CN109339123A - 一种用于群桩沉桩挤土效应的透明土试验装置 - Google Patents
一种用于群桩沉桩挤土效应的透明土试验装置 Download PDFInfo
- Publication number
- CN109339123A CN109339123A CN201811312550.1A CN201811312550A CN109339123A CN 109339123 A CN109339123 A CN 109339123A CN 201811312550 A CN201811312550 A CN 201811312550A CN 109339123 A CN109339123 A CN 109339123A
- Authority
- CN
- China
- Prior art keywords
- transparent
- pile
- piles
- clump
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Abstract
发明提供一种用于群桩沉桩挤土效应的透明土试验装置。该试验装置包括布置在试验平台上的透明模型箱和门型反力架,以及若干模型桩、沉桩加载设备和成像装置。所述透明模型箱的内腔底部布置有透水石。所述透水石上方填筑有透明土。所述模型桩按设计要求布设在透明土中。试验时,在模型试验箱内进行群桩沉桩挤土试验。该装置实现桩周围土体变形的可视化测量,群桩沉桩也可以观测到后沉入桩对先前沉入桩的影响,试验操作方便。
Description
技术领域
本发明涉及土体变形技术领域,特别涉及一种用于群桩沉桩挤土效应的透明土试验装置。
背景技术
以往对沉桩挤土效应的研究主要集中于单桩或双桩,对群桩的挤土效应分析较少,群桩一般是按组合进行分区,将每一分区的桩近似为当量单桩,然后按单桩分析群桩的挤土效应,但这种分析方法忽略了桩的施工次序,桩效应对桩间土及对已施工桩的影响。因此研究群桩沉桩过程中土体变形规律是十分必要的。
透明土的基本原理是利用透明颗粒材料和具有相同折射率的孔隙液体混合,排出空气得到的透明的饱和土,该土体与天然土体具有相似的岩土工程性质。利用激光器可以在透明土中形成散斑场,可以利用工业相机拍出高精度的图片。PIV技术是基于图像匹配技术发展起来的一种流体速度测量技术,通过对比不同时刻的图片灰度值,利用关联函数可以得到不同时刻的相对位移,从而得到群桩沉桩挤土后土体内部的宏观变形过程。
然而,现有技术对群桩挤土效应的研究方法并不成熟,且也未有研究群桩挤土过程中土体三维变形特性,所以亟需开发一种新型群桩沉桩挤土效应的透明土模型试验装置,以期深入认识群桩挤土过程中土体三维变形特性。
发明内容
本发明的目的是提供一种用于群桩沉桩挤土效应的透明土试验装置,以解决现有技术中存在的问题。
为实现本发明目的而采用的技术方案是这样的,一种用于群桩沉桩挤土效应的透明土试验装置,包括布置在试验平台上的透明模型箱和门型反力架,以及若干模型桩、沉桩加载设备和成像装置。
所述门型反力架包括两根立柱以及连接在两根立柱之间的横梁。所述横梁上设置有预留孔洞。
所述透明模型箱整体为一个矩形箱体。所述透明模型箱的内腔底部布置有透水石。所述透水石上方填筑有透明土。所述透明模型箱的侧壁上设置有若干个排水阀门。所述透明模型箱布置在横梁下方。所述模型桩按设计要求布设在透明土中。所述模型桩的桩顶伸出透明土的上表面。
所述沉桩加载设备包括传动杆和传力板。所述传动杆的上端穿过横梁的预留孔洞后与电动加载装置连接,下端与传力板连接。所述传力板的板面上设置有若干个连接孔。端头连接件通过连接孔可拆卸地安装在传力板的下板面。所述连接件的位置与模型桩的位置相对应。
所述成像装置包括3个激光器和3个工业相机。所述3个激光器和3个工业相机均位于透明模型箱外侧。所述3个激光器分别位于模型槽的三个侧面。所述3个激光器发射的激光在透明土中形成三个激光平面。所述3个工业相机的机拍摄方向分别位于三个激光平面的法线方向。
试验时,在模型试验箱内进行群桩沉桩挤土试验。依次安装对应连接件,电动加载装置驱动传动杆沿纵向运动,继而带动连接件将对应模型桩的桩顶挤入透明土中。所述工业相机实时记录透明土散斑场的变化。
进一步,所述光学平台上还布置有矩形滑轨。所述三个激光器中,两个活动连接在矩形滑轨上,一个活动连接在立柱上。所述三个工业相机中,两个活动连接在矩形滑轨上,一个活动连接在横梁下表面。
进一步,所述模型桩采用正方形或梅花形排列方式。
进一步,所述连接件整体为一个圆柱。
本发明的技术效果是毋庸置疑的:
A.实现桩周围土体变形的可视化测量,群桩沉桩也可以观测到后沉入桩对先前沉入桩的影响;
B.可通过多切面土体位移场测量,得到桩周土体变形的真实三维位移场;
C.采用激光器和相机在黑暗环境下对人工合成透明土内多个模型桩的沉桩过程进行观测记录,可较好的对桩体在土体内静压沉桩过程进行模拟,有很好的参考价值;
D.试验装置尺寸小,系统设置合理,试验操作方便。
附图说明
图1为试验装置结构示意图;
图2为加载板示意图;
图3为沉桩顺序示意图;
图中:试验台1、模型箱2、排水阀门201、激光发射器3、工业相机4、矩形相机轨道5、门形反力架6、立柱601、横梁602、透明土7、沉桩加载设备8、传动杆801、传力板802、连接孔8021、连接件9、透水石10、模型桩13。
具体实施方式
下面结合实施例对本发明作进一步说明,但不应该理解为本发明上述主题范围仅限于下述实施例。在不脱离本发明上述技术思想的情况下,根据本领域普通技术知识和惯用手段,做出各种替换和变更,均应包括在本发明的保护范围内。
实施例1:
参见图1,本实施例公开一种用于群桩沉桩挤土效应的透明土试验装置,包括布置在试验平台1上的透明模型箱2和门型反力架6,以及9个模型桩13、沉桩加载设备8和成像装置。
所述门型反力架6包括两根立柱601以及连接在两根立柱601之间的横梁602。所述横梁602上设置有预留孔洞。
所述透明模型箱2整体为一个上端敞口且内中空的矩形箱体。所述透明模型箱2的内腔底部布置有透水石10。所述透水石10上方填筑有透明土7。所述透明模型箱2的侧壁上设置有排水阀门201,用于土体固结排水。所述排水阀门201布置在对应于透水石10的位置处。所述透明模型箱2布置在横梁602下方。所述模型桩13按设计要求布设在透明土7中。所述模型桩13采用正方形或梅花形排列方式。所述模型桩13的桩顶伸出透明土7的上表面。所述模型桩13的材料折射率与透明土7的折射率一致,先前沉入的模型桩13不会对散斑平面上散斑点造成影响,可以实现土体内部变形的高精度实时测量,提高了试验结果的准确性。
参见图2,所述沉桩加载设备8包括传动杆801和传力板802。所述传动杆801的上端穿过横梁602的预留孔洞后与电动加载装置连接,下端与传力板802连接。所述传力板802的板面上设置有9个连接孔8021。所述连接孔8021的孔壁上设置有内螺纹。端头连接件9通过连接孔8021可拆卸地安装在传力板802的下板面。所述连接件9的位置与模型桩13的位置相对应。所述连接件9整体为一个圆柱。所述连接件9的上端设置有与连接孔8021内螺纹相匹配的外螺纹。通过拆卸连接件9实现依次沉桩。
所述成像装置包括3个激光器3和3个工业相机4。所述3个激光器3和3个工业相机4均位于透明模型箱2外侧。所述3个激光器3分别位于模型槽的三个侧面。所述光学平台1上还布置有矩形滑轨5。所述三个激光器3中,两个活动连接在矩形滑轨5上,一个活动连接在立柱601上。所述三个工业相机4中,两个活动连接在矩形滑轨5上,一个活动连接在横梁602下表面。所述3个激光器3发射的激光在透明土14中形成三个激光平面。所述3个工业相机4的机拍摄方向分别位于三个激光平面的法线方向。
参见图3,试验时,在模型试验箱2内进行群桩沉桩挤土试验。群桩沉桩挤土并不是所有桩一起沉入透明土内,而是一根一根分别沉入,以后也可以用本发明研究沉桩顺序对群桩挤土效应的影响。依次安装对应连接件9,电动加载装置驱动传动杆801沿纵向运动,继而带动连接件9将对应模型桩13的桩顶挤入透明土7中。所述工业相机4实时记录透明土散斑场的变化。经过软件分析,从而得到群桩沉桩挤土后土体三维变形特性。
值得说明的是,所述群桩沉桩挤土效应的透明土模型试验装置,尺寸可以根据研究需要进行调整,既可用于群桩挤土效应相关课题研究,也可作为教学仪器。
Claims (4)
1.一种用于群桩沉桩挤土效应的透明土试验装置,其特征在于:包括布置在试验平台(1)上的透明模型箱(2)和门型反力架(6),以及若干模型桩(13)、沉桩加载设备(8)和成像装置;
所述门型反力架(6)包括两根立柱(601)以及连接在两根立柱(601)之间的横梁(602);所述横梁(602)上设置有预留孔洞;
所述透明模型箱(2)整体为一个矩形箱体;所述透明模型箱(2)的内腔底部布置有透水石(10);所述透水石(10)上方填筑有透明土(7);所述透明模型箱(2)的侧壁上设置有若干个排水阀门(201);所述透明模型箱(2)布置在横梁(602)下方;所述模型桩(13)按设计要求布设在透明土(7)中;所述模型桩(13)的桩顶伸出透明土(7)的上表面;
所述沉桩加载设备(8)包括传动杆(801)和传力板(802);所述传动杆(801)的上端穿过横梁(602)的预留孔洞后与电动加载装置连接,下端与传力板(802)连接;所述传力板(802)的板面上设置有若干个连接孔(8021);端头连接件(9)通过连接孔(8021)可拆卸地安装在传力板(802)的下板面;所述连接件(9)的位置与模型桩(13)的位置相对应;
所述成像装置包括3个激光器(3)和3个工业相机(4);所述3个激光器(3)和3个工业相机(4)均位于透明模型箱(2)外侧;所述3个激光器(3)分别位于模型槽的三个侧面;所述3个激光器(3)发射的激光在透明土(14)中形成三个激光平面;所述3个工业相机(4)的机拍摄方向分别位于三个激光平面的法线方向;
试验时,在模型试验箱(2)内进行群桩沉桩挤土试验;依次安装对应连接件(9),电动加载装置驱动传动杆(801)沿纵向运动,继而带动连接件(9)将对应模型桩(13)的桩顶挤入透明土(7)中;所述工业相机(4)实时记录透明土散斑场的变化。
2.根据权利要求1所述的一种用于群桩沉桩挤土效应的透明土试验装置,其特征在于:所述光学平台(1)上还布置有矩形滑轨(5);所述三个激光器(3)中,两个活动连接在矩形滑轨(5)上,一个活动连接在立柱(601)上;所述三个工业相机(4)中,两个活动连接在矩形滑轨(5)上,一个活动连接在横梁(602)下表面。
3.根据权利要求1所述的一种用于群桩沉桩挤土效应的透明土试验装置,其特征在于:所述模型桩(13)采用正方形或梅花形排列方式。
4.根据权利要求1所述的一种用于群桩沉桩挤土效应的透明土试验装置,其特征在于:所述连接孔(8021)的孔壁上设置有内螺纹;所述连接件(9)整体为一个圆柱;所述连接件(9)的上端设置有与连接孔(8021)内螺纹相匹配的外螺纹;通过拆卸连接件(9)实现依次沉桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811312550.1A CN109339123A (zh) | 2018-11-06 | 2018-11-06 | 一种用于群桩沉桩挤土效应的透明土试验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811312550.1A CN109339123A (zh) | 2018-11-06 | 2018-11-06 | 一种用于群桩沉桩挤土效应的透明土试验装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109339123A true CN109339123A (zh) | 2019-02-15 |
Family
ID=65313857
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811312550.1A Pending CN109339123A (zh) | 2018-11-06 | 2018-11-06 | 一种用于群桩沉桩挤土效应的透明土试验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109339123A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110779669A (zh) * | 2019-09-18 | 2020-02-11 | 北京工业大学 | 重型机床基础排桩隔振形式可调的实验装置 |
CN111424732A (zh) * | 2020-03-21 | 2020-07-17 | 重庆大学 | 一种模拟群桩依次安装及负摩阻力全过程离心装置及方法 |
CN111424733A (zh) * | 2020-03-21 | 2020-07-17 | 重庆大学 | 基于土工离心机模拟群桩连续打桩及竖向加载的试验系统 |
CN111650027A (zh) * | 2020-05-20 | 2020-09-11 | 重庆大学 | 一种透明土石混合体的制备方法 |
CN113358531A (zh) * | 2021-06-28 | 2021-09-07 | 重庆大学 | 一种模拟地下挡墙结构对地下水渗流影响的透明土模型试验装置及其试验方法 |
CN113404098A (zh) * | 2021-06-10 | 2021-09-17 | 中国建筑第八工程局有限公司 | 沉桩模型试验装置及试验方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130067102A (ko) * | 2011-12-13 | 2013-06-21 | 주식회사 포스코 | 파일그룹의 수평재하시험장치 및 이를 사용한 수평재하시험방법 |
WO2015165138A1 (zh) * | 2014-04-30 | 2015-11-05 | 河海大学 | 一种透明冻土及其制备方法和应用 |
CN105044306A (zh) * | 2015-07-01 | 2015-11-11 | 重庆大学 | 一种桩承式路堤透明土模型试验装置和方法 |
CN105067511A (zh) * | 2015-09-02 | 2015-11-18 | 浙江大学城市学院 | 一种透明土模型桩试验测试装置及其使用方法 |
CN108508141A (zh) * | 2018-02-01 | 2018-09-07 | 重庆大学 | 一种桩承式加筋路堤三维变形场可视化试验装置及其试验方法 |
CN209620126U (zh) * | 2018-11-06 | 2019-11-12 | 重庆大学 | 一种用于群桩沉桩挤土效应的透明土试验装置 |
-
2018
- 2018-11-06 CN CN201811312550.1A patent/CN109339123A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130067102A (ko) * | 2011-12-13 | 2013-06-21 | 주식회사 포스코 | 파일그룹의 수평재하시험장치 및 이를 사용한 수평재하시험방법 |
WO2015165138A1 (zh) * | 2014-04-30 | 2015-11-05 | 河海大学 | 一种透明冻土及其制备方法和应用 |
CN105044306A (zh) * | 2015-07-01 | 2015-11-11 | 重庆大学 | 一种桩承式路堤透明土模型试验装置和方法 |
CN105067511A (zh) * | 2015-09-02 | 2015-11-18 | 浙江大学城市学院 | 一种透明土模型桩试验测试装置及其使用方法 |
CN108508141A (zh) * | 2018-02-01 | 2018-09-07 | 重庆大学 | 一种桩承式加筋路堤三维变形场可视化试验装置及其试验方法 |
CN209620126U (zh) * | 2018-11-06 | 2019-11-12 | 重庆大学 | 一种用于群桩沉桩挤土效应的透明土试验装置 |
Non-Patent Citations (4)
Title |
---|
周航等: "基于透明土的 XCC 桩沉桩挤土效应模型试验及其理论研究", 《土木工程学报》, vol. 50, no. 7, pages 99 - 109 * |
周航等: "基于透明土的XCC 桩沉桩挤土效应模型试验及其理论研究", 《土木工程学报》, vol. 50, no. 7, pages 99 - 109 * |
姜新新: "基于PIV 技术的 静压桩挤土效应的研究", 《中国优秀硕士学位论文全 文数据库(基础科学辑)》, no. 3, pages 11 - 18 * |
姜新新: "基于PIV技术的静压桩挤土效应的研究", 《中国优秀硕士学位论文全文数据库(基础科学辑)》, no. 3, pages 11 - 13 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110779669A (zh) * | 2019-09-18 | 2020-02-11 | 北京工业大学 | 重型机床基础排桩隔振形式可调的实验装置 |
CN110779669B (zh) * | 2019-09-18 | 2021-05-07 | 北京工业大学 | 重型机床基础排桩隔振形式可调的实验装置 |
CN111424732A (zh) * | 2020-03-21 | 2020-07-17 | 重庆大学 | 一种模拟群桩依次安装及负摩阻力全过程离心装置及方法 |
CN111424733A (zh) * | 2020-03-21 | 2020-07-17 | 重庆大学 | 基于土工离心机模拟群桩连续打桩及竖向加载的试验系统 |
CN111650027A (zh) * | 2020-05-20 | 2020-09-11 | 重庆大学 | 一种透明土石混合体的制备方法 |
CN113404098A (zh) * | 2021-06-10 | 2021-09-17 | 中国建筑第八工程局有限公司 | 沉桩模型试验装置及试验方法 |
CN113358531A (zh) * | 2021-06-28 | 2021-09-07 | 重庆大学 | 一种模拟地下挡墙结构对地下水渗流影响的透明土模型试验装置及其试验方法 |
CN113358531B (zh) * | 2021-06-28 | 2024-03-12 | 重庆大学 | 一种模拟地下挡墙结构对地下水渗流影响的透明土模型试验装置及其试验方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109339123A (zh) | 一种用于群桩沉桩挤土效应的透明土试验装置 | |
CN105696632B (zh) | 一种采动区桩基承载力透明土模型试验装置及试验方法 | |
CN104198276B (zh) | 土工合成材料大型可视化拉拔试验设备 | |
CN108490152B (zh) | 一种新型模拟隧道开挖的透明土模型试验装置及其试验方法 | |
CN107247128B (zh) | 实时量测降雨条件下牵引式滑坡滑动过程的模型试验装置 | |
CN107179396A (zh) | 多功能拼装式岩土工程物理相似试验系统 | |
CN108086369B (zh) | 不同嵌岩深度下桩土共同作用位移应力测量装置和方法 | |
CN209620126U (zh) | 一种用于群桩沉桩挤土效应的透明土试验装置 | |
CN107063883A (zh) | 一种土力学多功能联合试验装置及试验方法 | |
CN109374856A (zh) | 观测透明土模型内部三维空间变形的试验装置及使用方法 | |
CN103967057A (zh) | 一种沉桩过程中土体位移场可视化试验装置及使用方法 | |
CN103968774A (zh) | 一种取土过程中土体内部位移测量模型试验装置及其使用方法 | |
CN107621524A (zh) | 一种模拟隧道开挖变形的透明土模型试验装置和试验方法 | |
RU2421705C2 (ru) | Способ лабораторного определения прочности и деформируемости материалов под контролируемой трехосной нагрузкой и устройство для его осуществления | |
CN109868849A (zh) | 一种桩土相互作用可视化试验装置及其试验方法 | |
CN108508141A (zh) | 一种桩承式加筋路堤三维变形场可视化试验装置及其试验方法 | |
CN107227759A (zh) | 一种模拟土体侧移的透明土模型试验装置及其试验方法 | |
CN108007800A (zh) | 一种循环动载土体沉降的模型试验装置及试验方法 | |
AT519477B1 (de) | Vorrichtung und verfahren zur flexibilitätsprüfung von bituminös gebundenen dichtschichten | |
CN103698493A (zh) | 一种岩土材料多场耦合多尺度宏细观试验机 | |
CN108444885B (zh) | 隧道充填结构渗流、侵蚀与应力耦合失稳试验装置与方法 | |
CN101514978B (zh) | 一种研究土体渗透性破坏现象的试验方法及其试验装置 | |
CN113804560B (zh) | 一种非饱和土与结构物界面剪切可视化试验装置及方法 | |
CN206385578U (zh) | 桩土接触面土颗粒细观运动测量装置 | |
CN108445183B (zh) | 一种双孔交叉隧道透明土模型试验装置及其试验方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |