CN109322311A - Assembled support construction technique based on coercion underground continuous wall structure - Google Patents

Assembled support construction technique based on coercion underground continuous wall structure Download PDF

Info

Publication number
CN109322311A
CN109322311A CN201811183193.3A CN201811183193A CN109322311A CN 109322311 A CN109322311 A CN 109322311A CN 201811183193 A CN201811183193 A CN 201811183193A CN 109322311 A CN109322311 A CN 109322311A
Authority
CN
China
Prior art keywords
wall
underground continuous
continuous wall
grooving
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811183193.3A
Other languages
Chinese (zh)
Other versions
CN109322311B (en
Inventor
孙军
杨泓斌
隋新春
齐鹏飞
王国刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Dingchen Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dingchen Construction Management Co Ltd filed Critical Dingchen Construction Management Co Ltd
Priority to CN201811183193.3A priority Critical patent/CN109322311B/en
Publication of CN109322311A publication Critical patent/CN109322311A/en
Application granted granted Critical
Publication of CN109322311B publication Critical patent/CN109322311B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses the assembled support construction techniques based on coercion underground continuous wall structure, belong to support construction technical field, assembled support construction technique based on coercion underground continuous wall structure, the following steps are included: leading wall channel excavation, it builds branch and protects and lead wall, supporting trenching construction, coercion underground continuous wall plate, prefabricated panel is hung, the side slip casting of toe of wall wall, coercion underground continuous wall plate may be implemented, it is supported using assembled supporting construction, the form of construction work for being easy to use diaphram wall to engage as supporting construction and foundation structure, Groundwater infiltration is prevented simultaneously, circulating mud forms one layer of very low mudcake of water penetration on cell wall, it can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, fill up the junction gap of underground continuous wall plate, Simultaneously under forming pressure, the moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.

Description

Assembled support construction technique based on coercion underground continuous wall structure
Technical field
The present invention relates to support construction technical fields, more specifically to based on coercion underground continuous wall structure Assembled support construction technique.
Background technique
Assembled supporting construction is to be assembled at the scene based on molding prefabricated components by various technological means Supporting construction.Compared with conventional supporting means, which has the characteristics that low cost, short time limit, quality are easily controllable, from And greatly reduce energy consumption, reduce building waste, have higher social and economic benefits and environmental-protection function, currently, in the market compared with Have for mature assembled supporting construction: prefabricated pile, coercion underground continuous wall structure, prestressing force fish belly sill support construction, tool Formula combines inner support etc., and prefabricated pile is as foundation pit supporting construction in use, mainly using conventional construction of prefabricated piles method, such as Static pressure or hammer-impact construction, can also use borrowing cement mixing method, and TRD stirs wall or the stirring of CSM Double-wheel milling shape within the walls At continuous soil cement composite supporting construction.When prestressing force prefabricated pile is used for supporting construction, it should be noted that prevent prestressing force prefabricated pile Brittle break occurs and ensures the construction quality of connector.
Existing supporting construction is drawn using the support of short column diaphragm plate, the support of interim retaining wall, batter post support, anchor mostly Method for protecting support, the scope of application very littles of these supporting construction such as support only can be suitably used for cutting depth less than seven meters, and without special It is required that foundation pit, and ten meters are greater than for cutting depth, and the foundation pit one of Nearby Structure, critical facility within cutting depth As using part supporting construction and foundation structure unification form of construction work, mostly using diaphram wall as supporting construction The construction work of main body, but this construction work using diaphram wall as supporting construction main body is in some special geology items Under part, such as very soft muck soil, the alluvium containing erratic boulder and superhard rock, difficulty of construction is very big, is not available, and easily go out Existing adjacent wall section cannot be aligned and the problem of leak.
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide based on coercion underground continuous wall structure Assembled support construction technique, coercion underground continuous wall plate may be implemented in it, is supported, is convenient for using assembled supporting construction The form of construction work for using diaphram wall to engage as supporting construction and foundation structure, while by special circulating mud, it supports The anti-soil lateral pressure and water pressure acted on cell wall, prevents cell wall from collapsing and peeling off, while preventing Groundwater infiltration, recycles Mud forms one layer of very low mudcake of water penetration on cell wall, can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, circulation Under the pressure of mud after forming, at solid state, the junction gap of underground continuous wall plate is filled up, while in forming pressure Under, the moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
Assembled support construction technique based on coercion underground continuous wall structure, comprising the following steps:
Step 1: leading wall channel excavation, and staff is excavated using mini-excavator, to leading wall ditch with construction worker Slot carries out clear bottom, will lead the compacting of wall groove substrate;
Step 2: it builds branch and protects and lead wall, seven cm thick cement mortars are laid in guide wall groove, in concreting process In, it is supported using plank sheathing, leads wall top face and be made into level, after form removable, add twice one up and down every two meters along its longitudinal direction The square meter lumps of wood does inner support, and two panels is led wall and is supported;
Step 3: supporting trenching construction is parallel to chute forming machine grab bucket and leads wall, the center line of grab bucket and the center line for leading wall It is overlapped, grooving is excavated by chute forming machine;
Step 4: coercion underground continuous wall plate, by technical staff according to transport and lifting appliance ability, construction site road With stacking site condition, rationally determine that the framing and preform length of diaphram wall, wall framing width meet grooving simultaneously Stability requirement;
Step 5: prefabricated panel is hung, and by underground continuous wall plate by hoisting machine vertical lifting, is prolonged into groove groove wall and is put downwards It sets;
Step 6: the side slip casting of toe of wall wall, after prefabricated panel is placed in grooving, the slip casting into grooving be may be implemented pre- Underground continuous wall plate processed is supported using assembled supporting construction, is easy to use diaphram wall as supporting construction and basis knot The form of construction work of structure engagement, while passing through special circulating mud, soil lateral pressure and water pressure of the resistant function on cell wall, It prevents cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud forms one layer of very low mud of water penetration on cell wall Skin can prevent cell wall from peeling off, and after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, fill out The junction gap of underground continuous wall plate is mended, while under forming pressure, the moisture of silicon substrate growth bead consumption gap will follow Ring mud adhesion is fixed.
Further, during the hanging of the step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving, Suitable rubble is launched to grooving slot bottom, prefabricated panel is slowly lifted by crane, prefabricated panel is made to be compacted into the rubble of trench bottom, convenient for subtracting Pressure of the light prefabricated panel to grooving slot bottom.
Further, it during the step 2 build branch protects and lead wall, after the completion of concreting, is set around wall leading Vertical maintenance rack, and construction of guide wall seam is staggered with subterranean wall seam, damages convenient for reducing other construction personnel to supporting enclosure wall.
Further, during the step 2 build branch protects and lead wall, branch protects and lead wall section construction, and section length is according to mould Plate length and code requirement control at 40 meters, the distance of wall are protected and led convenient for control branch.
Further, during the step 3 supporting trenching construction, after chute forming machine excavates grooving, technical staff uses super Sonic wave detector checks grooving quality, convenient for checking grooving inside, finds convenient for technical staff into groove groove wall defect.
Further, during the step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is folded Layer production, and lamination number is two layers, is easy to use the very fast production underground continuous wall plate of lamination production.
Further, during the step 3 supporting trenching construction, before chute forming machine excavates grooving, in guide wall groove Circulating mud is injected, and as chute forming machine constantly excavates downwards, circulating mud is constantly injected into unfashioned grooving, convenient for supporting The anti-soil lateral pressure and water pressure acted on cell wall.
Further, the detail parameters of the circulating mud used during the step 3 supporting trenching construction are mud Specific gravity 1.05-1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, pH value 8-11, and sand factor is less than 7%, convenient for preventing cell wall from collapsing and peeling off, while preventing Groundwater infiltration.
Further, the main component of the circulating mud is that bentonite and water add bentonite and water in mixed mud sump Afterwards, it is stirred mixing, it is fine that chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl are added batch-wise in whipping process Dimension element, heavy weight additive and leak preventive, are convenient for after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid State.
Further, bead is grown filled with silicon substrate in the circulating mud, the silicon substrate growth bead is in circulating mud Interior densely arranged, the silicon substrate grows small ectosphere and is equipped with gel film, is filled with silicon substrate lubricating grease, institute in the gel film It states in gel film filled with production flocculant strain ball and silicon hydrocarbon chemical combination strain ball, the production flocculant strain ball and silicon hydrocarbon Chemical combination strain ball is uniformly arranged in silicon substrate lubricating grease, convenient under forming pressure, silicon substrate grows the moisture of bead consumption gap Circulating mud adhesion is fixed.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) coercion underground continuous wall plate may be implemented in this programme, is supported using assembled supporting construction, is easy to use underground The form of construction work that diaphragm wall is engaged as supporting construction and foundation structure, while by special circulating mud, resistant function exists Soil lateral pressure and water pressure on cell wall, prevent cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud is in slot Form the very low mudcake of one layer of water penetration on wall, can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, circulating mud at Under pressure after shape, at solid state, the junction gap of underground continuous wall plate is filled up, while under forming pressure, silicon substrate is raw The moisture of long bead consumption gap fixes circulating mud adhesion.
(2) during the hanging of step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving, to grooving slot bottom Suitable rubble is launched, prefabricated panel is slowly lifted by crane, prefabricated panel is made to be compacted into the rubble of trench bottom, convenient for mitigating prefabricated panel To the pressure of grooving slot bottom.
(3) during step 2 build branch protects and lead wall, after the completion of concreting, maintenance rack is set up around wall leading, And construction of guide wall seam is staggered with subterranean wall seam, damages convenient for reducing other construction personnel to supporting enclosure wall.
(4) during step 2 build branch protects and lead wall, branch protects and lead wall section construction, and section length is according to template length and rule Model requirement controls at 40 meters, the distance of wall is protected and led convenient for control branch.
(5) during step 3 supporting trenching construction, after chute forming machine excavates grooving, technical staff uses ultrasonic detector It checks grooving quality, convenient for checking grooving inside, finds convenient for technical staff into groove groove wall defect.
(6) during step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is lamination production, and folded The number of plies is two layers, is easy to use the very fast production underground continuous wall plate of lamination production.
(7) during step 3 supporting trenching construction, before chute forming machine excavates grooving, injection circulation mud in guide wall groove Slurry, and as chute forming machine constantly excavates downwards, circulating mud is constantly injected into unfashioned grooving, convenient for resistant function in slot Soil lateral pressure and water pressure on wall.
(8) detail parameters of the circulating mud used during step 3 supporting trenching construction are mud balance 1.05- 1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, and pH value 8-11, sand factor is less than 7%, convenient for anti- Only cell wall collapses and peels off, while preventing Groundwater infiltration.
(9) main component of circulating mud is that bentonite and water after adding bentonite and water, are stirred in mixed mud sump Mixing is mixed, chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl cellulose, exacerbation are added batch-wise in whipping process Agent and leak preventive are convenient for after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state.
(10) bead is grown filled with silicon substrate in circulating mud, silicon substrate growth bead is densely arranged in circulating mud, silicon The small ectosphere of basal growth is equipped with gel film, and silicon substrate lubricating grease is filled in gel film, is filled in gel film and produces flocculation It is uniform in silicon substrate lubricating grease to produce flocculant strain ball and silicon hydrocarbon chemical combination strain ball for agent strain ball and silicon hydrocarbon chemical combination strain ball Arrangement, convenient under forming pressure, the moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.
Detailed description of the invention
Fig. 1 is technical process figure of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description;Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments, is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instruction such as term " on ", "lower", "inner", "outside", " top/bottom end " Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot understand For indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable Connection is unloaded, or is integrally connected, can be mechanical connection, is also possible to be electrically connected, can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements, for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
Referring to Fig. 1, the assembled support construction technique based on coercion underground continuous wall structure, including following step It is rapid:
Step 1: leading wall channel excavation, and staff is excavated using mini-excavator, to leading wall ditch with construction worker Slot carries out clear bottom, will lead the compacting of wall groove substrate;
Step 2: it builds branch and protects and lead wall, seven cm thick cement mortars are laid in guide wall groove, in concreting process In, it is supported using plank sheathing, leads wall top face and be made into level, after form removable, add twice one up and down every two meters along its longitudinal direction The square meter lumps of wood does inner support, and two panels is led wall and is supported, and after the completion of concreting, maintenance rack is set up around wall leading, And construction of guide wall seam is staggered with subterranean wall seam, damages convenient for reducing other construction personnel to supporting enclosure wall, step 2 is repaired It builds during branch protects and lead wall, branch protects and lead wall section construction, and section length is controlled according to template length and code requirement 40 Rice protects and lead the distance of wall convenient for control branch;
Step 3: supporting trenching construction is parallel to chute forming machine grab bucket and leads wall, the center line of grab bucket and the center line for leading wall It being overlapped, grooving is excavated by chute forming machine, after chute forming machine excavates grooving, technical staff checks grooving quality using ultrasonic detector, Convenient for checking grooving inside, convenient for technical staff's discovery at groove groove wall defect, before chute forming machine excavates grooving, guide wall Circulating mud is injected in groove, and as chute forming machine constantly excavates downwards, constantly injects circulating mud into unfashioned grooving, Convenient for soil lateral pressure and water pressure of the resistant function on cell wall;
Step 4: coercion underground continuous wall plate, by technical staff according to transport and lifting appliance ability, construction site road With stacking site condition, rationally determine that the framing and preform length of diaphram wall, wall framing width meet grooving simultaneously Stability requirement, during step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is lamination production, and folded The number of plies is two layers, is easy to use the very fast production underground continuous wall plate of lamination production;
Step 5: prefabricated panel is hung, and by underground continuous wall plate by hoisting machine vertical lifting, is prolonged into groove groove wall and is put downwards It sets, during the hanging of step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving, is launched to grooving slot bottom appropriate Rubble, slowly lift by crane prefabricated panel, prefabricated panel made to be compacted into the rubble of trench bottom, convenient for mitigate prefabricated panel to grooving slot The pressure at bottom;
Step 6: the side slip casting of toe of wall wall, after prefabricated panel is placed in grooving, the slip casting into grooving be may be implemented pre- Underground continuous wall plate processed is supported using assembled supporting construction, is easy to use diaphram wall as supporting construction and basis knot The form of construction work of structure engagement, while passing through special circulating mud, soil lateral pressure and water pressure of the resistant function on cell wall, It prevents cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud forms one layer of very low mud of water penetration on cell wall Skin can prevent cell wall from peeling off, and after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, fill out The junction gap of underground continuous wall plate is mended, while under forming pressure, the moisture of silicon substrate growth bead consumption gap will follow Ring mud adhesion is fixed.
The detail parameters of the circulating mud used during step 3 supporting trenching construction are mud balance 1.05- 1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, and pH value 8-11, sand factor is less than 7%, convenient for anti- Only cell wall collapses and peels off, while preventing Groundwater infiltration.
The main component of circulating mud is that bentonite and water after adding bentonite and water, are stirred mixed in mixed mud sump Close, be added batch-wise in whipping process chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl cellulose, heavy weight additive and Leak preventive is convenient for after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, circulating mud Interior to grow bead filled with silicon substrate, silicon substrate growth bead is densely arranged in circulating mud, and silicon substrate grows small ectosphere equipped with solidifying Glue film, gel film is interior to be filled with silicon substrate lubricating grease, is filled in gel film and produces flocculant strain ball and silicon hydrocarbon chemical combination Strain ball, produces flocculant strain ball and silicon hydrocarbon chemical combination strain ball is uniformly arranged in silicon substrate lubricating grease, is convenient under forming pressure, The moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.
Coercion underground continuous wall plate may be implemented in the present invention, is supported using assembled supporting construction, and underground is easy to use to connect The form of construction work that continuous wall is engaged as supporting construction and foundation structure, while by special circulating mud, resistant function is in slot Soil lateral pressure and water pressure on wall, prevent cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud is in cell wall It is upper to form the very low mudcake of one layer of water penetration, it can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, circulating mud is shaping Under pressure afterwards, at solid state, the junction gap of underground continuous wall plate is filled up, while under forming pressure, silicon substrate growth The moisture of bead consumption gap fixes circulating mud adhesion.
The foregoing is intended to be a preferred embodiment of the present invention;But scope of protection of the present invention is not limited thereto. Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its It improves design and is subject to equivalent substitution or change, should be covered by the scope of protection of the present invention.

Claims (10)

1. the assembled support construction technique based on coercion underground continuous wall structure, it is characterised in that: the following steps are included:
Step 1: leading wall channel excavation, and staff is excavated using mini-excavator, with construction worker to lead wall groove into The clear bottom of row will lead the compacting of wall groove substrate;
Step 2: building branch and protect and lead wall, be laid with seven cm thick cement mortars in guide wall groove, in concreting process, It is supported using plank sheathing, leads wall top face and be made into level, after form removable, add one square meter of twice up and down every two meters along its longitudinal direction The lumps of wood does inner support, and two panels is led wall and is supported;
Step 3: supporting trenching construction is parallel to chute forming machine grab bucket and leads wall, the center line of grab bucket and the center line weight for leading wall It closes, grooving is excavated by chute forming machine;
Step 4: coercion underground continuous wall plate, by technical staff according to transport and lifting appliance ability, construction site road and heap Site condition is put, rationally determines that the framing and preform length of diaphram wall, wall framing width meet grooving simultaneously and stablize Property require;
Step 5: prefabricated panel is hung, and by underground continuous wall plate by hoisting machine vertical lifting, is prolonged into groove groove wall and is placed downwards;
Step 6: the side slip casting of toe of wall wall, after prefabricated panel is placed in grooving, the slip casting into grooving.
2. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special Sign is: during the hanging of the step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving, to grooving slot bottom Suitable rubble is launched, prefabricated panel is slowly lifted by crane, prefabricated panel is made to be compacted into the rubble of trench bottom.
3. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special Sign is: during the step 2 build branch protects and lead wall, after the completion of concreting, maintenance rack is set up around wall leading, And construction of guide wall seam is staggered with subterranean wall seam.
4. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special Sign is: during the step 2 build branch protects and lead wall, branch protects and lead wall section construction, and section length is according to template length and rule Model requirement, controls at 40 meters.
5. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special Sign is: during the step 3 supporting trenching construction, after chute forming machine excavates grooving, technical staff uses ultrasonic detector Check grooving quality.
6. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special Sign is: during the step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is lamination production, and folded The number of plies is two layers.
7. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special Sign is: during the step 3 supporting trenching construction, before chute forming machine excavates grooving, and injection circulation mud in guide wall groove Slurry, and as chute forming machine constantly excavates downwards, circulating mud is constantly injected into unfashioned grooving.
8. the assembled support construction technique according to claim 7 based on coercion underground continuous wall structure, special Sign is: the detail parameters of the circulating mud used during the step 3 supporting trenching construction are mud balance 1.05- 1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, and pH value 8-11, sand factor is less than 7%.
9. the assembled support construction technique according to claim 8 based on coercion underground continuous wall structure, special Sign is: the main component of the circulating mud is that bentonite and water after adding bentonite and water, are stirred in mixed mud sump Mixing is mixed, chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl cellulose, exacerbation are added batch-wise in whipping process Agent and leak preventive.
10. the assembled support construction technique according to claim 9 based on coercion underground continuous wall structure, special Sign is: bead is grown filled with silicon substrate in the circulating mud, the silicon substrate growth bead is densely arranged in circulating mud, The silicon substrate grows small ectosphere and is equipped with gel film, is filled with silicon substrate lubricating grease, the gel film in the gel film Interior be filled with produces flocculant strain ball and silicon hydrocarbon chemical combination strain ball, the production flocculant strain ball and silicon hydrocarbon chemical combination strain ball It uniformly arranges in silicon substrate lubricating grease.
CN201811183193.3A 2018-10-11 2018-10-11 Prefabricated underground continuous wall structure-based assembled supporting structure construction process Active CN109322311B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811183193.3A CN109322311B (en) 2018-10-11 2018-10-11 Prefabricated underground continuous wall structure-based assembled supporting structure construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811183193.3A CN109322311B (en) 2018-10-11 2018-10-11 Prefabricated underground continuous wall structure-based assembled supporting structure construction process

Publications (2)

Publication Number Publication Date
CN109322311A true CN109322311A (en) 2019-02-12
CN109322311B CN109322311B (en) 2021-03-26

Family

ID=65261849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811183193.3A Active CN109322311B (en) 2018-10-11 2018-10-11 Prefabricated underground continuous wall structure-based assembled supporting structure construction process

Country Status (1)

Country Link
CN (1) CN109322311B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844358A (en) * 2020-06-12 2020-10-30 上海市基础工程集团有限公司 Method for manufacturing cement test block in cement continuous wall construction
CN114960620A (en) * 2021-02-26 2022-08-30 中能(厦门)智慧科技有限公司 Construction method of underground continuous hollow wall
CN115094911A (en) * 2022-07-29 2022-09-23 深圳大学 Discontinuous construction method of prefabricated underground continuous wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844358A (en) * 2020-06-12 2020-10-30 上海市基础工程集团有限公司 Method for manufacturing cement test block in cement continuous wall construction
CN114960620A (en) * 2021-02-26 2022-08-30 中能(厦门)智慧科技有限公司 Construction method of underground continuous hollow wall
CN115094911A (en) * 2022-07-29 2022-09-23 深圳大学 Discontinuous construction method of prefabricated underground continuous wall

Also Published As

Publication number Publication date
CN109322311B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN107938676B (en) Pile foundation construction method for penetrating through full-filling karst cave
CN106545005B (en) A kind of reinforcing body and reinforcement means of subway tunnel shield end
CN105275381B (en) Impact drill drilling construction method in rich water pebble layer
CN108894214B (en) Karst cave geological environment cast-in-place pile and pile-forming construction method thereof
CN108914931A (en) A kind of ring-like foundation pile of the vertical shield of assembled and construction method
CN105951711A (en) Enclosing construction method of underground continuous wall of seashore power station
CN108797598A (en) The construction technology of pre-loaded support struts in a kind of deep basal pit
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN109537574B (en) Construction process of underground continuous wall in extremely hard rock
CN108797569A (en) A kind of control method that drilled pile novel energy-conserving pile crown is superfilled
CN109322311A (en) Assembled support construction technique based on coercion underground continuous wall structure
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN104153371A (en) Grouting-to-stop-water construction method of underwater rubble bed
CN112323823A (en) Filling device and method for waste air-raid shelter of pile foundation construction site
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN105714769A (en) Construction method for anti-sliding cast-in-place pile
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN114108649A (en) Foundation pit reinforcing construction method for mucky soil layer
CN102383442B (en) Water inlet pump chamber construction method
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN107587502B (en) Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile
CN112144514A (en) Simple method for forming hole and pile in sand and pebble stratum easy to collapse during rotary drilling machine
CN107956220A (en) A kind of prefabricated construction method for diaphragm walls based on TRD grooving
CN110777775A (en) Foundation pit structure and construction method thereof
CN213014295U (en) A slip casting fills device for handling abandonment air-raid shelter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190930

Address after: 528300 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: Room 105-46536, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Applicant before: Dingchen Construction Management Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant