CN109349130A - A kind of prefabricated pig house dropping pit easy to clean - Google Patents

A kind of prefabricated pig house dropping pit easy to clean Download PDF

Info

Publication number
CN109349130A
CN109349130A CN201811371583.3A CN201811371583A CN109349130A CN 109349130 A CN109349130 A CN 109349130A CN 201811371583 A CN201811371583 A CN 201811371583A CN 109349130 A CN109349130 A CN 109349130A
Authority
CN
China
Prior art keywords
concrete
pit
concrete floor
pig house
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811371583.3A
Other languages
Chinese (zh)
Inventor
曾才友
王凤军
金立虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Dazhi Agricultural Technology Co Ltd
Original Assignee
Zhengzhou Dazhi Agricultural Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Dazhi Agricultural Technology Co Ltd filed Critical Zhengzhou Dazhi Agricultural Technology Co Ltd
Priority to CN201811371583.3A priority Critical patent/CN109349130A/en
Publication of CN109349130A publication Critical patent/CN109349130A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01KANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
    • A01K1/00Housing animals; Equipment therefor
    • A01K1/01Removal of dung or urine, e.g. from stables
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Zoology (AREA)
  • Animal Husbandry (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Housing For Livestock And Birds (AREA)

Abstract

The invention discloses a kind of prefabricated pig house dropping pits easy to clean, it is characterised in that: is made of Y type concrete pit 1, Y steel bar rack 2, the urethral catheterization round tube 3 with gap, dovetail groove 4, built-in fitting 5, hanging ring 6, concrete floor boss 7, ladder notch 8;Y type concrete pit 1 is made of concrete vertical plate 11, concrete floor 12;Y steel bar rack 2 is made of transverse steel 21, vertical reinforcement 22, stiffener 23, and is located at 1 mid-depth of Y type concrete pit;Urethral catheterization round tube 3 with gap, positioned at the center of concrete floor 12, and gap is upward, equal with base surface height;Dovetail groove 4 is located at the ladder notch 8 at 1 both ends of Y type concrete pit, and perpendicular to concrete vertical plate 11 and concrete floor 12;Built-in fitting 5 is welded with 2 phase of bar frame, and is located at the top surface of concrete vertical plate 11;Hanging ring 6 is connected with built-in fitting 5;Concrete floor boss 7 is located at center below 12 bottom of concrete floor.

Description

A kind of prefabricated pig house dropping pit easy to clean
Technical field
The present invention relates to a kind of prefabricated pig house dropping pit easy to clean, the one of specifically a kind of livestock and poultry farm house construction use The prefabricated armored concrete liquid dung groove of kind;Belong to livestock and poultry breeding industry energy saving building and precast concrete arts.
Background technique
Fast-developing with animal husbandry needs, not pervious small-scale outdoor livestock-raising field, super large The modernization heat preservation energy-saving of scale is built, and in the energy saving livestock-raising building of this modernization, to be equipped with dropping pit;The dropping pit It is normally at the below ground of pig house, is equipped with leakage dropping-board in the upper surface of dropping pit, the excrement and rinse Pig dung and urine production that live pig generates Raw sewage is entered in following dropping pit by the strip-shaped hole of crevice board.Conventional dropping pit way is: 1) first support shuttering;2) Configuration reinforcement at the scene;3) carry out concreting, the concrete after pouring generally requires health in 7 days, can form removal, 4) Dismantle template;5) to being cleared up or being repaired on the inside of the dropping pit poured, so that the concrete surface surveyed in dropping pit is bright and clean, so as to live pig Excrement is easy cleaning.But actually pig house dropping pit construct at the scene in there are many problems: 1) speed of application is slow, clear up ground, Support shuttering, live assembling reinforcement, live mixing concrete, poured in place concrete dismantle template, clear up in concrete dropping pit Side surface etc. needs a large amount of time, if encountering rainy days, construction period can more extend;2) often there is quality in construction Problem, if pig house dropping pit inside dimensions are inconsistent, height, it is uneven, be unfavorable for the mechanical chipping of excrement;3) send out existing Pig house dropping pit has settlement crack, and liquid dung is caused to leak into underground, serious polluted underground water;4) reinforcing bar made is mixed Solidifying compost ditch, quality and maintenance problem are extremely prominent, and maintenance difficulty is big, and maintenance time is long, and maintenance cost is high, service life It is short.In order to solve problems, needs to design a kind of prefabricated armored concrete dropping pit that easy to clean installation is fast, become agriculture Herd a project of energy saving building industry concrete environmental protection field of components.
The present invention attempts to design a kind of prefabricated pig house dropping pit easy to clean, will substitute traditional field fabrication reinforced concrete aardvark Dropping pit is given up, technological deficiency existing for the pig house dropping pit of above-mentioned field fabrication and mass defect is overcome, reduces construction cost and dimension Shield is taken, and batch production machinery is prefabricated, and quality is guaranteed, and live standardized construction installation, prefabricated pig house dropping pit product and heat preservation save It can the pig house same service life.
Summary of the invention
The present invention is directed to overcome existing for the field fabrication armored concrete dropping pit in above-mentioned modern livestock and poultry energy saving building house Technological deficiency and mass defect provide a kind of prefabricated pig house dropping pit easy to clean, will substitute traditional field fabrication armored concrete Pig house dropping pit overcomes the pig house dropping pit of above-mentioned field fabrication, reduces construction cost and maintenance expense, and batch production is prefabricated, and quality has Guarantee, live standardized construction installation, prefabricated pig house dropping pit product and heat preservation energy-saving pig house same service life.
The technical scheme of the present invention is realized as follows: a kind of prefabricated pig house dropping pit easy to clean, it is characterised in that: by Y type Concrete pit 1, Y steel bar rack 2, the urethral catheterization round tube 3 with gap, dovetail groove 4, built-in fitting 5, hanging ring 6, concrete floor are convex Platform 7, ladder notch 8 are constituted;The Y type concrete pit 1 is made of concrete vertical plate 11, concrete floor 12, and described is mixed Solidifying soil vertical plate 11 is located at the both ends of the concrete floor 12, and the low both ends in 12 center of concrete floor are high, and bottom plate is at V Font;Y steel bar rack 2 is made of transverse steel 21, vertical reinforcement 22, stiffener 23, and it is thick to be located at Y type concrete pit 1 Degree center, and transverse steel 21 stretches out the ladder notch 8 at 1 both ends of Y type concrete pit, the length stretched out is less than ladder notch 8 Width;Urethral catheterization round tube 3 with gap, positioned at the center of concrete floor 12, and gap is upward, with concrete floor Plane is equal on 12;Several dovetail grooves 4 are located at the ladder notch 8 at 1 both ends of Y type concrete pit, and perpendicular to two sides Concrete vertical plate 11 and concrete floor 12;The built-in fitting 5 is welded with 2 phase of Y steel bar rack, and is located at mixed The top surface of solidifying soil vertical plate 11;The hanging ring 6 is connected with built-in fitting 5;The concrete floor boss 7 is located at concrete bottom 12 bottom centre position of plate;The Y type concrete pit 1 is located in concrete support posts 10.
One kind prefabricated pig house ditch easy to clean, it is characterised in that: positioned at 21 phase of transverse steel of two pig house dropping pits Mutually overlap joint, the lap of splice are not more than two width of ladder notch 8, and carry out soldering;It is secondary to pour the anti-infiltration of ungauged regions Solidifying soil 9, several dovetail grooves 4 at both ends are by the secondary ungauged regions impervious concrete 9 poured and Y type concrete pit prefabricated in advance 1 securely locking.
Detailed description of the invention:
Fig. 1 is composed structure stereoscopic schematic diagram of the invention;
Fig. 2 is composed structure main view diagrammatic cross-section of the invention;
Fig. 3 is that prefabricated pig house dropping pit of the invention connect main view diagrammatic cross-section with concrete support posts 10;
Fig. 4 is the arrangement schematic top plan view of concrete support posts 10 of prefabricated pig house dropping pit installation of the invention;
Fig. 5 is 2 contexture main view diagrammatic cross-section of Y steel bar rack of the invention;
Fig. 6 is the schematic top plan view of two pieces of prefabricated pig house dropping pits of the invention in installation docking construction;
Fig. 7 is that the overlap joint of transverse steel 21 of two pieces of prefabricated pig house dropping pit seam crossings of the invention and the secondary ungauged regions that pour are prevented Schematic top plan view after seeping concrete 9;
In figure:
1 is Y type concrete pit
2 be Y steel bar rack
3 be the urethral catheterization round tube with gap
4 be dovetail groove
5 be built-in fitting
6 be hanging ring
7 be concrete floor boss
8 be ladder notch
9 be ungauged regions impervious concrete
10 concrete support posts
Specific embodiment
The invention is realized in this way 1~Fig. 7 is described further with reference to the accompanying drawing:
One kind prefabricated pig house dropping pit easy to clean of the invention, it is characterised in that: by Y type concrete pit 1, Y steel bar rack 2, the urethral catheterization round tube 3 with gap, dovetail groove 4, built-in fitting 5, hanging ring 6, concrete floor boss 7, ladder notch 8 are constituted;Institute The Y type concrete pit 1 stated is made of concrete vertical plate 11, concrete floor 12, and the concrete vertical plate 11 is located at described The both ends of concrete floor 12, the low both ends in 12 center of concrete floor are high, and bottom plate is at V-shape;Y steel bar rack 2 by Transverse steel 21, vertical reinforcement 22, stiffener 23 are constituted, and are located at 1 mid-depth of Y type concrete pit, and transverse steel 21 The ladder notch 8 at 1 both ends of Y type concrete pit is stretched out, the length stretched out is less than the width of ladder notch 8;Leading with gap Round tube 3 is urinated, positioned at the center of concrete floor 12, and gap is upward, consistent with plane on concrete floor 12;Several institutes The dovetail groove 4 stated is located at the ladder notch 8 at 1 both ends of Y type concrete pit, and perpendicular to the concrete vertical plate 11 and coagulation of two sides Native bottom plate 12;The built-in fitting 5 is welded with 2 phase of Y steel bar rack, and is located at the top surface of concrete vertical plate 11;Institute The hanging ring 6 stated is connected with built-in fitting 5;The concrete floor boss 7 is located at 12 bottom centre position of concrete floor;Institute The Y type concrete pit 1 stated is located in concrete support posts 10.
One kind prefabricated pig house ditch easy to clean, it is characterised in that: the transverse steel 21 in two pig house dropping pits Mutually overlap joint, the lap of splice are not more than two width of ladder notch 8, and carry out soldering;It is secondary to pour ungauged regions antiseepage Concrete 9, several dovetail grooves 4 at both ends are by the secondary ungauged regions impervious concrete 9 poured and Y type concrete prefabricated in advance Slot 1 is securely locked.
Beneficial effect after the present invention is implemented is:
1. solving long construction period existing for the pig house dropping pit of site operation production in existing agriculture and animal husbandry farm construction Problem, save construction fund and time;
2. prefabricated pig house dropping pit is completed in concrete construction professional factory, quality is guaranteed, and pig house dropping pit owns Size is satisfied the criteria requirement, and non-crack seepage control performance is good, and frost resistance durability is high, scene standardization installation, two pig houses Good integrity at the docking of dropping pit solves traditional site operation poor quality and the liquid dung leakage phenomenon that generates, protection The environment of farm;
3. since pig house dropping pit is, scene standardization installation plant-manufactured in concrete component specialization, dropping pit and excrement It is consistent that apparent size is surveyed at the docking of ditch, in dropping pit, and the secondary any surface finish poured at docking, be conducive to using mechanization Slurry scraper operation improves the mechanization and automatization level of pig-breeding industry.
4. project cost will manufacture pig house excrement lower than existing site operation under the conditions of identical pig house construction area Ditch, and the maintenance and repair expense of dropping pit is not needed at all, prefabricated pig house dropping pit and energy saving pig house same service life.

Claims (2)

1. a kind of prefabricated pig house dropping pit easy to clean, it is characterised in that: by Y type concrete pit (1), Y steel bar rack (2), have Urethral catheterization round tube (3), dovetail groove (4), built-in fitting (5), hanging ring (6), concrete floor boss (7), ladder notch (8) structure of gap At;The Y type concrete pit (1) is made of concrete vertical plate (11), concrete floor (12), the concrete vertical plate (11) it is located at the both ends of the concrete floor (12), the low both ends in the concrete floor (12) center are high, and bottom plate is at V word Type;Y steel bar rack (2) is made of transverse steel (21), vertical reinforcement (22), stiffener (23), and is located at Y type concrete Slot (1) mid-depth, and transverse steel (21) stretches out the ladder notch (8) at Y type concrete pit (1) both ends, the length stretched out Less than the width of ladder notch (8);Urethral catheterization round tube (3) with gap is located at the center of concrete floor (12), and slits Mouth is upward, consistent with plane on concrete floor (12);Several dovetail grooves (4) are located at Y type concrete pit (1) both ends At ladder notch (8), and perpendicular to the concrete vertical plate (11) and concrete floor (12) of two sides;The built-in fitting (5) and Y Steel bar rack (2) mutually welds, and is located at the top surface of concrete vertical plate (11);The hanging ring (6) is connected with built-in fitting (5) It connects;The concrete floor boss (7) is located at concrete floor (12) bottom centre position;The Y type concrete pit (1) On concrete support posts (10).
2. one kind prefabricated pig house dropping pit easy to clean according to claim 1, it is characterised in that: positioned at two pig house dropping pits Transverse steel (21) mutually overlaps, and the lap of splice is not more than two width of ladder notch (8), and carries out soldering;It is secondary Pour ungauged regions impervious concrete (9), several dovetail grooves (4) at both ends by the secondary ungauged regions impervious concrete (9) poured with Y type concrete pit (1) prefabricated in advance is securely locked.
CN201811371583.3A 2018-11-19 2018-11-19 A kind of prefabricated pig house dropping pit easy to clean Pending CN109349130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811371583.3A CN109349130A (en) 2018-11-19 2018-11-19 A kind of prefabricated pig house dropping pit easy to clean

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811371583.3A CN109349130A (en) 2018-11-19 2018-11-19 A kind of prefabricated pig house dropping pit easy to clean

Publications (1)

Publication Number Publication Date
CN109349130A true CN109349130A (en) 2019-02-19

Family

ID=65332103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811371583.3A Pending CN109349130A (en) 2018-11-19 2018-11-19 A kind of prefabricated pig house dropping pit easy to clean

Country Status (1)

Country Link
CN (1) CN109349130A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112841049A (en) * 2021-01-07 2021-05-28 北京盈和瑞环境科技有限公司 Assembled excrement leaking groove

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107396836A (en) * 2017-08-24 2017-11-28 广东精宏建设有限公司 A kind of full assembled pig house
CN207022845U (en) * 2017-05-15 2018-02-23 广东精宏建设有限公司 A kind of prefabricated dropping pit of " V " shape
CN209151903U (en) * 2018-11-19 2019-07-26 郑州大智农牧科技有限公司 A kind of prefabricated pig house dropping pit easy to clean

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207022845U (en) * 2017-05-15 2018-02-23 广东精宏建设有限公司 A kind of prefabricated dropping pit of " V " shape
CN107396836A (en) * 2017-08-24 2017-11-28 广东精宏建设有限公司 A kind of full assembled pig house
CN209151903U (en) * 2018-11-19 2019-07-26 郑州大智农牧科技有限公司 A kind of prefabricated pig house dropping pit easy to clean

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112841049A (en) * 2021-01-07 2021-05-28 北京盈和瑞环境科技有限公司 Assembled excrement leaking groove

Similar Documents

Publication Publication Date Title
CN109329079A (en) A kind of modularization thermal insulation energy conservation pig house building system
CN111677094A (en) Prefabricated pig house excrement ditch of assembled prestressed concrete
CN209151903U (en) A kind of prefabricated pig house dropping pit easy to clean
CN109519004A (en) A kind of prefabricated assembled pond and its assembly method
CN208586722U (en) Precast concrete assembled piping shaft
CN109349130A (en) A kind of prefabricated pig house dropping pit easy to clean
CN213062313U (en) Prefabricated pig house excrement ditch of assembled prestressed concrete
CN209523509U (en) A kind of prefabricated assembled pond
CN209330854U (en) A kind of modularization thermal insulation energy conservation pig house building system
CN209603357U (en) Assembled integral floor
CN109680572B (en) Construction method of integrated comprehensive pipeline of concrete side mould of road bed
CN106088758A (en) A kind of double-deck assembled underground granary
CN100494608C (en) Method for manufacturing prefabricated reinforced concrete combined septic tank
CN113057106B (en) Sectional type prefabricated excrement groove and pig house drainage
CN205296105U (en) Field irrigation is with " U " shape concrete water conservation channel
CN209412844U (en) A kind of assembled resin concrete drainage ditch
CN209429284U (en) A kind of overlength reinforced concrete water pond expansion joint processing mechanism
CN214994461U (en) Rectangular-section assembled concrete manure pit
CN207295744U (en) Herringbone framework slope protection structure formed by precast blocks
CN208379648U (en) A kind of water blocking of garage ramp entrance constructs
CN214994462U (en) Water-saving assembled concrete excrement ditch
CN209243751U (en) A kind of low-rise building
CN207269316U (en) The building block system function ridge
CN208201614U (en) A kind of steel corrugated plating assembling combination bridge
CN206035043U (en) Prefabricated assembled rectangle underground granary of outer steel plated echelonment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 450000 Zhengzhou, Henan Dongfeng South Road, Chuang Road intersection greenbelt window Jingfeng 15 layer 140

Applicant after: Dazhi agriculture and Animal Husbandry Technology Group Co.,Ltd.

Address before: 450000 Zhengzhou, Henan Dongfeng South Road, Chuang Road intersection greenbelt window Jingfeng 15 layer 140

Applicant before: ZHENGZHOU DAZHI AGRICULTURE AND ANIMAL HUSBANDRY TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190219