CN109343491A - A kind of branch energy monitoring management system - Google Patents
A kind of branch energy monitoring management system Download PDFInfo
- Publication number
- CN109343491A CN109343491A CN201811320417.0A CN201811320417A CN109343491A CN 109343491 A CN109343491 A CN 109343491A CN 201811320417 A CN201811320417 A CN 201811320417A CN 109343491 A CN109343491 A CN 109343491A
- Authority
- CN
- China
- Prior art keywords
- branch
- energy
- intelligent
- monitoring management
- acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 20
- 238000005265 energy consumption Methods 0.000 claims abstract description 19
- 230000005540 biological transmission Effects 0.000 claims abstract description 7
- 238000013480 data collection Methods 0.000 claims description 20
- 238000013461 design Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 6
- 238000001514 detection method Methods 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 19
- 230000005611 electricity Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000005286 illumination Methods 0.000 description 4
- 230000027455 binding Effects 0.000 description 3
- 238000009739 binding Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000002159 abnormal effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- -1 electricity Substances 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32247—Real time scheduler
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of branch energy monitoring management systems, the system comprises branch energy acquisition system and intelligent mobile terminal, the branch energy acquisition system for realizing the electric power energy data to each branch point acquisition, transmission and storage;The intelligent mobile terminal is used to obtain and check the energy information of each branch collection point.The system application internet thoughtcast, two-dimension code correlation technique is combined with building energy branch management, it realizes and building branch energy consumption data quick obtaining and branch infologic is presented, the branch consumption information of any collection point position in institute compass of competency is efficiently checked convenient for user, to complete the detection and energy scheduling to energy branch.
Description
Technical field
The present invention relates to technical field of energy management, and in particular to a kind of branch energy monitoring management system.
Background technique
With the fast development of technology of Internet of things, country is to improving energy efficiency, energy conservation and environmental protection pay attention to day by day.In recent years also successively
Issue relevant policies and execute file, comprising: building energy consumption standard, unit area energy consumption, energy consumption to mark, to energy-saving outstanding
Reward of enterprise etc. promotes policy implementation.Energy supervision in use, the informatization of the energy, the energy fining pipe
Reason also enters a new phase, and energy consumption cost, energy consumption flow direction, the energy saving space are also paid special attention to for energy consumption enterprise itself.
Obviously it is directed to building body, the energy management system for establishing a set of synthesis is the trend of a certainty, has also been gone out successively in existing industry
Existing integrated energy source management system includes the integrated management of the water, electricity, gas energy, but in energy fine-grained management, is also lacked to electricity
Power input, output element, targeted energy branch management method.
Summary of the invention
In order to overcome the above technical defects, the present invention provides a kind of branch energy monitoring management system, the system applications
Internet thoughtcast combines two-dimension code correlation technique with building energy branch management, realizes to building branch energy consumption
Data quick obtaining and branch infologic are presented, and any collection point position in institute compass of competency is efficiently checked convenient for user
Branch consumption information, to complete detection to energy branch and energy scheduling.
In order to reach above-mentioned technical effect, the present invention provides a kind of branch energy monitoring management system, the system packet
Branch energy acquisition system and intelligent mobile terminal are included, the branch energy acquisition system is for realizing the electricity to each branch point
Acquisition, transmission and the storage of power multi-energy data;The intelligent mobile terminal is for obtaining and checking each branch collection point
Energy information.
Further technical solution is that the branch energy acquisition system includes Intelligent Data Collection System Terminal, intelligent gateway
And collected data are transmitted to back-end data by intelligent gateway by back-end data processing center, Intelligent Data Collection System Terminal
Processing center realizes the acquisition to the energy consumption data of branch energy source point, transimission and storage, the Intelligent Data Collection System Terminal, intelligence
It can be between gateway and back-end data processing center using wired plus wireless communication modes.
Further technical solution is that the intelligent mobile terminal supports two-dimensional code scanning function.
Further technical solution is that the back-end data processing center has the function of user authority setting.
Further technical solution is, in the node setting and building Electric Design drawing of the Intelligent Data Collection System Terminal
Each branch point physics it is corresponding.
Further technical solution is that the back-end data processing center generates the two dimensional code of each branch energy source point, this
Two dimensional code and the Intelligent Data Collection System Terminal correspond.
The present invention is further detailed below, branch energy monitoring management system provided by the invention, including branch
Road energy data collection system, this system are mainly completed based on Internet of Things the relevant technologies to the energy consumption data of energy branch point
Acquisition, transmission, storage, which includes Intelligent Data Collection System Terminal, intelligent gateway and back-end data processing center, by having
Line adds the transmission for wirelessly completing data;The system further includes that intelligent mobile terminal, including mobile phone, tablet computer etc. are hand-held
Smart machine, this terminal are carried for user, for realizing two-dimensional code scanning, obtain in real time and branch energy information is presented;
User by the two dimensional code on scanning Intelligent Data Collection System Terminal, can in quick obtaining this terminal corresponding branch energy letter
Breath, user can complete the energy consumption to this collection point, prop up without having any understanding to the physical layout of building energy branch
The fast slowdown monitoring of road distribution.Planar bar code technology is applied to electric power energy management, realizes that building branch energy monitoring management is main
Core process includes: the construction of energy acquisition system;The binding of energy resource collecting terminal and two dimensional code;The logic of building energy branch
It presents.Energy acquisition system construction includes the analysis to architectural electric figure, determines each branch energy resource collecting point according to electric power flow direction,
It determines data transmission scheme, energy resource collecting terminal is installed, Constructing data center, the main acquisition completed to energy branch energy consumption,
Storage, branch reduction;The binding of energy resource collecting terminal and two dimensional code is given birth to by the device id of acquisition terminal equipment by system automatically
At two dimensional code, the two dimensional code and acquisition terminal of generation are corresponded.After user is scanned the two-dimensional code by mobile intelligent terminal, it is
System will read the energy branch information of current acquisition terminal equipment from data center, and user can quickly position this bypass position,
The power condition for understanding this branch provides user and checking and analyze that the method is especially suitable to energy flow direction and current state
It is dispatched for electric power O&M, the scenes such as circuit inspection.
Compared with prior art, the invention has the following beneficial effects: the present invention by planar bar code technology and electrical power path pipe
Reason combines, and forms quickly and easily branch management method, two dimensional code and acquisition terminal equipment by system algorithm and carries out one
It is bound to one, ensure that the accurate of branch point information, user only needs to scan the two-dimensional code, and both can quickly take any collection point
Branch information, do not need have any understanding to the energy branch of building layout, and this method can be applied to other energy essence
It in ZOOM analysis system, is widely used, is easy to use.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of branch energy monitoring management system of the invention;
Fig. 2 is the structural schematic diagram that the system of embodiment 2 is applied.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Embodiment 1
The present invention provides a kind of branch energy monitoring management system, which includes branch energy acquisition system and intelligence
Mobile terminal, branch energy acquisition system for realizing the electric power energy data to each branch point acquisition, transmit and deposit
Storage comprising Intelligent Data Collection System Terminal, intelligent gateway and back-end data processing center, Intelligent Data Collection System Terminal will acquire
To data back-end data processing center is transmitted to by intelligent gateway, realize the acquisition to the energy consumption data of branch energy source point,
Transimission and storage, the Intelligent Data Collection System Terminal, using wired plus wireless between intelligent gateway and back-end data processing center
Communication modes;The intelligent mobile terminal is used to obtain and check that the energy information of each branch collection point, intelligent mobile to be whole
Support two-dimensional code scanning function in end.The back-end data processing center has the function of user authority setting, according to different application field
Scape returns to the information of different user permission, the safety of effective protection data.The Intelligent Data Collection System Terminal node setting with
The each branch point physics built in Electric Design drawing is corresponding, the monitoring point fining degree of entire branch acquisition system according to
Demand of the user to branch energy management is customized.The back-end data processing center generates the two dimensional code of each branch energy source point,
This two dimensional code and the Intelligent Data Collection System Terminal correspond.User passes through the two dimension on scanning Intelligent Data Collection System Terminal
Code, can in quick obtaining this terminal corresponding branch energy information, user is not necessarily to the physical layout to building energy branch
There is any understanding, the energy consumption to this collection point, the fast slowdown monitoring of branch distribution can be completed.
Embodiment 2
As shown in Fig. 2, the figure is the structural schematic diagram of one embodiment of the invention, it is applied to monitor certain office
The electrical power path in building, user scans the two dimensional code of the acquisition equipment of its position by smart phone in this example, completes
To the fast slowdown monitoring of the branch information of this branch, consumption information, completes the inspection to circuit and work;
In the present embodiment, it is assumed that management building is CH, and the total number of floor levels in building is N, and the branch of the building Zheng Dong electric power is divided into: total
Inlet wire, total air-conditioning, general ambient light, total output and other, then according to every floor branch, it is assumed that 2 buildings electrical power path flow directions are divided into
A, B, C tri- regions, user A are located at the power distribution room of second floor, it can be seen that three multifunction electric meters, have corresponded to three in power distribution room
Branch, user A can quickly view the branch case of this position, prop up by scanning the two dimensional code of multifunction electric meter fuselage
Road energy consumption.
In the normal operation for guaranteeing this system, the action related generally to includes:
The distribution design drawing of building CH is compareed, building branch information is completed in the building of data center, determines this branch
The acquisition point being specifically related in acquisition system scheme;
The installation and deployment of data collection terminal, the installation including each multifunction electric meter equipment, the installation of intelligent gateway are completed
The two dimensional code bindings of data center's branch logic chart and physics acquisition terminal, and corresponding two-dimensional barcode information is installed to and is adopted
Collect terminal fuselage;Intelligent gateway (CHGW) is by the preset frequency acquisition of data center, by the electric power energy consumption data of each branch point
Acquisition is uploaded to data center (DataCenter), the grouping subset storage of complete paired data;
After the completion of the above Contents Construction, user A is in the feelings without there is any understanding to building electrical power path in this example
Under condition, the branch to its position only can be completed by the two dimensional code that smart phone scans CHDB_ZM_2_C device body
The acquisition of information of the energy, the data that data center returns can clearly inform that user A, this bypass position are 2 layers of C area illumination
Branch, the parent branch of this branch are 2 layers of illumination CHDB_ZM_2, and the parent branch of 2 layers of illumination is general ambient light CHDB_ZM_Z, this
Branch are as follows: the total branch of illumination in entire 2 layers of region C, (if there is also branches under the region C, as it is sub without branch path for junior
The fining degree of grade branch, junior's branch can be determined according to user demand), and show the electric power energy consumption data letter of this branch
Breath.For clearly branch structure, user A if it find that the power equipment data of CHDB_ZM_2_C exist it is abnormal, such as: wink
When power it is excessively high, energy consumption data is persistently higher than critical field etc., and user A can quickly position 2 layers of C according to branch power information
Area, investigation is with the presence or absence of abnormal high load;If user A has distribution permission, relevant match can also be completed according to the actual situation
Electricity adjustment.
Claims (6)
1. a kind of branch energy monitoring management system, which is characterized in that the system comprises branch energy acquisition system and intelligence
Mobile terminal, the branch energy acquisition system for realizing the electric power energy data to each branch point acquisition, transmission with
And storage;The intelligent mobile terminal is used to obtain and check the energy information of each branch collection point.
2. branch energy monitoring management system according to claim 1, which is characterized in that the branch energy acquisition system
Including Intelligent Data Collection System Terminal, intelligent gateway and back-end data processing center, Intelligent Data Collection System Terminal will be collected
Data are transmitted to back-end data processing center by intelligent gateway, realize the acquisition to the energy consumption data of branch energy source point, transmission
And storage, the Intelligent Data Collection System Terminal are led between intelligent gateway and back-end data processing center using wired plus wireless
News mode.
3. branch energy monitoring management system according to claim 1, which is characterized in that the intelligent mobile terminal is supported
Two-dimensional code scanning function.
4. branch energy monitoring management system according to claim 2, which is characterized in that the back-end data processing center
Has the function of user authority setting.
5. branch energy monitoring management system according to claim 2, which is characterized in that the Intelligent Data Collection System Terminal
Node setting with build Electric Design drawing in each branch point physics it is corresponding.
6. branch energy monitoring management system according to claim 2, which is characterized in that the back-end data processing center
The two dimensional code of each branch energy source point is generated, the two dimensional code and the Intelligent Data Collection System Terminal correspond.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811320417.0A CN109343491B (en) | 2018-11-07 | 2018-11-07 | Branch energy monitoring and management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811320417.0A CN109343491B (en) | 2018-11-07 | 2018-11-07 | Branch energy monitoring and management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109343491A true CN109343491A (en) | 2019-02-15 |
CN109343491B CN109343491B (en) | 2020-07-28 |
Family
ID=65314425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811320417.0A Active CN109343491B (en) | 2018-11-07 | 2018-11-07 | Branch energy monitoring and management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109343491B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111046420A (en) * | 2019-12-04 | 2020-04-21 | 新奥数能科技有限公司 | Method and device for acquiring information of energy equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101650772A (en) * | 2009-09-18 | 2010-02-17 | 衡水供电公司 | Method for realizing newly installed electric meter relative information automatic input in one-household and one-meter engineering by applying bar code |
KR20140141923A (en) * | 2013-06-03 | 2014-12-11 | 지에스건설 주식회사 | Optimal building energy system design method with complex constraints |
CN106780161A (en) * | 2016-12-19 | 2017-05-31 | 上海置信节能环保有限公司 | A kind of building energy management system and data processing method |
CN107146016A (en) * | 2017-05-03 | 2017-09-08 | 中科九度(北京)空间信息技术有限责任公司 | The method and apparatus that a kind of utilization mobile terminal is managed to the energy input of building |
CN207850440U (en) * | 2018-03-06 | 2018-09-11 | 深圳市紫衡技术有限公司 | A kind of building energy conservation amount assessment system |
-
2018
- 2018-11-07 CN CN201811320417.0A patent/CN109343491B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101650772A (en) * | 2009-09-18 | 2010-02-17 | 衡水供电公司 | Method for realizing newly installed electric meter relative information automatic input in one-household and one-meter engineering by applying bar code |
KR20140141923A (en) * | 2013-06-03 | 2014-12-11 | 지에스건설 주식회사 | Optimal building energy system design method with complex constraints |
CN106780161A (en) * | 2016-12-19 | 2017-05-31 | 上海置信节能环保有限公司 | A kind of building energy management system and data processing method |
CN107146016A (en) * | 2017-05-03 | 2017-09-08 | 中科九度(北京)空间信息技术有限责任公司 | The method and apparatus that a kind of utilization mobile terminal is managed to the energy input of building |
CN207850440U (en) * | 2018-03-06 | 2018-09-11 | 深圳市紫衡技术有限公司 | A kind of building energy conservation amount assessment system |
Non-Patent Citations (2)
Title |
---|
张宇: "浅谈建筑能源管理", 《2015年10月建筑科技与管理学术交流会论文集》 * |
董飞翔: "建筑设备管理与能耗分析的", 《现代建筑电气》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111046420A (en) * | 2019-12-04 | 2020-04-21 | 新奥数能科技有限公司 | Method and device for acquiring information of energy equipment |
CN111046420B (en) * | 2019-12-04 | 2022-03-01 | 新奥数能科技有限公司 | Method and device for acquiring information of energy equipment |
Also Published As
Publication number | Publication date |
---|---|
CN109343491B (en) | 2020-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Talari et al. | A review of smart cities based on the internet of things concept | |
KR101215186B1 (en) | System, Apparatus and Method for Energy Display | |
CN203535436U (en) | Intelligent environmental monitoring system for pollution source | |
Suryadevara et al. | Smart plugs: Paradigms and applications in the smart city-and-smart grid | |
CN1477540A (en) | Long Distance meter fetch system and method based on mobile communication | |
CN107703413A (en) | A kind of device and method for detection family table relation of not registering one's residence | |
CN215376365U (en) | Building management system based on BIM | |
CN105825654A (en) | Water-electricity-gas joint reading and charging system and method thereof | |
CN106405183A (en) | Electric energy information provision system and method thereof | |
CN111652523B (en) | Method, system and electronic equipment for comprehensive monitoring and management of green building | |
CN207442841U (en) | Electric energy meter communication failure detecting system | |
Kaushik et al. | Continuous monitoring of power consumption in urban buildings based on Internet of Things | |
CN101937213B (en) | Wireless remote terminal cluster control system | |
CN104658119A (en) | Method, device and system for switching rate of electric device | |
CN109343491A (en) | A kind of branch energy monitoring management system | |
CN103152427A (en) | Remote wireless meter-reading control method | |
CN202904325U (en) | Electric energy consumption data remote-monitoring matching device | |
CN105844731B (en) | Patrol task distribution apparatus | |
Jha et al. | Portal based prepaid energy billing system using GSM | |
CN203799487U (en) | Power information testing device based on wireless communication | |
CN102288204A (en) | Energy-related information display apparatus and method thereof | |
Afandi et al. | A Smart Energy Management System Utilizing the Internet of Things and Big Data analytical Technique | |
Li et al. | Optimal Placement of IoT-Based Fault Indicator to Shorten Outage Time in Integrated Cyber-Physical Medium-Voltage Distribution Network | |
CN105223850A (en) | A kind of energy monitor based on smart bluetooth and control method | |
CN104155922B (en) | A kind of home appliance monitor system based on ZigBee |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |