CN109322404A - A kind of steel construction Integrated Building steel construction bending reinforcement by connection structure - Google Patents
A kind of steel construction Integrated Building steel construction bending reinforcement by connection structure Download PDFInfo
- Publication number
- CN109322404A CN109322404A CN201811509149.7A CN201811509149A CN109322404A CN 109322404 A CN109322404 A CN 109322404A CN 201811509149 A CN201811509149 A CN 201811509149A CN 109322404 A CN109322404 A CN 109322404A
- Authority
- CN
- China
- Prior art keywords
- steel construction
- main body
- wirerope
- fixed plate
- connection structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 55
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 53
- 239000010959 steel Substances 0.000 title claims abstract description 53
- 230000002787 reinforcement Effects 0.000 title claims abstract description 25
- 238000005452 bending Methods 0.000 title description 5
- 238000013016 damping Methods 0.000 claims abstract description 16
- PNEYBMLMFCGWSK-UHFFFAOYSA-N Alumina Chemical compound [O-2].[O-2].[O-2].[Al+3].[Al+3] PNEYBMLMFCGWSK-UHFFFAOYSA-N 0.000 claims description 24
- 230000006835 compression Effects 0.000 claims description 19
- 238000007906 compression Methods 0.000 claims description 19
- 238000005260 corrosion Methods 0.000 claims description 15
- 239000004831 Hot glue Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 11
- 230000007797 corrosion Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000003491 array Methods 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/64—Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
- E04B1/642—Protecting metallic construction elements against corrosion
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/98—Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of steel construction Integrated Building steel constructions to be bent reinforcement by connection structure, including main body, the first fixed plate, the second fixed plate and damping spring, the middle position of described main body one end is provided with the second wirerope, and the first wirerope is provided in the second main body above wirerope, third wirerope is provided in main body below second wirerope, and first wirerope, the second wirerope and third wirerope are all provided with link far from one end of main body, the top of the main body is evenly arranged with the hook with link cooperation.The present invention is by being equipped with link, the first wirerope, the second wirerope, third wirerope and hook, so that the multistage strap-on structure that device is made up of the first wirerope, the second wirerope and third wirerope, device is enhanced for the reinforcement effect of corresponding steel construction, improves the using effect of device.
Description
Technical field
The present invention relates to ruggedized construction technical field, specially a kind of steel construction Integrated Building steel construction is bent connection and adds
Fixing structure.
Background technique
The development of construction industry and the urbanization process of country have close ties, with the development of urbanization, urban population
Sharply expansion will lead to demand of the society to building products and increase sharply in a short time, in order to improve the firm of building products
Performance, construction personnel usually need to be bent reinforcement by connection structure with a kind of steel construction Integrated Building steel construction, but existing
Still there is the following when in use in steel construction Integrated Building steel construction bending reinforcement by connection structure:
1. traditional steel construction Integrated Building steel construction is bent reinforcement by connection structure in the prevalence of the simple defect of structure,
They often do not have knockdown function, this causes device to be not easy to be overhauled and be safeguarded, are unfavorable for the long-term popularization of device;
2. there is also be not easy to be fixedly mounted for existing steel construction Integrated Building steel construction bending reinforcement by connection structure on the market
With the problem of consolidation effect difference, this causes the using effect of device bad;
3. existing steel construction Integrated Building is bent reinforcement by connection structure there is also structural strengths low, crushing resistance with steel construction
The defect of energy difference and poor corrosion resistance, this greatly affected the service life of device.
Summary of the invention
The purpose of the present invention is to provide a kind of steel construction Integrated Building steel constructions to be bent reinforcement by connection structure, to solve
Structure mentioned above in the background art is simple, is not easy that, compressive property low with consolidation effect difference and structural strength is fixedly mounted
The problem of difference and poor corrosion resistance.
To achieve the above object, the invention provides the following technical scheme: a kind of steel construction Integrated Building is bent with steel construction
Reinforcement by connection structure, including main body, the first fixed plate, the second fixed plate and damping spring, the middle position of described main body one end
Place is provided with the second wirerope, and the first wirerope is provided in the main body above the second wirerope, under second wirerope
Third wirerope, and the one end of the first wirerope, the second wirerope and third wirerope far from main body are provided in the main body of side
It is all provided with link, the top of the main body is evenly arranged with the hook with link cooperation, and the inside of the main body is uniformly installed
There is the second fixed plate, and the second fixed plate is evenly arranged with damping spring far from one end of main body, the damping spring is far from
One end of two fixed plates is equipped with the first fixed plate, and the main body wall is internally provided with enhancement layer, and the inside of enhancement layer
It is evenly arranged with reinforcing rib.
Preferably, the lateral wall of the main body is provided with aluminium oxide anti-corrosion layer, and the thickness of the aluminium oxide anti-corrosion layer
Range is in 4-6mm.
Preferably, the main body wall is internally provided with resistance to compression layer, and the inside of resistance to compression layer be evenly arranged in etc. between
Present convex in the cross section of resistance to compression air bag away from arrangement, the resistance to compression air bag.
Preferably, first fixed plate is evenly arranged with fixed anchor ear, and fixed anchor ear far from one end of damping spring
The inner sidewall of the being integrally formed welding structure between the first fixed plate, the fixed anchor ear is evenly arranged in concentric arrays
Anti-slip rubber protrusion, and constitute hot-melt adhesive paste between anti-slip rubber protrusion and fixed anchor ear, be arranged on the fixed anchor ear
There is the first fixing bolt.
Preferably, on the same line, and first is fixed at the center of the center of first fixed plate and the second fixed plate
The area coverage of plate is greater than the area coverage of the second fixed plate.
Preferably, the top of second fixed plate is evenly arranged with fixture block, and is provided in main body and fixture block cooperation
Card slot is provided with the second fixing bolt connecting with card slot on the fixture block.
Compared with prior art, the beneficial effects of the present invention are:
1. the steel construction Integrated Building steel construction be bent reinforcement by connection structure by be equipped with main body, the second fixed plate, fixture block,
Card slot and the second fixing bolt so that the installation optimization structure of itself, convenient for according to the demand of user by main body and second
It is dismantled and is spliced between fixed plate, so that device realizes knockdown advantage, overhauled and tieed up convenient for device
Shield, is conducive to the long-term popularization of the device;
2. the steel construction Integrated Building steel construction is bent reinforcement by connection structure by being equipped with fixed anchor ear, the first fixed spiral shell
Bolt, anti-slip rubber protrusion, the first fixed plate, the second fixed plate and damping spring, so that on the one hand device is convenient in respective steel knot
Installation is fixed in the suitable location of structure, and utilizes anti-slip rubber raised role, improves firm performance when device is fixed,
Make it be not easy to slip, on the other hand improve the damping performance of device, enhances the functionality of device;
3. the steel construction Integrated Building steel construction is bent reinforcement by connection structure by being equipped with link, the first wirerope, second
Wirerope, third wirerope and hook, so that device passes through the more of the first wirerope, the second wirerope and third wirerope composition
Grade strap-on structure, enhances device for the reinforcement effect of corresponding steel construction, improves the using effect of device;
4. the steel construction Integrated Building steel construction is bent reinforcement by connection structure by being equipped with reinforcing rib, enhancement layer and aluminium oxide
Anti-corrosion layer, so that device enhances itself structural strength and corrosion resistance, to be conducive to extend the use longevity of device
Life;
5. the steel construction Integrated Building steel construction is bent reinforcement by connection structure by being equipped with resistance to compression layer and resistance to compression air bag, so that
Device improves the compressive property of itself, to ensure that device is unlikely to deform, enhances the practicability of device.
Detailed description of the invention
Fig. 1 is that the present invention faces the schematic diagram of the section structure;
Fig. 2 is the fixed anchor ear top view cross section structural schematic diagram of the present invention;
Fig. 3 is enlarged structure schematic diagram at A in Fig. 1 of the present invention;
Fig. 4 is B location the schematic diagram of the section structure in Fig. 1 of the present invention.
In figure: 1, main body;2, the first fixed plate;3, the second fixed plate;4, it links up with;5, damping spring;6, fixed anchor ear;7,
Link;8, the first wirerope;9, the second wirerope;10, third wirerope;11, anti-slip rubber protrusion;12, the first fixing bolt;
13, fixture block;14, card slot;15, the second fixing bolt;16, resistance to compression layer;17, resistance to compression air bag;18, reinforcing rib;19, enhancement layer;20,
Aluminium oxide anti-corrosion layer.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, a kind of embodiment provided by the invention: a kind of steel construction Integrated Building steel construction bending connection
Ruggedized construction, including main body 1, the first fixed plate 2, the second fixed plate 3 and damping spring 5, the middle position of 1 one end of main body are set
It is equipped with the second wirerope 9, and is provided with the first wirerope 8 in the main body 1 of 9 top of the second wirerope, the lateral wall setting of main body 1
There is aluminium oxide anti-corrosion layer 20, and the thickness range of the aluminium oxide anti-corrosion layer 20 makes the corrosion resistant which increase device in 4-6mm
Corrosion energy is provided with third wirerope in the main body 1 of 9 lower section of the second wirerope to be conducive to extend the service life of device
10, and the first wirerope 8, the one end of the second wirerope 9 and third wirerope 10 far from main body 1 are all provided with link 7, main body 1
Top be evenly arranged with the hook 4 cooperated with link 7, the inside of main body 1 is uniformly equipped with the second fixed plate 3, and second is solid
Fixed board 3 is evenly arranged with damping spring 5 far from one end of main body 1, and damping spring 5 is equipped with far from one end of the second fixed plate 3
First fixed plate 2, the first fixed plate 2 are evenly arranged with fixed anchor ear 6 far from one end of damping spring 5, and fixed anchor ear 6 and the
The inner sidewall of being integrally formed welding structure between one fixed plate 2, fixed anchor ear 6 is evenly arranged in the anti-skidding of concentric arrays
Rubber bumps 11, and hot-melt adhesive paste is constituted between anti-slip rubber protrusion 11 and fixed anchor ear 6 are provided with the on fixed anchor ear 6
One fixing bolt 12 makes it easy to device according to the demand of user, installation is fixed in suitable position, to enhance
The functionality of device, the center of the center of the first fixed plate 2 and the second fixed plate 3 on the same line, and the first fixed plate 2
Area coverage is greater than the area coverage of the second fixed plate 3, so that it is optimized the structure of device, the top of the second fixed plate 3 is uniform
It it is provided with fixture block 13, and is provided with the card slot 14 cooperated with fixture block 13 in main body 1, be provided on fixture block 13 and connect with card slot 14
Second fixing bolt 15 makes it easy between the second fixed plate 3 and main body 1 be mounted and dismounted, so that device be made to realize
Knockdown advantage, improves the using effect of device, and 1 side wall of main body is internally provided with enhancement layer 19, and enhancement layer 19
Inside is evenly arranged with reinforcing rib 18, and 1 side wall of main body is internally provided with resistance to compression layer 16, and the inside of resistance to compression layer 16 is uniformly arranged
There is the resistance to compression air bag 17 equally arranged, convex is presented in the cross section of resistance to compression air bag 17, it is made to improve the resistance to compression of device
Performance, to enhance the practicability of device.
Working principle: in use, mating reaction of the staff first with fixture block 13 and card slot 14, by the second fixed plate
It is assembled between 3 and main body 1, and cooperates the effect of the second fixing bolt 15, by the second fixed plate 3 and 1 fixation of main body,
Then each fixed anchor ear 6 is successively stuck in the suitable location of corresponding steel construction, is embraced using the first fixing bolt 12 by fixed
Hoop 6 and corresponding steel construction fixation, followed by the mating reaction for linking up with 4 and link 7, successively by the first wirerope 8, the
Two wirerope 9 and third wirerope 10 are fixed, to enhance device for the reinforcement effect of corresponding steel construction, improve
The using effect of device, meanwhile, in the use process of device, since the device is equipped with reinforcing rib 18, enhancement layer 19 and oxygen
Change aluminium anti-corrosion layer 20, so that device enhances itself structural strength and corrosion resistance, to be conducive to extend device
Service life, further, since the device is equipped with resistance to compression layer 16 and resistance to compression air bag 17, so that device improves the crushing resistance of itself
Can, to ensure that device is unlikely to deform, enhance the practicability of device.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
Claims (6)
1. a kind of steel construction Integrated Building steel construction is bent reinforcement by connection structure, including main body (1), the first fixed plate (2), the
Two fixed plates (3) and damping spring (5), it is characterised in that: the middle position of described main body (1) one end is provided with the second steel wire
It restricts (9), and is provided with the first wirerope (8) in the main body (1) above the second wirerope (9), below second wirerope (9)
Main body (1) on be provided with third wirerope (10), and the first wirerope (8), the second wirerope (9) and third wirerope (10)
One end far from main body (1) is all provided with link (7), and the top of the main body (1) is evenly arranged with the extension with link (7) cooperation
The inside of hook (4), the main body (1) is uniformly equipped with the second fixed plate (3), and the one of the second fixed plate (3) separate main body (1)
End is evenly arranged with damping spring (5), and the damping spring (5) is equipped with first far from the one end of the second fixed plate (3) and fixes
Plate (2), main body (1) side wall is internally provided with enhancement layer (19), and the inside of enhancement layer (19) is evenly arranged with reinforcement
Muscle (18).
2. a kind of steel construction Integrated Building according to claim 1 is bent reinforcement by connection structure with steel construction, feature exists
In: the lateral wall of the main body (1) is provided with aluminium oxide anti-corrosion layer (20), and the thickness model of the aluminium oxide anti-corrosion layer (20)
It is trapped among 4-6mm.
3. a kind of steel construction Integrated Building according to claim 1 is bent reinforcement by connection structure with steel construction, feature exists
In: main body (1) side wall is internally provided with resistance to compression layer (16), and the inside of resistance to compression layer (16) is evenly arranged with equally
Present convex in the cross section of the resistance to compression air bag (17) of arrangement, the resistance to compression air bag (17).
4. a kind of steel construction Integrated Building according to claim 1 is bent reinforcement by connection structure with steel construction, feature exists
In: first fixed plate (2) is evenly arranged with fixed anchor ear (6) far from the one end of damping spring (5), and fixed anchor ear (6)
The being integrally formed welding structure between the first fixed plate (2), the inner sidewall of the fixed anchor ear (6) are evenly arranged in concentric
The anti-slip rubber of circle best-fit is raised (11), and constitutes hot-melt adhesive paste between the anti-slip rubber raised (11) and fixed anchor ear (6), institute
It states and is provided with the first fixing bolt (12) on fixed anchor ear (6).
5. a kind of steel construction Integrated Building according to claim 1 is bent reinforcement by connection structure with steel construction, feature exists
In: first fixed plate (2) center and the second fixed plate (3) center on the same line, and the first fixed plate (2)
Area coverage is greater than the area coverage of the second fixed plate (3).
6. a kind of steel construction Integrated Building according to claim 1 is bent reinforcement by connection structure with steel construction, feature exists
In: the top of second fixed plate (3) is evenly arranged with fixture block (13), and is provided in main body (1) and is cooperated with fixture block (13)
Card slot (14), be provided with the second fixing bolt (15) connecting with card slot (14) on the fixture block (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811509149.7A CN109322404B (en) | 2018-12-11 | 2018-12-11 | Steel structure bending connection reinforcing structure for steel structure integrated building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811509149.7A CN109322404B (en) | 2018-12-11 | 2018-12-11 | Steel structure bending connection reinforcing structure for steel structure integrated building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109322404A true CN109322404A (en) | 2019-02-12 |
CN109322404B CN109322404B (en) | 2024-03-19 |
Family
ID=65256124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811509149.7A Active CN109322404B (en) | 2018-12-11 | 2018-12-11 | Steel structure bending connection reinforcing structure for steel structure integrated building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109322404B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2021437C1 (en) * | 1992-04-13 | 1994-10-15 | Украинский государственный научно-исследовательский институт металлов | Corner joint unit of panel-type articles |
JPH08338096A (en) * | 1995-06-12 | 1996-12-24 | Shin Nikkei Co Ltd | Panel support structure and fastening metal tool thereof |
KR101740509B1 (en) * | 2016-12-01 | 2017-05-30 | (주)청우종합건축사사무소 | Construction Corner Guard Shock absorber |
CN206495390U (en) * | 2017-01-20 | 2017-09-15 | 北京城建集团有限责任公司 | A kind of curved roof cleaning fixed structure of Fast Installation dismounting |
CN107288245A (en) * | 2017-08-03 | 2017-10-24 | 江河创建集团股份有限公司 | Wide span single layer single way cable net curtain wall corner structure |
CN206616926U (en) * | 2017-03-31 | 2017-11-07 | 国网四川省电力公司广元供电公司 | A kind of attachment means for column foot corner |
CN209227786U (en) * | 2018-12-11 | 2019-08-09 | 辰信重工(江苏)有限公司 | A kind of steel construction Integrated Building steel construction bending reinforcement by connection structure |
-
2018
- 2018-12-11 CN CN201811509149.7A patent/CN109322404B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2021437C1 (en) * | 1992-04-13 | 1994-10-15 | Украинский государственный научно-исследовательский институт металлов | Corner joint unit of panel-type articles |
JPH08338096A (en) * | 1995-06-12 | 1996-12-24 | Shin Nikkei Co Ltd | Panel support structure and fastening metal tool thereof |
KR101740509B1 (en) * | 2016-12-01 | 2017-05-30 | (주)청우종합건축사사무소 | Construction Corner Guard Shock absorber |
CN206495390U (en) * | 2017-01-20 | 2017-09-15 | 北京城建集团有限责任公司 | A kind of curved roof cleaning fixed structure of Fast Installation dismounting |
CN206616926U (en) * | 2017-03-31 | 2017-11-07 | 国网四川省电力公司广元供电公司 | A kind of attachment means for column foot corner |
CN107288245A (en) * | 2017-08-03 | 2017-10-24 | 江河创建集团股份有限公司 | Wide span single layer single way cable net curtain wall corner structure |
CN209227786U (en) * | 2018-12-11 | 2019-08-09 | 辰信重工(江苏)有限公司 | A kind of steel construction Integrated Building steel construction bending reinforcement by connection structure |
Also Published As
Publication number | Publication date |
---|---|
CN109322404B (en) | 2024-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209227786U (en) | A kind of steel construction Integrated Building steel construction bending reinforcement by connection structure | |
CN109322404A (en) | A kind of steel construction Integrated Building steel construction bending reinforcement by connection structure | |
CN210561894U (en) | Protective structure of telegraph pole | |
CN201459945U (en) | Steel damping device, steel damping supporting seat and steel damper | |
CN201366411Y (en) | Sieve connecting part for iron ore beneficiation plant | |
CN211340389U (en) | Spherical tensile steel support | |
CN204024443U (en) | Adopt the bamboo ladder stand of connector overlapping | |
CN215829797U (en) | Light composite anti-seismic wallboard | |
CN208951915U (en) | A kind of new energy advertisement road lamp | |
CN106549628A (en) | Solar tile and solar tile system | |
CN206003868U (en) | A kind of battery frame and the vehicle with this battery frame | |
CN201741885U (en) | Long-lived terminal | |
CN213806718U (en) | Steel beam fixing structure for increasing bearing capacity of concrete beam | |
CN213477843U (en) | Tent roof connecting piece | |
CN217897384U (en) | Steel strand support for reinforcing building structure | |
CN216040761U (en) | Corrugated steel culvert pipe antiskid structure | |
CN218780008U (en) | A prevent roof beam device that falls that is used for railway passenger station assembled concrete canopy | |
CN205012743U (en) | Combined material of heavy ice district transmission line wineglass tower strengthens tabula | |
CN208036549U (en) | A kind of N-type bohr anchor | |
CN216042156U (en) | Built-in prestressed pipe truss structure | |
CN215330834U (en) | Connecting joint of suspension cable structure | |
CN213477844U (en) | Novel tent roof connecting piece | |
CN217537336U (en) | Connecting device and steel construction assembly type building of ALC wallboard and steel construction roof beam | |
CN209637320U (en) | A kind of stereo garage is parked bit architecture | |
CN202117359U (en) | Combined lightweight steel structure communication machine room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |