement signed with client using existing ERP system;
Second step after reading job order, adds product drawing, generates system task list;
The work flow of the product to be produced indicated in third step, analysis system job order, is divided into difference for work flow Flow chart, flow chart is added in system task list, and component to be processed is added in flow chart, addition is current The starting date, completion date of current part and plan working hour under flow chart, flow chart only includes the processing step of operation Title, different product or has identical flow chart, and same flow chart is completed to produce by same teams and groups, and same teams and groups need to give birth to The different components of different product under corresponding flow chart are produced, each component is a production task of current teams and groups;
4th step judges whether the workload of each teams and groups has reached load, readjusts production to the teams and groups for reaching load and appoints Business, regenerates system task list, for i-th of teams and groups:
If corresponding j-th of the flow chart of i-th of teams and groups, under j-th of flow chart, there be K production task in i-th of teams and groups, then The workload of i-th of teams and groupsIn formula, TkFor the plan work of k-th of production task in K production task When, DfkFor the completion date of k-th of production task in K production task, DskFor k-th production task in K production task Starting date, the peak load MAX=Worker × T, Worker of i-th of teams and groups are operating personnel's sum of i-th of teams and groups, T For the daily working time, if W >=MAX, i-th of teams and groups reaches load, and otherwise i-th of teams and groups is not up to load;
5th step is generated according to the system task list that the 4th step obtains to the job instruction of each teams and groups, each teams and groups according to The operation that job instruction carries out corresponding flow chart after teams and groups fulfil assignment, is transferred to for current one of flow chart Quality inspection is checked, after quality inspection passed examination, is signed for by the teams and groups of lower one of flow chart of current one of flow chart, Only after completing to the signing for of upper one of flow chart, the operation of lower one of flow chart could be started.
2. a kind of production scheduling method as described in claim 1, which is characterized in that in the second step, read job order Obtain contract number, customer name, task odd numbers and product coding.
3. a kind of production scheduling method as claimed in claim 2, which is characterized in that in the second step, if more parts of tasks Customer name and product coding in list is identical, then merges more parts of job orders and generate a system task list.
4. a kind of production scheduling method as described in claim 1, which is characterized in that in the third step, according to history The charge book of the product similar with current product to be produced generates the flow chart.
CN201811186980.3A 2018-10-12 2018-10-12 A kind of production scheduling method Pending CN109359855A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811186980.3A CN109359855A (en) 2018-10-12 2018-10-12 A kind of production scheduling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811186980.3A CN109359855A (en) 2018-10-12 2018-10-12 A kind of production scheduling method

Publications (1)

Publication Number Publication Date
CN109359855A true CN109359855A (en) 2019-02-19

Family

ID=65348840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811186980.3A Pending CN109359855A (en) 2018-10-12 2018-10-12 A kind of production scheduling method

Country Status (1)

Country Link
CN (1) CN109359855A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378273A (en) * 2019-07-12 2019-10-25 深圳前海微众银行股份有限公司 A kind of method and apparatus of monitoring results process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101425159A (en) * 2008-04-30 2009-05-06 贵州同济堂制药有限公司 Producing monitoring system for chinese traditional medicine corporation
CN103839114A (en) * 2014-03-13 2014-06-04 中冶南方工程技术有限公司 Timing sequence plan automatic making system for steelmaking workshop
CN107844907A (en) * 2017-11-08 2018-03-27 厦门市再丰运动器材有限公司 A kind of production schedule and the production management method for sending work examination progress
CN108510151A (en) * 2017-02-28 2018-09-07 富士通株式会社 Generate method, information processing equipment and the computer-readable medium of task scheduling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101425159A (en) * 2008-04-30 2009-05-06 贵州同济堂制药有限公司 Producing monitoring system for chinese traditional medicine corporation
CN103839114A (en) * 2014-03-13 2014-06-04 中冶南方工程技术有限公司 Timing sequence plan automatic making system for steelmaking workshop
CN108510151A (en) * 2017-02-28 2018-09-07 富士通株式会社 Generate method, information processing equipment and the computer-readable medium of task scheduling
CN107844907A (en) * 2017-11-08 2018-03-27 厦门市再丰运动器材有限公司 A kind of production schedule and the production management method for sending work examination progress

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378273A (en) * 2019-07-12 2019-10-25 深圳前海微众银行股份有限公司 A kind of method and apparatus of monitoring results process

Similar Documents

Publication Publication Date Title
Kettinger et al. Business process change: a study of methodologies, techniques, and tools
Baird et al. An ethnographic study of engineering design teams at Rolls-Royce Aerospace
Mohanraj et al. QFD integrated value stream mapping: an enabler of lean manufacturing
CN1842811A (en) Customer service support system
US20130262169A1 (en) Automated contract mediator
JP2013045386A (en) Process design method, process design support system, and process design support device
Aichouni et al. Process improvement methodology selection in manufacturing: A literature review perspective
CN105388876A (en) Method and device for obtaining team-based intermittent-type chemical production process conformity
Gupta et al. Analysis & designing an engineering course using QFD
CN109359855A (en) A kind of production scheduling method
JP4152611B2 (en) Measures planning support method for management reform and system therefor
García-Navarro et al. Using action research to implement an operating efficiency initiative in a local government
von Wangenheim et al. Software measurement for small and medium enterprises
Hannola et al. Assessing the impact of socio-technical interventions on shop floor work practices
van der Krogt et al. On supporting Lean methodologies using constraint-based scheduling
CN115660261B (en) Production order information processing method, computer device and storage medium
Devi et al. Process enhancement in a wet grinder manufacturing company through lean implementation framework-a case study
CN114037326A (en) Cloud ERP modeling and evolution method and system based on E-CARGO model
Chairudin et al. Information system for selection of production line for plastic item injection machine number A36 using priority scheduling method
Nardello et al. Process model automation for industry 4.0: Challenges for automated model generation based on laboratory experiments
WO2012118504A1 (en) Project management system and method
CN111695819A (en) Method and device for scheduling seat personnel
Al-Mashari et al. The Enterprise Resource Planning (ERP) selection process: case analysis and proposed framework
Defèr et al. Putting data to use in maintenance: A method to introduce data driven risk centered maintenance in companies
McArdle et al. Takt Time in Pull Systems for Small and Medium-sized Enterprises

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219

RJ01 Rejection of invention patent application after publication