CN109345106A - Process management-control method and relevant device - Google Patents
Process management-control method and relevant device Download PDFInfo
- Publication number
- CN109345106A CN109345106A CN201811115336.7A CN201811115336A CN109345106A CN 109345106 A CN109345106 A CN 109345106A CN 201811115336 A CN201811115336 A CN 201811115336A CN 109345106 A CN109345106 A CN 109345106A
- Authority
- CN
- China
- Prior art keywords
- test
- pass
- executes
- test result
- procedure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
This application discloses a kind of process management-control method and relevant devices, applied to process control device, method includes: to obtain N number of first test result by first step, N number of first test result is that the associated N number of the second step of the first step executes the first pass and obtains, the second step executes whether first function of the first pass for test product be good, and the N is the integer greater than 1;It controls the first step and executes second procedure, whether the first step executes second procedure qualified for testing N number of first test result;If in N number of first test result there are M the first test results be it is unqualified, control the M corresponding M the second steps of the first test result and re-execute first pass.The adjustability that process can be improved using the embodiment of the present application increases the flexibility of process.
Description
Technical field
This application involves production management technical field more particularly to a kind of process management-control methods and relevant device.
Background technique
Production management system is manufacturing enterprise can be helped to establish one for the system of manufacturing enterprise's production application research and development
The accurate Production database of specification, effectively control production process, improve production efficiency.Currently used production management system is system
It makes enterprise production process and executes system (Manufacturing Execution System, MES).MES is mainly on-line maintenance
The testing process of good complete set, testing process include multiple processes, and each process is fixed in the testing process, the test stream
The working principle of journey is then obtained by the test of 2 test step 1 of process by the first function of the first test product of process 1
Whether test result is qualified, if qualified, by the second function of 2 test product of process, subsequently passes through 3 test step of process
Whether the 2 obtained test results of test are qualified, if qualified, by the third function of 3 test product of process, and so on.It can
See, the flexibility of the testing process is poor.
Summary of the invention
The embodiment of the present application provides a kind of process management-control method and relevant device, for promoting the flexibility of testing process.
In a first aspect, the embodiment of the present application provides a kind of process management-control method, it is applied to process control device, the process
Control device includes first pass and/or second procedure for managing multiple processes, the process, and the first pass is for controlling
Whether one of function of the corresponding test equipment test product of process processed is good, and the second procedure is closed for test step
Whether at least one process of connection executes the test result that first pass obtains qualified, which comprises
N number of first test result is obtained by first step, N number of first test result is the first step association
N number of the second step execute what the first pass obtained, the second step executes the of first pass for test product
Whether one function is good, and the N is the integer greater than 1;
It controls the first step and executes second procedure, it is described N number of for testing that the first step executes second procedure
Whether the first test result is qualified;
If in N number of first test result there are M the first test results be it is unqualified, control the M first
The corresponding M the second step of test result re-executes first pass.
Second aspect, the embodiment of the present application provide a kind of process control device, and the process control device is more for managing
A process, the process include first pass and/or second procedure, and the first pass is set for controlling the corresponding test of process
Whether one of function of standby test product is good, and the second procedure is held at least one associated process of test step
Whether the test result that row first pass obtains is qualified;Described device includes:
Acquiring unit, for obtaining N number of first test result by first step, N number of first test result is institute
It states the associated N number of the second step of first step and executes what the first pass obtained, the second step executes first pass and uses
Whether good in the first function of test product, the N is the integer greater than 1;
Control unit executes second procedure for controlling the first step, and the first step executes second procedure and uses
In testing, whether N number of first test result is qualified;
Described control unit, if being also used in N number of first test result there are M the first test results be not conform to
Lattice then control the M corresponding M the second steps of the first test result and re-execute first pass.
The third aspect, the embodiment of the present application provide a kind of process control device, including processor, memory, communication interface,
And one or more programs, one or more of programs are stored in the memory, and are configured by described
It manages device to execute, above procedure is included the steps that for executing the instruction in method described in the embodiment of the present application first aspect.
Fourth aspect, the embodiment of the present application provide a kind of computer readable storage medium, wherein above-mentioned computer-readable
Storage medium storage is used for the computer program of electronic data interchange, wherein above-mentioned computer program executes computer such as
Step some or all of described in method described in the embodiment of the present application first aspect.
5th aspect, the embodiment of the present application provide a kind of computer program product, wherein above-mentioned computer program product
Non-transient computer readable storage medium including storing computer program, above-mentioned computer program are operable to make to calculate
Step some or all of described in method of the machine execution as described in the embodiment of the present application first aspect.The computer program produces
Product can be a software installation packet.
As can be seen that in the embodiment of the present application, firstly, obtaining N number of first test result by first step, first is surveyed
Test result is that the second step execution first pass obtains;Then, control first step executes second procedure, to test N number of the
Whether one test result qualified, if in N number of first test result there are M the first test results be it is unqualified, control M the
The corresponding M the second step of one test result re-executes first pass.Since a process can be associated with multiple processes, avoid
Because some process influences entire testing process, and then improves the flexibility of testing process.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of framework schematic diagram of production management system provided by the embodiments of the present application;
Fig. 2 a is a kind of flow diagram of process management-control method provided by the embodiments of the present application;
Fig. 2 b is a kind of schematic diagram of testing process provided by the embodiments of the present application;
Fig. 3 is the flow diagram of another process management-control method provided by the embodiments of the present application;
Fig. 4 is a kind of structural schematic diagram of process control device provided by the embodiments of the present application;
Fig. 5 is the structural schematic diagram of another process control device provided by the embodiments of the present application.
Specific embodiment
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application
Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only
The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection
It encloses.
It is described in detail separately below.
The description and claims of this application and term " first ", " second ", " third " and " in the attached drawing
Four " etc. are not use to describe a particular order for distinguishing different objects.In addition, term " includes " and " having " and it
Any deformation, it is intended that cover and non-exclusive include.Such as it contains the process, method of a series of steps or units, be
System, product or equipment are not limited to listed step or unit, but optionally further comprising the step of not listing or list
Member, or optionally further comprising other step or units intrinsic for these process, methods, product or equipment.
Referenced herein " embodiment " is it is meant that a particular feature, structure, or characteristic described can wrap in conjunction with the embodiments
It is contained at least one embodiment of the application.Each position in the description occur the phrase might not each mean it is identical
Embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art explicitly and
Implicitly understand, embodiment described herein can be combined with other embodiments.
As shown in Figure 1, Fig. 1 is a kind of framework schematic diagram of production management system provided by the embodiments of the present application.The production
Management system includes process control device and multiple test equipments.Process control device passes through wireless technology or cable technology and survey
Try equipment communication connection.
Wherein, process control device for example can be server, industrial computer etc..Server is to provide setting for the service of calculating
It is standby.Since server needs to respond service request, and handled, thus in general server should have undertake service and
Ensure the ability of service.Industrial computer is the industrial control computer specializing in industry and using, basic performance and compatibility with
Commercial computer is very nearly the same, but industrial computer is more the stability focused under various circumstances.
Wherein, process control device is for managing multiple processes, and process includes first pass and/or second procedure, and first
Whether one of function that process is used to control the corresponding test equipment test product of process is good, and second procedure is for testing
Whether at least one associated process of process executes the test result that first pass obtains qualified.
Wherein, the corresponding test equipment of a process, such as the corresponding test equipment 1 of process 1, the corresponding test equipment of process 2
2, corresponding test equipment 3 of process 3 etc..Test equipment for example has high/low temperature circulating box, abrasion wear test machine, waterproof tester, sand dust
Testing machine, touch screen pressure testing machine, drop machine, tumbler test machine, comprehensive tester CMU200, bluetooth tester, screen
Cover case, mobile phone test card, mobile phone key tester etc..
Wherein, the function that different processes executes first pass test product is different, as process 1 executes first pass
Function 1, process 2 for test product execute function 2, process 3 of the first pass for test product and execute first pass and use
In the function 3 etc. of test product.
Wherein, the said goods can be mobile terminal, is also possible to other products, is not limited thereto.Mobile terminal, again
Referred to as user equipment (User Equipment, UE), is a kind of equipment for providing a user voice and/or data connectivity,
For example, handheld device, mobile unit etc. with unlimited linkage function.Common terminal for example, mobile phone, plate electricity
Brain, laptop, palm PC, mobile internet device (mobile internet device, MID), wearable device,
Such as smartwatch, Intelligent bracelet, pedometer etc..
Where it is assumed that the said goods are mobile phone, the function of test product is for instance that high temperature resistant function, low temperature resistant function, resistance to
Grind function, ageing-resistant function, resistance to acid and alkali function, water-proof function, dust reduction capability, drop resistant function, touch screen resistance to compression drop resistant function,
Antenna signal strength function, chargeable number of times of battery function, interface plug function, push button longevity function etc..
Fig. 2 a is please referred to, Fig. 2 a is a kind of flow diagram of process management-control method provided by the embodiments of the present application, application
In process control device, for the process control device for managing multiple processes, the process includes first pass and/or second
Process, whether one of function that the first pass is used to control the corresponding test equipment test product of process is good, institute
Whether qualified state the test result that second procedure is obtained for associated at least one process execution first pass of test step, institute
The method of stating includes:
Step 201: process control device obtains N number of first test result, N number of first test knot by first step
Fruit is that the associated N number of the second step of the first step executes the first pass and obtains, and the second step executes first
Whether first function of the process for test product be good, and the N is the integer greater than 1.
Further, the test result that process executes that first pass obtains is stored in designated storage location, and described specify is deposited
Storage space is set permission and is accessed by each process.Wherein, which can be one in working procedure management installation and specified deposits
Storage space is set, and a designated storage location being also possible in the associated storage equipment of working procedure management installation is not limited thereto.
Further, the function that different processes executes first pass test product is different.
For example, as shown in Figure 2 b, it is assumed that process control device is for managing 5 processes, such as process 1, process 2, work
Sequence 3, process 4 and process 5.Process 1 includes first pass, and the first pass for executing process 1 is used for the function 1 of test product.Work
Sequence 2 includes first pass, and the first pass for executing process 2 is used for the function 2 of test product.Process 3 includes first pass and the
Two processes, the first pass for executing process 3 are used for the function 3 of test product, and the second procedure for executing process 3 is used for test step
Whether 3 associated processes 1 and process 2 execute the test result that first pass obtains qualified.Process 4 includes first pass and second
Process, the first pass for executing process 4 are used for the function 4 of test product, and the second procedure for executing process 4 is used for test step 4
Whether associated process 2 and process 3 execute the test result that first pass obtains qualified.Process 5 includes second procedure, executes work
The second procedure of sequence 5 executes the test result that first pass obtains for the associated process 1 of test step 5, process 3 and process 4
It is whether qualified.
Assuming that process 3 is first step, the associated the second step of process 3 has process 1 and process 2.Process control device is logical
The first test result that process 3 obtains process 1 and the execution first pass of process 2 obtains is crossed, process 1 executes first pass for surveying
Whether the function 1 of trial product is good, and whether process 2 executes function 2 of the first pass for test product good.
In the implementation of the application, it is assumed that the first function is drop resistant function, and the first pass is for controlling work
Whether one of function of the corresponding test equipment test product of sequence is good, comprising: first pass is corresponding for controlling process
Drop machine test product drop resistant function, if in predetermined altitude and predetermined drop number, the appearance of product, structure and
Function is good, it is determined that the drop resistant function of product be it is good, otherwise determine product drop resistant function be it is non-good.
In another implementation of the application, it is assumed that the first function is dust reduction capability, and the first pass is for controlling
Whether one of function of the corresponding test equipment test product of process is good, comprising: first pass is for controlling process pair
The dust reduction capability for the dust and sand effect machine test product answered, if in predetermined dust concentration and in the predetermined time, product function normally and
Without into dirt phenomenon, it is determined that the dust reduction capability of product be it is good, otherwise the dust reduction capability of determining product is non-good.
In another implementation of the application, it is assumed that the first function is water-proof function, and the first pass is for controlling
Whether one of function of the corresponding test equipment test product of process is good, comprising: first pass is for controlling process pair
The water-proof function for the waterproof tester test product answered, if in predetermined depth and predetermined flow rate, product function it is normal and without into
Water phenomenon, it is determined that the water-proof function of product be it is good, otherwise determine product water-proof function be it is non-good.
Step 202: process control device controls the first step and executes second procedure, and the first step executes second
Whether process is qualified for testing N number of first test result.
Specifically, if the result of test result q is good, it is determined that test result q is qualification, otherwise determines test result
Q is test result unqualified, that test result q obtains for process execution first pass.
Step 203: if there are M the first test results being unqualified, process control in N number of first test result
Device controls the M corresponding M the second step of the first test result and re-executes first pass, wherein M is to be less than or wait
In the positive integer of N.
Here, the process control device controls the M corresponding M the second step of the first test result and re-executes
Before first pass, the method also includes being that underproof product is transmitted to the M first by M the first test results
At the test equipment of the corresponding M the second step control of test result.Wherein, for automation procedure managing and control system, there are one
Underproof product is transmitted to the test that the corresponding M the second step of the M the first test results controls and set by supply line
Standby place;For non-automated producing line, then need that underproof product is manually transmitted to the M the first test results corresponding
At the test equipment of M the second step control.
In a kind of implementation of the application, the method also includes: if there are K in N number of first test result
A first test result is qualification, then process control device controls the first step and executes first pass, the first step
Whether the second function of executing first pass for test product is good, and the K is positive integer, the K the first test results
Different from the M the first test results.
Wherein, K is the positive integer less than or equal to N, and the sum of K and M are equal to N.
As can be seen that in the embodiment of the present application, firstly, obtaining N number of first test result by first step, first is surveyed
Test result is that the second step execution first pass obtains;Then, control first step executes second procedure, to test N number of the
Whether one test result qualified, if in N number of first test result there are M the first test results be it is unqualified, control M the
The corresponding M the second step of one test result re-executes first pass.Since a process can be associated with multiple processes, avoid
Because some process influences entire testing process, and then improves the flexibility of testing process.
In a kind of implementation of the application, the control M corresponding M the second step of the first test result
After re-executing first pass, the method also includes:
Process control device obtains M second test result, the M second test knot by the first step
Fruit is that the M the second step re-executes first pass and obtain;
Process control device controls the first step and executes second procedure, and the first step executes second procedure and is used for
Whether qualified test the M the second test results;
If in the M the second test results there are H the second test results be it is unqualified, process control device is dished out
The product of the corresponding H the second step test of the H the second test results, the H is positive integer;
If there are G the second test results in the M the second test results to be qualified, process control device controls institute
It states first step and executes first pass, the G is positive integer, and the G the second test results are different from the H second test
As a result.
As can be seen that in the embodiment of the present application, being non-good product for function, performing its corresponding work again
The first pass of sequence detects the function, to avoid surveying again because detection is omitted labeled as non-good secondly, having dished out
Still underproof product is tried, prevents entire process control process from carrying out endless loop always, improves the discrimination of process, increase
The flexibility of process.
In the implementation of the application, it is described N number of first test result is obtained by first step before, the side
Method further include:
Process control device controls the second step i and executes first pass, to obtain the first test result j, second work
Sequence i is one of them in N number of the second step;
After the completion of the second step i executes first pass, it is first-class that process control device controls the second step k execution
Journey, to obtain the first test result h, the second step k be in N number of the second step in addition to the second step i its
In one, repeat this step until N number of the second step completes execution first pass.
For example, refering to Fig. 2 b, it is assumed that first step is process 3, then the second step is process 1 and process 2, passes through work
Before sequence 3 obtains the first test result of process 1 and process 2, process control device controls process 1 and executes first pass, with
To the first test result 1, then controls process 2 and execute first pass, to obtain the first test result 2.
In the implementation of the application, it is described N number of first test result is obtained by first step before, the side
Method further include:
The multiple process is arranged in process control device, and establishes the mapping relations between process and process, the work
Mapping relations between sequence and process include the corresponding multiple the second steps of a first step, and a second step corresponds to multiple the
One process.
As can be seen that in the embodiment of the present application, a first step corresponds to multiple the second steps, a second step pair
Multiple first steps are answered, are avoided because some process influences entire testing process, and then improves the flexibility of testing process.
It is consistent with embodiment shown in Fig. 2 a, referring to Fig. 3, Fig. 3 is another kind provided by the embodiments of the present application
The flow diagram of process management-control method, which comprises
Step 301: the multiple process is arranged in process control device, and the mapping established between process and process is closed
System, mapping relations between the process and process include the corresponding multiple the second steps of a first step, a second step
Corresponding multiple first steps.
Step 302: process control device controls the second step i and executes first pass, to obtain the first test result j, institute
Stating the second step i is one of them in N number of the second step.
Step 303: after the completion of the second step i executes first pass, process control device control the second step k is held
Row first pass is in N number of the second step in addition to second work to obtain the first test result h, the second step k
One of them of sequence i repeats this step until N number of the second step is completed to execute first pass.
Step 304: process control device obtains N number of first test result, N number of first test knot by first step
Fruit is that the associated N number of the second step of the first step executes the first pass and obtains, and the second step executes first
Whether first function of the process for test product be good, and the N is the integer greater than 1.
Step 305: process control device controls the first step and executes second procedure, and the first step executes second
Whether process is qualified for testing N number of first test result.
Step 306: if there are M the first test results being unqualified, process control in N number of first test result
Device controls the M corresponding M the second step of the first test result and re-executes first pass.
Step 307: if there are K the first test results being qualification, process control dress in N number of first test result
It sets the control first step and executes first pass, the first step executes the second function that first pass is used for test product
Whether good, the K is positive integer, and the K the first test results are different from the M the first test results.
Step 308: process control device obtains the M the second test results by the first step, and the M the
Two test results are that the M the second step re-executes first pass and obtain.
Step 309: process control device controls the first step and executes second procedure, and the first step executes second
Whether process is qualified for testing the M the second test results.
Step 310: if there are H the second test results being unqualified, process control in the M the second test results
Device is dished out the product of the corresponding H the second step test of the H the second test results, and the H is positive integer.
Step 311: if there are G the second test results being qualification, process control device in the M the second test results
It controls the first step and executes first pass, the G is positive integer, and the G the second test results are different from the H the
Two test results.
It should be noted that the specific implementation process of each step of method shown in Fig. 3 can be found in described in the method
Specific implementation process, no longer describe herein.
It is consistent with above-mentioned Fig. 2 a and embodiment shown in Fig. 3, referring to Fig. 4, Fig. 4 is provided by the embodiments of the present application one
The structural schematic diagram of kind process control device, the process control device include first for managing multiple processes, the process
Process and/or second procedure, the first pass are used to control one of function of the corresponding test equipment test product of process
Can whether good, the second procedure executes the test knot that first pass obtains at least one associated process of test step
Whether fruit is qualified, as shown, the process control device includes processor, memory, communication interface and one or more journeys
Sequence, wherein said one or multiple programs are stored in above-mentioned memory, and are configured to be executed by above-mentioned processor, on
Stating program includes the instruction for executing following steps:
N number of first test result is obtained by first step, N number of first test result is the first step association
N number of the second step execute what the first pass obtained, the second step executes the of first pass for test product
Whether one function is good, and the N is the integer greater than 1;
It controls the first step and executes second procedure, it is described N number of for testing that the first step executes second procedure
Whether the first test result is qualified;
If in N number of first test result there are M the first test results be it is unqualified, control the M first
The corresponding M the second step of test result re-executes first pass.
In the implementation of the application, process executes the test result that first pass obtains and is stored in specified storage position
It sets, the designated storage location permission is accessed by each process.
In the implementation of the application, above procedure includes the instruction for being also used to execute following steps:
If there are K the first test results being qualification in N number of first test result, controls the first step and hold
Row first pass, the first step execute whether second function of the first pass for test product be good, and the K is positive whole
Number, the K the first test results are different from the M the first test results.
In the implementation of the application, the M corresponding M the second step of the first test result is being controlled again
After executing first pass, above procedure includes the instruction for being also used to execute following steps:
M second test result is obtained by the first step, the M the second test results are the M
The second step re-executes what first pass obtained;
It controls the first step and executes second procedure, the first step executes second procedure for testing the M
Whether the second test result is qualified;
If in the M the second test results there are H the second test results be it is unqualified, dish out the H second
The product of the corresponding H the second step test of test result, the H is positive integer;
If there are G the second test results being qualification in the M the second test results, controls the first step and execute
First pass, the G are positive integer, and the G the second test results are different from the H the second test results.
In the implementation of the application, before obtaining N number of first test result by first step, above procedure
Instruction including being also used to execute following steps:
It controls the second step i and executes first pass, be described N number of to obtain the first test result j, the second step i
One of them in the second step;
After the completion of the second step i executes first pass, control the second step k executes first pass, to obtain the
One test result h, the second step k be in N number of the second step in addition to the second step i one of them, repeat
This step is until N number of the second step is completed to execute first pass.
In the implementation of the application, before obtaining N number of first test result by first step, above procedure
Instruction including being also used to execute following steps:
The multiple process is set, and establishes the mapping relations between process and process, between the process and process
Mapping relations include a first step correspond to multiple the second steps, a second step corresponds to multiple first steps.
In the implementation of the application, the function that different processes executes first pass test product is different.
It should be noted that the specific implementation process of the present embodiment can be found in specific implementation described in above method embodiment
Process no longer describes herein.
The embodiment of the present application can carry out the division of functional unit according to the method example to electronic equipment, for example, can
With each functional unit of each function division of correspondence, two or more functions can also be integrated in a processing unit
In.The integrated unit both can take the form of hardware realization, can also realize in the form of software functional units.It needs
It is noted that be schematical, only a kind of logical function partition to the division of unit in the embodiment of the present application, it is practical real
It is current that there may be another division manner.
It is below the application Installation practice, the application Installation practice is realized for executing the application embodiment of the method
Method.Referring to Fig. 5, Fig. 5 is a kind of structural schematic diagram of process control device provided by the embodiments of the present application, the process
Control device includes first pass and/or second procedure for managing multiple processes, the process, and the first pass is for controlling
Whether one of function of the corresponding test equipment test product of process processed is good, and the second procedure is closed for test step
At least one process of connection executes whether the test result that first pass obtains is qualified, and described device includes:
Acquiring unit 501, for obtaining N number of first test result by first step, N number of first test result is
The associated N number of the second step of first step executes what the first pass obtained, and the second step executes first pass
Whether the first function for test product is good, and the N is the integer greater than 1;Control unit 502, for controlling described
One process executes second procedure, and the first step executes second procedure for testing whether N number of first test result closes
Lattice;Described control unit 502, if be also used in N number of first test result be there are M the first test results it is unqualified,
It then controls the M corresponding M the second steps of the first test result and re-executes first pass.
In the implementation of the application, process executes the test result that first pass obtains and is stored in specified storage position
It sets, the designated storage location permission is accessed by each process.
In the implementation of the application, described control unit 502 is also used to:
If there are K the first test results being qualification in N number of first test result, controls the first step and hold
Row first pass, the first step execute whether second function of the first pass for test product be good, and the K is positive whole
Number, the K the first test results are different from the M the first test results.
In the implementation of the application, it is corresponding that the M the first test results are controlled in described control unit 502
After M the second step re-executes first pass, acquiring unit 501 is also used to obtain by the first step M described
Second test result, the M the second test results are that the M the second step re-executes first pass and obtain;
Control unit 502 is also used to control the first step and executes second procedure, and the first step executes second
Whether journey is qualified for testing the M the second test results;
Control unit 502, if be also used in the M the second test results be there are H the second test results it is unqualified,
The product of the corresponding H the second step test of the H the second test results of then dishing out, the H is positive integer;
Control unit 502, if being also used in the M the second test results there are G the second test results be qualification, control
It makes the first step and executes first pass, the G is positive integer, and the G the second test results are different from the H second
Test result.
In the implementation of the application, acquiring unit 501 by first step obtain N number of first test result it
Before, control unit 502 is also used to control the second step i and executes first pass, to obtain the first test result j, second work
Sequence i is one of them in N number of the second step;After the completion of the second step i executes first pass, the second work is controlled
Sequence k executes first pass, is in N number of the second step in addition to described to obtain the first test result h, the second step k
One of them of the second step i repeats this step until N number of the second step is completed to execute first pass.
In the implementation of the application, acquiring unit 501 by first step obtain N number of first test result it
Before, described device further include:
Processing unit 503 for the multiple process to be arranged, and establishes the mapping relations between process and process, institute
Stating mapping relations between process and process includes the corresponding multiple the second steps of a first step, and a second step corresponds to more
A first step.
In the implementation of the application, the function that different processes executes first pass test product is different.
It should be noted that the specific implementation process of the present embodiment can be found in specific implementation described in above method embodiment
Process no longer describes herein.
It should be noted that acquiring unit 501, control unit 502 and processing unit 503 can be realized by processor.
The embodiment of the present application also provides a kind of computer storage medium, wherein computer storage medium storage is for electricity
The computer program of subdata exchange, the computer program make computer execute any as recorded in above method embodiment
Some or all of method step, above-mentioned computer include process control device.
The embodiment of the present application also provides a kind of computer program product, and above-mentioned computer program product includes storing calculating
The non-transient computer readable storage medium of machine program, above-mentioned computer program are operable to that computer is made to execute such as above-mentioned side
Some or all of either record method step in method embodiment.The computer program product can be a software installation
Packet, above-mentioned computer includes process control device.
It should be noted that for the various method embodiments described above, for simple description, therefore, it is stated as a series of
Combination of actions, but those skilled in the art should understand that, the application is not limited by the described action sequence because
According to the application, some steps may be performed in other sequences or simultaneously.Secondly, those skilled in the art should also know
It knows, the embodiments described in the specification are all preferred embodiments, related actions and modules not necessarily the application
It is necessary.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment
Point, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed device, it can be by another way
It realizes.For example, the apparatus embodiments described above are merely exemplary, such as the division of said units, it is only a kind of
Logical function partition, there may be another division manner in actual implementation, such as multiple units or components can combine or can
To be integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Coupling, direct-coupling or communication connection can be through some interfaces, the indirect coupling or communication connection of device or unit,
It can be electrical or other forms.
Above-mentioned unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If above-mentioned integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer-readable access to memory.According to such understanding, the technical solution of the application substantially or
Person says that all or part of the part that contributes to existing technology or the technical solution can body in the form of software products
Reveal and, which is stored in a memory, including some instructions are used so that a computer equipment
(can be personal computer, server or network equipment etc.) executes all or part of each embodiment above method of the application
Step.And memory above-mentioned includes: USB flash disk, read-only memory (ROM, Read-Only Memory), random access memory
The various media that can store program code such as (RAM, Random Access Memory), mobile hard disk, magnetic or disk.
Those of ordinary skill in the art will appreciate that all or part of the steps in the various methods of above-described embodiment is can
It is completed with instructing relevant hardware by program, which can store in a computer-readable memory, memory
May include: flash disk, read-only memory (English: Read-Only Memory, referred to as: ROM), random access device (English:
Random Access Memory, referred to as: RAM), disk or CD etc..
The embodiment of the present application is described in detail above, specific case used herein to the principle of the application and
Embodiment is expounded, the description of the example is only used to help understand the method for the present application and its core ideas;
At the same time, for those skilled in the art can in specific embodiments and applications according to the thought of the application
There is change place, in conclusion the contents of this specification should not be construed as limiting the present application.
Claims (10)
1. a kind of process management-control method, which is characterized in that be applied to process control device, the process control device is for managing
Multiple processes, the process include first pass and/or second procedure, and the first pass is for controlling the corresponding test of process
Whether one of function of equipment test product is good, and the second procedure is used at least one associated process of test step
Whether qualified execute the test result that first pass obtains, which comprises
N number of first test result is obtained by first step, N number of first test result is the associated N of the first step
A the second step executes what the first pass obtained, and the second step executes the first function that first pass is used for test product
Can whether good, the N is the integer greater than 1;
It controls the first step and executes second procedure, the first step executes second procedure for testing described N number of first
Whether test result is qualified;
If in N number of first test result there are M the first test results be it is unqualified, control the M first test
As a result corresponding M the second step re-executes first pass.
2. being stored in the method according to claim 1, wherein process executes the test result that first pass obtains
Designated storage location, the designated storage location permission are accessed by each process.
3. according to the method described in claim 2, it is characterized in that, the method also includes:
If there are K the first test results being qualification in N number of first test result, controls the first step and execute the
One process, the first step execute whether second function of the first pass for test product be good, and the K is positive integer,
The K the first test results are different from the M the first test results.
4. method according to claim 1-3, which is characterized in that control M first test result
After corresponding M the second step re-executes first pass, the method also includes:
M the second test results are obtained by the first step, the M the second test results are the M the second steps
Re-execute what first pass obtained;
It controls the first step and executes second procedure, the first step executes second procedure for testing the M second
Whether test result is qualified;
If there are H the second test results being unqualified, the H second test of dishing out in the M the second test results
As a result the product of corresponding H the second step test, the H are positive integer;
If there are G the second test results being qualification in the M the second test results, controls the first step and execute first
Process, the G are positive integer, and the G the second test results are different from the H the second test results.
5. method according to claim 1-4, which is characterized in that described to obtain N number of first by first step
Before test result, the method also includes:
It controls the second step i and executes first pass, be described N number of second to obtain the first test result j, the second step i
One of them in process;
After the completion of the second step i executes first pass, control the second step k executes first pass, to obtain the first survey
Test result h, the second step k be in N number of the second step in addition to the second step i one of them, repeat this step
Suddenly until N number of the second step is completed to execute first pass.
6. method described in -5 according to claim 1, which is characterized in that described to obtain N number of first test knot by first step
Before fruit, the method also includes:
The multiple process is set, and establishes the mapping relations between process and process, reflecting between the process and process
Penetrating relationship includes that a first step corresponds to multiple the second steps, and a second step corresponds to multiple first steps.
7. method according to claim 1-6, which is characterized in that different processes executes first pass test and produces
The function of product is different.
8. a kind of process control device, which is characterized in that the process control device is for managing multiple processes, the process packet
First pass and/or second procedure are included, the first pass is for controlling the corresponding test equipment test product of process wherein
Whether one function is good, and the second procedure executes what first pass obtained at least one associated process of test step
Whether test result is qualified;Described device includes:
Acquiring unit, for obtaining N number of first test result by first step, N number of first test result is described
The associated N number of the second step of one process executes what the first pass obtained, and the second step executes first pass for surveying
Whether the first function of trial product is good, and the N is the integer greater than 1;
Control unit executes second procedure for controlling the first step, and the first step executes second procedure for surveying
Whether qualified try N number of first test result;
Described control unit, if be also used in N number of first test result be there are M the first test results it is unqualified,
It controls the M corresponding M the second steps of the first test result and re-executes first pass.
9. a kind of process control device, which is characterized in that including processor, memory, communication interface, and one or more journeys
Sequence, one or more of programs are stored in the memory, and are configured to be executed by the processor, described program
Include the steps that for executing the instruction in the method according to claim 1 to 7.
10. a kind of computer readable storage medium, which is characterized in that storage is used for the computer program of electronic data interchange,
In, the computer program makes computer execute the method according to claim 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811115336.7A CN109345106B (en) | 2018-09-25 | 2018-09-25 | Process control method and related equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811115336.7A CN109345106B (en) | 2018-09-25 | 2018-09-25 | Process control method and related equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109345106A true CN109345106A (en) | 2019-02-15 |
CN109345106B CN109345106B (en) | 2021-01-12 |
Family
ID=65306241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811115336.7A Active CN109345106B (en) | 2018-09-25 | 2018-09-25 | Process control method and related equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109345106B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101689051A (en) * | 2007-06-27 | 2010-03-31 | 夏普株式会社 | Abnormal factor specifying method and system, program for causing computer to execute the abnormal factor specifying method, and recording medium capable of reading the computer recorded with the prog |
JP2010204771A (en) * | 2009-02-27 | 2010-09-16 | Dainippon Printing Co Ltd | Electronic equipment manufacturing method, electronic equipment, and electronic device |
CN202533783U (en) * | 2011-06-22 | 2012-11-14 | 杭州炬华科技股份有限公司 | MES manufacturing execution system |
CN104198868A (en) * | 2014-09-23 | 2014-12-10 | 厦门雅迅网络股份有限公司 | Intelligent tool capable of being flexibly expanded and dynamically configured |
CN104636863A (en) * | 2015-01-07 | 2015-05-20 | 青岛海信移动通信技术股份有限公司 | Testing method and equipment of tool state |
US20150356476A1 (en) * | 2010-10-15 | 2015-12-10 | Invensys Systems, Inc. | System and method for workflow integration |
CN105182935A (en) * | 2015-08-29 | 2015-12-23 | 中山市万进智能科技有限公司 | Product production control system and control method |
CN106325242A (en) * | 2016-08-16 | 2017-01-11 | 苏州朋泰智能科技有限公司 | MES system based on modularized control units |
-
2018
- 2018-09-25 CN CN201811115336.7A patent/CN109345106B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101689051A (en) * | 2007-06-27 | 2010-03-31 | 夏普株式会社 | Abnormal factor specifying method and system, program for causing computer to execute the abnormal factor specifying method, and recording medium capable of reading the computer recorded with the prog |
JP2010204771A (en) * | 2009-02-27 | 2010-09-16 | Dainippon Printing Co Ltd | Electronic equipment manufacturing method, electronic equipment, and electronic device |
US20150356476A1 (en) * | 2010-10-15 | 2015-12-10 | Invensys Systems, Inc. | System and method for workflow integration |
CN202533783U (en) * | 2011-06-22 | 2012-11-14 | 杭州炬华科技股份有限公司 | MES manufacturing execution system |
CN104198868A (en) * | 2014-09-23 | 2014-12-10 | 厦门雅迅网络股份有限公司 | Intelligent tool capable of being flexibly expanded and dynamically configured |
CN104636863A (en) * | 2015-01-07 | 2015-05-20 | 青岛海信移动通信技术股份有限公司 | Testing method and equipment of tool state |
CN105182935A (en) * | 2015-08-29 | 2015-12-23 | 中山市万进智能科技有限公司 | Product production control system and control method |
CN106325242A (en) * | 2016-08-16 | 2017-01-11 | 苏州朋泰智能科技有限公司 | MES system based on modularized control units |
Non-Patent Citations (3)
Title |
---|
MUHAMMAD YOUNUS等: "MES development and significant applications in manufacturing -A review", 《2010 2ND INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY AND COMPUTER》 * |
姜兴宇等: "面向网络化制造的智能工序质量控制系统", 《机械工程学报》 * |
赵妙霞 等: "工序控制方法中工序能力的分析", 《甘肃工业大学学报》 * |
Also Published As
Publication number | Publication date |
---|---|
CN109345106B (en) | 2021-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106293914B (en) | A kind of method and terminal of task schedule | |
CN102054217B (en) | Entity morphing in metamodel-based tools | |
CN109991970A (en) | The charge control method and robot of robot | |
CN105933461A (en) | Big data platform system and operation method thereof | |
CN108089691A (en) | A kind of method and device for reducing terminal device power consumption | |
CN106331254B (en) | A kind of protection processing method and processing device that mobile terminal falls | |
CN106658704A (en) | Positioning method and system of starting point of indoor positioning | |
CN109408583A (en) | Data processing method and device, computer readable storage medium, electronic equipment | |
CN109145809A (en) | A kind of note spectrum processing method and device and computer readable storage medium | |
CN108961267A (en) | Image processing method, picture processing unit and terminal device | |
CN108628738A (en) | The generation method and device of application programming interface test case | |
CN110428311A (en) | Bidding information recommendation method and Related product | |
CN110263294A (en) | The determination method, apparatus and electronic equipment of loss function value | |
CN107222898A (en) | Method for switching network, mobile terminal and computer-readable recording medium | |
CN108920353A (en) | A kind of test method, device and electronic equipment | |
CN109699002A (en) | A kind of interior WiFi localization method, device and terminal device | |
CN108920085A (en) | Information processing method and device for wearable device | |
CN106646085B (en) | Leakage tests method, apparatus and equipment | |
CN109345106A (en) | Process management-control method and relevant device | |
CN105607913B (en) | The operation processing method and device of interconnecting application | |
CN108427599A (en) | Method, apparatus and storage medium is uniformly processed in asynchronous task | |
CN108875901A (en) | Neural network training method and generic object detection method, device and system | |
CN105610698B (en) | The treating method and apparatus of event result | |
CN106126560A (en) | The mobile electronic device of social interaction and the method carrying out social interaction | |
CN110209576A (en) | The calculation method and relevant device of test case coverage rate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |