CN109339708A - 一种锚固孔孔底扩孔装置的成孔工艺 - Google Patents
一种锚固孔孔底扩孔装置的成孔工艺 Download PDFInfo
- Publication number
- CN109339708A CN109339708A CN201811270043.6A CN201811270043A CN109339708A CN 109339708 A CN109339708 A CN 109339708A CN 201811270043 A CN201811270043 A CN 201811270043A CN 109339708 A CN109339708 A CN 109339708A
- Authority
- CN
- China
- Prior art keywords
- hole
- conduit
- turnbarrel
- water
- water injection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/28—Enlarging drilled holes, e.g. by counterboring
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/18—Drilling by liquid or gas jets, with or without entrained pellets
Abstract
一种锚固孔孔底扩孔装置的成孔工艺,包括以下步骤:打锚固孔直孔;将注水导管(2)和抽水导管(3)通过固定支架(7)固定在旋转套筒(1)中,使注水导管(2)和抽水导管(3)底部均伸出旋转套筒(1),再将旋转套筒(1)置于锚固孔直孔中;将注水导管(2)与外部高压水管接通,将抽水导管(3)与外部高压水泵接通,通过注水导管(2)射流切削锚固孔孔底内壁,同时采用高压水泵通过抽水导管(3)抽取孔底泥浆;待高压射流销孔结束后,保持高压水泵通过抽水导管(3)持续抽取孔底泥浆,直至高压水泵出水泥浆量减少后停止;调整注水导管(2)的高度从而实现调整可转动支架(6)的角度,将整个旋转套筒(1)取出即可。
Description
技术领域
本发明涉及一种扩孔工艺,更具体的说涉及一种锚固孔孔底扩孔装置的成孔工艺,属于锚固技术领域。
背景技术
土锚杆是在深基础土壁未开挖的土层内钻孔,达到一定深度后,在孔内放入钢筋、钢管、钢丝束、钢绞线等材料,灌入泥浆或化学浆液,使其与土层结合成为抗拉(拔)力强的锚杆。
目前,并无用于抗浮的土锚杆,传统工程采用抗浮桩实现这一功能。但是,抗浮桩相较于土锚杆钻孔孔径较大,且其底部不扩孔,单根抗浮桩极限抗拔力小于土锚杆;同时成本也高于土锚杆,难以满足使用需求。
发明内容
本发明的目的在于针对现有的抗浮桩相较于土锚杆钻孔孔径较大、且其底部不扩孔等问题,提供一种锚固孔孔底扩孔装置的成孔工艺。
本发明为实现上述目的,所采用技术解决方案是:一种锚固孔孔底扩孔装置的成孔工艺,其中的扩孔装置包括旋转套筒,旋转套筒设置在锚固孔中,所述的旋转套筒中设置有注水导管和抽水导管,旋转套筒下部外壁与锚固孔壁之间设置有橡胶塞,所述的注水导管底部连接有喷水管,所述的喷水管出口为喷水口,喷水管通过可转动支架固定在旋转套筒上,喷水管可绕注水导管转动,所述的喷水管可转动角度为15-45°,该角度为喷水管转动时与地平面垂直线之间的夹角,所述的可转动支架设置四个转动档位,该四个转动档位分别对应喷水管的可转动角度15°、 25°、 35°和45°,所述的注水导管和抽水导管通过固定支架固定在旋转套筒中,其特征在于,包括以下步骤:步骤一,采用地质钻或潜孔钻打锚固孔直孔;步骤二,将注水导管和抽水导管通过固定支架固定在旋转套筒中,使注水导管和抽水导管底部均伸出旋转套筒,再将旋转套筒置于锚固孔直孔中; 步骤三,将注水导管与外部高压水管接通,将抽水导管与外部高压水泵接通,通过注水导管射流切削锚固孔孔底内壁,同时采用高压水泵通过抽水导管抽取孔底泥浆;步骤四,待高压射流销孔结束后,保持高压水泵通过抽水导管持续抽取孔底泥浆,直至高压水泵出水泥浆量减少后停止;步骤五,调整注水导管的高度从而实现调整可转动支架的角度,将整个旋转套筒取出,即完成锚固孔孔底扩孔工艺。
所述的步骤三具体包括以下步骤:步骤11,先将可转动支架调至一档对应喷水管的可转动角度15°位置,保持高压射流削孔,同时缓慢转动旋转套筒1-2周,且使高压水泵抽取底部孔内泥浆;步骤12,将可转动支架调至二档对应喷水管的可转动角度25°位置,保持高压射流削孔,同时缓慢转动旋转套筒1-2周,且使高压水泵抽取底部孔内泥浆;步骤13,将可转动支架调至三档对应喷水管的可转动角度35°位置,保持高压射流削孔,同时缓慢转动旋转套筒1-2周,且使高压水泵抽取底部孔内泥浆;步骤14,将可转动支架调至四档对应喷水管的可转动角度45°位置,保持高压射流削孔,同时缓慢转动旋转套筒1-2周,且使高压水泵抽取底部孔内泥浆;步骤15,重复步骤11至14,直至锚固孔孔底内壁成型,结束高压射流销孔。
与现有技术相比较,本发明的有益效果是:
本工艺采用锚固孔孔底扩孔装置钻孔孔径小,且施工方便,较为经济。
附图说明
图1是本发明中扩孔装置结构示意图。
图2是本发明中喷水管转动图一。
图3是本发明中喷水管转动图二。
图中,旋转套筒1,注水导管2,抽水导管3,橡胶塞4,喷水管5,可转动支架6,固定支架7。
具体实施方式
以下结合附图说明和具体实施方式对本发明作进一步的详细描述。
参见图1至图3,一种锚固孔孔底扩孔装置,包括旋转套筒1,旋转套筒1设置在锚固孔中,旋转套筒1可以在锚固孔中360度旋转;所述的旋转套筒1中设置有注水导管2和抽水导管3,旋转套筒下部1外壁与锚固孔壁之间设置有橡胶塞4,橡胶塞4起到密封作用。所述的注水导管2底部连接有可转动喷水管5,所述的喷水管5出口为喷水口,喷水管5通过可转动支架6固定在旋转套筒1上,喷水管5可绕注水导管2转动。
参见图1至图3,进一步的,所述的喷水管5可转动角度为15-45°,该角度为喷水管5转动时与地平面垂直线之间的夹角;所述的可转动支架6设置四个转动档位,该四个转动档位分别对应喷水管5的可转动角度15°、 25°、 35°和45°。
参见图1至图3,具体的,所述的注水导管2和抽水导管3通过固定支架7固定在旋转套筒1中。
参见图1至图3,一种锚固孔孔底扩孔装置的成孔工艺,包括以下步骤:
步骤一,采用地质钻或潜孔钻打锚固孔直孔。
步骤二,将注水导管2和抽水导管3通过固定支架7固定在旋转套筒1中,使注水导管2和抽水导管3底部均伸出旋转套筒1;再将旋转套筒1置于锚固孔直孔中。
步骤三,将注水导管2与外部高压水管接通,将抽水导管3与外部高压水泵接通,通过注水导管2射流切削锚固孔孔底内壁,同时采用高压水泵通过抽水导管3抽取孔底泥浆。旋转套筒下部1外壁与锚固孔壁之间的橡胶塞4能够防止注水导管2射流切削锚固孔孔底内壁时水从旋转套筒和孔壁间涌出,冲刷破坏橡胶塞4以上孔壁,导致塌孔。
步骤四,待高压射流销孔结束后,保持高压水泵通过抽水导管3持续抽取孔底泥浆,直至高压水泵出水泥浆量减少后停止。
步骤五,调整注水导管2的高度从而实现调整可转动支架6的角度,此种方法方便旋转套筒1的拔出;然后将整个旋转套筒1取出,即完成锚固孔孔底扩孔工艺,可进行后续土锚杆植入工艺。
参见图1至图3,进一步的,所述的步骤三具体包括以下步骤:
步骤11,先将可转动支架6调至一档对应喷水管5的可转动角度15°位置,保持高压射流削孔,同时缓慢转动旋转套筒1使其旋转1-2周,且使高压水泵抽取底部孔内泥浆。
步骤12,将可转动支架6调至二档对应喷水管5的可转动角度25°位置,保持高压射流削孔,同时缓慢转动旋转套筒1使其旋转1-2周,且使高压水泵抽取底部孔内泥浆。
步骤13,将可转动支架6调至三档对应喷水管5的可转动角度35°位置,保持高压射流削孔,同时缓慢转动旋转套筒1使其旋转1-2周,且使高压水泵抽取底部孔内泥浆。
步骤14,将可转动支架6调至四档对应喷水管5的可转动角度45°位置,保持高压射流削孔,同时缓慢转动旋转套筒1使其旋转1-2周,且使高压水泵抽取底部孔内泥浆。
步骤15,重复步骤11至14,直至锚固孔孔底内壁成型,结束高压射流销孔。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,上述结构都应当视为属于本发明的保护范围。
Claims (2)
1.一种锚固孔孔底扩孔装置的成孔工艺,其中的扩孔装置包括旋转套筒(1),旋转套筒(1)设置在锚固孔中,所述的旋转套筒(1)中设置有注水导管(2)和抽水导管(3),旋转套筒(1)下部外壁与锚固孔壁之间设置有橡胶塞(4),所述的注水导管(2)底部连接有喷水管(5),所述的喷水管(5)出口为喷水口,喷水管(5)通过可转动支架(6)固定在旋转套筒(1)上,喷水管(5)可绕注水导管(2)转动,所述的喷水管(5)可转动角度为15-45°,该角度为喷水管(5)转动时与地平面垂直线之间的夹角,所述的可转动支架(6)设置四个转动档位,该四个转动档位分别对应喷水管(5)的可转动角度15°、 25°、 35°和45°,所述的注水导管(2)和抽水导管(3)通过固定支架(7)固定在旋转套筒(1)中,其特征在于,包括以下步骤:
步骤一,采用地质钻或潜孔钻打锚固孔直孔;
步骤二,将注水导管(2)和抽水导管(3)通过固定支架(7)固定在旋转套筒(1)中,使注水导管(2)和抽水导管(3)底部均伸出旋转套筒(1),再将旋转套筒(1)置于锚固孔直孔中;
步骤三,将注水导管(2)与外部高压水管接通,将抽水导管(3)与外部高压水泵接通,通过注水导管(2)射流切削锚固孔孔底内壁,同时采用高压水泵通过抽水导管(3)抽取孔底泥浆;
步骤四,待高压射流销孔结束后,保持高压水泵通过抽水导管(3)持续抽取孔底泥浆,直至高压水泵出水泥浆量减少后停止;
步骤五,调整注水导管(2)的高度从而实现调整可转动支架(6)的角度,将整个旋转套筒(1)取出,即完成锚固孔孔底扩孔工艺。
2.根据权利要求1所述的一种锚固孔孔底扩孔装置的成孔工艺,其特征在于,所述的步骤三具体包括以下步骤:
步骤11,先将可转动支架(6)调至一档对应喷水管(5)的可转动角度15°位置,保持高压射流削孔,同时缓慢转动旋转套筒(1)1-2周,且使高压水泵抽取底部孔内泥浆;
步骤12,将可转动支架(6)调至二档对应喷水管(5)的可转动角度25°位置,保持高压射流削孔,同时缓慢转动旋转套筒(1)1-2周,且使高压水泵抽取底部孔内泥浆;
步骤13,将可转动支架(6)调至三档对应喷水管(5)的可转动角度35°位置,保持高压射流削孔,同时缓慢转动旋转套筒(1)1-2周,且使高压水泵抽取底部孔内泥浆;
步骤14,将可转动支架(6)调至四档对应喷水管(5)的可转动角度45°位置,保持高压射流削孔,同时缓慢转动旋转套筒(1)1-2周,且使高压水泵抽取底部孔内泥浆;
步骤15,重复步骤11至14,直至锚固孔孔底内壁成型,结束高压射流销孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811270043.6A CN109339708B (zh) | 2018-10-29 | 2018-10-29 | 一种锚固孔孔底扩孔装置的成孔工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811270043.6A CN109339708B (zh) | 2018-10-29 | 2018-10-29 | 一种锚固孔孔底扩孔装置的成孔工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109339708A true CN109339708A (zh) | 2019-02-15 |
CN109339708B CN109339708B (zh) | 2020-05-15 |
Family
ID=65310818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811270043.6A Active CN109339708B (zh) | 2018-10-29 | 2018-10-29 | 一种锚固孔孔底扩孔装置的成孔工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109339708B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110607995A (zh) * | 2019-09-29 | 2019-12-24 | 中国矿业大学 | 一种井下新施工水文钻孔防套管断裂方法 |
CN113931186A (zh) * | 2021-10-18 | 2022-01-14 | 中交第二航务工程局有限公司 | 空间受限条件下的辅助桩基拔除施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4142593A (en) * | 1977-10-25 | 1979-03-06 | Smith International, Inc. | Raise drill inner yoke bridge |
CN1332309A (zh) * | 2001-08-03 | 2002-01-23 | 宁晋生 | 钻孔灌注桩砼灌注前直吸式反循环孔底清渣方法及装置 |
CN103758450A (zh) * | 2014-01-17 | 2014-04-30 | 北京市市政工程研究院 | 一种自钻进可随扩锚杆成孔装置 |
CN104790873A (zh) * | 2015-02-14 | 2015-07-22 | 河南理工大学 | 松软岩土层射流导向成孔-扩孔-防塌孔一体化钻进方法 |
CN106894759A (zh) * | 2017-04-19 | 2017-06-27 | 中海石油(中国)有限公司 | 一种自升式钻井平台桩腿主动刺穿一钻多孔钻头及方法 |
-
2018
- 2018-10-29 CN CN201811270043.6A patent/CN109339708B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4142593A (en) * | 1977-10-25 | 1979-03-06 | Smith International, Inc. | Raise drill inner yoke bridge |
CN1332309A (zh) * | 2001-08-03 | 2002-01-23 | 宁晋生 | 钻孔灌注桩砼灌注前直吸式反循环孔底清渣方法及装置 |
CN103758450A (zh) * | 2014-01-17 | 2014-04-30 | 北京市市政工程研究院 | 一种自钻进可随扩锚杆成孔装置 |
CN104790873A (zh) * | 2015-02-14 | 2015-07-22 | 河南理工大学 | 松软岩土层射流导向成孔-扩孔-防塌孔一体化钻进方法 |
CN106894759A (zh) * | 2017-04-19 | 2017-06-27 | 中海石油(中国)有限公司 | 一种自升式钻井平台桩腿主动刺穿一钻多孔钻头及方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110607995A (zh) * | 2019-09-29 | 2019-12-24 | 中国矿业大学 | 一种井下新施工水文钻孔防套管断裂方法 |
CN113931186A (zh) * | 2021-10-18 | 2022-01-14 | 中交第二航务工程局有限公司 | 空间受限条件下的辅助桩基拔除施工方法 |
CN113931186B (zh) * | 2021-10-18 | 2023-08-15 | 中交第二航务工程局有限公司 | 空间受限条件下的辅助桩基拔除施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109339708B (zh) | 2020-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631439B (zh) | 一种泵吸反循环桩基施工装置及方法 | |
CN101245600B (zh) | 用高压双液旋喷技术生成水平加固体的施工方法 | |
CN102444118A (zh) | 袖阀管注浆加固施工方法 | |
CN201908308U (zh) | 注浆袖阀管 | |
CN105569560B (zh) | 全套管式长螺旋钻孔桩机及利用该桩机施工的方法 | |
CN101525881B (zh) | 岩溶地层桩孔护壁构造及桩孔施工方法 | |
CN102926770A (zh) | 薄基岩、厚松散砂层富水区域井下疏水注浆工艺 | |
CN107747312A (zh) | 一种砂砾石地层钻孔灌浆施工的方法 | |
CN106917627B (zh) | 一种富水地层暗挖施工下导洞的超前支护方法 | |
CN204253056U (zh) | 一种盾构机进出洞洞口加固结构 | |
CN101634142A (zh) | 一种多重钢套管溶洞填充预处理施工方法 | |
CN104947652B (zh) | 长螺旋钻孔水泥浆护壁式植入管桩的施工装置及施工方法 | |
CN106522213A (zh) | 一种旋喷插筋式微型桩施工方法 | |
CN109339708A (zh) | 一种锚固孔孔底扩孔装置的成孔工艺 | |
CN109322624A (zh) | 一种锚固孔孔底扩孔装置 | |
CN201826315U (zh) | 注浆袖阀管 | |
CN102418337A (zh) | 一种新的灌浆法 | |
CN108316297A (zh) | 一种管式土钉及其施工方法 | |
CN209385062U (zh) | 一种锚固孔孔底扩孔装置 | |
CN107653889A (zh) | 一种型钢压灌水泥土帷幕支护桩的施工方法 | |
CN106759360A (zh) | 一种清渣注浆装置及采用该装置的清渣注浆方法 | |
CN107447755A (zh) | 一种锚杆设备及锚杆钻孔施工方法 | |
CN104832085B (zh) | 一种深厚覆盖层跟管钻进方法 | |
CN206448273U (zh) | 一种连续钢构渡槽gg2#墩地基灌浆系统 | |
CN206173985U (zh) | 井管 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 430223 Jucheng building, No.4, 1st Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province Patentee after: Wuhan Jucheng Structure Group Co.,Ltd. Address before: 430223 Jucheng building, No.4, 1st Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province Patentee before: WUDA JUCHENG STRUCTURE Co.,Ltd. |