CN109345410A - A kind of acquisition of town gas pipe construction data and management method - Google Patents
A kind of acquisition of town gas pipe construction data and management method Download PDFInfo
- Publication number
- CN109345410A CN109345410A CN201811124813.6A CN201811124813A CN109345410A CN 109345410 A CN109345410 A CN 109345410A CN 201811124813 A CN201811124813 A CN 201811124813A CN 109345410 A CN109345410 A CN 109345410A
- Authority
- CN
- China
- Prior art keywords
- data
- construction
- pipeline
- pipe
- acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
Abstract
The invention discloses a kind of acquisition of town gas pipe construction data and management methods, include following key step: before construction, encoding according to certain rules to the pipe part of acceptance(check);When construction, pipe part is attached, and forms connector;Butt joint is also encoded, associated adaptor pipes at two ends pipe fitting coding;Typing associated construction data in on-site data gathering equipment in work progress, and the associated documents that will construct are associated by coding with pipe part;After the completion of construction, using the three-dimensional coordinate data of acquisition, pipeline data, the three-dimensional modeling of pipeline is carried out;The data for carrying the acquisition of pipeline work progress, are managed collectively in visualization digital pipe-line system.The work progress of Application of Digitized Pipeline can effectively be managed and construction data is acquired, realize the trackability of full installation process, improve the efficiency of management of later period pipe safety operation phase.
Description
Technical field
The present invention relates to the data collecting fields of Application of Digitized Pipeline, more particularly to a kind of town gas pipe that is applied to construct
Data acquisition and management method.
Background technique
Gas pipeline is distributed in the streets and lanes in city, conveys the energy for huge numbers of families.But the inflammable and explosive spy of combustion gas
Different property makes gas pipeline have certain risk, once gas accidents occur, harm is big, social influence is big.So to combustion
The requirement of feed channel management is higher and higher, as pipeline integrity management, the continuous of lifecycle management theory are popularized, for
The data generated during gas pipeline engineering are increasingly paid attention to.
The gradually expansion of gas distributing system, traditional pipe-line construction theory, means and method, which have been difficult to meet pipeline, builds
And if the needs of operation.Theory based on digitalized city, wisdom pipe network, in order to guarantee that pipeline highly effective and safe is run, it is necessary to
Carry out the digital Construction of pipeline.Pipeline geospatial information and pipeline attribute is integrated, utilization is digitized by pipeline
Visualization, digitlization, networking mode the state simulation of pipeline is come out, and management function can be equipped with according to demand, can
Sufficient data resource is provided for the management of pipe network, maintenance and operation.Digital pipe can use the data information of collection, build
Found perfect pipeline Life cycle database, the following pipeline management will be from the data collection in each stage, management, development
Data unified planning, management for entire pipeline, standardize the data of database, to be pipeline lifecycle management
Foundation is provided, the data in Future Data library can also be extracted by long term data, be shown in the form of report.
The digital collection of pipeline data is one of the key difficulties that Contemporary Digital pipe technology needs to solve, and is especially managed
The data of road construction stage acquire, because many data acquisition in the stage has irreversible and nonrepeatability, need to standardize
The operating process of data acquisition;Which data is acquired, when acquires, how to acquire;In the construction process, it needs by construction
Data are transferred to computer by information-based means by certain standard record-format, establish a Database Systems by process,
Record construction information, material information, geography information etc.;And realize there is a trackability to pipeline construction process.
But none mature effectively method of current generation controls the work progress of management Application of Digitized Pipeline, and number
It is difficult to ensure according to accuracy necessary in collection process.The pipe network of combustion gas type is compared with other pipe networks, and there is higher safety to want
It asks, gas ductwork lays long operational time, and pipeline attribute is not complete, and the variation of road surface and object of reference causes pipeline location difficult;
Underground pipe network lacks Integrity Management, increases insecurity factor;Ground pipe network asset management is not in place, and associated property data lacks
It is weary, leave many security risks.In addition, being related to largely needing signed and stamped paper document, mesh in traditional work progress
Preceding only to be filed with regard to papery data, when the pipeline operation phase will search again from now on, search efficiency is low.
Therefore, those skilled in the art is dedicated to developing a kind of town gas pipe construction data acquisition and manager
Method not only effectively can control and manage the work progress of Application of Digitized Pipeline, but also facilitate gas distributing system Application of Digitized Pipeline
Construction.
Summary of the invention
In view of the above drawbacks of the prior art, the technical problem to be solved by the present invention is to how in gas pipeline engineering
It effectively manages in the process and construction data is acquired.
To achieve the above object, the present invention provides a kind of acquisition of town gas pipe construction data and management method, packets
Include following key step:
Step 1: being encoded to the pipe part of acceptance(check) according to rule before construction;
Step 2: pipe part is attached when construction, connector is formed;Butt joint is also encoded, to associated adaptor two
Hold pipe part coding;Typing associated construction data in on-site data gathering equipment in work progress;
Step 3:, using the three-dimensional coordinate data of acquisition, pipeline data, carrying out the three-dimensional modeling of pipeline after the completion of construction;
The data for carrying the acquisition of pipeline work progress, are managed collectively in visualization digital pipe-line system.
Further, before construction, acceptance is carried out after pipe part to construction site, after acceptance(check), makes a report on pipe
Material pipe fitting essential attribute information, including supplier, batch, material, length.
Further, number work pipe part and connector carried out before construction and when construction, by a set pattern
Uniqueness coding is then formed, realizes the trackability of pipe fitting tubing and connector.
Further, it is printed including the acceptance of work, completion information in papery data for unit in charge of construction oneself formation
When, associated pipe part unique encodings are printed upon in papery data, papery data coded scanning is compiled in pipe part
Code association is can be achieved in final visualization system to papery data inquiry, statistical management.
Further, paper document is provided for for other unit, prints related pipe part coding and is pasted onto papery
On file, it is associated with, is equally also inquired in visualization system, statistical management with coding after scanning and recognizing.
Further, the information of cross over line recorded in construction, information include crossover location three-dimensional coordinate,
The diameter of the type of cross over line, cross over line.
Further, when carrying out the three-dimensional modeling of pipeline, by the fine part of cross over line burning line as a whole
Model load.
Further, after the completion of pipeline laying, road pavement is restored, the embedded permanent mark of road surface above pipe position
Show, permanent mark has uniqueness coding, records the three-dimensional coordinate permanently indicated in a management system.
Further, the automatic checking function for making a report on data carries out school to the connector three-dimensional coordinate and duct length of acquisition
Core, the distance between two neighboring three-dimensional coordinate should be equal to duct length.
Further, the duct length error that the distance between two neighboring three-dimensional coordinate is answered is greater than 5%, then prompts data
Mistake, it is desirable that Field Force re-starts data collection task.
The present invention can effectively be managed the work progress of Application of Digitized Pipeline and be adopted to construction data by this method
Collection realizes the retrospective of full installation process, improves the efficiency of management of later period pipe safety operation phase.
It is described further below with reference to technical effect of the attached drawing to design of the invention, specific structure and generation, with
It is fully understood from the purpose of the present invention, feature and effect.
Detailed description of the invention
Fig. 1 is the town gas pipe construction data collecting flowchart figure of a preferred embodiment of the invention.
Specific embodiment
The preferred embodiment of the present invention is introduced below with reference to Figure of description, keeps its technology contents more clear and convenient for reason
Solution.The present invention can be emerged from by many various forms of embodiments, and protection scope of the present invention is not limited only to text
In the embodiment mentioned.
In the accompanying drawings, the identical component of structure is indicated with same numbers label, everywhere the similar component of structure or function with
Like numeral label indicates.The size and thickness of each component shown in the drawings are to be arbitrarily shown, and there is no limit by the present invention
The size and thickness of each component.Apparent in order to make to illustrate, some places suitably exaggerate the thickness of component in attached drawing.
The digital information for needing to acquire during gas pipeline engineering has construction material information, work progress information and
Construction detection information.
As shown in Figure 1, gas pipeline engineering data acquire in the description present invention process and management method.Before construction,
Acceptance is carried out after pipe part to construction site, after acceptance(check), make a report on pipe part essential attribute information such as supplier,
Material, length etc. number pipe part according to certain rules, form uniqueness coding, realize the traceable of pipe part
Property.
When construction, pipe part is attached, and forms connector, and butt joint also carries out uniqueness coding, associated adaptor both ends
Pipe part coding, in work progress, based on the pipe part of uniqueness coding, connector, data acquisition equipment at the scene
Upper typing associated construction data such as pipe fitting tubing information, three-dimensional coordinate, welding, pressure information etc..
In the construction process, it is related to largely needing signed and stamped paper document.For new construction, unit in charge of construction oneself
Data such as the data of the formation such as acceptance of work, completion etc., in papery data printing, by associated pipe part unique encodings two
Code form or printing bar code are tieed up in papery data, then carries out signature circulation, finally scans papery data, is by management
Papery data scanned copy is associated with by system automatic identification two dimensional code in pipe part coding.In addition, for construction unit etc. other
Unit provides paper document (such as material quality certificate), prints related pipe part coding quick response code form or bar code is pasted onto
On paper document, it is associated with after scanning and recognizing with coding;The management such as finally inquire, count in visualization system.
Town gas pipe is different from long distance pipeline, and in city, underground utilities are more, process of the burning line in operation
In, the case where especially paying close attention to these cross over line.In construction, after pavement excavation, these cross over line will affect gas pipeline
Guan Wei, carries out plus elbow switches through, and during data acquisition, the information of cross over line is recorded, including intersects
The three-dimensional coordinate of position, the type of cross over line, diameter of cross over line etc. will be handed over when carrying out the three-dimensional modeling of pipeline
Breeches pipe line is loaded as partial model, is provided full and accurate data for the transformation of pipeline maintenance from now on and is supported.
Process as shown in Figure 1, after the completion of piping connection construction, it is extensive to carry out road surface after the completion of underground laying for gas pipeline
It is multiple, the embedded permanent mark of road surface above pipe position, such as above threeway, elbow important part, straight pipe interval it is certain
Distance is embedded, and permanent mark has uniqueness coding, records the three-dimensional coordinate of mark in a management system, is used as pipeline from now on
The foundation that pipe position is quickly searched.
For the accuracy for guaranteeing core data in work progress, school is carried out to the connector three-dimensional coordinate and duct length of acquisition
Core, the distance between two neighboring three-dimensional coordinate should be equal to duct length error and be not more than 5%, prompt data wrong if being more than
Accidentally, it is desirable that Field Force re-starts data collection task, to realize the automatic inspection for making a report on data.Utilize the three of acquisition
Coordinate data, pipeline data are tieed up, the 3-dimensional digital modeling of pipeline is carried out.After the completion of pipeline digitizes system building, in foundation
Related data, information are carried on pipeline digital model, visualizes intuitive displaying, realize gas pipeline digital asset in each department
Circulation it is shared, negotiate and management.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that the ordinary skill of this field is without wound
The property made labour, which according to the present invention can conceive, makes many modifications and variations.Therefore, all technician in the art
Pass through the available technology of logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Scheme, all should be within the scope of protection determined by the claims.
Claims (10)
1. a kind of town gas pipe construction data acquisition and management method, which is characterized in that include following key step:
Step 1: being encoded according to certain rules before construction to the pipe part of acceptance(check);
Step 2: pipe part is attached in construction, connector is formed;The connector is also encoded, associated adaptor both ends
Pipe part coding;Typing associated construction data in on-site data gathering equipment in work progress;
Step 3:, using the three-dimensional coordinate data of acquisition, pipeline data, carrying out the three-dimensional modeling of pipeline after construction;Carry pipeline
The data of work progress acquisition, are managed collectively in visualization digital pipe-line system.
2. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that described
Step 1 before construction, carries out acceptance after pipe part to construction site, after acceptance(check), it is basic to make a report on pipe part
Attribute information, including supplier, material, length.
3. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that in institute
The coding work carried out when stating step 1 and step 2 to pipe part and connector is respectively formed uniqueness coding, realizes
The trackability of pipe fitting tubing and connector.
4. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that be directed to
What unit in charge of construction oneself was formed includes the acceptance of work, completion information, in papery data printing, by the associated pipe part
Unique encodings are printed upon in papery data;By papery data coded scanning, it is associated with pipe part coding.
5. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that be directed to
Paper document is provided for other unit, related pipe part coding is printed and pastes on a paper document, scanning and recognizing
The paper document is associated with the coding afterwards.
6. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that applying
Working hour records the information of cross over line, and information includes the three-dimensional coordinate of crossover location, the type of cross over line, cross pipe
The diameter of line.
7. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that applying
When carrying out the three-dimensional modeling of pipeline after the completion of work, the partial model of the three-dimensional data of cross over line pipeline as a whole is added
It carries.
8. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that pipeline
After the completion of laying, road surface recovery is carried out, the embedded permanent mark of road surface, permanent mark have uniqueness above pipe position
Coding, records the three-dimensional coordinate permanently indicated in a management system.
9. a kind of town gas pipe construction data acquisition as described in claim 1 and management method, which is characterized in that have
The automatic checking function for making a report on data checks connector three-dimensional coordinate and the duct length of acquisition, two neighboring three-dimensional seat
The distance between mark should be equal to duct length.
10. a kind of town gas pipe construction data acquisition as claimed in claim 9 and management method, which is characterized in that institute
The corresponding duct length error of the distance between two neighboring three-dimensional coordinate is stated greater than 5%, then prompts error in data, it is desirable that
Field Force re-starts data collection task.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811124813.6A CN109345410A (en) | 2018-09-26 | 2018-09-26 | A kind of acquisition of town gas pipe construction data and management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811124813.6A CN109345410A (en) | 2018-09-26 | 2018-09-26 | A kind of acquisition of town gas pipe construction data and management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109345410A true CN109345410A (en) | 2019-02-15 |
Family
ID=65307016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811124813.6A Pending CN109345410A (en) | 2018-09-26 | 2018-09-26 | A kind of acquisition of town gas pipe construction data and management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109345410A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109886835A (en) * | 2019-02-27 | 2019-06-14 | 国网上海市电力公司 | A kind of quick coding method of substation's component |
CN110005883A (en) * | 2019-04-09 | 2019-07-12 | 雷洋 | A kind of connection method that gas pipeline is not got angry |
CN110319818A (en) * | 2019-07-17 | 2019-10-11 | 伟志股份公司 | A kind of Finish Construction Survey of Underground Pipeline system and method |
CN110489509A (en) * | 2019-08-19 | 2019-11-22 | 北京讯腾智慧科技股份有限公司 | Gas pipeline survey report generation method and system |
CN112131692A (en) * | 2020-08-29 | 2020-12-25 | 大昌建设集团有限公司 | Gas pipeline construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050195210A1 (en) * | 2000-08-23 | 2005-09-08 | Nintendo Co., Ltd. | Method and apparatus for efficient generation of texture coordinate displacements for implementing emboss-style bump mapping in a graphics rendering system |
CN105574777A (en) * | 2015-12-31 | 2016-05-11 | 中国南方电网有限责任公司 | Three-dimensional intelligent construction method of substation |
CN106897825A (en) * | 2017-02-20 | 2017-06-27 | 红塔烟草(集团)有限责任公司 | Energy conduit three-dimensional visualization and information-based modeling and its method |
CN107256318A (en) * | 2017-07-18 | 2017-10-17 | 中国电建集团河南工程公司 | Boiler tubule pipeline construction method based on BIM technology |
CN108171795A (en) * | 2017-12-04 | 2018-06-15 | 金华市人民防空办公室 | A kind of display methods of pipe gallery, device and virtual reality device |
-
2018
- 2018-09-26 CN CN201811124813.6A patent/CN109345410A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050195210A1 (en) * | 2000-08-23 | 2005-09-08 | Nintendo Co., Ltd. | Method and apparatus for efficient generation of texture coordinate displacements for implementing emboss-style bump mapping in a graphics rendering system |
CN105574777A (en) * | 2015-12-31 | 2016-05-11 | 中国南方电网有限责任公司 | Three-dimensional intelligent construction method of substation |
CN106897825A (en) * | 2017-02-20 | 2017-06-27 | 红塔烟草(集团)有限责任公司 | Energy conduit three-dimensional visualization and information-based modeling and its method |
CN107256318A (en) * | 2017-07-18 | 2017-10-17 | 中国电建集团河南工程公司 | Boiler tubule pipeline construction method based on BIM technology |
CN108171795A (en) * | 2017-12-04 | 2018-06-15 | 金华市人民防空办公室 | A kind of display methods of pipe gallery, device and virtual reality device |
Non-Patent Citations (1)
Title |
---|
宁夏回族自治区建设厅: "《建筑工程计价定额 上》", 30 November 2008, 宁夏人民出版社 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109886835A (en) * | 2019-02-27 | 2019-06-14 | 国网上海市电力公司 | A kind of quick coding method of substation's component |
CN110005883A (en) * | 2019-04-09 | 2019-07-12 | 雷洋 | A kind of connection method that gas pipeline is not got angry |
CN110319818A (en) * | 2019-07-17 | 2019-10-11 | 伟志股份公司 | A kind of Finish Construction Survey of Underground Pipeline system and method |
CN110489509A (en) * | 2019-08-19 | 2019-11-22 | 北京讯腾智慧科技股份有限公司 | Gas pipeline survey report generation method and system |
CN112131692A (en) * | 2020-08-29 | 2020-12-25 | 大昌建设集团有限公司 | Gas pipeline construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109345410A (en) | A kind of acquisition of town gas pipe construction data and management method | |
Chong et al. | Comparative analysis on the adoption and use of BIM in road infrastructure projects | |
CN204303029U (en) | For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance | |
Zolfagharian et al. | Current trends in construction site layout planning | |
Altıntaş et al. | Loose coupling of GIS and BIM data models for automated compliance checking against zoning codes | |
CN106897825A (en) | Energy conduit three-dimensional visualization and information-based modeling and its method | |
CN109784876A (en) | Review system and method on line | |
CN103927604B (en) | Oil gas pipeline integrity data technology implementation method | |
Le et al. | Lifecycle data modeling to support transferring project-oriented data to asset-oriented systems in transportation projects | |
CN102903027A (en) | Method and system for fusing urban underground comprehensive pipelines and special pipelines | |
Zhou et al. | A BIM-based identification and classification method of environmental risks in the design of Beijing subway | |
Ding et al. | BIM research vs BIM practice: A bibliometric-qualitative analysis from China | |
Ramlakhan et al. | Modelling the legal spaces of 3D underground objects in 3D land administration systems | |
CN107545373A (en) | A kind of municipal information analysis and security evaluation management system | |
Chen et al. | Integrating knowledge management and BIM for safety risk identification of deep foundation pit construction | |
Tang et al. | Developing a BIM GIS–integrated method for urban underground piping management in China: a case study | |
Kubota et al. | Data model–centered four-dimensional information management system for road maintenance | |
US20120233046A1 (en) | Providing stationery asset information | |
Yang et al. | Cascading Failure Analysis of Causal Factors for Construction Collapse Accidents Based on Network Theory | |
Huang et al. | Using digital technologies to plan and manage the pipelines network in city | |
Chi et al. | Big data in urban construction archives and urban management: Detected underground pipes alignment with urban construction records | |
AU2021105175A4 (en) | Auxiliary planning auditing method for underground pipelines based on three-dimensional GIS technology | |
Kim et al. | A Study on BEM Application for the Efficient Maintenance Management of Bridge Structures | |
CN110390725A (en) | A kind of pipeline completion drawing generating method, device and system | |
JP2003271981A (en) | System and program for creating river ledger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: No.162 Weifang Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122 Applicant after: Shanghai Energy Construction Group Co.,Ltd. Address before: No.162 Weifang Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122 Applicant before: SHANGHAI MUNICIPAL GAS NO.2 PIPELINES ENGINEERING Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190215 |