CN109327350A - A kind of batch carries out the method and apparatus and system of terminal test - Google Patents
A kind of batch carries out the method and apparatus and system of terminal test Download PDFInfo
- Publication number
- CN109327350A CN109327350A CN201811044481.0A CN201811044481A CN109327350A CN 109327350 A CN109327350 A CN 109327350A CN 201811044481 A CN201811044481 A CN 201811044481A CN 109327350 A CN109327350 A CN 109327350A
- Authority
- CN
- China
- Prior art keywords
- router
- measured
- terminal
- test
- roll
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/12—Network monitoring probes
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/50—Testing arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04M—TELEPHONIC COMMUNICATION
- H04M1/00—Substation equipment, e.g. for use by subscribers
- H04M1/24—Arrangements for testing
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/16—Discovering, processing access restriction or access information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/10—Connection setup
- H04W76/11—Allocation or use of connection identifiers
Abstract
The invention discloses method and apparatus and system that a kind of batch carries out terminal test, the system includes at least one terminal, at least one the first router, at least one the second router and a test control end to be measured, wherein: test control end is that each the first router selects corresponding Termination ID to be measured, its corresponding Termination ID to be measured is indicated to terminal to be measured, terminal to be measured is established connection with corresponding the second router and is tested, after test, each Termination ID to be measured for completing test is deleted;The first router, the Termination ID to be measured for selecting test control end are indicated to terminal to be measured;The second router, for establishing connection with corresponding terminal to be measured;Terminal to be measured when receiving the instruction of any the first router, establishes connection with corresponding the second router, when receiving the instruction for closing hot spot scanning function, closes hot spot.The present invention realizes that automation is called the roll and tests that the test signal interference between each terminal substantially reduces.
Description
Technical field
The present invention relates to equipment the field of test technology more particularly to a kind of batch carry out terminal test method and apparatus and
System.
Background technique
With the development of mobile phone products, the senile experiment of mobile phone provides new detection method to the reliability of mobile phone.For
Increase by one of critical process that reliability many factory commercial cities manufacture aging as mobile phone.Aging has following two at present
Scheme:
1) USB hub handover scheme
USB connection is carried out to mobile phone by specific USB HUB, USBHUB is switched to and to be led to manually when needing to communicate
The mobile phone of news, is communicated, and communication completes that mobile phone is manually switched to charger charge mode again.
But this scheme is at high cost, HUB control function is complicated, and design debugging cycle is long.
2) WIFI hot spot communication plan
All mobile phones are opened into mobile phone hotspot pattern simultaneously, the end PC Target Wireless router is connected to, passes through Target Wireless
The WIFI hot spot of router scans communicates all mobile phones one by one.
And router could support up 255 connections, router excessively will lead to communication and generate biggish interference, communication quality
Decline.
It can be seen that existing testing scheme, if the network architecture is complicated and artificial participation is needed to cut using wired connection mode
It changes, if all mobile phones wirelessly carry out test there are interfering between data, although not needing simultaneously using wireless mode
It artificially participates in but the network architecture not enough simplifies.
Summary of the invention
The present invention provides method and apparatus and system that a kind of batch carries out terminal test, for solving in ageing process
Data upload and interference problem.
In a first aspect, the system includes that at least one is waited for the present invention provides the system that a kind of batch carries out terminal test
Survey terminal, at least one the first router, at least one the second router and a test control end, in which:
The test control end is each the first router from the ID list comprising each terminal identity mark ID to be measured
Select corresponding Termination ID to be measured;The corresponding Termination ID to be measured of the first router is indicated to unlatching by each the first router
The terminal to be measured of hot spot scanning function, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal with it is corresponding
The second router establish connection;It is communicated with corresponding by roll-call terminal by the second router, executes test process;Any
After by the test of roll-call terminal, indicate that this closes hot spot scanning function by roll-call terminal by corresponding the second router,
And the ID by roll-call terminal is deleted from ID list;
At least one the first router, for being the Termination ID to be measured of the first router selection by the test control end
It is indicated to the terminal to be measured for opening hot spot scanning function;
At least one the second router executes the test control end for establishing connection by roll-call terminal with corresponding
With the corresponding communication by roll-call terminal;
At least one terminal to be measured, each terminal to be measured opens hot spot scanning function when initial, according to each the first router
Instruction, when determining that the ID of the terminal to be measured is instructed to, the second router corresponding with the terminal to be measured establishes connection, and passes through
The corresponding the second router is communicated with test control end executes test process, receives from the pass of the testing and control
When closing the instruction of hot spot scanning function, hot spot scanning function is closed.
Second aspect, the present invention provides a kind of methods that batch carries out terminal test, this method comprises:
From the ID list comprising each terminal identity mark ID to be measured, corresponding end to be measured is selected for each the first router
Hold ID;
The corresponding Termination ID to be measured of the first router is indicated to by each the first router and opens hot spot scanning function
The terminal to be measured of energy, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal and corresponding secondary route
Device establishes connection;
It is communicated with corresponding by roll-call terminal by the second router, executes test process;
After any test by roll-call terminal, indicate that this is closed by roll-call terminal by corresponding the second router
Hot spot scanning function, and each ID by roll-call terminal is deleted from ID list.
The third aspect, the present invention provides a kind of test methods applied to terminal, this method comprises:
Open hot spot scanning function;
According to the corresponding Termination ID to be measured of each the first router that the first router indicates, the Termination ID quilt to be measured is determined
When instruction, connection is established with corresponding the second router as by roll-call terminal;
It is communicated by the corresponding the second router with test control end, executes test process;
By the corresponding the second router, the closing hot spot scanning function of receiving from the test control end refers to
When showing, hot spot scanning function is closed.
Fourth aspect, the present invention provides the devices that a kind of batch carries out terminal test, this method comprises:
ID configuration unit, for being each the first router from the ID list comprising each terminal identity mark ID to be measured
Select corresponding Termination ID to be measured;
Indicating unit, for being indicated to out the corresponding Termination ID to be measured of the first router by each the first router
Open the terminal to be measured of hot spot scanning function, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal with it is right
The second router answered establishes connection;
Test cell executes test process for being communicated with corresponding by roll-call terminal by the second router;
Indicating unit is closed, for referring to after any test by roll-call terminal by corresponding the second router
Show that this closes hot spot scanning function by roll-call terminal, and each ID by roll-call terminal is deleted from ID list.
5th aspect, the present invention provides a kind of terminals to be measured tested, comprising:
Opening unit is scanned, for opening hot spot scanning function;
Connection establishment unit, the corresponding Termination ID to be measured of each the first router for being indicated according to the first router, really
When fixed Termination ID to be measured is instructed to, connection is established with corresponding the second router as by roll-call terminal;
Test cell executes test process for communicating by the second router with test control end;
Hot spot closing unit passes through correspondence for receiving test control end after the test by roll-call terminal
The second router send closing hot spot scanning function instruction, close hot spot scanning function.
Using a kind of method and apparatus and system of batch progress terminal test provided by the invention, including at least one is waited for
Terminal, at least one the first router, at least one the second router and a test control end are surveyed, each the first router is passed through
It can determine whether each Termination ID to be measured is instructed to, and determine that can each terminal to be measured as by roll-call terminal and corresponding second
Router establishes connection, is communicated with corresponding by roll-call terminal by the second router, executes test process, in conclusion this
Invention has following advantageous effects:
In a first aspect, the system simplifies system architecture, only need at least one terminal to be measured, at least one first via by
Device, at least one the second router and a test control end;
Second aspect, each terminal to be measured open hot spot scanning function, establish connection with corresponding the second router, by the
Two routers are communicated with corresponding terminal, execute test process, this test process is wireless mode, therefore uses electricity in the terminal
Can also be tested simultaneously when the line charge electricity of source, avoid using terminal in wired test process cannot and meanwhile in the charge state
The drawbacks of being tested;
The third aspect, the corresponding terminal to be measured for the first router that each terminal to be measured is indicated according to the first router
ID when determining that terminal self ID to be measured is instructed to, establishes connection with corresponding the second router as by roll-call terminal, passes through
Two routers are communicated with test control end, execute test process, and to sum up, the present invention can guarantee terminal to be measured according to certain suitable
Sequence establishes connection with the second router in batches, and router could support up 255 connections, therefore, the second tunnel in the present invention
255 integral multiple terminals can be connected simultaneously by device to be tested, and open simultaneously hot spot function company without generating great amount of terminals
The problem of data interference problem caused by when connecing the second router or poor communications quality.
Detailed description of the invention
Fig. 1 is the system distribution map that a kind of batch carries out terminal test;
Fig. 2 is the test control end flow chart that a kind of batch carries out terminal test;
Fig. 3 is a kind of method flow diagram of batch progress terminal test applied to test control end;
Fig. 4 is a kind of test method flow chart applied to terminal;
The step of Fig. 5 is a kind of test method applied to terminal to be measured is schemed;
Fig. 6 is the device figure that a kind of batch carries out terminal test;
Fig. 7 is a kind of terminal module figure to be measured tested.
Specific embodiment
It is inadequate using the interference of terminal communication data and the network architecture when wireless mode in order to solve batch aging test process
Simplified problem, the embodiment of the invention provides method and apparatus and system that a kind of batch carries out terminal test.
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into
It is described in detail to one step, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole implementation
Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts
All other embodiment, shall fall within the protection scope of the present invention.
Embodiment one
The embodiment of the invention provides the systems that a kind of batch carries out terminal test, as shown in Figure 1, waiting for including at least one
Survey terminal, at least one the first router, at least one the second router and a test control end, in which:
Above-mentioned test control end is each the first router from the ID list comprising each terminal identity mark ID to be measured
Select corresponding Termination ID to be measured;The corresponding Termination ID to be measured of the first router is indicated to unlatching by each the first router
The terminal to be measured of hot spot scanning function, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal with it is corresponding
The second router establish connection;It is communicated with corresponding by roll-call terminal by the second router, executes test process;Any
After by the test of roll-call terminal, indicate that this closes hot spot scanning function by roll-call terminal by corresponding the second router,
And the ID by roll-call terminal is deleted from ID list;
In an implementation, test control end for control the first router pair terminal to be measured corresponding with the first router into
Row roll-call function, the terminal to be measured called the roll are connected automatically to the second router, and test control end is implemented by the second router
Test to terminal to be measured.
In an implementation, test control end can be according to the number of the current terminal to be measured for implementing test by the second router
Amount determines the quantity of terminal to be measured newly called the roll, specifically, the quantity for the terminal to be measured newly called the roll with currently testing
Terminal to be measured the sum of quantity, the maximum quantity for the terminal to be measured that can be connected for the second router.Test control end can be with
Separated in time is that the first router configures primary corresponding ID, can also be the last with postponing in distance, and instruction is closed
The quantity of terminal to be measured of hot spot scanning when reaching predetermined quantity, configure primary corresponding ID for the first router.It can select
It selects any one the first router and configures corresponding ID.
At least one the first router, for being the Termination ID to be measured of the first router selection by the test control end
It is indicated to the terminal to be measured for opening hot spot scanning function;
In an implementation, the first router is configured with corresponding end to be measured in test control end as roll-call router for it
After holding ID, configured Termination ID to be measured is indicated to all terminals to be measured for opening hot spot scanning functions, is realized to configuring
The corresponding terminal to be measured of Termination ID to be measured roll-call.
The terminal to be measured for opening hot spot scanning function, can scan the correlated characteristic information of the first router, as one
Kind preferred embodiment, will be able to be each by the correlated characteristic information for the first router that can be scanned by terminal to be measured
The ID of the first router selection is indicated to the terminal to be measured for opening hot spot scanning function.It is, of course, also possible to pass through other instruction sides
Formula is indicated to terminal to be measured.
At least one the second router executes above-mentioned test control end for establishing connection by roll-call terminal with corresponding
With the above-mentioned corresponding communication by roll-call terminal;
At least one terminal to be measured, when beginning, each terminal to be measured opened hot spot scanning function, according to each the first router
Instruction, when determining that the ID of the terminal to be measured is instructed to, the second router corresponding with the terminal to be measured establishes connection, and by pair
The second router answered is communicated with test control end executes test process, receives the closing hot spot from the testing and control
When the instruction of scanning function, hot spot scanning function is closed.
In an implementation, the terminal to be measured for opening hot spot scanning function, does not establish connection with any router before not calling the roll, only
It opens hot spot scanning function to be scanned, when being called the roll by any the first router, by roll-call terminal according to configuration automatically with the
Two routers establish connection, so that test control end be enable to execute test process with by roll-call terminal by the second router.
The system that above-mentioned batch provided in an embodiment of the present invention carries out terminal test, the role of router is classified,
One kind is implemented to call the roll towards all terminals to be measured, and one kind terminal that is only oriented to be called the roll is tested, and on the one hand eliminates and cuts manually
The complicated processes set are changed, on the other hand, carry out terminal test in batches both can simplify the framework of test macro, that is, subtract
The quantity of few router, does not need to determine router quantity according to the quantity of all terminals to be measured, on the other hand, due to while into
The terminal quantity of row wireless test is reduced, and the test signal interference between each terminal substantially reduces.
As a kind of possible preferred embodiment, above-mentioned test control end, for that will be what each the first router selected
The ID of terminal to be measured is configured in the correlated characteristic information of the first router, and the correlated characteristic information of the first router can
The terminal to be measured scanning for being turned on hot spot scanning function is arrived;
The terminal to be measured for opening hot spot scanning function, passes through hot spot scanning functionality scan to the correlation of each the first router
When in characteristic information including the test Termination ID, connection is established with corresponding the second router as by roll-call terminal.
In an implementation, test control end successively can be configured each ID by ID tab sequential wireless in any the first router
In network name SSID, by way of controlling the first router and restarting, by the corresponding Termination ID to be measured of the first router
Be indicated to open hot spot scanning function terminal to be measured so that each terminal hot spot scanning to be measured to the first via containing self ID by
It when device wireless network name SSID, that is, can determine that self ID is instructed to, built as by roll-call terminal with corresponding the second router
Vertical connection, wherein the SSID of the second router is stored in advance in each terminal connection network list, passes through second by roll-call terminal
Router SSID and the second router establish connection.
In an implementation, above-mentioned Termination ID to be measured be terminal to be measured device id or above-mentioned Termination ID to be measured be to
Survey the equipment component identification number of the unique identification terminal to be measured in the device id of terminal.
Above-mentioned test control end is the selected Termination ID to be measured of each the first router as a preferred implementation manner,
Quantity is the byte length of the first router title divided by the byte length of above-mentioned Termination ID title to be measured.If obtaining result
It is not integer, the quantity for the router that the first router can call the roll every time can be determined by the way of being rounded downwards.
As a kind of possible preferred embodiment, the quantity of the first router is multiple, secondary route in the present embodiment
The quantity of device is one, at most connect 255 terminals to be measured with the second router, the first router once at most roll-call 8 to
Survey terminal for, can suitably increase the first via by quantity, increase the speed of roll-call;Alternatively, the quantity of the first router is
One, the quantity of the second router is one, 255 terminals to be measured is at most connected with the second router, the first router is primary
For 8 terminals to be measured of at most calling the roll, due to calling the roll in such a way that the first router is restarted, roll-call speed is enough
Fastly, a first router can only be arranged to call the roll.
The terminal to be measured corresponding is stored in advance at least one above-mentioned terminal to be measured as a preferred implementation manner,
The wireless network name SSID of two routers, the terminal to be measured is using the SSID of corresponding the second router as by roll-call terminal
Connection is established with corresponding the second router.
In possible embodiment, above-mentioned test process is burn-in test process.It is, of course, also possible to be applied to other needs
It is connect with test control end and executes test process, it is especially desirable to the scene that the to be measured terminal bigger to quantity is tested.
Below to be illustrated for carrying out the system of terminal test in batches, which includes 1000 terminals to be measured, one
A the first router, a second router and a test control end carry out batch survey using the system as shown in connection with fig. 2
The process of examination is as follows:
Step 201, determine whether the ID list comprising each terminal identity mark ID to be measured is empty, if so, executing step
209, otherwise, execute step 202;
Step 202, test control end is from the ID list comprising each terminal identity to be measured mark ID, by ID tab sequential according to
It is secondary to select corresponding Termination ID to be measured for the first router;
Specifically, the ID of 1000 terminals to be measured to be stored in ID list to the word, it is specified that Termination ID title to be measured in advance
Section length be 4 bytes, in general, the byte length of the first router title be 32, then above-mentioned test control end be the first via by
The selected Termination ID quantity to be measured of device is the byte length of the first router title divided by above-mentioned Termination ID title to be measured
Byte length, i.e., 8.Test control end chooses 8 Termination ID to be measured from ID list, as it is corresponding with the first router to
Termination ID is surveyed, 8 terminals to be measured selected is equivalent at this time and has begun waiting the first router to each terminal roll-call to be measured;
Step 203, the corresponding Termination ID to be measured of the first router is indicated to and opens hot spot scanning function by test control end
Terminal to be measured so that each terminal to be measured, which is used as, by roll-call terminal establishes connection with corresponding the second router.
Specifically, test control end configures each Termination ID to be measured selected in order in the first router wireless network name
Claim to contain the ID of 8 terminals to be measured in that is, at this time SSID of the first router in SSID, by controlling the first router weight
Open, allow each terminal hot spot scanning to be measured to the first router SSID containing self ID when can determine that self ID is instructed to, this
When each terminal to be measured just called the roll, establish connection as by roll-call terminal and the second router, and record connection quantity;
Step 204, judge whether the quantity that the second router has connected is equal to the maximum that the second router can connect
Value.
Specifically, can be connected most when the connection quantity of each terminal to be measured and the second router is not up to the second router
When big value, step 201 is executed, continues to choose Termination ID to be measured;When the connection quantity of each terminal to be measured and the second router reaches
When the maximum value that the second router can connect, step 205 is executed, that is, stops choosing Termination ID to be measured from ID list.
Step 206, test control end judges whether establish connection by roll-call terminal and the second router;
If establishing connection, 207 are thened follow the steps, if not setting up connection, thens follow the steps 206;
Specifically, control the first router restart after, each terminal hot spot scanning to be measured to the first via containing self ID by
It when device wireless network name SSID, that is, can determine that each terminal to be measured is called the roll, connect corresponding second tunnel as by roll-call terminal
By the wireless network name SSID of device, connection is established with the second router, wherein the SSID of the second router is stored in advance in respectively
In terminal network list.
Step 207, test control end is communicated with corresponding by roll-call terminal by the second router, executes test process;
Step 208, judge whether completed to test by roll-call terminal;
If completing test, 209 are thened follow the steps, if not completing test, thens follow the steps 208;
Step 209, what instruction was completed to test closes hot spot scanning function by roll-call terminal, and by this respectively by roll-call terminal
ID is deleted from ID list;
Specifically, indicating each called the roll eventually by corresponding the second router after each test by roll-call terminal
Hot spot scanning function is closed at end, and each ID by roll-call terminal is deleted from ID list.
Step 210, it detects when there is no Termination ID to be measured in ID list, illustrates that terminals to be measured all at this time have been completed to survey
Examination, test terminate.
Embodiment two
The system that the batch provided based on the above embodiment carries out terminal test, the present embodiment provides one kind to be applied to test
The method that the batch of control terminal carries out terminal test, as shown in Figure 3, comprising:
Step 301, it from the ID list comprising each terminal identity mark ID to be measured, is corresponded to for the selection of each the first router
Termination ID to be measured;
Step 302, the corresponding Termination ID to be measured of the first router is indicated to by unlatching heat by each the first router
The terminal to be measured of spot scan function, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal with it is corresponding
The second router establishes connection;
Step 303, it is communicated with corresponding by roll-call terminal by the second router, executes test process;
Step 304, after test any by roll-call terminal, indicate that this is called the roll by corresponding the second router
Terminal closes hot spot scanning function, and each ID by roll-call terminal is deleted from ID list.
The corresponding Termination ID to be measured of the first router is referred to by each the first router as a preferred implementation manner,
Show to the terminal to be measured for opening hot spot scanning function, comprising:
The Termination ID to be measured that the first router is selected configures in the correlated characteristic information of the first router, this
The terminal to be measured scanning that the correlated characteristic information of one router can be turned on hot spot scanning function is arrived.
The corresponding Termination ID to be measured of the first router is referred to by each the first router as a preferred implementation manner,
Show to the terminal to be measured for opening hot spot scanning function, comprising:
The ID of the terminal to be measured selected for each the first router is configured after the title of the first router, instruction should
The first router is restarted, and the corresponding Termination ID to be measured of the first router is indicated to the end to be measured for opening hot spot scanning function
End.
Termination ID to be measured is the device id or Termination ID to be measured of terminal to be measured as a preferred implementation manner,
For the equipment component identification number of the unique identification terminal to be measured in the device id of terminal to be measured.
The specific embodiment of above steps, the function description of test control end, no longer superfluous here in reference implementation example 1
It states.
Embodiment three
The system that the batch provided based on the above embodiment carries out terminal test, the present embodiment provides one kind applied to be measured
The test method of terminal, as shown in Figure 4, comprising:
Step 401, hot spot scanning function is opened;
Step 402, the corresponding Termination ID to be measured of each the first router indicated according to the first router, determines terminal to be measured
When ID is instructed to, connection is established with corresponding the second router as by roll-call terminal;
Step 403, it is communicated by corresponding the second router with test control end, executes test process;
Step 404, by corresponding the second router, the closing hot spot scanning function from the test control end is received
When can indicate, hot spot scanning function is closed.
It is scanned in the correlated characteristic information of one of the first router as a preferred implementation manner, and includes
When the test Termination ID, determine that Termination ID to be measured is instructed to.
Termination ID to be measured is the device id or Termination ID to be measured of terminal to be measured as a preferred implementation manner,
For the equipment component identification number of the unique identification terminal to be measured in the device id of terminal to be measured.
The wireless network name of the corresponding the second router of terminal to be measured is stored in advance as a preferred implementation manner,
SSID;Wherein, using and the SSID of the corresponding the second router of terminal to be measured establish connection with corresponding the second router.
The following detailed description of a kind of test method applied to terminal to be measured, as shown in Figure 5, the specific steps are as follows:
Step 501, terminal opens hot spot scanning function, scans the wireless network name SSID of the first router;
Step 502, the corresponding Termination ID to be measured of each the first router indicated according to the first router, judges terminal to be measured
Whether ID is instructed to.
Specifically, when terminal to be measured scanning includes the Termination ID to be measured into the title of above-mentioned the first router, it should be to
It surveys terminal to be instructed to, executes step 503, if terminal to be measured scanning is not to be measured comprising this into the title of above-mentioned the first router
When Termination ID, step 501 is executed, continues the wireless network name SSID of hot spot scanning the first router.
Step 503, connection is established with corresponding the second router as by roll-call terminal;
Step 504, terminal is communicated by the second router with test control end, executes test process;
Step 505, judge whether terminal receives the test termination instruction of test control end transmission;
If receiving test termination instruction, step 506 is executed, if not receiving test termination instruction, executes step 505;
Step 506, terminal closes hot spot scanning function;
Specifically, receiving test control end after the above-mentioned test termination instruction by roll-call terminal, pass through corresponding second
The closing hot spot scanning function instruction that router is sent, closes hot spot scanning function.
Example IV
A kind of device of batch progress terminal test is provided, as shown in Figure 6, comprising:
ID configuration unit 601, for from the ID list comprising each terminal identity to be measured mark ID, be each first via by
Device selects corresponding Termination ID to be measured;
Indicating unit 602, for being indicated the corresponding Termination ID to be measured of the first router by each the first router
To the terminal to be measured for opening hot spot scanning function, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal
Connection is established with corresponding the second router;
Test cell 603 executes test process for being communicated with corresponding by roll-call terminal by the second router;
Indicating unit 604 is closed, for passing through corresponding the second router after any test by roll-call terminal
It indicates that this closes hot spot scanning function by roll-call terminal, and each ID by roll-call terminal is deleted from ID list.
Embodiment five
A kind of terminal to be measured tested is provided, as shown in fig. 7, comprises:
Opening unit 701 is scanned, for opening hot spot scanning function;
Connection establishment unit 702, the corresponding Termination ID to be measured of each the first router for being indicated according to the first router,
When determining that the Termination ID to be measured is instructed to, connection is established with corresponding the second router as by roll-call terminal;
Test cell 703, for being communicated by the corresponding the second router with test control end, execution was tested
Journey;
Hot spot closing unit 704, for receiving from the test control end by the corresponding the second router
Closing hot spot scanning function instruction when, close hot spot scanning function.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more,
The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.)
Formula.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (14)
1. the system that a kind of batch carries out terminal test, which is characterized in that at least one terminal to be measured, at least one first via by
Device, at least one the second router and a test control end, in which:
The test control end is selected from the ID list comprising each terminal identity mark ID to be measured for each the first router
Corresponding Termination ID to be measured;The corresponding Termination ID to be measured of the first router is indicated to unlatching hot spot by each the first router
The terminal to be measured of scanning function, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal and corresponding
Two routers establish connection;It is communicated with corresponding by roll-call terminal by the second router, executes test process;Any by point
After the test of name terminal, indicate that this closes hot spot scanning function by roll-call terminal by corresponding the second router, and will
The ID by roll-call terminal is deleted from ID list;
At least one the first router, for indicating the Termination ID to be measured that the test control end is the first router selection
To the terminal to be measured for opening hot spot scanning function;
At least one the second router executes the test control end and institute for establishing connection by roll-call terminal with corresponding
State the corresponding communication by roll-call terminal;
At least one terminal to be measured, each terminal to be measured opens hot spot scanning function when initial, according to the finger of each the first router
Show, when determining that the ID of the terminal to be measured is instructed to, the second router corresponding with the terminal to be measured establishes connection, and by described
Corresponding the second router is communicated with test control end executes test process, receives the closing heat from the testing and control
When the instruction of spot scan function, hot spot scanning function is closed.
2. system according to claim 1, which is characterized in that
The test control end, the ID for that will be the terminal to be measured that each the first router selects are configured in the first router
In correlated characteristic information, the terminal to be measured that the correlated characteristic information of the first router can be turned on hot spot scanning function is swept
It retouches;
The terminal to be measured for opening hot spot scanning function, passes through hot spot scanning functionality scan to each the first router
When in correlated characteristic information including the test Termination ID, connection is established with corresponding the second router as by roll-call terminal.
3. system according to claim 2, which is characterized in that
The correlated characteristic information of each the first router is the title of each the first router, the test control end
ID specifically for that will be the terminal to be measured that each the first router selects is configured after the title of the first router, and instruction should
The first router is restarted, and the corresponding Termination ID to be measured of the first router is indicated to the end to be measured for opening hot spot scanning function
End.
4. system according to claim 1, which is characterized in that
The quantity of the first router be it is multiple, the quantity of the second router is one;Or
The quantity of the first router is one, and the quantity of the second router is one.
5. system according to claim 1, which is characterized in that
The wireless network name of the corresponding the second router of the terminal to be measured is stored in advance at least one described terminal to be measured
SSID establishes connection with corresponding the second router using the SSID of the corresponding the second router as by roll-call terminal.
6. system according to claim 1, which is characterized in that the test process is burn-in test process.
7. a kind of method that batch carries out terminal test, which is characterized in that this method comprises:
From the ID list comprising each terminal identity mark ID to be measured, corresponding terminal to be measured is selected for each the first router
ID;
The corresponding Termination ID to be measured of the first router is indicated to by each the first router and opens hot spot scanning function
Terminal to be measured when so that each terminal to be measured determining that self ID is instructed to, is built as by roll-call terminal with corresponding the second router
Vertical connection;
It is communicated with corresponding by roll-call terminal by the second router, executes test process;
After any test by roll-call terminal, indicate that this closes hot spot by roll-call terminal by corresponding the second router
Scanning function, and each ID by roll-call terminal is deleted from ID list.
8. the method according to the description of claim 7 is characterized in that by each the first router that the first router is corresponding
Termination ID to be measured is indicated to the terminal to be measured for opening hot spot scanning function, comprising:
The Termination ID to be measured that the first router is selected configures in the correlated characteristic information of the first router, and described first
The terminal to be measured scanning that the correlated characteristic information of router can be turned on hot spot scanning function is arrived.
9. according to the method described in claim 8, it is characterized in that,
The correlated characteristic information of each the first router be each the first router title, by each first via by
The corresponding Termination ID to be measured of the first router is indicated to the terminal to be measured for opening hot spot scanning function by device, comprising:
The ID of the terminal to be measured selected for each the first router is configured after the title of the first router, indicate this first
Router is restarted, and the corresponding Termination ID to be measured of the first router is indicated to the terminal to be measured for opening hot spot scanning function.
10. a kind of test method applied to terminal to be measured, which is characterized in that this method comprises:
Open hot spot scanning function;
According to the corresponding Termination ID to be measured of each the first router that the first router indicates, determine that the Termination ID to be measured is instructed to
When, connection is established with corresponding the second router as by roll-call terminal;
It is communicated by the corresponding the second router with test control end, executes test process;
By the corresponding the second router, the closing hot spot scanning function instruction from the test control end is received
When, close hot spot scanning function.
11. according to the method described in claim 10, it is characterized in that,
According to the corresponding Termination ID to be measured of each the first router of the first router instruction, determine that Termination ID to be measured is instructed to,
Include:
When scanning in the correlated characteristic information of one of the first router comprising the test Termination ID, end to be measured is determined
End ID is instructed to.
12. according to the method described in claim 10, it is characterized by further comprising:
The wireless network name SSID of the corresponding the second router of the terminal to be measured is stored in advance;
Wherein, using and the SSID of the corresponding the second router of the terminal to be measured establish connection with corresponding the second router.
13. the device that a kind of batch carries out terminal test, which is characterized in that this method comprises:
ID configuration unit, for being selected for each the first router from the ID list comprising each terminal identity mark ID to be measured
Corresponding Termination ID to be measured;
Indicating unit, for the corresponding Termination ID to be measured of the first router to be indicated to unlatching heat by each the first router
The terminal to be measured of spot scan function, when so that each terminal to be measured determining that self ID is instructed to, as by roll-call terminal with it is corresponding
The second router establishes connection;
Test cell executes test process for being communicated with corresponding by roll-call terminal by the second router;
Indicating unit is closed, it, should by the instruction of corresponding the second router for after any test by roll-call terminal
Hot spot scanning function is closed by roll-call terminal, and each ID by roll-call terminal is deleted from ID list.
14. a kind of terminal to be measured tested characterized by comprising
Opening unit is scanned, for opening hot spot scanning function;
Connection establishment unit, the corresponding Termination ID to be measured of each the first router for being indicated according to the first router, determines institute
When stating Termination ID to be measured and being instructed to, connection is established with corresponding the second router as by roll-call terminal;
Test cell executes test process for communicating by the corresponding the second router with test control end;
Hot spot closing unit, for receiving the closing from the test control end by the corresponding the second router
When hot spot scanning function indicates, hot spot scanning function is closed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811044481.0A CN109327350B (en) | 2018-09-07 | 2018-09-07 | Method, device and system for carrying out terminal test in batch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811044481.0A CN109327350B (en) | 2018-09-07 | 2018-09-07 | Method, device and system for carrying out terminal test in batch |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109327350A true CN109327350A (en) | 2019-02-12 |
CN109327350B CN109327350B (en) | 2021-07-27 |
Family
ID=65263945
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811044481.0A Active CN109327350B (en) | 2018-09-07 | 2018-09-07 | Method, device and system for carrying out terminal test in batch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109327350B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110572839A (en) * | 2019-09-06 | 2019-12-13 | Oppo(重庆)智能科技有限公司 | Test method and test system |
CN111508550A (en) * | 2020-04-16 | 2020-08-07 | 苏州浪潮智能科技有限公司 | Nand Flash test method, system and device |
CN112929905A (en) * | 2021-01-28 | 2021-06-08 | 博为科技有限公司 | Wireless network equipment testing method and device |
CN113311354A (en) * | 2021-05-28 | 2021-08-27 | 深圳市飞腾云科技有限公司 | Lamp strip double-hotspot production and measurement configuration method |
CN113709795A (en) * | 2021-08-24 | 2021-11-26 | 深圳艾创力科技有限公司 | Method, device and storage medium for detecting Bluetooth transmission speed |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101651502A (en) * | 2009-09-23 | 2010-02-17 | 深圳华为通信技术有限公司 | Calibration test method, device and system |
CN101783708A (en) * | 2010-01-21 | 2010-07-21 | 哈尔滨工业大学 | Wireless parallel test system and test method based on ZigBee |
CN104007340A (en) * | 2014-05-21 | 2014-08-27 | 杭州互诚控制技术有限公司 | Electronic product aging test system and aging test method |
CN104022921A (en) * | 2014-06-26 | 2014-09-03 | 北京安兔兔科技有限公司 | Method and device for testing performance of device |
US20140247340A1 (en) * | 2013-03-04 | 2014-09-04 | iStoc Oy | Test management |
CN104717337A (en) * | 2015-04-03 | 2015-06-17 | 杭州昕云信息科技有限公司 | Method for testing mobile application in batch and equipment used in method |
CN104968007A (en) * | 2015-07-31 | 2015-10-07 | 小米科技有限责任公司 | Test method and device of intelligent device |
CN107548083A (en) * | 2017-07-31 | 2018-01-05 | 歌尔科技有限公司 | WAP function test method and equipment |
CN108055209A (en) * | 2017-12-26 | 2018-05-18 | 温岭卓致智能科技有限公司 | A kind of router batch terminal upgrading method and system |
CN108174405A (en) * | 2017-12-22 | 2018-06-15 | 歌尔科技有限公司 | Product test method and apparatus |
-
2018
- 2018-09-07 CN CN201811044481.0A patent/CN109327350B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101651502A (en) * | 2009-09-23 | 2010-02-17 | 深圳华为通信技术有限公司 | Calibration test method, device and system |
CN101783708A (en) * | 2010-01-21 | 2010-07-21 | 哈尔滨工业大学 | Wireless parallel test system and test method based on ZigBee |
US20140247340A1 (en) * | 2013-03-04 | 2014-09-04 | iStoc Oy | Test management |
CN104007340A (en) * | 2014-05-21 | 2014-08-27 | 杭州互诚控制技术有限公司 | Electronic product aging test system and aging test method |
CN104022921A (en) * | 2014-06-26 | 2014-09-03 | 北京安兔兔科技有限公司 | Method and device for testing performance of device |
CN104717337A (en) * | 2015-04-03 | 2015-06-17 | 杭州昕云信息科技有限公司 | Method for testing mobile application in batch and equipment used in method |
CN104968007A (en) * | 2015-07-31 | 2015-10-07 | 小米科技有限责任公司 | Test method and device of intelligent device |
CN107548083A (en) * | 2017-07-31 | 2018-01-05 | 歌尔科技有限公司 | WAP function test method and equipment |
CN108174405A (en) * | 2017-12-22 | 2018-06-15 | 歌尔科技有限公司 | Product test method and apparatus |
CN108055209A (en) * | 2017-12-26 | 2018-05-18 | 温岭卓致智能科技有限公司 | A kind of router batch terminal upgrading method and system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110572839A (en) * | 2019-09-06 | 2019-12-13 | Oppo(重庆)智能科技有限公司 | Test method and test system |
CN111508550A (en) * | 2020-04-16 | 2020-08-07 | 苏州浪潮智能科技有限公司 | Nand Flash test method, system and device |
CN112929905A (en) * | 2021-01-28 | 2021-06-08 | 博为科技有限公司 | Wireless network equipment testing method and device |
CN113311354A (en) * | 2021-05-28 | 2021-08-27 | 深圳市飞腾云科技有限公司 | Lamp strip double-hotspot production and measurement configuration method |
CN113311354B (en) * | 2021-05-28 | 2023-01-17 | 深圳市飞腾云科技有限公司 | Lamp strip double-hotspot production, measurement and configuration method |
CN113709795A (en) * | 2021-08-24 | 2021-11-26 | 深圳艾创力科技有限公司 | Method, device and storage medium for detecting Bluetooth transmission speed |
Also Published As
Publication number | Publication date |
---|---|
CN109327350B (en) | 2021-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109327350A (en) | A kind of batch carries out the method and apparatus and system of terminal test | |
CN102421132B (en) | Test system, test equipment and test method for mobile terminal | |
US8320839B2 (en) | Method for testing a mobile-radio device | |
CN104978263A (en) | Mobile terminal application program test method and mobile terminal application program test system | |
CN106888060B (en) | Anti-interference test method and system for wireless communication module | |
CN106452620A (en) | Method and system of testing receptivity of wireless terminal | |
CN110351875A (en) | A kind of secondary cell wave beam failure recovery method, terminal and base station | |
CN108028707A (en) | Method for testing low-power radio frequency (RF) data packet signal transceiver | |
CN106776350A (en) | The accurate method of testing and device of a kind of program | |
US10707973B2 (en) | Method of testing bluetooth low energy devices over-the-air and testing system | |
CN105827333A (en) | System and method of baseband chip automatic test | |
CN109309930A (en) | Mobile terminal test device and its parameter modification method | |
CN102355678A (en) | Wireless network channel simulator as well as system and method for testing wireless network equipment | |
CN108141291A (en) | For testing the method for low-power radio frequency (RF) data packet signal transceiver | |
US20110250847A1 (en) | Method for testing appliances for a mobile-radio system, signal generator, appliance for a mobile-radio system, and a measurement system | |
CN111050333A (en) | Base station automatic test method and system | |
CN101895917B (en) | Method and equipment for measuring switching interrupting time | |
CN108337125A (en) | Intelligent hardware devices test method, cloud platform and background controller | |
CN105992234B (en) | Method and system for simulating boundary-free network channel environment | |
CN105657857B (en) | Wireless network connecting method and device | |
EP4030645A1 (en) | Interference simulation system, method and apparatus, interference test system, method and apparatus, and computer readable storage medium | |
CN104735687B (en) | A kind of single verification service test method and device of standing | |
US20100173591A1 (en) | Method and device for alternately allocating base-station signals to a limited number of channels of a test device | |
CN111597083A (en) | Test system of intelligent terminal | |
CN105142158A (en) | Testing system and method of wireless channel automatic selection function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 266071 Shandong city of Qingdao province Jiangxi City Road No. 11 Patentee after: Qingdao Hisense Mobile Communication Technology Co.,Ltd. Address before: 266071 Shandong city of Qingdao province Jiangxi City Road No. 11 Patentee before: HISENSE MOBILE COMMUNICATIONS TECHNOLOGY Co.,Ltd. |