CN109299833A - Fast charge station energy storage optimization system and its working method based on block chain technology - Google Patents

Fast charge station energy storage optimization system and its working method based on block chain technology Download PDF

Info

Publication number
CN109299833A
CN109299833A CN201811434971.1A CN201811434971A CN109299833A CN 109299833 A CN109299833 A CN 109299833A CN 201811434971 A CN201811434971 A CN 201811434971A CN 109299833 A CN109299833 A CN 109299833A
Authority
CN
China
Prior art keywords
data
block chain
energy storage
fast charge
charge station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811434971.1A
Other languages
Chinese (zh)
Inventor
燕树民
刘春华
崔海超
李志民
扈筱薇
杨光
韩元凯
袁弘
许玮
刘继东
慕世友
张华栋
张洪利
张健
李建祥
刘海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Intelligent Electrical Branch of Shandong Luneng Software Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Shandong Luneng Intelligence Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd, Shandong Luneng Intelligence Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811434971.1A priority Critical patent/CN109299833A/en
Publication of CN109299833A publication Critical patent/CN109299833A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of based on the fast charge station energy storage optimization system of block chain technology through working method, the network that the present invention is formed using the block chain module of the multinode in cloud, each block chain node is configured as the number according to energy storage device, the mapping relations between three that fast charge station ID and vehicle ID is formed, determine the block chain Data Identification for needing to obtain data, storage mark and block chain Data Identification further according to block chain network node determine corresponding block chain network storage location, carry out corresponding data extraction and storage, the operation data of each energy storage device is verified and stored using block linked data structure, it generates and updating operation data can promote electric car direct current charge facility technology to upgrade, promote energy-storage system bulk life time and performance, reduce energy storage Facilities Construction O&M cost.

Description

Fast charge station energy storage optimization system and its working method based on block chain technology
Technical field
The present invention relates to a kind of fast charge station energy storage optimization system and its working method based on block chain technology.
Background technique
The links of its application of energy storage technology through electric system are improved for alleviating peak load power demands The operational efficiency of existing power grid and its equipment delays and reduces power supply and power grid construction.It improves generation of electricity by new energy utilization rate and connects Enter ability, realize green energy conservation target, improve power quality and power consumption efficiency, ensure power grid high-quality, safe and reliable power supply and The demand of efficient electricity consumption promotes the structural form of power grid, planning and designing, management and running, operation control excellent with usage mode etc. Change and improve, influence of the energy storage technology to power grid is more far-reaching on depth and broadness.
" electric car charging infrastructure develops guide (2015-2020) " (hair changes the energy (2015) 1454) proposes, By newly-increased centralized electric charging station it is more than 1.2 ten thousand to the year two thousand twenty China, distributing charging pile is more than 4,800,000, entirely with satisfaction 5,000,000 charging demand for electric vehicles of state.Electric car large-scale application brings many problems, due to the charging row of electric car For uncertainty with the time and spatially, when electric car direct current charge station is accessed on a large scale, it will give network load Impact is brought, influence cannot be neglected on generations such as the power quality of power grid, via net loss, utilization rates of equipment and installations, especially big function Rate DC charging has the characteristics that charge power is big, the charging time is short, can for the high-power charge requirement for meeting quick charge station Energy-storage system is configured in quick charge station, and energy-storage system is avoided the behaviour for influencing battery life and performance such as over-discharge occur, overcharge Make.The operating status of comprehensive monitoring energy-storage system, electric car electrically-charging equipment and other equipment is needed, also simultaneously to analyze charging station Reliable data are provided with the reciprocal effect of power distribution network.
It is fast-developing and electronic with the relevant technologies such as electric car and power battery, electrically-charging equipment, smart grid User vehicle quick charge demand it is growing, energy storage technology application market prospects gradually show.
Therefore, application of the research block chain technology in energy storage technology promotes energy-storage system to peak load regulation network and frequency modulation etc. The ability of ancillary service is that there is an urgent need for solve the problems, such as.
Summary of the invention
The present invention to solve the above-mentioned problems, propose a kind of fast charge station energy storage optimization system based on block chain technology and Its working method, the present invention can promote electric car direct current charge facility technology upgrade, promoted energy-storage system bulk life time with Performance reduces energy storage Facilities Construction O&M cost.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of fast charge station energy storage optimization system based on block chain technology, comprising:
Energy storage device is configured as having energy storage, charging and discharging ability, fills including positive power generation regulating power and negative Electric regulating power, and can assign active distribution network flexible power active regulating power;
Client, the typing, communication and data for being configured as information are shown and transmission optimization charging regulation and control instruction;
Fast charge station energy-storage system: be configured for energy storage system capacity distribute rationally and battery charge state is estimated It calculates and monitors in real time, take into account peak load regulation network and frequency modulation;
Fast charge station energy-storage system is wirelessly communicated with client;The client and cloud pass through nothing Line network communication, the real time data of acquisition in client by sending to cloud;
Cloud, the network that the block chain module including multinode is formed, each block chain node are configured as according to storage The mapping relations between three that number, fast charge station ID and the vehicle ID of energy device are formed, determine the area for needing to obtain data Block chain Data Identification, storage mark and block chain Data Identification further according to block chain network node determine corresponding block link network Network storage location carries out corresponding data extraction and storage, each energy storage is verified and stored using block linked data structure The operation data of device generates and updates operation data.
Further, fast charge station energy-storage system includes data acquisition module, real-time monitoring module, algorithm calculating mould Block, scheduler module and load prediction module, in which:
The data acquisition module is configured as the real-time capacity of acquisition fast charge station energy storage device, power and battery SOC number According to, and the data after calculating are uploaded into fast charge station energy-storage system by communication module, and calculate mould for monitoring module, algorithm In block, scheduler module and load prediction module, the information on load of power grid is received, when current power load is excessive, energy-storage system It cannot recharge, discharge when necessary;
Real-time monitoring module, be configured as the real time data of real time monitoring fast charge station energy storage device, and monitoring power grid is current Real-time load, whether monitor energy-storage system needs charge or discharge;
Algorithm computing module is configured as calculating the current capacities and power of energy storage device, when electric car fills electrochronograph Residual capacity is calculated, calculates energy-storage system battery charge state, distributed energy storage in peak load regulation network frequency modulation service ability, and will be remaining Cloud is sent in the result of capacity and service ability;
Further, it is real to formulate fast charge station load using the energy storage resource at fast charge station for the calculation method of the service ability When optimization ability management strategy.The specific method is as follows:
1, using fast charge station history charge data, historical load data and prediction load data, to needed for the target Energy storage electrical demand carries out estimating calculating.
2, the result for estimating calculating can be divided into chargeable vehicle fleet size, maximum load-carrying capacity and maximum charge load.
3, calculated result segmentation service ability according to the time period, the maximum charge that each period fast charge station can bear are estimated Vehicle number and stored energy capacitance are the service ability at the fast charge station.
Load prediction module is configured as the load data at prediction fast charge station, according to the historical load at fast charge station and area The Power system load data in domain carries out load prediction;
Scheduler module is configured as electric car orderly charges in fast charge station scheduling and each block chain node model Enclose interior electric car orderly charge, the scheduling of energy storage optimization and peak load regulation network frequency modulation service ability.
Further, the Optimized Operation refers to and is filled by Optimal Control Strategy and the diversity of electric passenger vehicle user The variation of power distribution network regulatory requirement caused by electric demand for services, the different residual capacities of electric passenger vehicle battery, load dynamic change It is closely related, need to take what the mode of correlated sampling analyzed each characteristic quantity and orderly intelligent charge control strategy to be associated with journey Degree, and being established according to these characteristic quantities includes charge control target, charging process associated variable and adjusting user's charging behavior The mathematical model of measure.
Further, affiliated Optimal Control Strategy is the spy that charged according to the handling characteristics and habit of electric car, battery Property, in conjunction with power grid changing rule and control measures, consider the various power demands of user.
Further, fast charge station energy-storage system, energy storage device and user identity identification specific identity are sent to cloud, Cloud transfer to identification authentication service complete identification, if identification passes through, activate data originating end request data in Hold and service, while starting and the active data of the fast charge station, energy storage device, battery and user are analyzed;Conversely, then returned data Originating end failed authentication.
Further, the client includes:
Communication module is configured as realizing the data communication of client and cloud;
Display module is configured as the data information that display identification device inquires, while providing the work of user's operation Interface;
Module is issued, is configured as sending optimal charging to client or the instruction of electric car push operation or to user Location information.
The optimal charge position information, is whether the fast charge station in the regional scope of block chain has charging energy Power, electric car residue SOC can operating range, client at a distance from fast charge station etc. combined factors evaluate and test, obtain apart from electronic The nearest fast charge station of automobile.
Further, each described block chain node includes block chain data authentication module, is configured as according to energy storage The mapping relations between three that asset number, fast charge station ID and the vehicle ID of device are formed, determination need to obtain data Block chain Data Identification determines corresponding block link network according to the storage mark of block chain network node and block chain Data Identification Network storage location, to extract data.
Further, each described block chain node further includes block chain data memory module, specifically includes and is distributed in The storage equipment of each network node, and the storage mark for corresponding to the block chain network node in this region in equipment is stored herein The area known and determined according to the mapping relations between the three of energy storage device asset number, fast charge station ID and vehicle ID formation Block chain Data Identification, with to fast charge station information, battery information, charging equipment information data sealed storage.
Further, each described block chain node further includes block chain application management module, specifically includes data visit Ask that management module and data safety management module, the data access management module are configured as the request of data access After parsing, the data after parsing include the storage mark and block chain Data Identification of block chain network node, and are sent to block Chain data authentication module;The data safety management module is configured for digital signature, data protection and storage safety.
Further, the fast charge station is verified and is stored using block linked data structure energy storage station operation data, utilizes Distributed node knows together algorithm to generate and update energy storage station operation data, guarantee data transmission and visit in the way of cryptography The safety asked.
A kind of fast charge station energy storage Optimization Work method based on block chain technology, comprising the following steps:
It is required according to the access of block chain network node, carries out client-side information registration;
By real time data in the operational process of the energy storage device of fast charge station energy-storage system data collecting module collected, fill Real time data, load data when electric discharge, the data in client by sending into the block chain in cloud;
Strategy, Optimum Regulation strategy, orderly charging strategy, energy storage are distributed rationally by the way that fast charge station energy-storage system is calculated Optimize, the data of peak load regulation network frequency modulation service ability, the data in client by sending into the block chain in cloud;
User and information of vehicles, fast charge station data input client, client is by wireless network by user, vehicle and fast It fills in the information data of station and send into the block chain in cloud;
By in the operational process of collected energy storage device real time data, charge and discharge when real time data, load data Strategy, Optimum Regulation strategy, orderly charging strategy, energy storage optimization and peak load regulation network frequency modulation service energy are distributed rationally with calculated The data of power are stored in block chain network node;
Block chain data access, parses data access request, and the data requested access to include identity information, energy storage device money Number, fast charge station ID and vehicle ID are produced, block chain network node can be identified according to fast charge station ID, further according to fast charge station and storage The mapping relations of energy device asset number determine block chain Data Identification, and the data of required access are extracted and return to client End.
Further, the method for data storage is carried out specifically:
1) identification authentication is carried out to data according to block chain Data Identification, identification, identity are completed in identification authentication service It is identified by, then the data content for activating data originating end to request and service, while starting to the energy-storage system, battery and user The active data of vehicle is analyzed;Conversely, then returned data originating end failed authentication;
2) data are sent in foundation client, and according to the asset number of energy storage device, fast charge station ID and vehicle ID shape At three between mapping relations be formed in block chain Data Identification;
It 3) at least also include block chain Data Identification in block chain memory module, the block chain Data Identification is according to generation Time and number successively produce;
4) data above sent are digitally signed and safety inspection;
5) data storage is carried out.
Compared with prior art, the invention has the benefit that
The present invention provides energy storage station operation data, benefit are verified and stored using block linked data structure for fast charge station With distributed node know together algorithm come generate and update energy storage station operation data, guaranteed in the way of cryptography data transmission and The safety of access is programmed and the completely new distribution of one kind of operation data using the intelligent contract being made of automatized script code Formula architecture and calculation paradigm.
The present invention solves the optimization of fast charge station energy management strategies, to promote the economy and practicability of optimisation strategy;Management Data source is more, data volume is big, the fast charge station more than data type, analyzes relationship between data and vehicle safety performance index, And quantify this relationship;It digs according to energy-storage system in electric car direct current charge load in ancillary services such as power distribution network peak regulation, frequency modulation The sales potential of aspect promotes the service ability of energy-storage system;
Energy storage is conducive to increase system reserve capacity, improves power grid security and stability and power quality, realizes economical with energy Property, improve comprehensive benefit;Promote the upgrading of electric car direct current charge facility technology, promote energy-storage system bulk life time and performance, Reduce energy storage Facilities Construction O&M cost.
The application of energy storage technology is conducive to the energy management of optimization system, improves system effectiveness and utilization rate of equipment and installations.It promotes The scale application of electric car fast charge equipment, is beneficial to energy conservation emission reduction.
Focused user, precisely service.Using big data, block chain as means, centered on electric car fast charge station, excavates and use Family pain spot demand, the application of continuous iteration upgrading energy storage technology, improves user's viscosity, expands occupation rate of market.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is the network architecture diagram of the present embodiment;
Fig. 2 is the system construction drawing of the present embodiment;
Fig. 3 is the working-flow figure of the present embodiment;
Specific embodiment:
The invention will be further described with embodiment with reference to the accompanying drawing.
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
In the present invention, term for example "upper", "lower", "left", "right", "front", "rear", "vertical", "horizontal", " side ", The orientation or positional relationship of the instructions such as "bottom" is to be based on the orientation or positional relationship shown in the drawings, only to facilitate describing this hair Bright each component or component structure relationship and the relative of determination, not refer in particular to either component or element in the present invention, cannot understand For limitation of the present invention.
In the present invention, term such as " affixed ", " connected ", " connection " be shall be understood in a broad sense, and indicate may be a fixed connection, It is also possible to be integrally connected or is detachably connected;It can be directly connected, it can also be indirectly connected through an intermediary.For The related scientific research of this field or technical staff can determine the concrete meaning of above-mentioned term in the present invention as the case may be, It is not considered as limiting the invention.
As shown in Figure 1, a kind of fast charge station energy storage optimization system based on block chain technology, comprising:
Regional power grid: the power grid applied to entire energy storage charge and discharge region.
Energy storage device: having energy storage, charging, discharge capability, adjusts energy including positive power generation regulating power and negative charging Power, thus can assign active distribution network flexible power active regulating power.
Client: typing, communication and data for fast charge station, energy storage device, client and information of vehicles are shown;It is also used to The operation such as charge and discharge strategy setting and modification;It is also equipped with the function that optimization charging regulation and control instruction is sent to client and vehicle.
Fast charge station energy-storage system: by data acquisition module, real-time monitoring module, algorithm computing module, scheduler module and Load prediction module composition, for distributing rationally for energy storage system capacity, electric car fast charge station energy-storage system battery charge shape State high-precision evaluation method and real time monitoring, the ancillary services such as peak load regulation network, frequency modulation.
Cloud: being made of the block chain module network of multinode, each block chain node includes block chain data authentication Module, block chain data memory module and block chain application management module;
Fast charge station energy-storage system is wirelessly communicated with client;The client and cloud pass through nothing Line network communication;The real time data of data collecting module collected in client by sending into the block chain module in cloud.
Further, the client includes:
Communication module: for realizing the data communication of client and cloud;
Display module: the data information inquired for showing identification device, while the working interface of user's operation being provided.
Issue module: for sending optimal charge position to client or the instruction of electric car push operation or to user Information.
Further, fast charge station energy-storage system includes:
Data acquisition module: for acquiring the data such as the real-time capacity of fast charge station energy storage device, power, battery SOC, and will Data after calculating upload to fast charge station energy-storage system by communication module, and for monitoring in real time, optimizing the moulds such as calculating, prediction In block;It is also used to receive the information on load of power grid, when current power load is excessive, energy-storage system cannot be recharged, when necessary It discharges.
Real-time monitoring module: current for monitoring power grid for monitoring the real time data of fast charge station energy storage device in real time Real-time load is also used to monitor whether needing to charge, discharging for energy-storage system.It is also used to energy-accumulating power station monitoring performance parameter.
Algorithm computing module: it for calculating current capacities, the power of energy storage device, is calculated when electric car charging remaining The data such as capacity.It is also used to calculate energy-storage system battery charge state, distributed energy storage in peak load regulation network frequency modulation service ability It calculates.And cloud will be sent in the result of residual capacity and service ability.
Load prediction module: for predicting the load data at fast charge station.The load of prediction is filled as fast charge station energy-storage system Electricity, the foundation discharged, are also used to foundation in the range of block chain node to energy-storage system Optimized Operation.
Scheduler module: the scheduling orderly charged for electric car in fast charge station;It is also used in block chain range of nodes electric Electrical automobile orderly charges, energy storage optimization, the scheduling of peak load regulation network frequency modulation service ability.
In specific communication, fast charge station, energy-storage system, energy storage device (battery) and user identity are known by data originating end Other specific identity is sent to cloud, and cloud transfers to identification authentication service to complete identification and then activates number if identification passes through According to originating end request data content and service, while start to the fast charge station, energy storage device, battery, user active data Analysis;Conversely, then returned data originating end failed authentication.
Further, the block chain data authentication module is also used to according to energy storage device (battery) asset number, fast charge The mapping relations stood between the three that ID and vehicle ID are formed, determine the block chain Data Identification for needing to obtain data, then root Corresponding block chain network storage location is determined according to the storage mark and block chain Data Identification of block chain network node, to mention Access evidence.
Further, the block chain data memory module includes the storage equipment for being distributed in each network node, Yi Ji Correspond to the storage mark of the block chain network node in this region in this storage equipment and according to energy storage device (battery) money Produce the block chain Data Identification that the mapping relations between number, the three that fast charge station ID and vehicle ID are formed determine, for pair Fast charge station information, battery information, charging equipment information data sealed storage.
Further, the block chain application management module includes data access management and data safety management;It is described After data access management is the request analysis by data access, the data after parsing include the storage mark of block chain network node With block chain Data Identification, and it is sent to block chain data authentication module;The data safety management includes digital signature, data Protection and storage safety.
A kind of fast charge station energy storage Optimization Work method based on block chain technology, comprising the following steps:
Step 1: requiring according to the access of block chain network node, client-side information registration is carried out;
Step 2: real-time in the operational process for passing through the energy storage device of fast charge station energy-storage system data collecting module collected Real time data, load data when data, charge and discharge, the data in client by sending into the block chain in cloud;
Step 3: distributing that strategy, Optimum Regulation strategy, orderly charge plan rationally by the way that fast charge station energy-storage system is calculated Summary, energy storage optimization, peak load regulation network frequency modulation service ability data, the data are by sending to the block chain in cloud in client In;
Step 4: user and information of vehicles, fast charge station data input client, client by wireless network by user, It send in vehicle and fast charge station information data into the block chain in cloud;
Step 5: by the operational process of energy storage device collected in step 2 real time data, charge and discharge when reality When data, load data and step 3 in calculated distribute strategy, Optimum Regulation strategy, orderly charging strategy, energy storage rationally Optimize, the data of peak load regulation network frequency modulation service ability are stored in block chain network node;
Step 6: block chain data access, parses data access request, the data requested access to include identity information, storage Energy equipment (battery) asset number, fast charge station ID and vehicle ID can identify block chain network node according to fast charge station ID, then Block chain Data Identification is determined according to the mapping relations at fast charge station and energy storage device (battery) asset number, by required access Data, which are extracted, returns to client.
Further, the method for data storage is carried out in the step 4 specifically:
Identification authentication is carried out to data according to block chain Data Identification, identification is completed in identification authentication service, and identity is known Do not pass through, then the data content for activating data originating end to request and service, while starting to the energy-storage system, battery, Yong Huche Active data analysis;Conversely, then returned data originating end failed authentication;
Data are sent in foundation client, and according to energy storage device (battery) asset number, fast charge station ID and vehicle ID Mapping relations between the three of formation are formed in block chain Data Identification;
It at least also include block chain Data Identification in block chain memory module, the block chain Data Identification is according to generation Time and number successively produce;
The data above sent are digitally signed and safety inspection;
Data storage.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (10)

1. a kind of fast charge station energy storage optimization system based on block chain technology, it is characterized in that:
The network that block chain module including multinode is formed, each block chain node are configured as the volume according to energy storage device Number, the mapping relations between the three that is formed of fast charge station ID and vehicle ID, determine the block chain data mark for needing to obtain data Know.
2. a kind of fast charge station energy storage optimization system based on block chain technology as described in claim 1, it is characterized in that: further including Fast charge station energy-storage system specifically includes data acquisition module, real-time monitoring module, algorithm computing module, scheduler module and bears Lotus prediction module, in which:
The data acquisition module is configured as the real-time capacity of acquisition fast charge station energy storage device, power and battery SOC data, And the data after calculating are uploaded into fast charge station energy-storage system by communication module, and for monitoring module, algorithm computing module, In scheduler module and load prediction module, the information on load of power grid is received, when current power load is excessive, energy-storage system is just not It can recharge, discharge when necessary;
Real-time monitoring module, is configured as the real time data of real time monitoring fast charge station energy storage device, current real-time of monitoring power grid Load, whether monitor energy-storage system needs charge or discharge;
Algorithm computing module is configured as calculating the current capacities and power of energy storage device, calculates when electric car charging surplus Covolume amount calculates energy-storage system battery charge state, distributed energy storage in peak load regulation network frequency modulation service ability, and by residual capacity And cloud is sent in the result of service ability;
Load prediction module is configured as the load data at prediction fast charge station;
Scheduler module is configured as in the scheduling and each block chain range of nodes that electric car orderly charges in fast charge station Electric car orderly charges, the scheduling of energy storage optimization and peak load regulation network frequency modulation service ability.
3. a kind of fast charge station energy storage optimization system based on block chain technology as described in claim 1, it is characterized in that: further including Energy storage device, user identity identification specific identity are sent to cloud, and cloud transfers to identification authentication service to complete identification, if body Part be identified by, then the data content for activating data originating end to request and service, at the same start to the fast charge station, energy storage device, The analysis of the active data of battery and user;Conversely, then returned data originating end failed authentication.
4. a kind of fast charge station energy storage optimization system based on block chain technology as described in claim 1, it is characterized in that: further including Client, the client include:
Communication module is configured as realizing the data communication of client and cloud;
Display module is configured as the data information that display identification device inquires, while providing the working interface of user's operation;
Module is issued, is configured as sending optimal charge position to client or the instruction of electric car push operation or to user Information.
5. a kind of fast charge station energy storage optimization system based on block chain technology as described in claim 1, it is characterized in that: described every One block chain node includes block chain data authentication module, is configured as the asset number according to energy storage device, fast charge station ID And the mapping relations between the three of vehicle ID formation, the block chain Data Identification for needing to obtain data is determined, according to block The storage mark and block chain Data Identification of chain network node determine corresponding block chain network storage location, to extract number According to.
6. a kind of fast charge station energy storage optimization system based on block chain technology as described in claim 1, it is characterized in that: each Block chain node further includes block chain data memory module, specifically includes the storage equipment for being distributed in each network node, Yi Ji This storage equipment on correspond to this region in block chain network node storage mark and according to energy storage device asset number, The block chain Data Identification that the mapping relations between three that fast charge station ID and vehicle ID is formed determine, to believe fast charge station Breath, battery information, charging equipment information data sealed storage.
7. a kind of fast charge station energy storage optimization system based on block chain technology as described in claim 1, it is characterized in that: each Block chain node further includes block chain application management module, specifically includes data access management module and data safety management mould Block, the data access management module, after being configured as the request analysis by data access, the data after parsing include block chain The storage mark and block chain Data Identification of network node, and it is sent to block chain data authentication module;The data safety pipe Reason module is configured for digital signature, data protection and storage safety.
8. a kind of fast charge station energy storage optimization system based on block chain technology as described in claim 1, it is characterized in that: described fast Station is filled to verify and store energy storage station operation data using block linked data structure, know together algorithm using distributed node to generate With the safety for updating energy storage station operation data, guaranteeing data transmission in the way of cryptography and accessing.
9. a kind of fast charge station energy storage Optimization Work method based on block chain technology, it is characterized in that: the following steps are included:
It is required according to the access of block chain network node, carries out client-side information registration;
Pass through the real time data in the operational process of the energy storage device of fast charge station energy-storage system data collecting module collected, charge and discharge When real time data, load data, the data are by sending into the block chain in cloud in client;
By fast charge station energy-storage system, calculated to distribute strategy, Optimum Regulation strategy, orderly charging strategy, energy storage rationally excellent Change, the data of peak load regulation network frequency modulation service ability, the data in client by sending into the block chain in cloud;
User and information of vehicles, fast charge station data input client, client pass through wireless network for user, vehicle and fast charge station It is sent in information data into the block chain in cloud;
By in the operational process of collected energy storage device real time data, charge and discharge when real time data, load data and institute What is calculated distributes strategy, Optimum Regulation strategy, orderly charging strategy, energy storage optimization and peak load regulation network frequency modulation service ability rationally Data are stored in block chain network node;
Block chain data access, parses data access request, and the data requested access to include identity information, energy storage device assets volume Number, fast charge station ID and vehicle ID, can identify block chain network node according to fast charge station ID, be filled further according to fast charge station and energy storage The mapping relations for setting asset number determine block chain Data Identification, and the data of required access are extracted and return to client.
10. working method as claimed in claim 9, it is characterized in that: the method for carrying out data storage specifically:
(1) identification authentication is carried out to data according to block chain Data Identification, identification, identification are completed in identification authentication service Pass through, then the data content for activating data originating end to request and service, while starting to the energy-storage system, battery and user's vehicle Active data analysis;Conversely, then returned data originating end failed authentication;
(2) data are sent in foundation client, and formed according to the asset number of energy storage device, fast charge station ID and vehicle ID Mapping relations between three are formed in block chain Data Identification;
It (3) at least also include block chain Data Identification in block chain memory module, the block chain Data Identification is according to generation Time and number successively produce;
(4) data above sent are digitally signed and safety inspection;
(5) data storage is carried out.
CN201811434971.1A 2018-11-28 2018-11-28 Fast charge station energy storage optimization system and its working method based on block chain technology Pending CN109299833A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811434971.1A CN109299833A (en) 2018-11-28 2018-11-28 Fast charge station energy storage optimization system and its working method based on block chain technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811434971.1A CN109299833A (en) 2018-11-28 2018-11-28 Fast charge station energy storage optimization system and its working method based on block chain technology

Publications (1)

Publication Number Publication Date
CN109299833A true CN109299833A (en) 2019-02-01

Family

ID=65143287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811434971.1A Pending CN109299833A (en) 2018-11-28 2018-11-28 Fast charge station energy storage optimization system and its working method based on block chain technology

Country Status (1)

Country Link
CN (1) CN109299833A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110119848A (en) * 2019-05-15 2019-08-13 长沙理工大学 Chain type communicates electric car group and shares decision frequency modulation method of commerce and system
CN110147409A (en) * 2019-04-02 2019-08-20 爱驰汽车有限公司 Method, equipment and the medium of battery information for enquiring vehicle
CN110189072A (en) * 2019-04-17 2019-08-30 中国电子科技集团公司电子科学研究院 Unmanned plane logistics system and its operation method based on block chain technology
CN110276903A (en) * 2019-06-28 2019-09-24 智慧谷(厦门)物联科技有限公司 A kind of shared charging system and method based on block chain
CN110347744A (en) * 2019-06-03 2019-10-18 阿里巴巴集团控股有限公司 Date storage method, device and the equipment of multilayer block chain type account book
CN111516547A (en) * 2020-05-09 2020-08-11 国网电子商务有限公司 Charging method and device of private charging pile based on alliance chain
US10949118B2 (en) 2019-06-03 2021-03-16 Advanced New Technologies Co., Ltd. Data storage method, apparatus, and device for multi-layer blockchain-type ledger
CN112632848A (en) * 2020-11-30 2021-04-09 上海万向区块链股份公司 Electric vehicle battery life evaluation method and system based on block chain and charging equipment
CN113580986A (en) * 2021-07-21 2021-11-02 广东电网有限责任公司广州供电局 Monitoring method and device for charging pile equipment
CN113673987A (en) * 2020-05-14 2021-11-19 上海电盛科技有限公司 Retired battery management method and device based on block chain
CN113874246A (en) * 2019-05-31 2021-12-31 Abb瑞士股份有限公司 Method and system for charging Electric Vehicle (EV) using block chain
CN114500556A (en) * 2022-01-06 2022-05-13 国网江苏省电力有限公司盐城供电分公司 Decentralized power control system for high-capacity medium-voltage direct-hanging energy storage system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106972534A (en) * 2017-04-28 2017-07-21 国网山东省电力公司泰安供电公司 A kind of photovoltaic charge station energy schedule management method
CN107786639A (en) * 2017-09-28 2018-03-09 山东鲁能智能技术有限公司 A kind of electric automobile networked system and its method of work based on block chain technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106972534A (en) * 2017-04-28 2017-07-21 国网山东省电力公司泰安供电公司 A kind of photovoltaic charge station energy schedule management method
CN107786639A (en) * 2017-09-28 2018-03-09 山东鲁能智能技术有限公司 A kind of electric automobile networked system and its method of work based on block chain technology

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110147409B (en) * 2019-04-02 2021-07-13 爱驰汽车有限公司 Method, apparatus, and medium for querying battery information of vehicle
CN110147409A (en) * 2019-04-02 2019-08-20 爱驰汽车有限公司 Method, equipment and the medium of battery information for enquiring vehicle
CN110189072A (en) * 2019-04-17 2019-08-30 中国电子科技集团公司电子科学研究院 Unmanned plane logistics system and its operation method based on block chain technology
CN110119848A (en) * 2019-05-15 2019-08-13 长沙理工大学 Chain type communicates electric car group and shares decision frequency modulation method of commerce and system
CN110119848B (en) * 2019-05-15 2022-11-11 长沙理工大学 Chain communication electric vehicle group sharing decision frequency modulation trading method and system
CN113874246B (en) * 2019-05-31 2024-04-23 Abb电动汽车有限责任公司 Method and system for charging an Electric Vehicle (EV) using a blockchain
CN113874246A (en) * 2019-05-31 2021-12-31 Abb瑞士股份有限公司 Method and system for charging Electric Vehicle (EV) using block chain
CN110347744A (en) * 2019-06-03 2019-10-18 阿里巴巴集团控股有限公司 Date storage method, device and the equipment of multilayer block chain type account book
US10949118B2 (en) 2019-06-03 2021-03-16 Advanced New Technologies Co., Ltd. Data storage method, apparatus, and device for multi-layer blockchain-type ledger
CN110347744B (en) * 2019-06-03 2020-07-24 阿里巴巴集团控股有限公司 Data storage method, device and equipment for multilayer block chain type account book
CN110276903A (en) * 2019-06-28 2019-09-24 智慧谷(厦门)物联科技有限公司 A kind of shared charging system and method based on block chain
CN111516547A (en) * 2020-05-09 2020-08-11 国网电子商务有限公司 Charging method and device of private charging pile based on alliance chain
CN113673987A (en) * 2020-05-14 2021-11-19 上海电盛科技有限公司 Retired battery management method and device based on block chain
CN112632848A (en) * 2020-11-30 2021-04-09 上海万向区块链股份公司 Electric vehicle battery life evaluation method and system based on block chain and charging equipment
CN113580986A (en) * 2021-07-21 2021-11-02 广东电网有限责任公司广州供电局 Monitoring method and device for charging pile equipment
CN114500556A (en) * 2022-01-06 2022-05-13 国网江苏省电力有限公司盐城供电分公司 Decentralized power control system for high-capacity medium-voltage direct-hanging energy storage system
CN114500556B (en) * 2022-01-06 2024-01-23 国网江苏省电力有限公司盐城供电分公司 High-capacity medium-voltage direct-hanging type energy storage system decentralization power control system

Similar Documents

Publication Publication Date Title
CN109299833A (en) Fast charge station energy storage optimization system and its working method based on block chain technology
CN102074978B (en) Charging and replacing power station, charging and replacing control method and system and operation monitoring system
Yang et al. Electric vehicle route optimization considering time-of-use electricity price by learnable partheno-genetic algorithm
He et al. Optimal scheduling for charging and discharging of electric vehicles
Shaaban et al. Real-time PEV charging/discharging coordination in smart distribution systems
CN103559567B (en) Electrical network manages the management method of system to electric automobile charging station
CN101901945B (en) Centralized intelligent dispatching method for charging plug-in hybrid electric vehicle (PHEV)
EP2458704A1 (en) Method and system for charging a fleet of batteries
CN109523087A (en) Electric car fast charge station energy storage based on deep learning monitors system and method
RU2014137174A (en) DISTRIBUTED ELECTRICITY OF ELECTRIC VEHICLE
CN109501630A (en) A kind of electric car charging scheme real-time recommendation method and system
CN108229733A (en) A kind of electric vehicle charging schedule method for considering customer satisfaction evaluation
CN106339778A (en) Optical storage microgrid operation optimization method considering multiple objectives
CN106295942A (en) City electric car public charging network service ability evaluation methodology and the system of evaluation
Shalaby et al. A dynamic optimal battery swapping mechanism for electric vehicles using an LSTM-based rolling horizon approach
Yang et al. An optimal battery allocation model for battery swapping station of electric vehicles
CN109888414A (en) Management method, the device and system of power battery
KR101629807B1 (en) System and method for controlling particpation-capacity of electric charging station for associating with renewable energy source
JP2015530860A (en) Recharging the battery pool
CN110015137A (en) A kind of battery management method and device
CN110293872A (en) A kind of electric car intelligent charge navigation system and method
CN106873552B (en) The electric car charging monitoring system and method for group's intarconnected cotrol
Gao et al. Integrated configuration and optimization of electric vehicle aggregators for charging facilities in power networks with renewables
CN114039372B (en) Electric vehicle scheduling method and system participating in power grid partition peak clipping and valley filling
Hu et al. Optimal charging schedule of an electric vehicle fleet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 253043 No. 41 Dongfeng East Road, Decheng District, Shandong, Dezhou

Applicant after: Dezhou Power Supply Company of State Grid Shandong Province Electric Power Company

Applicant after: National Network Intelligent Technology Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 253043 No. 41 Dongfeng East Road, Decheng District, Shandong, Dezhou

Applicant before: Dezhou Power Supply Company of State Grid Shandong Province Electric Power Company

Applicant before: Shandong Luneng Intelligent Technology Co., Ltd.

Applicant before: State Grid Corporation of China

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20210224

Address after: 253000 41 Dongfeng East Road, Decheng District, Dezhou City, Shandong Province

Applicant after: DEZHOU POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER Co.

Applicant after: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: 253043 No.41 Dongfeng East Road, Decheng District, Dezhou City, Shandong Province

Applicant before: DEZHOU POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER Co.

Applicant before: National Network Intelligent Technology Co.,Ltd.

Applicant before: STATE GRID CORPORATION OF CHINA

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20190201

RJ01 Rejection of invention patent application after publication