CN109308394A - A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium - Google Patents

A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium Download PDF

Info

Publication number
CN109308394A
CN109308394A CN201811158525.2A CN201811158525A CN109308394A CN 109308394 A CN109308394 A CN 109308394A CN 201811158525 A CN201811158525 A CN 201811158525A CN 109308394 A CN109308394 A CN 109308394A
Authority
CN
China
Prior art keywords
water power
dimensional
buried
horizontal member
map generalization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811158525.2A
Other languages
Chinese (zh)
Inventor
唐鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201811158525.2A priority Critical patent/CN109308394A/en
Publication of CN109308394A publication Critical patent/CN109308394A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and computer readable storage mediums.Wherein, method includes to each horizontal member, according to the water power mark in the pre-buried figure of two-dimensional level component being shown on three-dimensional drawing interface and the corresponding relationship between present level component, each water power mark is placed on opposite position in each perspective view of present level component, generates multiple projection subgraphs of present level component;Its corresponding three-dimensional properties information is matched in water power identification database according to the type that each water power identifies, and shows corresponding water power built-in fitting in each projection subgraph;The pre-buried figure of three-dimensional water power is generated according to each projection subgraph of the pre-buried rule of the water power of each horizontal member, each horizontal member.Technical solution provided by the present application substitutes the pre-buried figure of the three-dimensional water power of traditional artificial production, improves the pre-buried map generalization efficiency of three-dimensional water power, is conducive to save a large amount of manpower and financial resources.

Description

A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium
Technical field
The present embodiments relate to construction-engineering project technical fields, more particularly to a kind of life of the pre-buried figure of three-dimensional water power At method, apparatus, equipment and computer readable storage medium.
Background technique
With the development of architectural engineering industry, the cast-in-place mode of traditional architecture, since process is tedious, artificial demand is big, pipe Reason confusion, the wasting of resources, noise is big, the duration is longer, construction quality is uncontrollable, leads to construction quality more problems.And assembled Construction method can effectively avoid the above problem that is, by design-manufacture-assembly (construction) integration, be widely used in building row Industry.
The pre-buried water power part of assembled architecture is manually to be handled, since building engineer is more ripe to X-Y scheme It knows, is generally to make the pre-buried image of two-dimentional water power according to the integral layout of the water power built-in fitting of assembled architecture, it is then related Personnel are further according to the pre-buried pre-buried image of image making three-dimensional water power of two-dimentional water power, as the scale of construction-engineering project constantly increases Greatly, by the pre-buried image of manual manufacture three-dimensional water power, not only need to expend a large amount of manpowers, image making efficiency pole, and not It can avoid that there are the accuracy of manual manufacture is low and the not high drawback of precision.
Summary of the invention
The purpose of the embodiment of the present invention is that providing a kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and calculating Machine readable storage medium storing program for executing substitutes the pre-buried figure of the three-dimensional water power of traditional artificial production, improves the pre-buried map generalization efficiency of three-dimensional water power, Be conducive to save a large amount of manpower and financial resources.
In order to solve the above technical problems, the embodiment of the present invention the following technical schemes are provided:
On the one hand the embodiment of the present invention provides a kind of pre-buried map generalization method of three-dimensional water power, comprising:
The pre-buried figure of two-dimensional level component water power is obtained on three-dimensional drawing interface;
To each horizontal member, according between the water power mark in the pre-buried figure of two-dimensional level component and present level component Corresponding relationship, each water power mark is placed on opposite position in each perspective view of the present level component, described in generation Multiple projection subgraphs of present level component;
Its corresponding three-dimensional properties information is matched in water power identification database according to the type that each water power identifies, and each Corresponding water power built-in fitting is shown in projection subgraph;
It is pre-buried that three-dimensional water power is generated according to each projection subgraph of the pre-buried rule of the water power of each horizontal member, each horizontal member Figure;
Wherein, the water power identification database includes that multiple water power identify image block, and each water power mark image block includes The perspective view and deduction model of attribute information, three-dimensional water power built-in fitting on preset direction, to constitute the three of corresponding water power mark Dimension attribute information.
Optionally, each projection subgraph generation of the pre-buried rule of the water power according to each horizontal member, each horizontal member After the three-dimensional pre-buried figure of water power, further includes:
The space attribute information of each water power built-in fitting is set in the pre-buried figure of the three-dimensional water power;
The space attribute information include location information of each water power built-in fitting in horizontal member and with the horizontal structure in place Space geometry relationship between part.
Optionally, the pre-buried figure of two-dimensional level component water power is the pre-buried figure of two-dimentional floor water power.
On the other hand the embodiment of the present invention provides a kind of pre-buried map generalization device of three-dimensional water power, comprising:
X-Y scheme obtains module, for obtaining the pre-buried figure of two-dimensional level component water power on three-dimensional drawing interface;
Subgraph generation module is projected, is used for each horizontal member, according to the water in the pre-buried figure of two-dimensional level component Each water power mark is placed on each perspective view of the present level component by the corresponding relationship between electricity mark and present level component Middle opposite position generates multiple projection subgraphs of the present level component;
Water power built-in fitting display module, the type for being identified according to each water power match its phase in water power identification database The three-dimensional properties information answered, and corresponding water power built-in fitting is shown in each projection subgraph;The water power identification database includes Multiple water power identify image block, and each water power mark image block includes attribute information, three-dimensional water power built-in fitting on preset direction Perspective view and deduct model, to constitute the three-dimensional properties information of corresponding water power mark;
The three-dimensional pre-buried figure generation module of water power, for the pre-buried rule of the water power according to each horizontal member, each horizontal member Each projection subgraph generate the three-dimensional pre-buried figure of water power.
It optionally, further include adeditive attribute module, for each water power built-in fitting to be arranged in the pre-buried figure of the three-dimensional water power Space attribute information;The space attribute information include location information of each water power built-in fitting in horizontal member and with place Space geometry relationship between horizontal member.
Optionally, it is the mould that the pre-buried figure of two-dimentional floor water power is obtained on three-dimensional drawing interface that the X-Y scheme, which obtains module, Block.
The embodiment of the invention also provides a kind of pre-buried map generalization equipment of three-dimensional water power, including processor, the processing The three-dimensional water power pre-buried map generalization side as described in preceding any one is realized when device is for executing the computer program stored in memory The step of method.
The embodiment of the present invention finally additionally provides a kind of computer readable storage medium, the computer readable storage medium On be stored with the pre-buried map generalization program of three-dimensional water power, the three-dimensional water power pre-buried map generalization program is real when being executed by processor Now the step of pre-buried map generalization method of the three-dimensional water power as described in preceding any one.
The embodiment of the invention provides a kind of pre-buried map generalization methods of three-dimensional water power, to each horizontal member, according to aobvious Show in the water power mark in the pre-buried figure of two-dimensional level component on three-dimensional drawing interface and the corresponding relationship between present level component, Each water power mark is placed on opposite position in each perspective view of present level component, generates multiple throwings of present level component Shadow figure;Its corresponding three-dimensional properties information is matched in water power identification database according to the type that each water power identifies, and each Corresponding water power built-in fitting is shown in projection subgraph;According to each of pre-buried regular, each horizontal member of the water power of each horizontal member It projects subgraph and generates the pre-buried figure of three-dimensional water power;Wherein, water power identification database includes that multiple water power identify image block, each water power Mark image block includes the perspective view and deduction model of attribute information, three-dimensional water power built-in fitting on preset direction, to constitute phase The three-dimensional properties information for answering water power to identify.
The advantages of technical solution provided by the present application, is, since the water power that water power mark compares specification and horizontal member is pre- The trend buried be it is regular, by for each class two-dimensional water power mark preset three-dimensional properties information image block based, root According to the pre-buried figure of two-dimentional water power when being converted into the pre-buried figure of three-dimensional water power, it is only necessary to which water power each in X-Y scheme is identified corresponding three Dimension attribute information is shown in each perspective view corresponding position of each horizontal member, in the pre-buried rule of water power based on horizontal member, It can realize the conversion of the pre-buried figure of two-dimensional level water power and the pre-buried figure of three-dimensional water power.It is pre- instead of the three-dimensional water power of traditional artificial production Figure is buried, the pre-buried map generalization efficiency of three-dimensional water power is improved, is conducive to save a large amount of manpower and financial resources.
In addition, the embodiment of the present invention also directed to the pre-buried map generalization method of three-dimensional water power provide corresponding realization device, Equipment and computer readable storage medium, further such that the method has more practicability, described device, equipment and computer Readable storage medium storing program for executing has the advantages that corresponding.
Detailed description of the invention
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of flow diagram of the pre-buried map generalization method of three-dimensional water power provided in an embodiment of the present invention;
Fig. 2 is the flow diagram of the pre-buried map generalization method of another three-dimensional water power provided in an embodiment of the present invention;
Fig. 3 is a kind of specific embodiment structure of the pre-buried map generalization device of three-dimensional water power provided in an embodiment of the present invention Figure;
Fig. 4 is another specific embodiment knot of the pre-buried map generalization device of three-dimensional water power provided in an embodiment of the present invention Composition.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.
The description and claims of this application and term " first ", " second ", " third " " in above-mentioned attached drawing Four " etc. be for distinguishing different objects, rather than for describing specific sequence.Furthermore term " includes " and " having " and Their any deformations, it is intended that cover and non-exclusive include.Such as contain a series of steps or units process, method, System, product or equipment are not limited to listed step or unit, but may include the step of not listing or unit.
After describing the technical solution of the embodiment of the present invention, the various non-limiting realities of detailed description below the application Apply mode.
Referring first to Fig. 1, Fig. 1 is a kind of process of the pre-buried map generalization method of three-dimensional water power provided in an embodiment of the present invention Schematic diagram, the embodiment of the present invention may include the following contents:
S101: the pre-buried figure of two-dimensional level component water power is obtained on three-dimensional drawing interface.
The pre-buried figure of two-dimentional water power manually prepared is beaten in any three-dimensional drawing interface (such as based on BIM platform) It opens, the pre-buried figure of water power is the two-dimentional technological design figure for carrying the component of water power mark, and the two-dimentional pre-buried figure of water power is some component The pre-buried figure of water power, can also be includes multiple components (such as multiple structures such as first floor of building, including floor, window, wallboard Part) the pre-buried figure of water power.
The pre-buried figure of two-dimensional level component water power is the pre-buried figure of two-dimentional water power of horizontal member, and horizontal member is in whole building In position be the component parallel with level ground, may be, for example, floor, beam etc..
S102: to each horizontal member, according to the water power mark and present level component in the pre-buried figure of two-dimensional level component Between corresponding relationship, by each water power mark be placed on opposite position in each perspective view of present level component, generate current water Multiple projection subgraphs of flat component.
The corresponding relationship between each water power built-in fitting and component is being indicated in the pre-buried figure of two-dimensional level component, namely Position of the water power built-in fitting in component.
It, can be known according to the technological design figure of whole construction project and those skilled in the art for each component Content, learn projection of each component on each face in space, for example, with Descartes's three-dimensional system of coordinate for, to any one structure Part, only it is to be understood that projection of this component in x/y plane, xz plane and yz plane, projects basic with component according to these three Parameter (such as size) can learn the 3 dimensional drawing of this component.
After water power built-in fitting to be fed through to the corresponding position of each perspective view of horizontal member, just in each perspective view There is corresponding water power mark, namely generate multiple projection subgraphs for carrying water power mark, in general, a component is corresponding Three projection subgraphs.
S103: matching its corresponding three-dimensional properties information according to the type that each water power identifies in water power identification database, And corresponding water power built-in fitting is shown in each projection subgraph.
Water power identification database is the database that image block is identified comprising multiple water power, and each water power mark image block includes The perspective view and deduction model of attribute information, three-dimensional water power built-in fitting on preset direction, to constitute the three of corresponding water power mark Dimension attribute information.
The attribute information of water power mark image block may include the classification of water power mark, position, function, size, shape, ID number (serial number, each water power mark have unique ID number), two dimension mark image, three-dimensional marking image etc. are relevant to water power mark All parameter informations.
Perspective view of the three-dimensional water power built-in fitting on preset direction is corresponding with perspective view of the component on preset direction, I.e. if by taking three Cartesian coordinates as an example, the perspective view of component is the perspective view in x/y plane, xz plane and yz plane, The perspective view of so each water power built-in fitting is also the perspective view in x/y plane, xz plane and yz plane.
For each horizontal member, the perspective view of water power built-in fitting and projection subgraph are combined, and corresponding in figure Position shows water power mark, can learn the 3 dimensional drawing of each water power built-in fitting and component.
S104: three-dimensional water is generated according to each projection subgraph of the pre-buried rule of the water power of each horizontal member, each horizontal member The pre-buried figure of electricity.
The pre-buried rule of water power is preset according to index bed, or carries out personalized formulation according to the demand of user , this does not influence the realization of the application.
When carrying out link process, (different colors, different line width or not is can be used in the type that cable can be preset Different types of line is distinguished with figure layer), then the identical cable of attribute is connected (such as the line of same color is connected, or Person is that the line of same line width is connected), just complete the pre-buried cabling of entire water power.
In technical solution provided in an embodiment of the present invention, since the water power that water power mark compares specification and horizontal member is pre- The trend buried be it is regular, by for each class two-dimensional water power mark preset three-dimensional properties information image block based, root According to the pre-buried figure of two-dimentional water power when being converted into the pre-buried figure of three-dimensional water power, it is only necessary to which water power each in X-Y scheme is identified corresponding three Dimension attribute information is shown in each perspective view corresponding position of each horizontal member, in the pre-buried rule of water power based on horizontal member, It can realize the conversion of the pre-buried figure of two-dimensional level water power and the pre-buried figure of three-dimensional water power.It is pre- instead of the three-dimensional water power of traditional artificial production Figure is buried, the pre-buried map generalization efficiency of three-dimensional water power is improved, is conducive to save a large amount of manpower and financial resources.
Based on the above embodiment, Fig. 2 is referred to, Fig. 2 is the pre-buried figure of another three-dimensional water power provided in an embodiment of the present invention Generation method flow diagram, may also include the following contents:
S105: the space attribute information of each water power built-in fitting is set in the pre-buried figure of three-dimensional water power.
The additional parameter instruction that can be inputted according to user is configured (i.e. with man-machine interactively mode), can also voluntarily read phase It closes parameter to be configured, this does not influence the application realization.
Space attribute information may include each water power built-in fitting in horizontal member location information (such as component which Position, at which height of component) and space geometry relationship between the horizontal member of place.
Space geometry relationship is the correlation referred between component and water power built-in fitting, such as includes and by inclusion relation.
From the foregoing, it will be observed that the embodiment of the present invention for each water power built-in fitting installation space attribute in the pre-buried figure of three-dimensional water power by believing Breath so that relevant staff definitely, it is clear, quickly learn position and its and component of the water power built-in fitting in component Inclusion relation, improve work efficiency, improve the usage experience of user.
In addition, can also pre-establish components three-dimensional picture library, component three to promote the pre-buried map generalization efficiency of three-dimensional water power Dimension picture library includes perspective view, three-dimensional marking figure and two-dimentional mark figure of each component on preset direction, and perspective view, three-dimensional are marked Know figure and two dimension mark figure and the ID number (for the serial number of unique identification component, similar identification card number) of component is corresponding, so as to The information such as the perspective view, three-dimensional marking figure and two dimension mark figure of component are obtained according to the ID number of component.
In order to make the clear technical solution provided by the present application of those skilled in the art, the application is by taking floor as an example, tool Body illustrates the above process:
Floor projection directly is obtained from components three-dimensional picture library, corresponding water power built-in fitting is sent to corresponding component corresponding position In, to establish the corresponding relationship of floor and water power built-in fitting.Water power identification database and three-dimensional picture library are called, it is corresponding in wallboard Position show corresponding water power mark, add corresponding position attribution information (such as which position, which highly), water power The correlation and inclusion relation of built-in fitting and floor ultimately produce the pre-buried figure of three-dimensional water power of floor.
The embodiment of the present invention provides corresponding realization device also directed to the pre-buried map generalization method of three-dimensional water power, further So that the method has more practicability.The three-dimensional pre-buried map generalization device of water power provided in an embodiment of the present invention is carried out below It introduces, the three-dimensional pre-buried map generalization device of water power described below and the pre-buried map generalization method of above-described three-dimensional water power can Correspond to each other reference.
Referring to Fig. 3, Fig. 3 is the three-dimensional pre-buried map generalization device of water power provided in an embodiment of the present invention in a kind of specific implementation Structure chart under mode, the device can include:
X-Y scheme obtains module 301, for obtaining the pre-buried figure of two-dimensional level component water power on three-dimensional drawing interface.
Subgraph generation module 302 is projected, is used for each horizontal member, according to the water power in the pre-buried figure of two-dimensional level component Each water power mark is placed in each perspective view of present level component opposite by the corresponding relationship between mark and present level component Position is answered, multiple projection subgraphs of present level component are generated.
Water power built-in fitting display module 303, the type for being identified according to each water power match in water power identification database Its corresponding three-dimensional properties information, and corresponding water power built-in fitting is shown in each projection subgraph;Water power identification database includes Multiple water power identify image block, and each water power mark image block includes attribute information, three-dimensional water power built-in fitting on preset direction Perspective view and deduct model, to constitute the three-dimensional properties information of corresponding water power mark.
The three-dimensional pre-buried figure generation module 304 of water power, for the pre-buried rule of the water power according to each horizontal member, each horizontal structure Each projection subgraph of part generates the pre-buried figure of three-dimensional water power.
Optionally, in some embodiments of the present embodiment, referring to Fig. 4, described device for example can also include attached Additive attribute module 305, the adeditive attribute module 305 are used to that each water power built-in fitting to be arranged in the pre-buried figure of the three-dimensional water power Space attribute information;The space attribute information include location information of each water power built-in fitting in horizontal member and with place water Space geometry relationship between flat component.
Optionally, in other embodiments of the present embodiment, the X-Y scheme obtains module 301 can also be in three-dimensional The module of the pre-buried figure of two-dimentional floor water power is obtained on drawing interface.
The function of each functional module of the pre-buried map generalization device of three-dimensional water power described in the embodiment of the present invention can be according to above-mentioned Method specific implementation in embodiment of the method, specific implementation process are referred to the associated description of above method embodiment, this Place repeats no more.
From the foregoing, it will be observed that the embodiment of the present invention substitutes the pre-buried figure of the three-dimensional water power of traditional artificial production, it is pre- to improve three-dimensional water power Map generalization efficiency is buried, is conducive to save a large amount of manpower and financial resources.
The embodiment of the invention also provides a kind of pre-buried map generalization equipment of three-dimensional water power, specifically can include:
Memory, for storing computer program;
Processor realizes the life of the pre-buried figure of three-dimensional water power described in any one embodiment as above for executing computer program The step of at method.
The function of each functional module of the pre-buried map generalization equipment of three-dimensional water power described in the embodiment of the present invention can be according to above-mentioned Method specific implementation in embodiment of the method, specific implementation process are referred to the associated description of above method embodiment, this Place repeats no more.
From the foregoing, it will be observed that the embodiment of the present invention substitutes the pre-buried figure of the three-dimensional water power of traditional artificial production, it is pre- to improve three-dimensional water power Map generalization efficiency is buried, is conducive to save a large amount of manpower and financial resources.
The embodiment of the invention also provides a kind of computer readable storage mediums, are stored with the pre-buried map generalization of three-dimensional water power Program, as above three-dimensional water power described in any one embodiment is pre- when being executed by processor for the three-dimensional water power pre-buried map generalization program The step of burying map generalization method.
The function of each functional module of computer readable storage medium described in the embodiment of the present invention can be according to above method reality The method specific implementation in example is applied, specific implementation process is referred to the associated description of above method embodiment, herein no longer It repeats.
From the foregoing, it will be observed that the embodiment of the present invention substitutes the pre-buried figure of the three-dimensional water power of traditional artificial production, it is pre- to improve three-dimensional water power Map generalization efficiency is buried, is conducive to save a large amount of manpower and financial resources.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other The difference of embodiment, same or similar part may refer to each other between each embodiment.For being filled disclosed in embodiment For setting, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
It above can to a kind of pre-buried map generalization method, apparatus of three-dimensional water power provided by the present invention, equipment and computer Storage medium is read to be described in detail.Specific case used herein explains the principle of the present invention and embodiment It states, the above description of the embodiment is only used to help understand the method for the present invention and its core ideas.It should be pointed out that for this skill For the those of ordinary skill in art field, without departing from the principle of the present invention, several change can also be carried out to the present invention Into and modification, these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims (8)

1. a kind of pre-buried map generalization method of three-dimensional water power characterized by comprising
The pre-buried figure of two-dimensional level component water power is obtained on three-dimensional drawing interface;
To each horizontal member, according to the water power mark in the pre-buried figure of two-dimensional level component and pair between present level component It should be related to, each water power mark is placed on opposite position in each perspective view of the present level component, generate described current Multiple projection subgraphs of horizontal member;
Its corresponding three-dimensional properties information is matched in water power identification database according to the type that each water power identifies, and in each projection Corresponding water power built-in fitting is shown in subgraph;
The pre-buried figure of three-dimensional water power is generated according to each projection subgraph of the pre-buried rule of the water power of each horizontal member, each horizontal member;
Wherein, the water power identification database includes that multiple water power identify image block, and each water power mark image block includes attribute The perspective view and deduction model of information, three-dimensional water power built-in fitting on preset direction, are belonged to constituting corresponding the three-dimensional of water power mark Property information.
2. the pre-buried map generalization method of three-dimensional water power according to claim 1, which is characterized in that described according to each horizontal structure Each projection subgraph of pre-buried regular, each horizontal member of the water power of part generates after the pre-buried figure of three-dimensional water power, further includes:
The space attribute information of each water power built-in fitting is set in the pre-buried figure of the three-dimensional water power;
The space attribute information includes location information of each water power built-in fitting in horizontal member and between the horizontal member of place Space geometry relationship.
3. the pre-buried map generalization method of three-dimensional water power according to claim 2, which is characterized in that the two-dimensional level component The pre-buried figure of water power is the pre-buried figure of two-dimentional floor water power.
4. a kind of pre-buried map generalization device of three-dimensional water power characterized by comprising
X-Y scheme obtains module, for obtaining the pre-buried figure of two-dimensional level component water power on three-dimensional drawing interface;
Subgraph generation module is projected, is used for each horizontal member, according to the water power mark in the pre-buried figure of two-dimensional level component Know the corresponding relationship between present level component, each water power mark is placed on phase in each perspective view of the present level component Corresponding position generates multiple projection subgraphs of the present level component;
Water power built-in fitting display module, it is corresponding that the type for being identified according to each water power matches it in water power identification database Three-dimensional properties information, and corresponding water power built-in fitting is shown in each projection subgraph;The water power identification database includes multiple Water power identifies image block, and each water power mark image block includes the throwing of attribute information, three-dimensional water power built-in fitting on preset direction Shadow figure and deduction model, to constitute the three-dimensional properties information of corresponding water power mark;
The three-dimensional pre-buried figure generation module of water power, for each of pre-buried regular, each horizontal member of the water power according to each horizontal member It projects subgraph and generates the pre-buried figure of three-dimensional water power.
5. the pre-buried map generalization device of three-dimensional water power according to claim 4, which is characterized in that further include adeditive attribute mould Block, for the space attribute information of each water power built-in fitting to be arranged in the pre-buried figure of the three-dimensional water power;The space attribute information Including location information of each water power built-in fitting in horizontal member and the space geometry relationship between the horizontal member of place.
6. the pre-buried map generalization device of three-dimensional water power according to claim 5, which is characterized in that the X-Y scheme obtains mould Block is the module that the pre-buried figure of two-dimentional floor water power is obtained on three-dimensional drawing interface.
7. a kind of pre-buried map generalization equipment of three-dimensional water power, which is characterized in that including processor, the processor is deposited for executing The three-dimensional water power pre-buried map generalization method as described in any one of claims 1 to 3 is realized when the computer program stored in reservoir The step of.
8. a kind of computer readable storage medium, which is characterized in that be stored with three-dimensional water on the computer readable storage medium The pre-buried map generalization program of electricity, the three-dimensional water power pre-buried map generalization program realize such as claim 1 when being executed by processor The step of map generalization method pre-buried to 3 any one three-dimensional water power.
CN201811158525.2A 2018-09-30 2018-09-30 A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium Withdrawn CN109308394A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811158525.2A CN109308394A (en) 2018-09-30 2018-09-30 A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811158525.2A CN109308394A (en) 2018-09-30 2018-09-30 A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium

Publications (1)

Publication Number Publication Date
CN109308394A true CN109308394A (en) 2019-02-05

Family

ID=65225088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811158525.2A Withdrawn CN109308394A (en) 2018-09-30 2018-09-30 A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109308394A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109992684A (en) * 2019-04-12 2019-07-09 中民筑友智能装备科技有限公司 Prefabricated components production line automatic projection method, apparatus, equipment, system and medium
CN112488135A (en) * 2020-12-28 2021-03-12 深圳供电局有限公司 Method for classifying BIM three-dimensional image features of transformer substation
CN114373055A (en) * 2022-01-08 2022-04-19 北京建工集团有限责任公司 BIM-based three-dimensional image generation method and device, electronic equipment and medium

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109992684A (en) * 2019-04-12 2019-07-09 中民筑友智能装备科技有限公司 Prefabricated components production line automatic projection method, apparatus, equipment, system and medium
CN112488135A (en) * 2020-12-28 2021-03-12 深圳供电局有限公司 Method for classifying BIM three-dimensional image features of transformer substation
CN114373055A (en) * 2022-01-08 2022-04-19 北京建工集团有限责任公司 BIM-based three-dimensional image generation method and device, electronic equipment and medium

Similar Documents

Publication Publication Date Title
CN110262865B (en) Method and device for constructing game scene, computer storage medium and electronic equipment
CN108267154B (en) Map display method and device
CN109308394A (en) A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium
CN105893655B (en) A kind of physical simulating method of petroleum reservoir configuration
CN110276816A (en) Regional color filling method and device, electronic equipment and computer readable storage medium
CN105718643A (en) Optimization view angle based ship production design drawing-inspection device implementation method
CN106649817A (en) Three-dimensional pipe model establishment lofting method and device for geography information system
CN112489213A (en) Three-dimensional terrain model generation method and device, electronic equipment and storage medium
CN109816792A (en) Localization method and device in a kind of three-dimensional scenic
CN109903382A (en) The fusion method and device of point cloud data
CN105741340B (en) A kind of transmission line of electricity three-dimensional scenic emulation mode and system for web page display
CN113449355A (en) Building house type graph automatic generation method based on artificial intelligence
CN115170749A (en) WEBGIS three-dimensional visualization construction method and system based on Cesium
CN108664860A (en) The recognition methods of room floor plan and device
CN115409957A (en) Map construction method based on illusion engine, electronic device and storage medium
CN109325991A (en) A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium
CN110517347A (en) A kind of construction project data model environment method for visualizing and its device and application
CN108664738A (en) Three dimensional image processing method and device
CN109376409A (en) A kind of pre-buried map generalization method, apparatus of three-dimensional water power, equipment and storage medium
CN112052489B (en) Method and system for generating house type graph
CN110378948A (en) 3D model reconstruction method, device and electronic equipment
CN106156376A (en) A kind of UHV transmission line electromagnetic interference Three-dimensional Simulation System
CN109002626A (en) A kind of dimensional component high-speed simulation layout method based on BIM technology
CN115409962A (en) Method for constructing coordinate system in illusion engine, electronic equipment and storage medium
CN111311745B (en) Model placement method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190205