CN109339451A - The floor heating construction method of factory's energy pressure-bearing weight - Google Patents

The floor heating construction method of factory's energy pressure-bearing weight Download PDF

Info

Publication number
CN109339451A
CN109339451A CN201811477522.5A CN201811477522A CN109339451A CN 109339451 A CN109339451 A CN 109339451A CN 201811477522 A CN201811477522 A CN 201811477522A CN 109339451 A CN109339451 A CN 109339451A
Authority
CN
China
Prior art keywords
floor heating
concrete
heating pipe
laid
factory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811477522.5A
Other languages
Chinese (zh)
Inventor
张永军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811477522.5A priority Critical patent/CN109339451A/en
Publication of CN109339451A publication Critical patent/CN109339451A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a kind of factory floor heating construction methods of energy pressure-bearing weight, comprising the following steps: is laid with a layer concrete in the factory for needing to be laid with floor heating, then draws a line at a certain distance on the concrete laid;It is punched on each line, the quantity in hole is several, and is uniformly placed equidistant with;The stopper in above-mentioned hole internal plug, the size of stopper are identical as the diameter in the hole;Foam strip is tied up on floor heating pipe for use with adhesive tape;The effective plastic clamp with nail of the floor heating bound is fixed on the stopper;It installs and is poured concrete in the gap location of floor heating pipe after floor heating pipe, concrete height and the floor heating pipe of casting are flush;It is being laid with one layer of wire netting above after pouring concrete between floor heating pipe and floor heating pipe, is then being poured a layer concrete, it is levelling finally to carry out surface.The method of the present invention is simple, and load bearing effect is good, the weight of 10 tons of pressure-bearing of energy, and heat dissipation effect is preferable, and extends the service life of floor heating.

Description

The floor heating construction method of factory's energy pressure-bearing weight
Technical field
The present invention relates to floor heating technical field of construction, more particularly, to a kind of factory floor heating construction party of energy pressure-bearing weight Method.
Background technique
In existing floor heating structure, in-site installation laying is usually used, but was installed since scene carries out floor heating Each structure sheaf and pipeline are laid with respectively in journey, and thickness is big;It is fixed also to need to carry out pipeline scene, procedure complexity, so that The laying duration of floor heating is longer under normal circumstances;In addition, existing floor heating structure pipeline is needed in process of deployment by whole foam It is laid on and pours on the concrete being poured in, then floor heating pipe is installed on foam, install after floor heating pipe in the coagulation for being laid with 10cm thickness Soil, such structure and paving mode are easy to appear the phenomenon that being not fixed firmly, destructible interlayer structure;And use whole foam It being easily deformed, load-bearing is poor, and heat dissipation effect is bad, service life is reduced, for factory, this common laying Mode is simultaneously not suitable for, because needing to place very heavy equipment and fork truck in factory, fork truck is easy to damage by pressure on ground and floor heating pipe, from And influence to use, and for factory, it is impossible to floor heating is frequently replaced, brings many inconvenience to enterprise.In view of the above original Cause, design a kind of factory with can the floor heating construction method of pressure-bearing weight be necessary.
Summary of the invention
The object of the present invention is to provide a kind of factory floor heating construction methods of energy pressure-bearing weight, and method is simple, load-bearing effect Fruit is good, the weight of 10 tons of pressure-bearing of energy, and heat dissipation effect is preferable, and extends the service life of floor heating.
To achieve the above object, the present invention provides a kind of factory floor heating construction methods of energy pressure-bearing weight, including with Lower step:
A, it draws lines: a layer concrete is laid in the factory for needing to be laid with floor heating, then on the concrete laid A line is drawn at a certain distance;
B, it punches: being punched on each line, the quantity in hole is several, and is uniformly placed equidistant with;
C, fill in stopper: the stopper in above-mentioned hole internal plug, the size of stopper are identical as the diameter in the hole;
D, foam strip is bound on floor heating pipe: being tied up foam strip on floor heating pipe for use with adhesive tape;
E, floor heating pipe is installed: the effective plastic clamp with nail of the floor heating bound is fixed on the stopper;
F, it is poured concrete: installing and be poured concrete in the gap location of floor heating pipe after floor heating pipe, the concrete of casting is high Degree is flush with floor heating pipe;
G, it is surface-treated: being laid with one layer of wire netting above after pouring concrete between floor heating pipe and floor heating pipe, then It is being poured a layer concrete, it is levelling finally to carry out surface.
Preferably, the concrete thickness being laid in the step A is 18-20cm.
Preferably, the spacing of the step B mesoporous is 40cm, and the diameter in hole is 5cm.
Preferably, the foam strip in the step D is set as rectangular parallelepiped structure, and the width of the foam strip is 2cm.
Preferably, the plastic clamp in the step E is made of fixed part and clamping portion, and the clamping portion is set as semicircle It shape structure and is integrally formed with the fixed part, is provided with fixation hole on the fixed part.
Preferably, in the step F concrete with a thickness of 4cm.
Preferably, the wire netting in the step G is set as square structure, and the width of the wire netting is 1cm, institute State concrete with a thickness of 4cm.
Therefore, the factory of the present invention using the above structure floor heating construction method of energy pressure-bearing weight, method is simple, load-bearing Effect is good, the weight of 10 tons of pressure-bearing of energy, and heat dissipation effect is preferable, and extends the service life of floor heating.
Below by drawings and examples, technical scheme of the present invention will be described in further detail.
Detailed description of the invention
Fig. 1 is a kind of process flow chart of the floor heating construction method embodiment of factory's energy pressure-bearing weight of the present invention;
Fig. 2 is a kind of plastic clamp structural representation of the floor heating construction method embodiment of factory's energy pressure-bearing weight of the present invention Figure.
Specific embodiment
Embodiment
Fig. 1 is a kind of process flow chart of the floor heating construction method embodiment of factory's energy pressure-bearing weight of the present invention, is such as schemed Shown, the present invention provides a kind of factory floor heating construction methods of energy pressure-bearing weight, comprising the following steps:
A, it draws lines: being laid with a layer concrete in the factory for needing to be laid with floor heating, concrete thickness 18-20cm, then Draw a line at a certain distance on the concrete laid;
B, it punches: being punched on each line, the quantity in hole is several, and is uniformly placed equidistant with, the spacing in hole For 40cm, the diameter in hole is 5cm;
C, fill in stopper: the stopper in above-mentioned hole internal plug, the size of stopper are identical as the diameter in the hole;
D, foam strip is bound on floor heating pipe: being tied up foam strip on floor heating pipe for use with adhesive tape, foam strip is set as rectangular Body structure, and the width of the foam strip is 2cm;
E, floor heating pipe is installed: the effective plastic clamp with nail of the floor heating bound is fixed on the stopper;
F, be poured concrete: installing and be poured concrete in the gap location of floor heating pipe after floor heating pipe, concrete with a thickness of 4cm, concrete height and the floor heating pipe of casting are flush;
G, it is surface-treated: being laid with one layer of wire netting, iron wire above after pouring concrete between floor heating pipe and floor heating pipe Net is set as square structure, and the width of the wire netting is 1cm, is then being poured a layer concrete, the thickness of concrete For 4cm, it is levelling finally to carry out surface.
The present invention punches on the line of the concrete laid first, then in hole internal plug stopper, will have foam strip The effective plastic clamp of floor heating is fixed on stopper, and concrete is poured at the gap of floor heating pipe and floor heating pipe, is then laid with iron wire Net re-lays concrete on wire netting, and such weight is pressed in above, and the concrete and floor heating pipe at floor heating pipe gap are mutually neat Flat, the two undertakes weight together in this way, to increase pressure-bearing effect, extends the service life of floor heating pipe.
Fig. 2 is a kind of plastic clamp structural representation of the floor heating construction method embodiment of factory's energy pressure-bearing weight of the present invention Figure, as shown, plastic clamp is made of fixed part 1 and clamping portion 2, clamping portion 2 be set as semicircular structure and with fixed part 1 It is integrally formed, is provided with fixation hole 3 on fixed part 1.
Therefore, the factory of the present invention using the above structure floor heating construction method of energy pressure-bearing weight, method is simple, load-bearing Effect is good, the weight of 10 tons of pressure-bearing of energy, and heat dissipation effect is preferable, and extends the service life of floor heating.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than is limited, Although the present invention is described in detail with reference to preferred embodiments, those skilled in the art should understand that: its according to So can be with modification or equivalent replacement of the technical solution of the present invention are made, and these modifications or equivalent replacement cannot also make to repair Technical solution after changing is detached from the spirit and scope of technical solution of the present invention.

Claims (7)

1. a kind of factory floor heating construction method of energy pressure-bearing weight, which comprises the following steps:
A, draw lines: a layer concrete is laid in the factory for needing to be laid with floor heating, then on the concrete laid every Certain distance draws a line;
B, it punches: being punched on each line, the quantity in hole is several, and is uniformly placed equidistant with;
C, fill in stopper: the stopper in above-mentioned hole internal plug, the size of stopper are identical as the diameter in the hole;
D, foam strip is bound on floor heating pipe: being tied up foam strip on floor heating pipe for use with adhesive tape;
E, floor heating pipe is installed: the effective plastic clamp with nail of the floor heating bound is fixed on the stopper;
F, be poured concrete: installing and be poured concrete in the gap location of floor heating pipe after floor heating pipe, the concrete height of casting with Floor heating pipe is flush;
G, it is surface-treated: being laid with one layer of wire netting above after pouring concrete between floor heating pipe and floor heating pipe, then pouring It is levelling finally to carry out surface for one layer concrete of note.
2. the factory according to claim 1 floor heating construction method of energy pressure-bearing weight, it is characterised in that: the step A The concrete thickness of middle laying is 18-20cm.
3. the factory according to claim 1 floor heating construction method of energy pressure-bearing weight, it is characterised in that: the step B The spacing of mesoporous is 40cm, and the diameter in hole is 5cm.
4. the factory according to claim 1 floor heating construction method of energy pressure-bearing weight, it is characterised in that: the step D In foam strip be set as rectangular parallelepiped structure, and the width of the foam strip is 2cm.
5. the factory according to claim 1 floor heating construction method of energy pressure-bearing weight, it is characterised in that: the step E In plastic clamp be made of fixed part and clamping portion, the clamping portion be set as semicircular structure and with fixed part one It forms, is provided with fixation hole on the fixed part.
6. the factory according to claim 1 floor heating construction method of energy pressure-bearing weight, it is characterised in that: the step F Middle concrete with a thickness of 4cm.
7. the factory according to claim 1 floor heating construction method of energy pressure-bearing weight, it is characterised in that: the step G In wire netting be set as square structure, and the width of the wire netting is 1cm, the concrete with a thickness of 4cm.
CN201811477522.5A 2018-12-05 2018-12-05 The floor heating construction method of factory's energy pressure-bearing weight Pending CN109339451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811477522.5A CN109339451A (en) 2018-12-05 2018-12-05 The floor heating construction method of factory's energy pressure-bearing weight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811477522.5A CN109339451A (en) 2018-12-05 2018-12-05 The floor heating construction method of factory's energy pressure-bearing weight

Publications (1)

Publication Number Publication Date
CN109339451A true CN109339451A (en) 2019-02-15

Family

ID=65320297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811477522.5A Pending CN109339451A (en) 2018-12-05 2018-12-05 The floor heating construction method of factory's energy pressure-bearing weight

Country Status (1)

Country Link
CN (1) CN109339451A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113125077A (en) * 2021-04-13 2021-07-16 湖州建院环境艺术工程有限公司 Water floor heating construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3554067B2 (en) * 1995-04-04 2004-08-11 東京瓦斯株式会社 Interior body
CN101825308A (en) * 2010-05-07 2010-09-08 奉政一 Geothermal paved heating device
CN101914987A (en) * 2010-09-13 2010-12-15 天津天一建设集团有限公司 Ground construction method of ground heating fiber steel reinforcing concrete
CN201883549U (en) * 2010-12-13 2011-06-29 上海朗诗建筑科技有限公司 Concrete structure capable of improving energy accumulation and heat insulation of building ground surface
CN102777013A (en) * 2012-07-17 2012-11-14 黄茂景 Water floor heating construction method
JP2014129975A (en) * 2012-12-28 2014-07-10 Sumisho Metalex Corp Construction method on site of hot water mat for floor heating
CN204693559U (en) * 2015-05-22 2015-10-07 广州豪特电器设备有限公司 Pressure-bearing type floor heating structure
CN205908946U (en) * 2016-05-04 2017-01-25 王丰景 Warm up laying device with heat preservation fixed band
CN206016166U (en) * 2016-08-31 2017-03-15 青岛中建联合建设工程有限公司 A kind of anticracking floor heating earth construction
CN206989295U (en) * 2017-07-21 2018-02-09 常州市武进建筑设计院有限公司 Ground radiation heating floor panel structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3554067B2 (en) * 1995-04-04 2004-08-11 東京瓦斯株式会社 Interior body
CN101825308A (en) * 2010-05-07 2010-09-08 奉政一 Geothermal paved heating device
CN101914987A (en) * 2010-09-13 2010-12-15 天津天一建设集团有限公司 Ground construction method of ground heating fiber steel reinforcing concrete
CN201883549U (en) * 2010-12-13 2011-06-29 上海朗诗建筑科技有限公司 Concrete structure capable of improving energy accumulation and heat insulation of building ground surface
CN102777013A (en) * 2012-07-17 2012-11-14 黄茂景 Water floor heating construction method
JP2014129975A (en) * 2012-12-28 2014-07-10 Sumisho Metalex Corp Construction method on site of hot water mat for floor heating
CN204693559U (en) * 2015-05-22 2015-10-07 广州豪特电器设备有限公司 Pressure-bearing type floor heating structure
CN205908946U (en) * 2016-05-04 2017-01-25 王丰景 Warm up laying device with heat preservation fixed band
CN206016166U (en) * 2016-08-31 2017-03-15 青岛中建联合建设工程有限公司 A kind of anticracking floor heating earth construction
CN206989295U (en) * 2017-07-21 2018-02-09 常州市武进建筑设计院有限公司 Ground radiation heating floor panel structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113125077A (en) * 2021-04-13 2021-07-16 湖州建院环境艺术工程有限公司 Water floor heating construction method

Similar Documents

Publication Publication Date Title
CN203924112U (en) Prefabricated pipe gallery
CN103591628A (en) Floor radiant heating construction method
KR102106058B1 (en) System for prevention of pavement freezing
CN109339451A (en) The floor heating construction method of factory's energy pressure-bearing weight
KR20110041937A (en) Power supply device for electric vehicle protected by concrete structure
CN206759013U (en) Framework assembly type cable slot unit and cable duct
US8806811B1 (en) Thermally non-conductive lifting insert for insulated concrete sandwich panels
CN205541639U (en) Electron sign marker peg
CN207453225U (en) A kind of superstructure unit and assembly concrete integrated floor
JP4111616B2 (en) Concrete slab
KR102141577B1 (en) Method and structure for constructing ventilation duct
CN207685852U (en) The multi-faceted guyed foundation of anticorrosion shaft tower
CN201153205Y (en) High-voltage cable S shaped laying-out construction
CN109537635B (en) Waterproof node for deformation joint of top plate of underground garage and construction method
KR101967402B1 (en) Foundation structure and construction method thereof
CN202495309U (en) Directly-inserting type simple insulator
CN201713933U (en) Trench cover plate
CN204311606U (en) A kind of footing reinforced body of wall
CN215253712U (en) Anchor plate and partition wall connecting device for building reconstruction
JP6514947B2 (en) Construction method of waterproof structure and board connector used therefor
CN205738733U (en) A kind of coil of strip preventer
CN213390689U (en) New and old wall overlap joint prevents processing apparatus that ftractures
CN203866857U (en) Universal base for mounting MINI equipment cabinet
CN208267116U (en) Built-in fitting for the installation of electromechanical pipeline bracket
KR20190028167A (en) Apparatus for load distribution of underground structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190215