CN109356117A - A kind of arragement construction of hydroelectric project water inlet - Google Patents

A kind of arragement construction of hydroelectric project water inlet Download PDF

Info

Publication number
CN109356117A
CN109356117A CN201811506460.6A CN201811506460A CN109356117A CN 109356117 A CN109356117 A CN 109356117A CN 201811506460 A CN201811506460 A CN 201811506460A CN 109356117 A CN109356117 A CN 109356117A
Authority
CN
China
Prior art keywords
hydraulic
platform
gate
water inlet
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811506460.6A
Other languages
Chinese (zh)
Inventor
王兴恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201811506460.6A priority Critical patent/CN109356117A/en
Publication of CN109356117A publication Critical patent/CN109356117A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/04Valves, slides, or the like; Arrangements therefor; Submerged sluice gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/06Pressure galleries or pressure conduits; Galleries specially adapted to house pressure conduits; Means specially adapted for use therewith, e.g. housings, valves, gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Barrages (AREA)

Abstract

The invention discloses a kind of arragement construction of hydroelectric project water inlet, including dam body (1), flow direction is successively arranged one group of trash rack slot (2), one group of maintenance gate slot (3) and one group of rapid door vertical shaft (4) downstream at the top of dam body (1);Inspection platform (5) are equipped at the top of each maintenance gate slot (3);It is equipped with below the inspection platform (5) of each maintenance gate slot (3) and is equipped with locking platform (6);It is equipped with hydraulic framework platform (7) below the well head of each rapid door vertical shaft (4), hydraulic framework platform (7) is equipped with the hydraulic press (10) for opening and closing stop gate;Hydraulic pump (8) are equipped in dam body between two rapid door vertical shafts (4), hydraulic pump (8) is connect through hydraulic tube (9) with hydraulic press (10).Shaking of the bulkhead gate under water impact can both have been solved the problems, such as using the present invention, can also make dam crest is neatly free from worry not influence traffic.

Description

A kind of arragement construction of hydroelectric project water inlet
Technical field
The present invention relates to a kind of arragement constructions of hydroelectric project water inlet, belong to hydraulic and hydroelectric engineering metal structure technology neck Domain.
Background technique
For the water inlet of hydroelectric project, generally flow direction sets gradually trash rack, bulkhead gate and stop gate downstream, existing There is bulkhead gate in technology to be normally locked on inspection platform or be stored in Men Kunei, the hydraulic pump house of stop gate is arranged on dam Top, this lesser for size dam crest arrangement door library is limited, and to be locked in inspection platform exposed more for bulkhead gate, sets in dam crest Setting hydraulic pump house will affect traffic, if door library is set by increasing dam crest size and arrange hydraulic pump house will increase investment compared with More, economy is poor;In addition, prior art bulkhead gate lockplate be locked in inspection platform lock beam by way of, gate In the soaking water of bottom, shake vulnerable to water impact;Therefore, there is also deficiencies for existing technology, up for further complete It is kind.
Summary of the invention
The purpose of the present invention is to provide a kind of arragement constructions of hydroelectric project water inlet, can both solve bulkhead gate in water The problem of flowing the shaking under impact also makes dam crest is neatly free from worry not influence traffic, thus overcome the deficiencies in the prior art.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of arragement construction of hydroelectric project water inlet of the invention, including dam body, flow direction is successively arranged one downstream at dam body top Group trash rack slot, one group of maintenance gate slot and one group of rapid door vertical shaft;Inspection platform is equipped at the top of each maintenance gate slot;Each inspection It repairs and is equipped with locking platform below the inspection platform of gate slot;It is flat that hydraulic rack is equipped with below the well head of each rapid door vertical shaft Platform, hydraulic framework platform are equipped with the hydraulic press for opening and closing stop gate;It is set in dam body between two rapid door vertical shafts There is hydraulic pump, hydraulic pump is connect through hydraulic tube with hydraulic press.
In aforementioned arrangement structure, the hydraulic framework platform is located at check flood level or more.
In aforementioned arrangement structure, bulkhead gate is equipped in the maintenance gate slot, bulkhead gate bottom is locked in locking platform On, bulkhead gate top is fixed on inspection platform by short rod.
In aforementioned arrangement structure, stop gate is equipped in the rapid door vertical shaft, stop gate is connect with hydraulic press.
By adopting the above-described technical solution, compared with prior art, the present invention bulkhead gate of the present invention passes through upper and lower two End lock mode is fixed, and is effectively prevented shaking of the bulkhead gate under water impact, and pull rod size is smaller, will not be exposed dam Top, can make bulkhead gate below dam facing.Hydraulic pump and hydraulic press are each provided at dam facing hereinafter, dam facing does not have to setting simultaneously Hydraulic pump house will not influence traffic, and not have to setting door library, to reduce investment outlay.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the side view of Fig. 1 section side.
The label in accompanying drawing is: 1- dam body, 2- trash rack slot, 3- maintenance gate slot, 4- rapid door vertical shaft, 5- inspection platform, 6- lock platform, the hydraulic framework platform of 7-, 8- hydraulic pump, 9- hydraulic tube, 10- hydraulic press, 11- bulkhead gate, 12- short rod, 13- stop gate.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
A kind of arragement construction of hydroelectric project water inlet of the invention, as shown in FIG. 1 to 3.Including dam body 1, dam body 1 is pushed up Portion flows to downstream is successively arranged one group of trash rack slot, 2, one groups of maintenance gate slots 3 and one group of rapid door vertical shaft 4;Each maintenance gate slot 3 Top is equipped with inspection platform 5;It is equipped with below the inspection platform 5 of each maintenance gate slot 3 and is equipped with locking platform 6;It is each quick Hydraulic framework platform 7 is equipped with below the well head of door vertical shaft 4, hydraulic framework platform 7 is equipped with the liquid for opening and closing stop gate Press;Hydraulic pump 8 is equipped in dam body 1 between two rapid door vertical shafts 4, hydraulic pump 8 connects through hydraulic tube 9 and hydraulic press 10 It connects.Hydraulic framework platform 7 is located at check flood level or more.Bulkhead gate 11,11 bottom of bulkhead gate lock are equipped in maintenance gate slot 3 It is scheduled on locking platform 6,11 top of bulkhead gate is fixed on inspection platform 5 by short rod 12.It is equipped in rapid door vertical shaft 4 Stop gate 13, stop gate 13 are connect with hydraulic press 10.
Embodiment
This example is in 5 lower part of inspection platform of the bulkhead gate 11 of hydroelectric project water inlet setting, one locking platform 6, quick Hydraulic framework platform 7 is arranged in door vertical shaft 4.11 bottom of bulkhead gate is locked on locking platform 6, and 11 top of bulkhead gate passes through one Section short rod 12 is fixed on inspection platform 5.The middle part of hydraulic framework platform 7 is symmetrical arranged hydraulic pump 8, hydraulic framework platform 7 It is located at check flood level or more.
The present invention effectively prevents shaking of the bulkhead gate under water impact, while will not expose after bulkhead gate locking Dam crest, hydraulic pump and hydraulic press are each provided in dam facing dam body below.Dam facing does not have to that hydraulic pump house and Men Ku is arranged, and will not influence Dam facing traffic, can cost saving.

Claims (4)

1. a kind of arragement construction of hydroelectric project water inlet, including dam body (1), flow direction is successively arranged one downstream at dam body (1) top Group trash rack slot (2), one group of maintenance gate slot (3) and one group of rapid door vertical shaft (4);Inspection is equipped at the top of each maintenance gate slot (3) Equating platform (5);It is characterized by: being equipped with locking platform (6) below the inspection platform (5) of each maintenance gate slot (3);It is each fast It is equipped with hydraulic framework platform (7) below the well head of fast door vertical shaft (4), hydraulic framework platform (7) is equipped with for opening and closing quickly The hydraulic press of door;Hydraulic pump (8) are equipped in dam body (1) between two rapid door vertical shafts (4), hydraulic pump (8) is through hydraulic tube (9) it is connect with hydraulic press (10).
2. the arragement construction of hydroelectric project water inlet according to claim 1, it is characterised in that: the hydraulic framework platform (7) it is located at check flood level or more.
3. the arragement construction of hydroelectric project water inlet according to claim 1, it is characterised in that: in the maintenance gate slot (3) Equipped with bulkhead gate (11), bulkhead gate (11) bottom is locked in locking platform (6), and bulkhead gate (11) top passes through short drawing Bar (12) is fixed on inspection platform (5).
4. the arragement construction of hydroelectric project water inlet according to claim 1, it is characterised in that: the rapid door vertical shaft (4) Interior to be equipped with stop gate (13), stop gate (13) is connect with hydraulic press (10).
CN201811506460.6A 2018-12-10 2018-12-10 A kind of arragement construction of hydroelectric project water inlet Pending CN109356117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811506460.6A CN109356117A (en) 2018-12-10 2018-12-10 A kind of arragement construction of hydroelectric project water inlet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811506460.6A CN109356117A (en) 2018-12-10 2018-12-10 A kind of arragement construction of hydroelectric project water inlet

Publications (1)

Publication Number Publication Date
CN109356117A true CN109356117A (en) 2019-02-19

Family

ID=65332024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811506460.6A Pending CN109356117A (en) 2018-12-10 2018-12-10 A kind of arragement construction of hydroelectric project water inlet

Country Status (1)

Country Link
CN (1) CN109356117A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331136A (en) * 1997-06-02 1998-12-15 Kawasaki Heavy Ind Ltd Circular multistage gate
CN104452702A (en) * 2014-11-14 2015-03-25 中国电建集团贵阳勘测设计研究院有限公司 Maintenance method for emergency gate of low-head gate dam and gate dam structure
CN108842730A (en) * 2018-07-25 2018-11-20 中国电建集团华东勘测设计研究院有限公司 Huge intake tower stop gate slot structure and stop gate overhaul hoisting method
CN209307976U (en) * 2018-12-10 2019-08-27 中国电建集团贵阳勘测设计研究院有限公司 A kind of arragement construction of hydroelectric project water inlet

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331136A (en) * 1997-06-02 1998-12-15 Kawasaki Heavy Ind Ltd Circular multistage gate
CN104452702A (en) * 2014-11-14 2015-03-25 中国电建集团贵阳勘测设计研究院有限公司 Maintenance method for emergency gate of low-head gate dam and gate dam structure
CN108842730A (en) * 2018-07-25 2018-11-20 中国电建集团华东勘测设计研究院有限公司 Huge intake tower stop gate slot structure and stop gate overhaul hoisting method
CN209307976U (en) * 2018-12-10 2019-08-27 中国电建集团贵阳勘测设计研究院有限公司 A kind of arragement construction of hydroelectric project water inlet

Similar Documents

Publication Publication Date Title
CN209307976U (en) A kind of arragement construction of hydroelectric project water inlet
CN109356128A (en) A kind of arragement construction of list diversion tunnel hydroelectric project headstock gear
CN104452702B (en) The repair method of a kind of low gate dam emergency gate and gate dam structure
CN109356117A (en) A kind of arragement construction of hydroelectric project water inlet
CN106498909B (en) For spillway on bank or the defrlector bucket of flood discharge hole outlet
CN106702978A (en) Low-overflow dam equal-water head step-by-step energy dissipation structure
CN201598621U (en) Sand discharging and disturbing structure
CN209110141U (en) Segment cooling device
CN108238213A (en) Ventilative overflow mechanism and ship
CN106315055B (en) Open top container
CN110396994A (en) A kind of vibration-proof structure and oscillation damping method of upstream sealing plane gate
CN209603095U (en) Oblique stand alone type flood discharging tunnel water inlet tower structure
CN109469022A (en) A kind of root edge structure of plane emergency gate
CN208376998U (en) Body section closes up auxiliary device
CN115320793A (en) Construction method of modular floating vessel pump station
CN112030886B (en) Diversion channel arrangement method combining diversion channel with bottom transparent navigation wall
CN109555089A (en) Oblique stand alone type flood discharging tunnel water inlet tower structure and its construction method
CN106702975B (en) The application method of integral type pumping plant gate trash rack
CN209099291U (en) A kind of high novel dock structure frame of stability
CN110258465A (en) Plane gate system
CN108505533A (en) A kind of offshore wind farm single-pile foundation mechanism and its construction method
CN213417742U (en) A empty navigation wall that passes through for jointly arranging with drainage canal divides
CN209664256U (en) Pivot flange and crystallizer on a kind of modified
CN109364733A (en) A kind of board-like slurries cooler
CN109235626A (en) Special-shaped thin board type eliminates reflux unit in a kind of box type bidirectional runner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination