CN109322441A - The binding method of fashioned iron column tie-bar - Google Patents

The binding method of fashioned iron column tie-bar Download PDF

Info

Publication number
CN109322441A
CN109322441A CN201710636304.0A CN201710636304A CN109322441A CN 109322441 A CN109322441 A CN 109322441A CN 201710636304 A CN201710636304 A CN 201710636304A CN 109322441 A CN109322441 A CN 109322441A
Authority
CN
China
Prior art keywords
stirrup
steel column
bar
steel
fashioned iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710636304.0A
Other languages
Chinese (zh)
Inventor
丁帅
史卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710636304.0A priority Critical patent/CN109322441A/en
Publication of CN109322441A publication Critical patent/CN109322441A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Abstract

The present invention relates to a kind of binding method of fashioned iron column tie-bar, step 1: carrying out the pre- suit of stirrup to steel column in processing site, be arranged half stirrup on the first steel column top that need to be lifted, the other half stirrup covers on the second steel column top for stretching out concrete plate surface;Two: the first steel column of lifting;Three: two steel columns are welded;Four: connecting vertical reinforcement in the outside of two steel columns, stirrup;Five: stirrup is arranged apart;Six: a position limiting clamp is set on symmetrical two faces of two steel columns respectively, and position limiting clamp includes a root long reinforcing bar and several bar dowels being welded on long reinforcing bar;Seven: stirrup is whole toward transferring, a stirrup is clamped between every two bar dowels, stirrup starts to be bound with tied silk after transferring to absolute altitude;Eight: step 7 is repeated after binding is good, until all stirrups are all bound completion.The present invention gathers materials on the spot, easy to process, meets the requirement of green construction;It improves fashioned iron column tie-bar and binds quality, stirrup binds efficiency.

Description

The binding method of fashioned iron column tie-bar
Technical field
The present invention relates to a kind of stirrup binding methods, the specifically binding method of fashioned iron column tie-bar.
Background technique
Live steel column is the lifting of two sections one, so whole height is higher, if using conventional concrete structure Stirrup installation method is come constructed (lifting fashioned iron → welding → vertical reinforcement connection → suit stirrup → binding), stirrup set There are certain difficulty for dress, in addition worker is easy to ignore the quality problems of binding when pursuit progress simply, so leading The spacing of stirrup is caused to hardly result in guarantee.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of binding method of fashioned iron column tie-bar is provided, improves steel column The quality and binding efficiency of stirrup binding.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of binding method of fashioned iron column tie-bar, which is characterized in that it includes the following steps:
Step 1: carrying out the pre- suit of stirrup in processing site to steel column, and the first steel column top lifted is being needed to be arranged Half stirrup, the other half stirrup cover on the second steel column top for stretching out concrete plate surface;
Step 2: lifting has packaged the first steel column of stirrup;
Step 3: the first steel column for packaging stirrup is lifted into the second steel column top and is welded;
Step 4: vertical reinforcing bar is connected in the outside of the first steel column and the second steel column, stirrup;
Step 5: stirrup is arranged apart;
Step 6: a position limiting clamp, the position limiting clamp are set on symmetrical two faces of the first steel column and the second steel column respectively Including a root long reinforcing bar and several bar dowels being welded on long reinforcing bar;
Step 7: stirrup is whole toward transferring, a stirrup is clamped between every two bar dowels, stirrup starts after transferring to absolute altitude It is bound with tied silk;
Step 8: step 7 is repeated after binding is good, until all stirrups are all bound completion.
The beneficial effects of the present invention are: this method is by a root long reinforcing bar and several reinforcement weldings, materials are simple, production side Just, cost is relatively low.The position limiting clamp being equidistantly welded by bar dowel, to fix the spacing of stirrup, after fixing spacing, It is whole to be promoted, then bind.Can be once-forming with multiple stirrups, reduce binding stirrup the time it takes.Overcome fashioned iron Column tie-bar binds the non-uniform defect of spacing, it is ensured that steel column stirrup spacing meets the requirements, while improving construction efficiency, protects Demonstrate,proving steel column can be by the completion construction task of matter according to quantity.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the structural schematic diagram of position limiting clamp.
Fig. 2 is the structural schematic diagram of pre- set stirrup.
Fig. 3 is the structural schematic diagram after integrally transferring in step 7.
Specific embodiment
As shown in Figure 2: a kind of binding method of fashioned iron column tie-bar, it includes the following steps:
Step 1: carrying out the pre- suit of stirrup 4 in processing site to steel column 3, covers on the first steel column top for needing to lift If half stirrup, the other half stirrup covers on the second steel column top for stretching out concrete plate surface;
Step 2: lifting has packaged the first steel column of stirrup;
Step 3: the first steel column for packaging stirrup is lifted into the second steel column top and is welded;
Step 4: vertical reinforcing bar 5 is connected in the outside of the first steel column and the second steel column, stirrup;
Step 5: stirrup is arranged apart;
Step 6 as shown in Figure 1:: a limit is set on symmetrical two faces of the first steel column and the second steel column respectively Folder, which includes a root long reinforcing bar 1 and several bar dowels 2 being welded on long reinforcing bar;
It is as shown in Figure 3: step 7: stirrup is whole toward decentralization, first by a portion stirrup toward decentralization, every two bar dowels it Between clamp a stirrup, start to be bound with tied silk after stirrup is transferred to absolute altitude;
Step 8: step 7 is repeated after binding is good, then by a part of stirrup toward decentralization, until all stirrups are all bound completion.

Claims (1)

1. a kind of binding method of fashioned iron column tie-bar, which is characterized in that it includes the following steps:
Step 1: carrying out the pre- suit of stirrup in processing site to steel column, and the first steel column top lifted is being needed to be arranged Half stirrup, the other half stirrup cover on the second steel column top for stretching out concrete plate surface;
Step 2: lifting has packaged the first steel column of stirrup;
Step 3: the first steel column for packaging stirrup is lifted into the second steel column top and is welded;
Step 4: vertical reinforcing bar is connected in the outside of the first steel column and the second steel column, stirrup;
Step 5: stirrup is arranged apart;
Step 6: a position limiting clamp, the position limiting clamp are set on symmetrical two faces of the first steel column and the second steel column respectively Including a root long reinforcing bar and several bar dowels being welded on long reinforcing bar;
Step 7: stirrup is whole toward transferring, a stirrup is clamped between every two bar dowels, stirrup starts after transferring to absolute altitude It is bound with tied silk;
Step 8: step 7 is repeated after binding is good, until all stirrups are all bound completion.
CN201710636304.0A 2017-07-31 2017-07-31 The binding method of fashioned iron column tie-bar Pending CN109322441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710636304.0A CN109322441A (en) 2017-07-31 2017-07-31 The binding method of fashioned iron column tie-bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710636304.0A CN109322441A (en) 2017-07-31 2017-07-31 The binding method of fashioned iron column tie-bar

Publications (1)

Publication Number Publication Date
CN109322441A true CN109322441A (en) 2019-02-12

Family

ID=65244837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710636304.0A Pending CN109322441A (en) 2017-07-31 2017-07-31 The binding method of fashioned iron column tie-bar

Country Status (1)

Country Link
CN (1) CN109322441A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113042662A (en) * 2021-04-20 2021-06-29 中国建筑第八工程局有限公司 Steel reinforcement framework forming system for large box girder
CN114108812A (en) * 2021-12-09 2022-03-01 中国化学工程第九建设有限公司 Construction method of main body frame of concrete engineering frame structure building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762402B2 (en) * 1988-04-21 1995-07-05 株式会社日本インダストリー製作所 Spacing hardware for column hoop muscles
JP2001012080A (en) * 1999-07-02 2001-01-16 Im Trust Kk Hoop bar locking tool
JP2002256706A (en) * 2001-03-05 2002-09-11 Maeda Corp Method of arranging hoop in src column
CN203891343U (en) * 2014-05-08 2014-10-22 北京万兴建筑集团有限公司 Mounting device for column reinforcements in core region of frame structure
CN204456668U (en) * 2012-12-29 2015-07-08 青建集团股份公司 A kind of stirrup positioning fixture
CN205476089U (en) * 2016-04-06 2016-08-17 中国建筑第八工程局有限公司 Beam column node stirrup spacing controlling means
CN106192732A (en) * 2016-09-09 2016-12-07 中铁十局集团有限公司 A kind of pier shaft horizontal hoop fixture

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762402B2 (en) * 1988-04-21 1995-07-05 株式会社日本インダストリー製作所 Spacing hardware for column hoop muscles
JP2001012080A (en) * 1999-07-02 2001-01-16 Im Trust Kk Hoop bar locking tool
JP2002256706A (en) * 2001-03-05 2002-09-11 Maeda Corp Method of arranging hoop in src column
CN204456668U (en) * 2012-12-29 2015-07-08 青建集团股份公司 A kind of stirrup positioning fixture
CN203891343U (en) * 2014-05-08 2014-10-22 北京万兴建筑集团有限公司 Mounting device for column reinforcements in core region of frame structure
CN205476089U (en) * 2016-04-06 2016-08-17 中国建筑第八工程局有限公司 Beam column node stirrup spacing controlling means
CN106192732A (en) * 2016-09-09 2016-12-07 中铁十局集团有限公司 A kind of pier shaft horizontal hoop fixture

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113042662A (en) * 2021-04-20 2021-06-29 中国建筑第八工程局有限公司 Steel reinforcement framework forming system for large box girder
CN114108812A (en) * 2021-12-09 2022-03-01 中国化学工程第九建设有限公司 Construction method of main body frame of concrete engineering frame structure building

Similar Documents

Publication Publication Date Title
CN109322441A (en) The binding method of fashioned iron column tie-bar
CN105587060B (en) The construction method of the retarded adhesive prestressed cassette ceiling of the cast-in-place post stretching of large span super thick
CN104260190A (en) Side mould, sealing clamp and mould and method for producing reinforced wall
CN204738236U (en) Pier vertical reinforcement installation mould
CN202227590U (en) Column rib locator for reinforced concrete column
CN208179078U (en) Equipment suitable for carrying out clamping overturning to workpiece
CN202170573U (en) Connecting structure for steel column and concrete column
CN106368234B (en) A kind of new rim of a cup basis box steel column construction technique
CN105201204A (en) Method and structure for preventing root rotting in pouring process of column legs of reinforced concrete columns
CN104196023A (en) Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip
CN204081483U (en) A kind of structure of rotten when preventing pouring reinforcement concrete post suspension column
CN204221944U (en) L-type flue or pipe envelope vertical template
CN203171165U (en) Welding structure of steel box beam
CN106013620A (en) Connection structure of main reinforcements and hoops
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
CN209308432U (en) A kind of adjustable spacer ferrule of frame column
CN203834931U (en) Obstructer for pouring of concrete of different types at beam column joint
CN203545454U (en) Special lifting device for hydroelectric generation thin-walled workpiece
CN202910233U (en) Device for manufacturing annular stirrup
CN207205660U (en) One kind is welded and fixed mechanism
CN205476442U (en) A wall pouring mode structure is led to anti - L shape concrete
CN204384472U (en) Fixing device in a kind of setting machine folder base system
CN204098031U (en) A kind of concrete precast pipe pile pile top with mechanical connecting device
CN204510481U (en) Shaped steel junction plate vertical in steel building
CN203905510U (en) High-precision embedded bolt mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212