CN109345106A CN201811115336.7A CN201811115336A CN109345106A CN 109345106 A CN109345106 A CN 109345106A CN 201811115336 A CN201811115336 A CN 201811115336A CN 109345106 A CN109345106 A CN 109345106A
Authority
CN
China
Prior art keywords
test
pass
executes
test result
procedure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811115336.7A
Other languages
Chinese (zh)
Other versions
CN109345106B (en
Inventor
黄志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oppo Chongqing Intelligent Technology Co Ltd
Original Assignee
Oppo Chongqing Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oppo Chongqing Intelligent Technology Co Ltd filed Critical Oppo Chongqing Intelligent Technology Co Ltd
Priority to CN201811115336.7A priority Critical patent/CN109345106B/en
Publication of CN109345106A publication Critical patent/CN109345106A/en
Application granted granted Critical
Publication of CN109345106B publication Critical patent/CN109345106B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

This application discloses a kind of process management-control method and relevant devices, applied to process control device, method includes: to obtain N number of first test result by first step, N number of first test result is that the associated N number of the second step of the first step executes the first pass and obtains, the second step executes whether first function of the first pass for test product be good, and the N is the integer greater than 1;It controls the first step and executes second procedure, whether the first step executes second procedure qualified for testing N number of first test result;If in N number of first test result there are M the first test results be it is unqualified, control the M corresponding M the second steps of the first test result and re-execute first pass.The adjustability that process can be improved using the embodiment of the present application increases the flexibility of process.

Description

Process management-control method and relevant device
Technical field
This application involves production management technical field more particularly to a kind of process management-control methods and relevant device.
Background technique
Production management system is manufacturing enterprise can be helped to establish one for the system of manufacturing enterprise's production application research and development The accurate Production database of specification, effectively control production process, improve production efficiency.Currently used production management system is system It makes enterprise production process and executes system (Manufacturing Execution System, MES).MES is mainly on-line maintenance The testing process of good complete set, testing process include multiple processes, and each process is fixed in the testing process, the test stream The working principle of journey is then obtained by the test of 2 test step 1 of process by the first function of the first test product of process 1 Whether test result is qualified, if qualified, by the second function of 2 test product of process, subsequently passes through 3 test step of process Whether the 2 obtained test results of test are qualified, if qualified, by the third function of 3 test product of process, and so on.It can See, the flexibility of the testing process is poor.
Summary of the invention
The embodiment of the present application provides a kind of process management-control method and relevant device, for promoting the flexibility of testing process.
In a first aspect, the embodiment of the present application provides a kind of process management-control method, it is applied to process control device, the process Control device includes first pass and/or second procedure for managing multiple processes, the process, and the first pass is for controlling Whether one of function of the corresponding test equipment test product of process processed is good, and the second procedure is closed for test step Whether at least one process of connection executes the test result that first pass obtains qualified, which comprises
N number of first test result is obtained by first step, N number of first test result is the first step association N number of the second step execute what the first pass obtained, the second step executes the of first pass for test product Whether one function is good, and the N is the integer greater than 1;
It controls the first step and executes second procedure, it is described N number of for testing that the first step executes second procedure Whether the first test result is qualified;
If in N number of first test result there are M the first test results be it is unqualified, control the M first The corresponding M the second step of test result re-executes first pass.
Second aspect, the embodiment of the present application provide a kind of process control device, and the process control device is more for managing A process, the process include first pass and/or second procedure, and the first pass is set for controlling the corresponding test of process Whether one of function of standby test product is good, and the second procedure is held at least one associated process of test step Whether the test result that row first pass obtains is qualified;Described device includes:
Acquiring unit, for obtaining N number of first test result by first step, N number of first test result is institute It states the associated N number of the second step of first step and executes what the first pass obtained, the second step executes first pass and uses Whether good in the first function of test product, the N is the integer greater than 1;
Control unit executes second procedure for controlling the first step, and the first step executes second procedure and uses In testing, whether N number of first test result is qualified;
Described control unit, if being also used in N number of first test result there are M the first test results be not conform to Lattice then control the M corresponding M the second steps of the first test result and re-execute first pass.
The third aspect, the embodiment of the present application provide a kind of process control device, including processor, memory, communication interface, And one or more programs, one or more of programs are stored in the memory, and are configured by described It manages device to execute, above procedure is included the steps that for executing the instruction in method described in the embodiment of the present application first aspect.
Fourth aspect, the embodiment of the present application provide a kind of computer readable storage medium, wherein above-mentioned computer-readable Storage medium storage is used for the computer program of electronic data interchange, wherein above-mentioned computer program executes computer such as Step some or all of described in method described in the embodiment of the present application first aspect.
5th aspect, the embodiment of the present application provide a kind of computer program product, wherein above-mentioned computer program product Non-transient computer readable storage medium including storing computer program, above-mentioned computer program are operable to make to calculate Step some or all of described in method of the machine execution as described in the embodiment of the present application first aspect.The computer program produces Product can be a software installation packet.
As can be seen that in the embodiment of the present application, firstly, obtaining N number of first test result by first step, first is surveyed Test result is that the second step execution first pass obtains;Then, control first step executes second procedure, to test N number of the Whether one test result qualified, if in N number of first test result there are M the first test results be it is unqualified, control M the The corresponding M the second step of one test result re-executes first pass.Since a process can be associated with multiple processes, avoid Because some process influences entire testing process, and then improves the flexibility of testing process.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of framework schematic diagram of production management system provided by the embodiments of the present application;
Fig. 2 a is a kind of flow diagram of process management-control method provided by the embodiments of the present application;
Fig. 2 b is a kind of schematic diagram of testing process provided by the embodiments of the present application;
Fig. 3 is the flow diagram of another process management-control method provided by the embodiments of the present application;
Fig. 4 is a kind of structural schematic diagram of process control device provided by the embodiments of the present application;
Fig. 5 is the structural schematic diagram of another process control device provided by the embodiments of the present application.
Specific embodiment
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection It encloses.
It is described in detail separately below.
The description and claims of this application and term " first ", " second ", " third " and " in the attached drawing Four " etc. are not use to describe a particular order for distinguishing different objects.In addition, term " includes " and " having " and it Any deformation, it is intended that cover and non-exclusive include.Such as it contains the process, method of a series of steps or units, be System, product or equipment are not limited to listed step or unit, but optionally further comprising the step of not listing or list Member, or optionally further comprising other step or units intrinsic for these process, methods, product or equipment.
Referenced herein " embodiment " is it is meant that a particular feature, structure, or characteristic described can wrap in conjunction with the embodiments It is contained at least one embodiment of the application.Each position in the description occur the phrase might not each mean it is identical Embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art explicitly and Implicitly understand, embodiment described herein can be combined with other embodiments.
As shown in Figure 1, Fig. 1 is a kind of framework schematic diagram of production management system provided by the embodiments of the present application.The production Management system includes process control device and multiple test equipments.Process control device passes through wireless technology or cable technology and survey Try equipment communication connection.
Wherein, process control device for example can be server, industrial computer etc..Server is to provide setting for the service of calculating It is standby.Since server needs to respond service request, and handled, thus in general server should have undertake service and Ensure the ability of service.Industrial computer is the industrial control computer specializing in industry and using, basic performance and compatibility with Commercial computer is very nearly the same, but industrial computer is more the stability focused under various circumstances.
Wherein, process control device is for managing multiple processes, and process includes first pass and/or second procedure, and first Whether one of function that process is used to control the corresponding test equipment test product of process is good, and second procedure is for testing Whether at least one associated process of process executes the test result that first pass obtains qualified.
Wherein, the corresponding test equipment of a process, such as the corresponding test equipment 1 of process 1, the corresponding test equipment of process 2 2, corresponding test equipment 3 of process 3 etc..Test equipment for example has high/low temperature circulating box, abrasion wear test machine, waterproof tester, sand dust Testing machine, touch screen pressure testing machine, drop machine, tumbler test machine, comprehensive tester CMU200, bluetooth tester, screen Cover case, mobile phone test card, mobile phone key tester etc..
Wherein, the function that different processes executes first pass test product is different, as process 1 executes first pass Function 1, process 2 for test product execute function 2, process 3 of the first pass for test product and execute first pass and use In the function 3 etc. of test product.
Wherein, the said goods can be mobile terminal, is also possible to other products, is not limited thereto.Mobile terminal, again Referred to as user equipment (User Equipment, UE), is a kind of equipment for providing a user voice and/or data connectivity, For example, handheld device, mobile unit etc. with unlimited linkage function.Common terminal for example, mobile phone, plate electricity Brain, laptop, palm PC, mobile internet device (mobile internet device, MID), wearable device, Such as smartwatch, Intelligent bracelet, pedometer etc..
Where it is assumed that the said goods are mobile phone, the function of test product is for instance that high temperature resistant function, low temperature resistant function, resistance to Grind function, ageing-resistant function, resistance to acid and alkali function, water-proof function, dust reduction capability, drop resistant function, touch screen resistance to compression drop resistant function, Antenna signal strength function, chargeable number of times of battery function, interface plug function, push button longevity function etc..
Fig. 2 a is please referred to, Fig. 2 a is a kind of flow diagram of process management-control method provided by the embodiments of the present application, application In process control device, for the process control device for managing multiple processes, the process includes first pass and/or second Process, whether one of function that the first pass is used to control the corresponding test equipment test product of process is good, institute Whether qualified state the test result that second procedure is obtained for associated at least one process execution first pass of test step, institute The method of stating includes:
Step 201: process control device obtains N number of first test result, N number of first test knot by first step Fruit is that the associated N number of the second step of the first step executes the first pass and obtains, and the second step executes first Whether first function of the process for test product be good, and the N is the integer greater than 1.
Further, the test result that process executes that first pass obtains is stored in designated storage location, and described specify is deposited Storage space is set permission and is accessed by each process.Wherein, which can be one in working procedure management installation and specified deposits Storage space is set, and a designated storage location being also possible in the associated storage equipment of working procedure management installation is not limited thereto.
Further, the function that different processes executes first pass test product is different.
For example, as shown in Figure 2 b, it is assumed that process control device is for managing 5 processes, such as process 1, process 2, work Sequence 3, process 4 and process 5.Process 1 includes first pass, and the first pass for executing process 1 is used for the function 1 of test product.Work Sequence 2 includes first pass, and the first pass for executing process 2 is used for the function 2 of test product.Process 3 includes first pass and the Two processes, the first pass for executing process 3 are used for the function 3 of test product, and the second procedure for executing process 3 is used for test step Whether 3 associated processes 1 and process 2 execute the test result that first pass obtains qualified.Process 4 includes first pass and second Process, the first pass for executing process 4 are used for the function 4 of test product, and the second procedure for executing process 4 is used for test step 4 Whether associated process 2 and process 3 execute the test result that first pass obtains qualified.Process 5 includes second procedure, executes work The second procedure of sequence 5 executes the test result that first pass obtains for the associated process 1 of test step 5, process 3 and process 4 It is whether qualified.
Assuming that process 3 is first step, the associated the second step of process 3 has process 1 and process 2.Process control device is logical The first test result that process 3 obtains process 1 and the execution first pass of process 2 obtains is crossed, process 1 executes first pass for surveying Whether the function 1 of trial product is good, and whether process 2 executes function 2 of the first pass for test product good.
In the implementation of the application, it is assumed that the first function is drop resistant function, and the first pass is for controlling work Whether one of function of the corresponding test equipment test product of sequence is good, comprising: first pass is corresponding for controlling process Drop machine test product drop resistant function, if in predetermined altitude and predetermined drop number, the appearance of product, structure and Function is good, it is determined that the drop resistant function of product be it is good, otherwise determine product drop resistant function be it is non-good.
In another implementation of the application, it is assumed that the first function is dust reduction capability, and the first pass is for controlling Whether one of function of the corresponding test equipment test product of process is good, comprising: first pass is for controlling process pair The dust reduction capability for the dust and sand effect machine test product answered, if in predetermined dust concentration and in the predetermined time, product function normally and Without into dirt phenomenon, it is determined that the dust reduction capability of product be it is good, otherwise the dust reduction capability of determining product is non-good.
In another implementation of the application, it is assumed that the first function is water-proof function, and the first pass is for controlling Whether one of function of the corresponding test equipment test product of process is good, comprising: first pass is for controlling process pair The water-proof function for the waterproof tester test product answered, if in predetermined depth and predetermined flow rate, product function it is normal and without into Water phenomenon, it is determined that the water-proof function of product be it is good, otherwise determine product water-proof function be it is non-good.
Step 202: process control device controls the first step and executes second procedure, and the first step executes second Whether process is qualified for testing N number of first test result.
Specifically, if the result of test result q is good, it is determined that test result q is qualification, otherwise determines test result Q is test result unqualified, that test result q obtains for process execution first pass.
Step 203: if there are M the first test results being unqualified, process control in N number of first test result Device controls the M corresponding M the second step of the first test result and re-executes first pass, wherein M is to be less than or wait In the positive integer of N.
Here, the process control device controls the M corresponding M the second step of the first test result and re-executes Before first pass, the method also includes being that underproof product is transmitted to the M first by M the first test results At the test equipment of the corresponding M the second step control of test result.Wherein, for automation procedure managing and control system, there are one Underproof product is transmitted to the test that the corresponding M the second step of the M the first test results controls and set by supply line Standby place;For non-automated producing line, then need that underproof product is manually transmitted to the M the first test results corresponding At the test equipment of M the second step control.
In a kind of implementation of the application, the method also includes: if there are K in N number of first test result A first test result is qualification, then process control device controls the first step and executes first pass, the first step Whether the second function of executing first pass for test product is good, and the K is positive integer, the K the first test results Different from the M the first test results.
Wherein, K is the positive integer less than or equal to N, and the sum of K and M are equal to N.
As can be seen that in the embodiment of the present application, firstly, obtaining N number of first test result by first step, first is surveyed Test result is that the second step execution first pass obtains;Then, control first step executes second procedure, to test N number of the Whether one test result qualified, if in N number of first test result there are M the first test results be it is unqualified, control M the The corresponding M the second step of one test result re-executes first pass.Since a process can be associated with multiple processes, avoid Because some process influences entire testing process, and then improves the flexibility of testing process.
In a kind of implementation of the application, the control M corresponding M the second step of the first test result After re-executing first pass, the method also includes:
Process control device obtains M second test result, the M second test knot by the first step Fruit is that the M the second step re-executes first pass and obtain;
Process control device controls the first step and executes second procedure, and the first step executes second procedure and is used for Whether qualified test the M the second test results;
If in the M the second test results there are H the second test results be it is unqualified, process control device is dished out The product of the corresponding H the second step test of the H the second test results, the H is positive integer;
If there are G the second test results in the M the second test results to be qualified, process control device controls institute It states first step and executes first pass, the G is positive integer, and the G the second test results are different from the H second test As a result.
As can be seen that in the embodiment of the present application, being non-good product for function, performing its corresponding work again The first pass of sequence detects the function, to avoid surveying again because detection is omitted labeled as non-good secondly, having dished out Still underproof product is tried, prevents entire process control process from carrying out endless loop always, improves the discrimination of process, increase The flexibility of process.
In the implementation of the application, it is described N number of first test result is obtained by first step before, the side Method further include:
Process control device controls the second step i and executes first pass, to obtain the first test result j, second work Sequence i is one of them in N number of the second step;
After the completion of the second step i executes first pass, it is first-class that process control device controls the second step k execution Journey, to obtain the first test result h, the second step k be in N number of the second step in addition to the second step i its In one, repeat this step until N number of the second step completes execution first pass.
For example, refering to Fig. 2 b, it is assumed that first step is process 3, then the second step is process 1 and process 2, passes through work Before sequence 3 obtains the first test result of process 1 and process 2, process control device controls process 1 and executes first pass, with To the first test result 1, then controls process 2 and execute first pass, to obtain the first test result 2.
In the implementation of the application, it is described N number of first test result is obtained by first step before, the side Method further include:
The multiple process is arranged in process control device, and establishes the mapping relations between process and process, the work Mapping relations between sequence and process include the corresponding multiple the second steps of a first step, and a second step corresponds to multiple the One process.
As can be seen that in the embodiment of the present application, a first step corresponds to multiple the second steps, a second step pair Multiple first steps are answered, are avoided because some process influences entire testing process, and then improves the flexibility of testing process.
It is consistent with embodiment shown in Fig. 2 a, referring to Fig. 3, Fig. 3 is another kind provided by the embodiments of the present application The flow diagram of process management-control method, which comprises
Step 301: the multiple process is arranged in process control device, and the mapping established between process and process is closed System, mapping relations between the process and process include the corresponding multiple the second steps of a first step, a second step Corresponding multiple first steps.
Step 302: process control device controls the second step i and executes first pass, to obtain the first test result j, institute Stating the second step i is one of them in N number of the second step.
Step 303: after the completion of the second step i executes first pass, process control device control the second step k is held Row first pass is in N number of the second step in addition to second work to obtain the first test result h, the second step k One of them of sequence i repeats this step until N number of the second step is completed to execute first pass.
Step 304: process control device obtains N number of first test result, N number of first test knot by first step Fruit is that the associated N number of the second step of the first step executes the first pass and obtains, and the second step executes first Whether first function of the process for test product be good, and the N is the integer greater than 1.
Step 305: process control device controls the first step and executes second procedure, and the first step executes second Whether process is qualified for testing N number of first test result.
Step 306: if there are M the first test results being unqualified, process control in N number of first test result Device controls the M corresponding M the second step of the first test result and re-executes first pass.
Step 307: if there are K the first test results being qualification, process control dress in N number of first test result It sets the control first step and executes first pass, the first step executes the second function that first pass is used for test product Whether good, the K is positive integer, and the K the first test results are different from the M the first test results.
Step 308: process control device obtains the M the second test results by the first step, and the M the Two test results are that the M the second step re-executes first pass and obtain.
Step 309: process control device controls the first step and executes second procedure, and the first step executes second Whether process is qualified for testing the M the second test results.
Step 310: if there are H the second test results being unqualified, process control in the M the second test results Device is dished out the product of the corresponding H the second step test of the H the second test results, and the H is positive integer.
Step 311: if there are G the second test results being qualification, process control device in the M the second test results It controls the first step and executes first pass, the G is positive integer, and the G the second test results are different from the H the Two test results.
It should be noted that the specific implementation process of each step of method shown in Fig. 3 can be found in described in the method Specific implementation process, no longer describe herein.
It is consistent with above-mentioned Fig. 2 a and embodiment shown in Fig. 3, referring to Fig. 4, Fig. 4 is provided by the embodiments of the present application one The structural schematic diagram of kind process control device, the process control device include first for managing multiple processes, the process Process and/or second procedure, the first pass are used to control one of function of the corresponding test equipment test product of process Can whether good, the second procedure executes the test knot that first pass obtains at least one associated process of test step Whether fruit is qualified, as shown, the process control device includes processor, memory, communication interface and one or more journeys Sequence, wherein said one or multiple programs are stored in above-mentioned memory, and are configured to be executed by above-mentioned processor, on Stating program includes the instruction for executing following steps:
N number of first test result is obtained by first step, N number of first test result is the first step association N number of the second step execute what the first pass obtained, the second step executes the of first pass for test product Whether one function is good, and the N is the integer greater than 1;
It controls the first step and executes second procedure, it is described N number of for testing that the first step executes second procedure Whether the first test result is qualified;
If in N number of first test result there are M the first test results be it is unqualified, control the M first The corresponding M the second step of test result re-executes first pass.
In the implementation of the application, process executes the test result that first pass obtains and is stored in specified storage position It sets, the designated storage location permission is accessed by each process.
In the implementation of the application, above procedure includes the instruction for being also used to execute following steps:
If there are K the first test results being qualification in N number of first test result, controls the first step and hold Row first pass, the first step execute whether second function of the first pass for test product be good, and the K is positive whole Number, the K the first test results are different from the M the first test results.
In the implementation of the application, the M corresponding M the second step of the first test result is being controlled again After executing first pass, above procedure includes the instruction for being also used to execute following steps:
M second test result is obtained by the first step, the M the second test results are the M The second step re-executes what first pass obtained;
It controls the first step and executes second procedure, the first step executes second procedure for testing the M Whether the second test result is qualified;
If in the M the second test results there are H the second test results be it is unqualified, dish out the H second The product of the corresponding H the second step test of test result, the H is positive integer;
If there are G the second test results being qualification in the M the second test results, controls the first step and execute First pass, the G are positive integer, and the G the second test results are different from the H the second test results.
In the implementation of the application, before obtaining N number of first test result by first step, above procedure Instruction including being also used to execute following steps:
It controls the second step i and executes first pass, be described N number of to obtain the first test result j, the second step i One of them in the second step;
After the completion of the second step i executes first pass, control the second step k executes first pass, to obtain the One test result h, the second step k be in N number of the second step in addition to the second step i one of them, repeat This step is until N number of the second step is completed to execute first pass.
In the implementation of the application, before obtaining N number of first test result by first step, above procedure Instruction including being also used to execute following steps:
The multiple process is set, and establishes the mapping relations between process and process, between the process and process Mapping relations include a first step correspond to multiple the second steps, a second step corresponds to multiple first steps.
In the implementation of the application, the function that different processes executes first pass test product is different.
It should be noted that the specific implementation process of the present embodiment can be found in specific implementation described in above method embodiment Process no longer describes herein.
The embodiment of the present application can carry out the division of functional unit according to the method example to electronic equipment, for example, can With each functional unit of each function division of correspondence, two or more functions can also be integrated in a processing unit In.The integrated unit both can take the form of hardware realization, can also realize in the form of software functional units.It needs It is noted that be schematical, only a kind of logical function partition to the division of unit in the embodiment of the present application, it is practical real It is current that there may be another division manner.
It is below the application Installation practice, the application Installation practice is realized for executing the application embodiment of the method Method.Referring to Fig. 5, Fig. 5 is a kind of structural schematic diagram of process control device provided by the embodiments of the present application, the process Control device includes first pass and/or second procedure for managing multiple processes, the process, and the first pass is for controlling Whether one of function of the corresponding test equipment test product of process processed is good, and the second procedure is closed for test step At least one process of connection executes whether the test result that first pass obtains is qualified, and described device includes:
Acquiring unit 501, for obtaining N number of first test result by first step, N number of first test result is The associated N number of the second step of first step executes what the first pass obtained, and the second step executes first pass Whether the first function for test product is good, and the N is the integer greater than 1;Control unit 502, for controlling described One process executes second procedure, and the first step executes second procedure for testing whether N number of first test result closes Lattice;Described control unit 502, if be also used in N number of first test result be there are M the first test results it is unqualified, It then controls the M corresponding M the second steps of the first test result and re-executes first pass.
In the implementation of the application, process executes the test result that first pass obtains and is stored in specified storage position It sets, the designated storage location permission is accessed by each process.
In the implementation of the application, described control unit 502 is also used to:
If there are K the first test results being qualification in N number of first test result, controls the first step and hold Row first pass, the first step execute whether second function of the first pass for test product be good, and the K is positive whole Number, the K the first test results are different from the M the first test results.
In the implementation of the application, it is corresponding that the M the first test results are controlled in described control unit 502 After M the second step re-executes first pass, acquiring unit 501 is also used to obtain by the first step M described Second test result, the M the second test results are that the M the second step re-executes first pass and obtain;
Control unit 502 is also used to control the first step and executes second procedure, and the first step executes second Whether journey is qualified for testing the M the second test results;
Control unit 502, if be also used in the M the second test results be there are H the second test results it is unqualified, The product of the corresponding H the second step test of the H the second test results of then dishing out, the H is positive integer;
Control unit 502, if being also used in the M the second test results there are G the second test results be qualification, control It makes the first step and executes first pass, the G is positive integer, and the G the second test results are different from the H second Test result.
In the implementation of the application, acquiring unit 501 by first step obtain N number of first test result it Before, control unit 502 is also used to control the second step i and executes first pass, to obtain the first test result j, second work Sequence i is one of them in N number of the second step;After the completion of the second step i executes first pass, the second work is controlled Sequence k executes first pass, is in N number of the second step in addition to described to obtain the first test result h, the second step k One of them of the second step i repeats this step until N number of the second step is completed to execute first pass.
In the implementation of the application, acquiring unit 501 by first step obtain N number of first test result it Before, described device further include:
Processing unit 503 for the multiple process to be arranged, and establishes the mapping relations between process and process, institute Stating mapping relations between process and process includes the corresponding multiple the second steps of a first step, and a second step corresponds to more A first step.
In the implementation of the application, the function that different processes executes first pass test product is different.
It should be noted that the specific implementation process of the present embodiment can be found in specific implementation described in above method embodiment Process no longer describes herein.
It should be noted that acquiring unit 501, control unit 502 and processing unit 503 can be realized by processor.
The embodiment of the present application also provides a kind of computer storage medium, wherein computer storage medium storage is for electricity The computer program of subdata exchange, the computer program make computer execute any as recorded in above method embodiment Some or all of method step, above-mentioned computer include process control device.
The embodiment of the present application also provides a kind of computer program product, and above-mentioned computer program product includes storing calculating The non-transient computer readable storage medium of machine program, above-mentioned computer program are operable to that computer is made to execute such as above-mentioned side Some or all of either record method step in method embodiment.The computer program product can be a software installation Packet, above-mentioned computer includes process control device.
It should be noted that for the various method embodiments described above, for simple description, therefore, it is stated as a series of Combination of actions, but those skilled in the art should understand that, the application is not limited by the described action sequence because According to the application, some steps may be performed in other sequences or simultaneously.Secondly, those skilled in the art should also know It knows, the embodiments described in the specification are all preferred embodiments, related actions and modules not necessarily the application It is necessary.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment Point, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed device, it can be by another way It realizes.For example, the apparatus embodiments described above are merely exemplary, such as the division of said units, it is only a kind of Logical function partition, there may be another division manner in actual implementation, such as multiple units or components can combine or can To be integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Coupling, direct-coupling or communication connection can be through some interfaces, the indirect coupling or communication connection of device or unit, It can be electrical or other forms.
Above-mentioned unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If above-mentioned integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer-readable access to memory.According to such understanding, the technical solution of the application substantially or Person says that all or part of the part that contributes to existing technology or the technical solution can body in the form of software products Reveal and, which is stored in a memory, including some instructions are used so that a computer equipment (can be personal computer, server or network equipment etc.) executes all or part of each embodiment above method of the application Step.And memory above-mentioned includes: USB flash disk, read-only memory (ROM, Read-Only Memory), random access memory The various media that can store program code such as (RAM, Random Access Memory), mobile hard disk, magnetic or disk.
Those of ordinary skill in the art will appreciate that all or part of the steps in the various methods of above-described embodiment is can It is completed with instructing relevant hardware by program, which can store in a computer-readable memory, memory May include: flash disk, read-only memory (English: Read-Only Memory, referred to as: ROM), random access device (English: Random Access Memory, referred to as: RAM), disk or CD etc..
The embodiment of the present application is described in detail above, specific case used herein to the principle of the application and Embodiment is expounded, the description of the example is only used to help understand the method for the present application and its core ideas; At the same time, for those skilled in the art can in specific embodiments and applications according to the thought of the application There is change place, in conclusion the contents of this specification should not be construed as limiting the present application.

Claims (10)

1. a kind of process management-control method, which is characterized in that be applied to process control device, the process control device is for managing Multiple processes, the process include first pass and/or second procedure, and the first pass is for controlling the corresponding test of process Whether one of function of equipment test product is good, and the second procedure is used at least one associated process of test step Whether qualified execute the test result that first pass obtains, which comprises
N number of first test result is obtained by first step, N number of first test result is the associated N of the first step A the second step executes what the first pass obtained, and the second step executes the first function that first pass is used for test product Can whether good, the N is the integer greater than 1;
It controls the first step and executes second procedure, the first step executes second procedure for testing described N number of first Whether test result is qualified;
If in N number of first test result there are M the first test results be it is unqualified, control the M first test As a result corresponding M the second step re-executes first pass.
2. being stored in the method according to claim 1, wherein process executes the test result that first pass obtains Designated storage location, the designated storage location permission are accessed by each process.
3. according to the method described in claim 2, it is characterized in that, the method also includes:
If there are K the first test results being qualification in N number of first test result, controls the first step and execute the One process, the first step execute whether second function of the first pass for test product be good, and the K is positive integer, The K the first test results are different from the M the first test results.
4. method according to claim 1-3, which is characterized in that control M first test result After corresponding M the second step re-executes first pass, the method also includes:
M the second test results are obtained by the first step, the M the second test results are the M the second steps Re-execute what first pass obtained;
It controls the first step and executes second procedure, the first step executes second procedure for testing the M second Whether test result is qualified;
If there are H the second test results being unqualified, the H second test of dishing out in the M the second test results As a result the product of corresponding H the second step test, the H are positive integer;
If there are G the second test results being qualification in the M the second test results, controls the first step and execute first Process, the G are positive integer, and the G the second test results are different from the H the second test results.
5. method according to claim 1-4, which is characterized in that described to obtain N number of first by first step Before test result, the method also includes:
It controls the second step i and executes first pass, be described N number of second to obtain the first test result j, the second step i One of them in process;
After the completion of the second step i executes first pass, control the second step k executes first pass, to obtain the first survey Test result h, the second step k be in N number of the second step in addition to the second step i one of them, repeat this step Suddenly until N number of the second step is completed to execute first pass.
6. method described in -5 according to claim 1, which is characterized in that described to obtain N number of first test knot by first step Before fruit, the method also includes:
The multiple process is set, and establishes the mapping relations between process and process, reflecting between the process and process Penetrating relationship includes that a first step corresponds to multiple the second steps, and a second step corresponds to multiple first steps.
7. method according to claim 1-6, which is characterized in that different processes executes first pass test and produces The function of product is different.
8. a kind of process control device, which is characterized in that the process control device is for managing multiple processes, the process packet First pass and/or second procedure are included, the first pass is for controlling the corresponding test equipment test product of process wherein Whether one function is good, and the second procedure executes what first pass obtained at least one associated process of test step Whether test result is qualified;Described device includes:
Acquiring unit, for obtaining N number of first test result by first step, N number of first test result is described The associated N number of the second step of one process executes what the first pass obtained, and the second step executes first pass for surveying Whether the first function of trial product is good, and the N is the integer greater than 1;
Control unit executes second procedure for controlling the first step, and the first step executes second procedure for surveying Whether qualified try N number of first test result;
Described control unit, if be also used in N number of first test result be there are M the first test results it is unqualified, It controls the M corresponding M the second steps of the first test result and re-executes first pass.
9. a kind of process control device, which is characterized in that including processor, memory, communication interface, and one or more journeys Sequence, one or more of programs are stored in the memory, and are configured to be executed by the processor, described program Include the steps that for executing the instruction in the method according to claim 1 to 7.
10. a kind of computer readable storage medium, which is characterized in that storage is used for the computer program of electronic data interchange, In, the computer program makes computer execute the method according to claim 1 to 7.
CN201811115336.7A 2018-09-25 2018-09-25 Process control method and related equipment Active CN109345106B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811115336.7A CN109345106B (en) 2018-09-25 2018-09-25 Process control method and related equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811115336.7A CN109345106B (en) 2018-09-25 2018-09-25 Process control method and related equipment

Publications (2)

Publication Number Publication Date
CN109345106A true CN109345106A (en) 2019-02-15
CN109345106B CN109345106B (en) 2021-01-12

Family

ID=65306241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811115336.7A Active CN109345106B (en) 2018-09-25 2018-09-25 Process control method and related equipment

Country Status (1)

Country Link
CN (1) CN109345106B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101689051A (en) * 2007-06-27 2010-03-31 夏普株式会社 Abnormal factor specifying method and system, program for causing computer to execute the abnormal factor specifying method, and recording medium capable of reading the computer recorded with the prog
JP2010204771A (en) * 2009-02-27 2010-09-16 Dainippon Printing Co Ltd Electronic equipment manufacturing method, electronic equipment, and electronic device
CN202533783U (en) * 2011-06-22 2012-11-14 杭州炬华科技股份有限公司 MES manufacturing execution system
CN104198868A (en) * 2014-09-23 2014-12-10 厦门雅迅网络股份有限公司 Intelligent tool capable of being flexibly expanded and dynamically configured
CN104636863A (en) * 2015-01-07 2015-05-20 青岛海信移动通信技术股份有限公司 Testing method and equipment of tool state
US20150356476A1 (en) * 2010-10-15 2015-12-10 Invensys Systems, Inc. System and method for workflow integration
CN105182935A (en) * 2015-08-29 2015-12-23 中山市万进智能科技有限公司 Product production control system and control method
CN106325242A (en) * 2016-08-16 2017-01-11 苏州朋泰智能科技有限公司 MES system based on modularized control units

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101689051A (en) * 2007-06-27 2010-03-31 夏普株式会社 Abnormal factor specifying method and system, program for causing computer to execute the abnormal factor specifying method, and recording medium capable of reading the computer recorded with the prog
JP2010204771A (en) * 2009-02-27 2010-09-16 Dainippon Printing Co Ltd Electronic equipment manufacturing method, electronic equipment, and electronic device
US20150356476A1 (en) * 2010-10-15 2015-12-10 Invensys Systems, Inc. System and method for workflow integration
CN202533783U (en) * 2011-06-22 2012-11-14 杭州炬华科技股份有限公司 MES manufacturing execution system
CN104198868A (en) * 2014-09-23 2014-12-10 厦门雅迅网络股份有限公司 Intelligent tool capable of being flexibly expanded and dynamically configured
CN104636863A (en) * 2015-01-07 2015-05-20 青岛海信移动通信技术股份有限公司 Testing method and equipment of tool state
CN105182935A (en) * 2015-08-29 2015-12-23 中山市万进智能科技有限公司 Product production control system and control method
CN106325242A (en) * 2016-08-16 2017-01-11 苏州朋泰智能科技有限公司 MES system based on modularized control units

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
MUHAMMAD YOUNUS等: "MES development and significant applications in manufacturing -A review", 《2010 2ND INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY AND COMPUTER》 *
姜兴宇等: "面向网络化制造的智能工序质量控制系统", 《机械工程学报》 *
赵妙霞 等: "工序控制方法中工序能力的分析", 《甘肃工业大学学报》 *

Also Published As

Publication number Publication date
CN109345106B (en) 2021-01-12

Similar Documents

Publication Publication Date Title
CN106293914B (en) A kind of method and terminal of task schedule
CN102054217B (en) Entity morphing in metamodel-based tools
CN109991970A (en) The charge control method and robot of robot
CN105933461A (en) Big data platform system and operation method thereof
CN108089691A (en) A kind of method and device for reducing terminal device power consumption
CN106331254B (en) A kind of protection processing method and processing device that mobile terminal falls
CN106658704A (en) Positioning method and system of starting point of indoor positioning
CN109408583A (en) Data processing method and device, computer readable storage medium, electronic equipment
CN109145809A (en) A kind of note spectrum processing method and device and computer readable storage medium
CN108961267A (en) Image processing method, picture processing unit and terminal device
CN108628738A (en) The generation method and device of application programming interface test case
CN110428311A (en) Bidding information recommendation method and Related product
CN110263294A (en) The determination method, apparatus and electronic equipment of loss function value
CN107222898A (en) Method for switching network, mobile terminal and computer-readable recording medium
CN108920353A (en) A kind of test method, device and electronic equipment
CN109699002A (en) A kind of interior WiFi localization method, device and terminal device
CN108920085A (en) Information processing method and device for wearable device
CN106646085B (en) Leakage tests method, apparatus and equipment
CN109345106A (en) Process management-control method and relevant device
CN105607913B (en) The operation processing method and device of interconnecting application
CN108427599A (en) Method, apparatus and storage medium is uniformly processed in asynchronous task
CN108875901A (en) Neural network training method and generic object detection method, device and system
CN105610698B (en) The treating method and apparatus of event result
CN106126560A (en) The mobile electronic device of social interaction and the method carrying out social interaction
CN110209576A (en) The calculation method and relevant device of test case coverage rate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant