CN109317367A - A kind of leaching molding apparatus of electri forklift power supply box - Google Patents

A kind of leaching molding apparatus of electri forklift power supply box Download PDF

Info

Publication number
CN109317367A
CN109317367A CN201810976571.7A CN201810976571A CN109317367A CN 109317367 A CN109317367 A CN 109317367A CN 201810976571 A CN201810976571 A CN 201810976571A CN 109317367 A CN109317367 A CN 109317367A
Authority
CN
China
Prior art keywords
bearing
lead screw
screw shaft
fixture
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810976571.7A
Other languages
Chinese (zh)
Inventor
杨积村
周立波
柏乐
孙世勇
顾世桃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengbu Xintai Engineering Plastic Products Co Ltd
Original Assignee
Bengbu Xintai Engineering Plastic Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengbu Xintai Engineering Plastic Products Co Ltd filed Critical Bengbu Xintai Engineering Plastic Products Co Ltd
Priority to CN201810976571.7A priority Critical patent/CN109317367A/en
Publication of CN109317367A publication Critical patent/CN109317367A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C13/00Means for manipulating or holding work, e.g. for separate articles
    • B05C13/02Means for manipulating or holding work, e.g. for separate articles for particular articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C19/00Apparatus specially adapted for applying particulate materials to surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C19/00Apparatus specially adapted for applying particulate materials to surfaces
    • B05C19/06Storage, supply or control of the application of particulate material; Recovery of excess particulate material

Abstract

A kind of leaching molding apparatus of electri forklift power supply box, including bridge crane, the hanging basket component of inverted U-shape, left fixture, right fixture, the upside of crane is equipped with horizontally disposed first motor, first motor is equipped with the lifting rope for being easy to folding and unfolding and extending straight down by winder, hanging basket component is articulated in the lower end of lifting rope, the cabinet that hanging basket component includes horizontally disposed and left and right extends, the left linking arm and right linking arm for being symmetrically arranged at the two sides of cabinet left and right directions and extending straight down, left fixture is located at the lower part of left linking arm, right fixture is located at the lower part of right linking arm, left fixture, right fixture includes the identical clamp assemblies of structure, in the positional relationship faced between two clamp assemblies, hanging basket component, left fixture, right fixture is within the frame structure of bridge crane.The present apparatus clamps fork truck power supply box using left fixture, right fixture, and completes leaching modeling operation by hanging basket, moulds compared to traditional artificial leaching, and speed is fast, high-efficient, is suitable for mass production.

Description

A kind of leaching molding apparatus of electri forklift power supply box
Technical field
The present invention relates to a kind of leaching molding apparatus of electri forklift power supply box.
Background technique
Electri forklift is using DC power supply as the handling of power and carrying vehicle.Electri forklift uses electric drive, with internal combustion Fork truck is compared, and is had many advantages, such as pollution-free, easy to operate, energy-efficient.
Electri forklift is using battery as the energy, and for the stabilization for guaranteeing battery, battery is in power supply box, power supply box It is made of metal material mostly, electric leakage is so need that insulating layer is arranged on surface, usual ambroin is to pass through leaching in order to prevent The mode of modeling is attached to power supply box surface.
For impregnation still in the initial stage of development, there are also many aspects to need to be accomplished manually at present, and efficiency is lower, no It is suitble to produce in enormous quantities.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of leaching molding apparatus of electri forklift power supply box, pass through the device The leaching modeling operation of power supply box can be efficiently completed.
In order to solve the above technical problems, the present invention provides a kind of leaching molding apparatus of electri forklift power supply box, including bridge-type Crane, the hanging basket component of inverted U-shape, left fixture, right fixture, the upside of crane are equipped with horizontally disposed first motor, the One motor is equipped with the lifting rope for being easy to folding and unfolding and extending straight down by winder, and hanging basket component is articulated in the lower end of lifting rope, hangs Basket assembly includes horizontally disposed and controls the cabinet extended, is symmetrically arranged at the two sides of cabinet left and right directions and extends straight down Left linking arm and right linking arm, left fixture are located at the lower part of left linking arm, and right fixture is located at the lower part of right linking arm, left fixture, Right fixture includes the identical clamp assemblies of structure, is in the positional relationship faced, hanging basket component, a left side between two clamp assemblies Fixture, right fixture are within the frame structure of bridge crane.
It is simple to a kind of leaching molding apparatus of electri forklift power supply box of the present invention below for the sake of simple declaration problem The referred to as present apparatus.
The advantages of present apparatus: the present apparatus clamps fork truck power supply box using left fixture, right fixture, and complete by bridge crane At leaching modeling operation, moulded compared to traditional artificial leaching, speed is fast, and high-efficient cost of labor is low, is suitable for mass production.
To reach the better using effect of the present apparatus, preferred embodiment is as follows:
Preferably, the left fixture includes the second motor, the first sprocket wheel, chain, the second sprocket wheel, first bearing, the Sleeve, the first lead screw shaft, the first worm gear, the first worm screw, third motor, the first erecting bed, second bearing, first flange group Part, clamp assemblies;
Horizontally disposed second motor connect with the second motor and is located in cabinet close to the first sprocket wheel of left linking arm, First sprocket wheel is parallel with the axis of first bearing and axis direction is left and right directions;
First bearing, first sleeve, the first lead screw shaft, the first worm gear, the second sprocket wheel, second bearing coaxial line and axis side To being left and right directions;
The outer wall of first sleeve is equipped with axially extending spline, and the inner hole of the first turbine is equipped with the outer spiral shell with the first lead screw shaft The compatible internal screw thread of line;
First bearing is inlaid in the lower part of left linking arm, and the right side of the inner ring of first bearing is equipped with coaxial line, internal diameter Identical and columnar first extension, the inner wall of the inner ring of first bearing, the first extension inner wall be equipped with mutually fitted with spline The keyway matched;
First sleeve is connected by key with first bearing and the first extension respectively, the first lead screw shaft, first sleeve socket; The left end of first sleeve exceeds the first extension beyond the right end of first bearing, first sleeve;The left end of first lead screw shaft exceeds The left end of first sleeve, the right end of the first lead screw shaft and the right end flush of first sleeve;
The first erecting bed lower than first sleeve is horizontally fixed on the lower part of left linking arm and extends to the left, first sleeve Axis it is parallel with the first erecting bed, the first worm screw for being connected, third motor are located at the left end of the first erecting bed, the first snail The axis perpendicular of bar and the first lead screw shaft, the first turbine spinning engaged with the first worm screw is in the left side of the first lead screw shaft;
The outer wall for being located to second sprocket coaxiality the first extension is circumferential, and the chain of drawing-in cabinet is separately connected the second sprocket wheel With the first sprocket wheel;
It is formed between first lead screw shaft and the right end of first sleeve with the above two coaxial lines and for accommodating second bearing Annular compartment, second bearing are coaxially placed in annular compartment, the left side of second bearing and the room bottom of annular compartment recline, Right side is concordant with the right end of first sleeve with the first lead screw shaft;
The right side of first sleeve, is equipped with the connect simultaneously with former three between second bearing at the right end of the first lead screw shaft One flange assembly, so that being fixed between former three in axial and circumferential, a clamp assemblies are mounted on first flange component Right side.
Preferably, the right fixture includes 3rd bearing, the second lead screw shaft, the second worm gear, the second worm screw, the 4th electricity Machine, the second erecting bed, fourth bearing, second flange component, clamp assemblies;
3rd bearing, the second lead screw shaft, the second worm gear, fourth bearing coaxial line and axis direction are left and right directions;
3rd bearing is inlaid in the lower part of right linking arm, and the left side of the inner ring of 3rd bearing is equipped with coaxial line, internal diameter Identical and columnar second extension, the inner wall of the inner ring of 3rd bearing, the second extension inner wall be equipped with and second The outer wall of the compatible internal screw thread of the external screw thread of thick stick axis, the second extension is equipped with axially extending spline, the inner hole of the second turbine Equipped with keyway compatible with spline;
Second turbine is connected by key with the second extension;
Inner ring of second lead screw shaft respectively with the second extension and 3rd bearing is screwed on, and the left end of the second lead screw shaft is beyond the Two extensions, right end exceed 3rd bearing;
The second erecting bed lower than 3rd bearing is horizontally fixed on the lower part of right linking arm and extends to the left, 3rd bearing Axis it is parallel with the second erecting bed, the second worm screw for being connected, the 4th motor are located at the left end of the second erecting bed, the second snail The axis perpendicular of bar and the second lead screw shaft, the second turbine are meshed with the second worm screw;
The left end of second lead screw shaft is equipped with coaxial line and flushes in the fourth bearing at the end;
The second flange component connecting simultaneously with the above two is equipped between the left side of second lead screw shaft, fourth bearing, so that It is fixed between the above two in axial and circumferential, another clamp assemblies are mounted on the left side of second flange component.
The operation that the clamping and overturning to power supply box can be completed by left fixture, right fixture, can be convenient will be extra Molding powder pours out power box body.
Preferably, the lower horizontal of the right linking arm be equipped with to the right extend and be lower than the second lead screw shaft third Erecting bed, the right end of third erecting bed is horizontally equipped with the second lead screw shaft coaxial line and lumen cross sectional shape is circular support Casing, the right side of the second lead screw shaft and supporting sleeve are socketed.
Supporting sleeve makes support suffered by the second lead screw shaft left and right sides to playing a supporting role on the right side of the second lead screw shaft Dynamic balance.
Preferably, the first flange component include horizontal left and right arrangement and open at both ends the first installation cylinder, Level left and right arrangement the first bolt, arrange vertically first circle baffle, former three with the first lead screw shaft coaxial line;
The right end outer rim of first installation cylinder is equipped with the first flange plate of circumferentially extending and annular, and first installs the interior of cylinder Hole is made of the first circular hole, the second circular hole that left and right coaxial communication and internal diameter are incremented by, and forms ring between the first circular hole, the second circular hole The First terrace of shape, first installation the outer diameter of cylinder, the outer diameter of first sleeve, the first circular hole internal diameter successively successively decrease;
The right side of first sleeve is inserting section compatible with the first circular hole, and inserting section is inserted into the first circular hole, the first circle Baffle penetrates in the second circular hole, and the central area of the first bolt drawing-in first circle baffle screws among the right end of the first lead screw shaft, So that the first circle baffle is tight with First terrace, the right end of inserting section, the right side of second bearing, the right end of the first lead screw shaft respectively Close abutting contact;
One clamp assemblies are mounted on the right side of first flange plate.
A clamp assemblies are made to be easily installed in the right side of left fixture by first flange component, first flange component also has Have the advantages that structure is simple, convenient for disassembly and assembly.
Preferably, the second flange component include horizontal left and right arrangement and open at both ends the second installation cylinder, The blockings cylinder of level left and right arrangement, the second bolt of horizontal left and right arrangement, the second round baffle for arranging vertically, preceding four with Second lead screw shaft coaxial line;
The left end outer rim of second installation cylinder is equipped with the second flange plate of circumferentially extending and annular, and second installs the interior of cylinder Hole is made of third circular hole, the 4th circular hole that left and right coaxial communication and internal diameter are incremented by, and forms ring between third circular hole, the 4th circular hole The second step face of shape;
Stop the left end of cylinder open, stops to be provided with the blocking plectane that circle first is perforated centered on the right end of cylinder, resistance The outer diameter for keeping off plectane is greater than the outer diameter for stopping cylinder, stops the outer diameter of the outer diameter of cylinder and the internal diameter of the 4th circular hole, fourth bearing It is identical, stop plectane identical as the second installation outer diameter of cylinder;
The diameter of second circle baffle is identical as the outer diameter of the inner ring of fourth bearing;
Stop cylinder to be sleeved on the left side of the second lead screw shaft by the first perforation of circle and be located at fourth bearing and second to prolong Between extending portion, fourth bearing stops cylinder to be inserted into the 4th circular hole, the left side and second step face of the outer ring of fourth bearing Closely against contact, stop cylinder and the right side of the outer ring of fourth bearing closely against contacting, the right end of the second installation cylinder with Stop plectane closely against contact;Second circle baffle penetrates in third circular hole, the center of the second bolt drawing-in second circle baffle Domain screw in the second lead screw shaft left end among so that second circle baffle respectively with the left side of the inner ring of fourth bearing, the second lead screw The left end of axis is closely against contact;
Another clamp assemblies are mounted on the left side of second flange plate.
Another clamp assemblies are made to be easily installed in the left side of right fixture, second flange component by second flange component Have the advantages that structure is simple, convenient for disassembly and assembly.
Preferably, the clamp assemblies include vertical arrangement and circular mounting flange plate, rectangular fixed block, two End closure and circular support tube, two-way lead screw shaft, two screws, two horizontally disposed and identical pin rods of specification;
The normal direction of mounting flange plate, two pin rods axis direction be left and right directions;
Fixed block is located at the central area of mounting flange plate either side, is horizontally provided on fixed block for installing support Pipe and axis direction are the in the front-back direction second perforation;
The middle section region of support tube coaxially places and is fixed in the second perforation, so that support tube connects with fixed block, The every side of the length direction of support tube is mutually provided with a strip far from the horizontal perforation in place with mounting flange plate in position Resettlement groove, the specification of two resettlement grooves is identical, flute length trend is front-rear direction and is in symmetry status relative to fixed block;
The axis direction of two-way lead screw shaft is front-rear direction, and the every side of the length direction of two-way lead screw shaft is equipped with a screw thread Section, two thread segments are in inverse state, one corresponding screw of each spinning on each thread segment spinning up;
Spinning is coaxially inserted and is carried on a shoulder pole there are two the two-way lead screw shaft of screw and sets in support tube, the length of two-way lead screw shaft The degree every end in direction exceeds support tube, two thread segments of two-way lead screw shaft and corresponding two screws and two resettlement grooves are in place It is corresponding one by one to set difference;
Extension block of each pin rod by being slidably matched with any resettlement groove, the conical head coaxial line outside support tube are connect It forms;
Each screw is connected to the corresponding extension block of the ipsilateral resettlement groove of drawing-in;
Clamp assemblies are connect by mounting flange plate with first flange plate or second flange plate.
Two-way lead screw shaft is rotated when use, with the rotation of two-way lead screw shaft, two screws are along the axial same of two-way lead screw shaft To movement or counter motion, clamped to adjust the distance between two pin rods with the power supply box to different model.
Preferably, the first motor is the servo motor with speed reducer;In left linking arm and right linking arm Portion is equipped with vibrating motor.
Preferably, second motor, third motor are the servo motor with speed reducer.
Preferably, the 4th motor is the servo motor with speed reducer.
Servo motor is very accurate to speed, position precision control, and energy fast reaction, and has electromechanical time constant Advantage small, the linearity is high can be started with moment, moment stops, accurate positioning.Vibrating motor can be assisted power supply box surface Remaining molding powder is shaken off.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present apparatus.
Fig. 2 is the partial enlarged view in the portion A in Fig. 1.
Fig. 3 is the partial enlarged view in the portion B in Fig. 1.
Fig. 4 is the main view of clamp assemblies in the present apparatus.
Fig. 5 is the top view of clamp assemblies in the present apparatus.
Fig. 6 is the transverse sectional view of Fig. 5.
Fig. 7 is the longitudinal sectional view of Fig. 5.
Specific embodiment
Referring to Fig. 1-Fig. 7, the present apparatus includes bridge crane 1, the hanging basket component 2 of inverted U-shape, left fixture 3, right fixture 4.
The upside of crane 1 is equipped with horizontally disposed first motor 11, and the first motor 11 is watching with speed reducer Motor is taken, first motor 11 is equipped with the lifting rope 13 for being easy to folding and unfolding and extending straight down by winder 12, and lifting rope 13 uses steel Cord, hanging basket component 2 are articulated in the lower end of lifting rope 13, hanging basket component 2 includes horizontally disposed and left and right extends cabinet 21, symmetrical The left linking arm 22 and right linking arm 23 for being located at the two sides of 21 left and right directions of cabinet and extending straight down, left linking arm 22 and the right side The middle part of linking arm 23 is equipped with vibrating motor 24, and left fixture 3 is located at the lower part of left linking arm 22, and right fixture 4 is located at right connection The lower part of arm 23, left fixture 3, right fixture 4 include the identical clamp assemblies 5 of structure, are in face between two clamp assemblies 5 Positional relationship, hanging basket component 2, left fixture 3, right fixture 4 are within the frame structure of bridge crane 1.
The left fixture 3 includes the second motor, the first sprocket wheel 311, chain 312, the second sprocket wheel 313, first bearing 32, the Sleeve 33, the first lead screw shaft 34, the first worm gear 35, the first worm screw 351, third motor (third motor is not shown in the figure), One erecting bed 36, second bearing 38, first flange component 39, clamp assemblies 5.
Horizontally disposed second motor connect with the second motor and is located at case close to the first sprocket wheel 311 of left linking arm 22 In body 21, second motor is the servo motor with speed reducer, and the first sprocket wheel 311 is equal with the axis of first bearing 32 It goes and axis direction is left and right directions.
First bearing 32, first sleeve 33, the first lead screw shaft 34, the first worm gear 35, the second sprocket wheel 313, second bearing 38 Coaxial line and axis direction are left and right directions.
The outer wall of first sleeve 33 is equipped with axially extending spline, and the inner hole of the first turbine is equipped with and the first lead screw shaft 34 The compatible internal screw thread of external screw thread.
First bearing 32 is inlaid in the lower part of left linking arm 22, and the right side of the inner ring of first bearing 32 is equipped with coaxial Line, internal diameter be identical and columnar first extension 321, the inner wall of the inner wall of the inner ring of first bearing 32, the first extension 321 Equipped with keyway compatible with spline.
First sleeve 33 is connected by key with first bearing 32 and the first extension 321 respectively, the first lead screw shaft 34, first Casing 33 is socketed;The left end of first sleeve 33 exceeds the first extension 321 beyond the right end of first bearing 32, first sleeve 33; The left end of first lead screw shaft 34 exceeds the left end of first sleeve 33, the right end of the first lead screw shaft 34 and the right end phase of first sleeve 33 Concordantly.
The first erecting bed 36 lower than first sleeve 33 is horizontally fixed on the lower part of left linking arm 22 and extends to the left, the The axis of sleeve 33 is parallel with the first erecting bed 36, and the left end of the first erecting bed 36 is directed toward and close to the first lead screw shaft 34 Left end, two left ends are respectively positioned on the left side of left linking arm 22, and the first worm screw 351 for being connected, third motor are located at The left end of first erecting bed 36, the third motor are the servo motor with speed reducer, the first worm screw 351 and the first lead screw The axis perpendicular of axis 34, the first turbine spinning engaged with the first worm screw 351 is in the left side of the first lead screw shaft 34.
The outer wall that second sprocket wheel 313 is coaxially disposed at the first extension 321 is circumferential, and the chain 312 of drawing-in cabinet 21 is distinguished Connect the second sprocket wheel 313 and the first sprocket wheel 311.
It is formed between first lead screw shaft 34 and the right end of first sleeve 33 with the above two coaxial lines and for accommodating the second axis 38 annular compartment 37 is held, second bearing 38 is coaxially placed in annular compartment 37, the left side of second bearing 38 and annular The room bottom of chamber 37 reclines, right side and the first lead screw shaft 34 are concordant with the right end of first sleeve 33.
The right side of first sleeve 33, the right end of the first lead screw shaft 34 are equipped between second bearing 38 and connect simultaneously with former three The first flange component 39 connect, so that being fixed between former three in axial and circumferential, a clamp assemblies 5 are mounted on first The right side of flange assembly 39.
The first flange component 39 includes level left and right arrangement and the first installation cylinder 391 of open at both ends, a horizontal left side First bolt 392 of right arrangement, first arranged vertically circle baffle 393, former three with 34 coaxial line of the first lead screw shaft.
The right end outer rim of first installation cylinder 391 is equipped with the first flange plate 394 of circumferentially extending and annular, the first installation circle The inner hole of cylinder 391 is made of the first circular hole 3911, the second circular hole 3912 that left and right coaxial communication and internal diameter are incremented by, the first circular hole 3911, the First terrace of annular is formed between the second circular hole 3912, the first installation outer diameter of cylinder 391, first sleeve 33 Outer diameter, the first circular hole 3911 internal diameter successively successively decrease.
The right side of first sleeve 33 is inserting section compatible with the first circular hole 3911, and inserting section is inserted into the first circular hole 3911 In, the first circle baffle 393 penetrates in the second circular hole 3912, and the central area of 392 drawing-in first of the first bolt circle baffle 393 screws in Among the right end of first lead screw shaft 34 so that first circle baffle 393 respectively with First terrace, the right end of inserting section, the second axis Hold 38 right side, the first lead screw shaft 34 right end closely against contact.
One clamp assemblies 5 are mounted on the right side of first flange plate 394.
The right fixture 4 includes 3rd bearing 41, the second lead screw shaft 42, the second worm gear 43, the 431, the 4th electricity of the second worm screw Machine (the 4th motor is not shown in the figure), the second erecting bed 44, fourth bearing 45, second flange component 46, clamp assemblies 5.
3rd bearing 41, the second lead screw shaft 42, the second worm gear 43,45 coaxial line of fourth bearing and axis direction are left and right Direction.
3rd bearing 41 is inlaid in the lower part of right linking arm 23, and the left side of the inner ring of 3rd bearing 41 is equipped with coaxial Line, internal diameter be identical and columnar second extension 411, the inner wall of the inner wall of the inner ring of 3rd bearing 41, the second extension 411 It is equipped with internal screw thread compatible with the external screw thread of the second lead screw shaft 42, the outer wall of the second extension 411 is equipped with axially extending The inner hole of spline, the second turbine is equipped with keyway compatible with spline.
Second turbine is connected by key with the second extension 411.
Inner ring of second lead screw shaft 42 respectively with the second extension 411 and 3rd bearing 41 is screwed on, the second lead screw shaft 42 Left end exceeds 3rd bearing 41 beyond the second extension 411, right end.
The second erecting bed 44 lower than 3rd bearing 41 is horizontally fixed on the lower part of right linking arm 23 and extends to the left, the The axis of three bearings 41 is parallel with the second erecting bed 44, and the left end of the second erecting bed 44 is directed toward and close to the second lead screw shaft 42 Left end, two left ends are respectively positioned on the left side of right linking arm 23, and the second worm screw 431 for being connected, the 4th motor are located at The left end of second erecting bed 44, the 4th motor are the servo motor with speed reducer, the second worm screw 431 and the second lead screw shaft 42 axis perpendicular, the second turbine are meshed with the second worm screw 431.
The lower horizontal of the right linking arm 23 it is equipped with the third erecting bed for extending and being lower than to the right the second lead screw shaft 42 47, the right end of third erecting bed 47 is horizontally equipped with 42 coaxial line of the second lead screw shaft and lumen cross sectional shape is circular support Casing 471, the right side of the second lead screw shaft 42 and supporting sleeve 471 are socketed.The axis and third erecting bed 47 of second lead screw shaft 42 Parallel, the right end of third erecting bed 47 is directed toward and close to the right end of the second lead screw shaft 42, and two right ends are located at the right side The right side of linking arm 23.
The left end of second lead screw shaft 42 is equipped with coaxial line and flushes in the fourth bearing 45 at the end.
The second flange component connecting simultaneously with the above two is equipped between the left side of second lead screw shaft 42, fourth bearing 45 46, so that being fixed between the above two in axial and circumferential, another clamp assemblies 5 are mounted on a left side for second flange component 46 Side.
The second flange component 46 includes level left and right arrangement and the second installation cylinder 461 of open at both ends, a horizontal left side The blocking cylinder 462 of right arrangement, horizontal or so the second bolt 463 of arrangement, the second circle baffle 464 arranged vertically, preceding four With 42 coaxial line of the second lead screw shaft.
The left end outer rim of second installation cylinder 461 is equipped with the second flange plate 465 of circumferentially extending and annular, the second installation circle The inner hole of cylinder 461 is made of third circular hole 4611, the 4th circular hole 4612 that left and right coaxial communication and internal diameter are incremented by, third circular hole 4611, the second step face of annular is formed between the 4th circular hole 4612.
Stop the left end of cylinder 462 open, the resistance of the first perforation 4622 of circle is provided with centered on the right end of blocking cylinder 462 Plectane 4621 is kept off, the outer diameter of plectane 4621 is stopped to be greater than the outer diameter for stopping cylinder 462, stops the outer diameter and the 4th circle of cylinder 462 Internal diameter, the outer diameter of fourth bearing 45 in hole 4612 are identical, stop plectane 4621 identical as the second installation outer diameter of cylinder 461.
The diameter of second circle baffle 464 is identical as the outer diameter of the inner ring of fourth bearing 45.
Stop cylinder 462 to be sleeved on the left side of the second lead screw shaft 42 by the first perforation 4622 of circle and is located at fourth bearing 45 and second between extension 411, and fourth bearing 45 stops cylinder 462 to be inserted into the 4th circular hole 4612, fourth bearing 45 Outer ring left side and second step face closely against contacting, stop cylinder 462 and the right side of the outer ring of fourth bearing 45 close Abutting contact, the right end of the second installation cylinder 461 is with blocking plectane 4621 closely against contacting;Second circle baffle 464 penetrates the In three circular holes 4611,463 drawing-in second of the second bolt circle baffle 464 central area screw in the second lead screw shaft 42 left end it In so that second circle baffle 464 respectively with the left side of the inner ring of fourth bearing 45, the second lead screw shaft 42 left end closely against Contact.
Another clamp assemblies 5 are mounted on the left side of second flange plate 465.
The clamp assemblies 5 include vertical arrangement and circular mounting flange plate 51, rectangular fixed block 52, sealing two ends And circular support tube 53, the identical pin rod of horizontally disposed and specification of screw 55, two of two-way lead screw shaft 54, two.
The normal direction of mounting flange plate 51, two pin rods axis direction be left and right directions.
Fixed block 52 is located at the central area of 51 either side of mounting flange plate, is horizontally provided on fixed block 52 for pacifying It fills support tube 53 and axis direction is the second perforation 521 in the front-back direction.
The middle section region of support tube 53 coaxially places and is fixed in the second perforation 521, so that support tube 53 and fixation Block 52 connects, and the every side of the length direction of support tube 53 is provided with 51 phase of mounting flange plate far from the horizontal perforation in place in position The resettlement groove 531 of one strip, the specification of two resettlement grooves 531 is identical, flute length moves towards for front-rear direction and relative to fixation Block 52 is in symmetry status.
The axis direction of two-way lead screw shaft 54 is front-rear direction, and the every side of length direction of two-way lead screw shaft 54 is equipped with one Thread segment, two thread segments are in inverse state, the corresponding screw 55 of each spinning one on each thread segment spinning up.
Spinning is coaxially inserted and is carried on a shoulder pole there are two the two-way lead screw shaft 54 of screw 55 and sets in support tube 53, two-way lead screw The every end of the length direction of axis 54 exceeds support tube 53, two thread segments of two-way lead screw shaft 54 and corresponding two screws 55 with Two resettlement grooves 531 are distinguished corresponding one by one in position.
Extension block 561 of each pin rod by being slidably matched with any resettlement groove 531, the conical head outside support tube 53 are total to Axis is formed by connecting, and the height of extension block 561 is identical as the groove width of resettlement groove 531.
Each screw 55 is connected to the corresponding extension block 561 of the ipsilateral resettlement groove 531 of drawing-in.
Clamp assemblies 5 are connect by mounting flange plate 51 with first flange plate 394 or second flange plate 465.
The workflow of the present apparatus: molding powder case 14 is set to the lower section of the present apparatus, is equipped with modeling inside 14 opening upwards of molding powder case Powder adjusts the two-way lead screw shaft 54 of two clamp assemblies 5 so that the distance between two pin rods on each clamp assemblies 5 with The pitch match of preset pin hole on power supply box, the power supply box opening upwards after heating, then third motor, the 4th motor driven Worm screw is inserted into the pin rod of two clamp assemblies 5 respectively in the pin hole of power supply box two sides, then will be hung by first motor 11 The molding powder that basket assembly 2 drops in molding powder case 14 did not had power supply box just, was then lifted out hanging basket component 2 away from molding powder case 14, power supply box then is overturn by the second motor, the extra molding powder in power supply box is refunded in molding powder case 14, and start vibration Dynamic motor 24, the extra molding powder for being attached to power supply box surface is shaken off.
The advantages of present apparatus: the present apparatus is clamped fork truck power supply box, and is passed through bridge crane using left fixture 3, right fixture 4 1 completes leaching modeling operation, moulds compared to traditional artificial leaching, speed is fast, and high-efficient cost of labor is low, is suitable for mass production.Branch Support set pipe 471 plays a supporting role to the right side of the second lead screw shaft 42, makes support force suffered by 42 left and right sides of the second lead screw shaft Balance.Servo motor is very accurate to speed, position precision control, and energy fast reaction, and the small, line with electromechanical time constant Property the high advantage of degree, can with moment start, moment stop, be accurately positioned.

Claims (10)

1. a kind of leaching molding apparatus of electri forklift power supply box, it is characterised in that: the hanging basket group including bridge crane, inverted U-shape Part, left fixture, right fixture, the upside of crane are equipped with horizontally disposed first motor, and first motor is equipped with easy by winder The lifting rope extended in folding and unfolding and straight down, hanging basket component are articulated in the lower end of lifting rope, and hanging basket component includes horizontally disposed and left The cabinet of right extension, the two sides for being symmetrically arranged at cabinet left and right directions and the left linking arm and right linking arm that extend straight down, it is left Fixture is located at the lower part of left linking arm, and right fixture is located at the lower part of right linking arm, and left fixture, right fixture include that structure is identical Clamp assemblies, in the positional relationship faced between two clamp assemblies, hanging basket component, left fixture, right fixture rise in bridge-type Within the frame structure of heavy-duty machine.
2. a kind of leaching molding apparatus of electri forklift power supply box according to claim 1, it is characterised in that:
The left fixture includes the second motor, the first sprocket wheel, chain, the second sprocket wheel, first bearing, first sleeve, the first lead screw Axis, the first worm gear, the first worm screw, third motor, the first erecting bed, second bearing, first flange component, clamp assemblies;
Horizontally disposed second motor connect with the second motor and is located in cabinet close to the first sprocket wheel of left linking arm, first Sprocket wheel is parallel with the axis of first bearing and axis direction is left and right directions;
First bearing, first sleeve, the first lead screw shaft, the first worm gear, the second sprocket wheel, second bearing coaxial line and axis direction are equal For left and right directions;
The outer wall of first sleeve is equipped with axially extending spline, and the inner hole of the first turbine is equipped with the external screw thread phase with the first lead screw shaft The internal screw thread of adaptation;
First bearing is inlaid in the lower part of left linking arm, and it is identical that the right side of the inner ring of first bearing is equipped with coaxial line, internal diameter And columnar first extension, the inner wall of the inner ring of first bearing, the first extension inner wall be equipped with it is compatible with spline Keyway;
First sleeve is connected by key with first bearing and the first extension respectively, the first lead screw shaft, first sleeve socket;First The left end of casing exceeds the first extension beyond the right end of first bearing, first sleeve;The left end of first lead screw shaft exceeds first The left end of casing, the right end of the first lead screw shaft and the right end flush of first sleeve;
The first erecting bed lower than first sleeve is horizontally fixed on the lower part of left linking arm and extends to the left, the axis of first sleeve Line is parallel with the first erecting bed, and the first worm screw for being connected, third motor are located at the left end of the first erecting bed, the first worm screw and The axis perpendicular of first lead screw shaft, the first turbine spinning engaged with the first worm screw is in the left side of the first lead screw shaft;
The outer wall for being located to second sprocket coaxiality the first extension is circumferential, and the chain of drawing-in cabinet is separately connected the second sprocket wheel and the One sprocket wheel;
It is formed between first lead screw shaft and the right end of first sleeve with the above two coaxial lines and for accommodating the annular of second bearing Chamber, second bearing are coaxially placed in annular compartment, and the left side of second bearing and the room bottom of annular compartment recline, right side It is concordant with the right end of first sleeve with the first lead screw shaft;
The right side of first sleeve, is equipped with the first method connecting simultaneously with former three between second bearing at the right end of the first lead screw shaft Blue component, so that being fixed between former three in axial and circumferential, a clamp assemblies are mounted on the right side of first flange component Side.
3. a kind of leaching molding apparatus of electri forklift power supply box according to claim 1, it is characterised in that:
The right fixture include 3rd bearing, the second lead screw shaft, the second worm gear, the second worm screw, the 4th motor, the second erecting bed, Fourth bearing, second flange component, clamp assemblies;
3rd bearing, the second lead screw shaft, the second worm gear, fourth bearing coaxial line and axis direction are left and right directions;
3rd bearing is inlaid in the lower part of right linking arm, and it is identical that the left side of the inner ring of 3rd bearing is equipped with coaxial line, internal diameter And columnar second extension, the inner wall of the inner ring of 3rd bearing, the second extension inner wall be equipped with and the second lead screw shaft The compatible internal screw thread of external screw thread, the outer wall of the second extension is equipped with axially extending spline, and the inner hole of the second turbine is equipped with Keyway compatible with spline;
Second turbine is connected by key with the second extension;
Inner ring of second lead screw shaft respectively with the second extension and 3rd bearing is screwed on, and the left end of the second lead screw shaft is prolonged beyond second Extending portion, right end exceed 3rd bearing;
The second erecting bed lower than 3rd bearing is horizontally fixed on the lower part of right linking arm and extends to the left, the axis of 3rd bearing Line is parallel with the second erecting bed, and the second worm screw for being connected, the 4th motor are located at the left end of the second erecting bed, the second worm screw and The axis perpendicular of second lead screw shaft, the second turbine are meshed with the second worm screw;
The left end of second lead screw shaft is equipped with coaxial line and flushes in the fourth bearing at the end;
The second flange component connecting simultaneously with the above two is equipped between the left side of second lead screw shaft, fourth bearing, so that preceding two It is fixed between person in axial and circumferential, another clamp assemblies are mounted on the left side of second flange component.
4. a kind of leaching molding apparatus of electri forklift power supply box according to claim 3, it is characterised in that:
The lower horizontal of the right linking arm it is equipped with the third erecting bed for extending and being lower than to the right the second lead screw shaft, third installation The right end of platform is horizontally equipped with the second lead screw shaft coaxial line and lumen cross sectional shape is circular supporting sleeve, the second lead screw shaft Right side and supporting sleeve be socketed.
5. a kind of leaching molding apparatus of electri forklift power supply box according to claim 2, it is characterised in that:
The first flange component include the first installation cylinder of horizontal left and right arrangement and open at both ends, horizontal left and right arrangement the One bolt, first arranged vertically circle baffle, former three with the first lead screw shaft coaxial line;
First installation cylinder right end outer rim be equipped with circumferentially extending and annular first flange plate, first installation cylinder inner hole by The first incremental circular hole of left and right coaxial communication and internal diameter, the second circular hole are constituted, and annular is formed between the first circular hole, the second circular hole First terrace, first installation the outer diameter of cylinder, the outer diameter of first sleeve, the first circular hole internal diameter successively successively decrease;
The right side of first sleeve is inserting section compatible with the first circular hole, and inserting section is inserted into the first circular hole, the first circle baffle It penetrating in the second circular hole, the central area of the first bolt drawing-in first circle baffle screws among the right end of the first lead screw shaft, so that Right end of the first circle baffle respectively with First terrace, the right end of inserting section, the right side of second bearing, the first lead screw shaft closely pastes By contact;
One clamp assemblies are mounted on the right side of first flange plate.
6. a kind of leaching molding apparatus of electri forklift power supply box according to claim 3, it is characterised in that:
The second flange component includes the resistance of the second installation cylinder, horizontal left and right arrangement of horizontal left and right arrangement and open at both ends Gear cylinder, horizontal or so the second bolt of arrangement, the second circle baffle arranged vertically, preceding four is coaxial with the second lead screw shaft Line;
Second installation cylinder left end outer rim be equipped with circumferentially extending and annular second flange plate, second installation cylinder inner hole by The incremental third circular hole of left and right coaxial communication and internal diameter, the 4th circular hole are constituted, and annular is formed between third circular hole, the 4th circular hole Second step face;
Stop the left end of cylinder open, stops to be provided with the blocking plectane that circle first is perforated centered on the right end of cylinder, stop circle The outer diameter of plate is greater than the outer diameter for stopping cylinder, stops the outer diameter of cylinder identical as the internal diameter of the 4th circular hole, the outer diameter of fourth bearing, Stop plectane identical as the second installation outer diameter of cylinder;
The diameter of second circle baffle is identical as the outer diameter of the inner ring of fourth bearing;
Stop cylinder to be sleeved on the left side of the second lead screw shaft by the first perforation of circle and is located at fourth bearing and the second extension Between, fourth bearing stops cylinder to be inserted into the 4th circular hole, and the left side and second step face of the outer ring of fourth bearing are close Abutting contact stops cylinder with the right side of the outer ring of fourth bearing closely against contacting, and second installs the right end of cylinder and blocking Plectane is closely against contact;Second circle baffle penetrates in third circular hole, the central area rotation of the second bolt drawing-in second circle baffle Among the left end for entering the second lead screw shaft so that the second circle baffle respectively with the left side of the inner ring of fourth bearing, second lead screw shaft Left end is closely against contact;
Another clamp assemblies are mounted on the left side of second flange plate.
7. a kind of leaching molding apparatus of electri forklift power supply box according to claim 5 or 6, it is characterised in that:
The clamp assemblies include vertical arrangement and circular mounting flange plate, rectangular fixed block, sealing two ends and circular Support tube, two-way lead screw shaft, two screws, two horizontally disposed and identical pin rods of specification;
The normal direction of mounting flange plate, two pin rods axis direction be left and right directions;
Fixed block is located at the central area of mounting flange plate either side, be horizontally provided on fixed block for install support tube and Axis direction is the in the front-back direction second perforation;
The middle section region of support tube coaxially places and is fixed in the second perforation, so that support tube connects with fixed block, support The every side of the length direction of pipe is mutually provided with the placement of a strip with mounting flange plate far from the horizontal perforation in place in position Slot, the specification of two resettlement grooves is identical, flute length trend is front-rear direction and is in symmetry status relative to fixed block;
The axis direction of two-way lead screw shaft is front-rear direction, and the every side of the length direction of two-way lead screw shaft is equipped with a thread segment, Two thread segments are in inverse state, one corresponding screw of each spinning on each thread segment spinning up;
Spinning is coaxially inserted and is carried on a shoulder pole there are two the two-way lead screw shaft of screw and sets in support tube, the length side of two-way lead screw shaft Exceed support tube, two thread segments of two-way lead screw shaft and corresponding two screws and two resettlement grooves in position to every end It is corresponding one by one respectively;
Extension block of each pin rod by being slidably matched with any resettlement groove, the conical head coaxial line outside support tube connect and At;
Each screw is connected to the corresponding extension block of the ipsilateral resettlement groove of drawing-in;
Clamp assemblies are connect by mounting flange plate with first flange plate or second flange plate.
8. a kind of leaching molding apparatus of electri forklift power supply box according to claim 1, it is characterised in that: the first motor For the servo motor with speed reducer;Vibrating motor is equipped in the middle part of left linking arm and right linking arm.
9. a kind of leaching molding apparatus of electri forklift power supply box according to claim 2, it is characterised in that: second electricity Machine, third motor are the servo motor with speed reducer.
10. a kind of leaching molding apparatus of electri forklift power supply box according to claim 3, it is characterised in that: the 4th electricity Machine is the servo motor with speed reducer.
CN201810976571.7A 2018-08-25 2018-08-25 A kind of leaching molding apparatus of electri forklift power supply box Pending CN109317367A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810976571.7A CN109317367A (en) 2018-08-25 2018-08-25 A kind of leaching molding apparatus of electri forklift power supply box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810976571.7A CN109317367A (en) 2018-08-25 2018-08-25 A kind of leaching molding apparatus of electri forklift power supply box

Publications (1)

Publication Number Publication Date
CN109317367A true CN109317367A (en) 2019-02-12

Family

ID=65263827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810976571.7A Pending CN109317367A (en) 2018-08-25 2018-08-25 A kind of leaching molding apparatus of electri forklift power supply box

Country Status (1)

Country Link
CN (1) CN109317367A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113102164A (en) * 2021-04-01 2021-07-13 山东金帝精密机械科技股份有限公司 Clamping and vibrating device of plastic-impregnated bearing retainer

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253963A (en) * 1996-03-21 1997-09-30 Ckd Corp Clamp device and feeding device
CN103252614A (en) * 2013-04-19 2013-08-21 杭州凯尔达机器人科技股份有限公司 Double-gantry lifting type turnover machine
CN203355974U (en) * 2013-07-25 2013-12-25 嘉兴永信精密钢管有限公司 Steel tube oil immersion device
CN203976291U (en) * 2014-06-20 2014-12-03 莱芜金鼎电子材料有限公司 Suspension type Copper Foil volume transport trolley
CN205361873U (en) * 2015-12-30 2016-07-06 安徽力普拉斯电源技术有限公司 A clamping device for iron box soaks and moulds processing
CN205590164U (en) * 2016-05-05 2016-09-21 东风设计研究院有限公司 Rotatory hoist of instrument board
KR20170043062A (en) * 2015-10-12 2017-04-20 두산중공업 주식회사 Pipe cutting apparatus for cutting a steam pipe of the waste nuclear generators
CN208976186U (en) * 2018-08-25 2019-06-14 蚌埠市鑫泰工程塑料制品有限公司 A kind of leaching molding apparatus of electri forklift power supply box

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253963A (en) * 1996-03-21 1997-09-30 Ckd Corp Clamp device and feeding device
CN103252614A (en) * 2013-04-19 2013-08-21 杭州凯尔达机器人科技股份有限公司 Double-gantry lifting type turnover machine
CN203355974U (en) * 2013-07-25 2013-12-25 嘉兴永信精密钢管有限公司 Steel tube oil immersion device
CN203976291U (en) * 2014-06-20 2014-12-03 莱芜金鼎电子材料有限公司 Suspension type Copper Foil volume transport trolley
KR20170043062A (en) * 2015-10-12 2017-04-20 두산중공업 주식회사 Pipe cutting apparatus for cutting a steam pipe of the waste nuclear generators
CN205361873U (en) * 2015-12-30 2016-07-06 安徽力普拉斯电源技术有限公司 A clamping device for iron box soaks and moulds processing
CN205590164U (en) * 2016-05-05 2016-09-21 东风设计研究院有限公司 Rotatory hoist of instrument board
CN208976186U (en) * 2018-08-25 2019-06-14 蚌埠市鑫泰工程塑料制品有限公司 A kind of leaching molding apparatus of electri forklift power supply box

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113102164A (en) * 2021-04-01 2021-07-13 山东金帝精密机械科技股份有限公司 Clamping and vibrating device of plastic-impregnated bearing retainer
CN113102164B (en) * 2021-04-01 2022-07-15 山东金帝精密机械科技股份有限公司 Clamping and vibrating device of plastic-impregnated bearing retainer

Similar Documents

Publication Publication Date Title
CN101234731B (en) Internal-swelling type stator hoisting special purpose tools
CN102672392B (en) Suspension clamping device
CN208976186U (en) A kind of leaching molding apparatus of electri forklift power supply box
CN208178741U (en) A kind of welding rod extrusion device
CN109317367A (en) A kind of leaching molding apparatus of electri forklift power supply box
CN105127391A (en) Novel vertical-type centrifugal casting machine
CN204787669U (en) Dewatering centrifuge device
CN107191399A (en) A kind of electric fan for being easy to repair
CN208800339U (en) A kind of fixture for electri forklift power supply box leaching molding apparatus
CN208391888U (en) Positioning fixture is used in a kind of heating of round steel
CN207297393U (en) A kind of water circulating pump fast safeguarded
CN103934148A (en) Coating machine
CN204364980U (en) Crystallizing and washing filter drying apparatus
CN209665431U (en) A kind of Steel Structure Installation frame of industrial robot
CN108787351A (en) A kind of fixture for electri forklift power supply box leaching molding apparatus
CN209652465U (en) It is a kind of for flying the automatic rotation pouring machine of palladium hanger
CN210093075U (en) Full-automatic partition plate inserting equipment for motor stator
CN208605832U (en) A kind of bottom fixation kit of steam generating tank mounting rack
CN206717402U (en) A kind of hydraulic means
CN209698996U (en) Bearing dismounting tool
CN219449908U (en) Work piece hanger of electrophoresis application of magnet
CN206302249U (en) A kind of pedestal bearing threephase asynchronous
CN216758701U (en) Full-automatic gasket welding machine
CN204270728U (en) Get rid of a barrel paying out machine
CN216991768U (en) A auxiliary fixtures for nut assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination