CN109299205A - The method and apparatus that will plan that the spatial data that industry uses is put in storage - Google Patents
The method and apparatus that will plan that the spatial data that industry uses is put in storage Download PDFInfo
- Publication number
- CN109299205A CN109299205A CN201811239918.6A CN201811239918A CN109299205A CN 109299205 A CN109299205 A CN 109299205A CN 201811239918 A CN201811239918 A CN 201811239918A CN 109299205 A CN109299205 A CN 109299205A
- Authority
- CN
- China
- Prior art keywords
- term
- small short
- storage
- spatial data
- reference line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a kind of method and apparatus that will plan that the spatial data that industry uses is put in storage, and spatial data to be put in storage is converted to by CAD data file this method comprises: obtaining;All graphical elements of search space data;Several small short-terms are determined in all graphical elements;For each small short-term, topological analysis is carried out to small short-term in range of tolerable variance, finds out reference line corresponding with small short-term, wherein small short-term is consistent with the attribute of reference line;Small short-term is handled;Each small short-term will be completed treated GML data storage to database.Through the invention, the processing that small short-term is carried out for planning industry spatial data to be put in storage, promotes warehouse-in efficiency.
Description
Technical field
The present invention relates to planning industry technology fields, more particularly, to a kind of spatial data that will plan that industry uses
The method and apparatus being put in storage.
Background technique
The spatial data that planning industry uses is usually to be carried out by specified designing unit of local or regional planning agency to city
The performance data exported after planning and designing, this kind of performance data are mostly the graph data of CAD, due to CAD data do not have attribute value,
It is inconvenient to save, so all can be converted to the spatial data with attribute value by the advanced row data conversion of CAD data and enter inventory
Storage, while conducive to later access or rule can be repaired by the attribute value of data together in database purchase.
But having a kind of distinctive data type in CAD data is " small short-term data ", the generation of this reference book be due to
The feelings lack of standardization for causing some line numbers to be engaged according to appearance suspension, without closure or only with the line closed on during CAD mapping
Condition, but after the small short-term data of broken line are converted to the spatial data with attribute value, can not be put in storage, so needing to carry out small
The processing of short-term.But interpretation inspection is manually carried out if passed through, efficiency is greatly influenced, meanwhile, artificial interpretation is also to exist
Error, so automatic inspection processing can be carried out to the spatial data of this respect by being badly in need of a method.
Therefore it provides a kind of method and apparatus that will plan that the spatial data that industry uses is put in storage, before storage
It automaticly inspects the small short-term data wait be put in storage in spatial data and is handled, promote the efficiency of storage, be that solution is badly in need of in this field
Certainly the technical issues of.
Summary of the invention
In view of this, the present invention provides a kind of methods and dress that will plan that the spatial data that industry uses is put in storage
It sets and computer equipment and computer readable storage medium, to solve the spatial data that planning industry uses in the prior art
In storage the technical issues of low efficiency.
On the one hand, the present invention provides a kind of methods that will plan that the spatial data that industry uses is put in storage.
Spatial data to be put in storage is converted to by CAD data file this method comprises: obtaining;Inquire the spatial data
All graphical elements;Several small short-terms are determined in all graphical elements;For small short-term described in each, to institute
It states small short-term and carries out topological analysis in range of tolerable variance, find out reference line corresponding with the small short-term, wherein described small
Short-term is consistent with the attribute of the reference line;The small short-term is handled, wherein when the small short-term and the reference line
When being parallel to each other, judge whether the length of the small short-term is greater than scheduled length threshold, when the length of the small short-term is less than
Or when being equal to scheduled length threshold, the small short-term is deleted wait be put in storage in spatial data described, when the small short-term
When length is less than or equal to scheduled length threshold, the small short-term is merged with the reference line, when the small short-term and institute
State reference line it is not parallel when, the small short-term is merged with the reference line;It will complete each small short-term treated institute
GML data storage is stated to database.
Further, the method also includes: construct the corresponding configuration file of the spatial data, wherein the configuration
File includes the map data mining platform of graphical element, attribute information and identification information in the spatial data;The small short-term is being held
The step of carrying out topological analysis in poor range, finding out reference line corresponding with the small short-term includes: to search described small
Graphical element in the range of tolerable variance of short-term obtains the element group being made of several graphical elements;To respectively it scheme in the element group
Information of the shape element in the configuration file is compared with information of the small short-term in the configuration file, determines
Being located at same figure layer and the identical image-element of attribute information with the small short-term out is the reference line.
Further, the attribute information is CASS code.
Further, the step of determining several small short-terms in all graphical elements includes: in all figures
Found out in shape element suspension, without closure or only with close on line occlusion line segment as the small short-term.
Further, the spatial data is SHP data.
Further, after the step of handling the small short-term, the method also includes, mabage report is generated,
Wherein, the mabage report includes the item number of the small short-term of the file information and each figure layer process.
On the other hand, the present invention provides a kind of devices that will plan that the spatial data that industry uses is put in storage.
The device includes: acquisition module, and spatial data to be put in storage is converted to by CAD data file for obtaining;It looks into
Module is ask, for inquiring all graphical elements of the spatial data;Determining module, for true in all graphical elements
Make several small short-terms;Analysis module carries out the small short-term for being directed to each described small short-term in range of tolerable variance
Topological analysis finds out reference line corresponding with the small short-term, wherein the attribute one of the small short-term and the reference line
It causes;Processing module, for handling the small short-term, wherein when the small short-term and the reference line are parallel to each other,
Judge whether the length of the small short-term is greater than scheduled length threshold, when the length of the small short-term is less than or equal to scheduled
When length threshold, the small short-term is deleted wait be put in storage in spatial data described, when the length of the small short-term is less than or waits
When scheduled length threshold, the small short-term is merged with the reference line, when the small short-term and the reference line are uneven
When row, the small short-term is merged with the reference line;Transmission module, treated for will complete each small short-term institute
GML data storage is stated to database.
Further, described device further include: memory module, for storing the corresponding configuration file of the spatial data,
Wherein, the configuration file includes the map data mining platform of graphical element, attribute information and identification information in the spatial data;It is described
Analysis module includes: searching unit, for searching the graphical element in the range of tolerable variance of the small short-term, is obtained by several figures
The element group of shape element composition;Comparing unit, for by letter of each graphical element in the configuration file in the element group
Breath, is compared with information of the small short-term in the configuration file, determines to be located at same figure layer with the small short-term
And the identical image-element of attribute information is the reference line.
Another aspect, the present invention provides a kind of computer equipments.
The computer equipment includes memory, processor and storage on a memory and can run on a processor
Computer program, the processor realized when executing the computer program it is provided by the invention any one planning industry is made
The step of method that spatial data is put in storage.
Another aspect, the present invention provides a kind of computer readable storage mediums.
Computer program is stored on the computer readable storage medium, it is real when the computer program is executed by processor
Existing any one the step of planning method that the spatial data that industry uses is put in storage provided by the invention.
Compared with prior art, the method and dress provided by the invention that will plan that the spatial data that industry uses is put in storage
Set and computer equipment and computer readable storage medium, at least realize it is following the utility model has the advantages that
For spatial data to be put in storage, small short-term is first found out, then finds out reference line in range of tolerable variance for small short-term,
Namely with the small consistent line segment of short-term attribute, finally according to the mutual position between the length of small short-term and small short-term and reference line
The relationship of setting is handled, and is put in storage after the completion of processing, and the small short-term in storage spatial data can be treated automatically before storage
Data are handled, and can be guaranteed to plan that the spatial data in industry is successfully put in storage, are also able to ascend the efficiency of storage.
By referring to the drawings to the detailed description of exemplary embodiment of the present invention, other feature of the invention and its
Advantage will become apparent.
Detailed description of the invention
It is combined in the description and the attached drawing for constituting part of specification shows the embodiment of the present invention, and even
With its explanation together principle for explaining the present invention.
The step of Fig. 1 is the method that the spatial data for using planning industry that the embodiment of the present invention 1 provides is put in storage
Flow chart;
The step of Fig. 2 is the method that the spatial data for using planning industry that the embodiment of the present invention 2 provides is put in storage
Flow chart;
The step of Fig. 3 is the method that the spatial data for using planning industry that the embodiment of the present invention 3 provides is put in storage
Flow chart;
Fig. 4 is the block diagram for the device that the spatial data for using planning industry that the embodiment of the present invention 4 provides is put in storage;
Fig. 5 is the block diagram for the computer equipment that the embodiment of the present invention 5 provides.
Specific embodiment
Carry out the various exemplary embodiments of detailed description of the present invention now with reference to attached drawing.It should also be noted that unless in addition having
Body explanation, the unlimited system of component and the positioned opposite of step, numerical expression and the numerical value otherwise illustrated in these embodiments is originally
The range of invention.
Be to the description only actually of at least one exemplary embodiment below it is illustrative, never as to the present invention
And its application or any restrictions used.
Technology, method and apparatus known to person of ordinary skill in the relevant may be not discussed in detail, but suitable
In the case of, the technology, method and apparatus should be considered as part of specification.
It is shown here and discuss all examples in, any occurrence should be construed as merely illustratively, without
It is as limitation.Therefore, other examples of exemplary embodiment can have different values.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, then in subsequent attached drawing does not need that it is further discussed.
Embodiment 1
The step of Fig. 1 is the method that the spatial data for using planning industry that the embodiment of the present invention 1 provides is put in storage
Flow chart, as shown in Figure 1, embodiment offer will plan that the method that the spatial data that industry uses is put in storage includes as follows
Step S101 to step S106:
Step S101: acquisition is converted to spatial data to be put in storage by CAD data file.
In planning, CAD software production planning chart can be used, the planning chart to complete mutually should be CAD data file,
Spatial data to be put in storage is the spatial data made of being converted as CAD data file with attribute, optionally, sky to be put in storage
Between data be SHP data.
During using CAD software production planning chart, due to mapping lack of standardization, it will form some small short-terms, this is small
Short-term exists after being converted to the spatial datas such as SHP data as a kind of graphical element.
Step S102: all graphical elements of search space data.
The graphical element inquired includes the element of each figure layer, includes small short-term in the element.
Step S103: several small short-terms are determined in all graphical elements.
Found out in all graphical elements suspension, without closure or only with close on line occlusion line segment as small short
Line.
Step S104: be directed to each small short-term, topological analysis is carried out in range of tolerable variance to small short-term, find out with it is small
The corresponding reference line of short-term.
Wherein, range of tolerable variance can be preset as needed, and for each small short-term, a buffering is formed in range of tolerable variance
Area carries out topological analysis in buffer area, can find multiple graphical elements, determines in the multiple graphical elements found
Out with the consistent graphical element of small short-term attribute namely reference line.
Step S105: small short-term is handled.
Wherein, specifically, can according to the mutual alignment relation between the length and small short-term and reference line of small short-term into
Row processing.When small short-term and reference line are parallel to each other, judge whether the length of small short-term is greater than scheduled length threshold, when small
When the length of short-term is less than or equal to scheduled length threshold, small short-term is deleted wait be put in storage in spatial data, when small short-term
Length be less than or equal to scheduled length threshold when, small short-term is merged with reference line, when small short-term and reference line are not parallel
When, small short-term is merged with reference line.
Step S106: each small short-term will be completed treated GML data storage to database.
The method that will plan that the spatial data that industry uses is put in storage provided using the embodiment, for sky to be put in storage
Between data, first find out small short-term, then find out reference line in range of tolerable variance for small short-term, namely consistent with small short-term attribute
Line segment, finally handled according to the mutual alignment relation between the length of small short-term and small short-term and reference line, handle
It is put in storage after the completion, the small short-term data that can be treated automatically before storage in storage spatial data are handled, Neng Goubao
Spatial data in card planning industry is successfully put in storage, and is also able to ascend the efficiency of storage.
Embodiment 2
The step of Fig. 2 is the method that the spatial data for using planning industry that the embodiment of the present invention 2 provides is put in storage
Flow chart, the embodiment are that preferred embodiment, relevant portion can refer to above-described embodiment 1 on the basis of above-described embodiment 1.
As shown in Fig. 2, the method that the spatial data for using planning industry that the embodiment provides is put in storage includes the following steps, namely
S201 to step S208:
Step S201: acquisition is converted to spatial data to be put in storage by CAD data file.
Step S202: the corresponding configuration file of building spatial data.
Wherein, configuration file includes the map data mining platform of graphical element, attribute information and identification information, figure layer in spatial data
Information is figure layer locating for graphical element, and attribute information is the attribute for describing graphical element, and identification information is used for image-element
It is identified.Wherein, attribute information can be reached by CASS code table.
Step S203: all graphical elements of search space data.
Step S204: several small short-terms are determined in all graphical elements.
Found out in all graphical elements suspension, without closure or only with close on line occlusion line segment as small short
Line.
Step S205: searching graphical element in the range of tolerable variance of small short-term, obtains being made of several graphical elements
Element group.
Step S206: by information of the graphical element each in element group in configuration file, with small short-term in configuration file
Information be compared, determine that being located at same figure layer and the identical image-element of attribute information with small short-term is reference line.
Specifically, for a certain graphical element, correspondence is found according to the identification information of the graphical element in configuration file
The record of the image-element, the expression information in configuration file according to small short-term find the record of the corresponding small short-term, judgement
Whether two records are under same figure layer, when under same figure layer, judge whether the CASS code in two records is consistent, if
Unanimously, illustrate that the graphical element is located at same figure layer with small short-term and attribute information is identical, as reference line.
Step S207: small short-term is handled.
Wherein, when small short-term and reference line are parallel to each other, judge whether the length of small short-term is greater than scheduled length threshold
Value deletes small short-term wait be put in storage in spatial data when the length of small short-term is less than or equal to scheduled length threshold, when
When the length of small short-term is less than or equal to scheduled length threshold, small short-term is merged with reference line, when small short-term and reference line
When not parallel, small short-term is merged with reference line.
Step S208: each small short-term will be completed treated GML data storage to database.
The method that will plan that the spatial data that industry uses is put in storage provided using the embodiment, for sky to be put in storage
Between data, building is for configuration file wait be put in storage graphical element in spatial data, when determining reference line, according to configuration file
It is determined, promotes the efficiency of small short-term processing, thus the further efficiency of room for promotion data loading.
Embodiment 3
The step of Fig. 3 is the method that the spatial data for using planning industry that the embodiment of the present invention 3 provides is put in storage
Flow chart, the embodiment are that preferred embodiment, relevant portion can refer to above-mentioned implementation on the basis of above-described embodiment 1 and 2
Example 1 and 2.As shown in figure 3, embodiment offer will plan that the method that the spatial data that industry uses is put in storage includes as follows
Step S301 to step S309:
Step S301: acquisition is converted to spatial data to be put in storage by CAD data file.
Step S302: the corresponding configuration file of building spatial data.
Wherein, configuration file includes the map data mining platform of graphical element, attribute information and identification information in spatial data, the category
Property information can be CASS code.
Step S303: all graphical elements of search space data.
Step S304: several small short-terms are determined in all graphical elements.
Found out in all graphical elements suspension, without closure or only with close on line occlusion line segment as small short
Line.
Step S305: searching graphical element in the range of tolerable variance of small short-term, obtains being made of several graphical elements
Element group.
Step S306: by information of the graphical element each in element group in configuration file, with small short-term in configuration file
Information be compared, determine that being located at same figure layer and the identical image-element of attribute information with small short-term is reference line.
Step S307: small short-term is handled.
Wherein, when small short-term and reference line are parallel to each other, judge whether the length of small short-term is greater than scheduled length threshold
Value deletes small short-term wait be put in storage in spatial data when the length of small short-term is less than or equal to scheduled length threshold, when
When the length of small short-term is less than or equal to scheduled length threshold, small short-term is merged with reference line, when small short-term and reference line
When not parallel, small short-term is merged with reference line.
Step S308: each small short-term will be completed treated GML data storage to database.
Step S309: mabage report is generated.
Wherein, mabage report includes the item number of the small short-term of the file information and each figure layer process.For example, certain processing report
It accuses as follows:
F:\00118203610\A.mdb
Small short-term at the co-melting conjunction modification 10 of #jmdxian.
Small short-term at the co-melting conjunction modification 0 of #jmd, deletes small short-term at modification 1.
F:\00118203610\B.mdb
Small short-term at the co-melting conjunction modification 10 of #jmdxian.
#jmd modifies small short-term at 0 altogether.
The method that will plan that the spatial data that industry uses is put in storage provided using the embodiment, at by small short-term
While GML data storage to be put in storage to database after reason, corresponding mabage report is also generated, file is embodied in report
The item number of the small short-term of information and each figure layer process, thus it is subsequent to database spatial data in use, being capable of basis
Mabage report further to data correction or inspection, further promotes the accuracy of data.
Embodiment 4
Fig. 4 is the block diagram for the device that the spatial data for using planning industry that the embodiment of the present invention 4 provides is put in storage,
The device is corresponding with the method for any offer of above-described embodiment 1 to 3, and related place can be referred to mutually, and details are not described herein again,
As shown in figure 4, the device includes obtaining module 401, enquiry module 402, determining module 403, analysis module 404, processing module
405 and transmission module 406
Wherein, it obtains module 401 and is converted to spatial data to be put in storage by CAD data file for obtaining;Inquire mould
Block 402 is used for all graphical elements of search space data;Determining module 403 is several for determining in all graphical elements
Small short-term;Analysis module 404 is used to be directed to each small short-term, and topological analysis is carried out in range of tolerable variance to small short-term, searches
Reference line corresponding with small short-term out, wherein small short-term is consistent with the attribute of reference line;Processing module 405 is used for small short
Line is handled, wherein when small short-term and reference line are parallel to each other, judges whether the length of small short-term is greater than scheduled length
Threshold value deletes small short-term wait be put in storage in spatial data when the length of small short-term is less than or equal to scheduled length threshold,
When the length of small short-term is less than or equal to scheduled length threshold, small short-term is merged with reference line, when small short-term and reference
When line is not parallel, small short-term is merged with reference line;Treated for will the complete each small short-term space number of transmission module 406
According to storing to database.
Optionally, device further include: memory module is used for the corresponding configuration file of memory space data, wherein configuration
File includes the map data mining platform of graphical element, attribute information and identification information in spatial data;Analysis module includes: to search list
Member obtains the element group being made of several graphical elements for searching the graphical element in the range of tolerable variance of small short-term;It compares
Unit, for the information by graphical element each in element group in configuration file, with information of the small short-term in configuration file into
Row compares, and determines that being located at same figure layer and the identical image-element of attribute information with small short-term is reference line.
Optionally, attribute information is CASS code.
Optionally it is determined that module 403 includes: to find out suspension in all graphical elements, do not have the step of specifically execution
Closure or the only line segment with the line occlusion closed on are as small short-term.
Optionally, spatial data is SHP data.
Optionally, which further includes generation module, for generating mabage report, wherein mabage report includes file letter
The item number of breath and the small short-term of each figure layer process.
Embodiment 5
The present embodiment also provides a kind of computer equipment, can such as execute the smart phone, tablet computer, notebook of program
Computer, desktop computer, rack-mount server, blade server, tower server or Cabinet-type server are (including independent
Server cluster composed by server or multiple servers) etc..
Fig. 5 is the block diagram for the computer equipment that the embodiment of the present invention 5 provides.As shown in figure 5, the computer of the present embodiment is set
Standby 50 include, but is not limited to: memory 501, processor 502 that connection can be in communication with each other by system bus, such as Fig. 5 institute
Show.It should be pointed out that Fig. 5 illustrates only the computer equipment 50 with component 501-502, it should be understood that not
It is required that implement all components shown, the implementation that can be substituted is more or less component.
In the present embodiment, memory 501 (i.e. readable storage medium storing program for executing) includes flash memory, hard disk, multimedia card, card-type memory
(for example, SD or DX memory etc.), random access storage device (RAM), static random-access memory (SRAM), read-only memory
(ROM), electrically erasable programmable read-only memory (EEPROM), programmable read only memory (PROM), magnetic storage, magnetic
Disk, CD etc..In some embodiments, memory 501 can be the internal storage unit of computer equipment 50, such as the calculating
The hard disk or memory of machine equipment 50.In further embodiments, memory 501 is also possible to the external storage of computer equipment 50
The plug-in type hard disk being equipped in equipment, such as the computer equipment 50, intelligent memory card (Smart Media Card, SMC), peace
Digital (Secure Digital, SD) card, flash card (Flash Card) etc..Certainly, memory 501 can also both include meter
The internal storage unit for calculating machine equipment 50 also includes its External memory equipment.In the present embodiment, memory 501 is commonly used in storage
It is installed on the operating system and types of applications software of computer equipment 50, such as the space that will plan that industry uses of embodiment 5
The program code etc. for the device that data are put in storage.In addition, memory 501 can be also used for temporarily storing exported or
The Various types of data that will be exported.
Processor 502 can be in some embodiments central processing unit (Central Processing Unit, CPU),
Controller, microcontroller, microprocessor or other data processing chips.The processor 502 is commonly used in control computer equipment
50 overall operation.In the present embodiment, program code or processing number of the processor 502 for being stored in run memory 501
According to, such as the device etc. that will plan that the spatial data that industry uses is put in storage.
Embodiment 6
The present embodiment also provides a kind of computer readable storage medium, such as flash memory, hard disk, multimedia card, card-type memory
(for example, SD or DX memory etc.), random access storage device (RAM), static random-access memory (SRAM), read-only memory
(ROM), electrically erasable programmable read-only memory (EEPROM), programmable read only memory (PROM), magnetic storage, magnetic
Disk, CD, server, App are stored thereon with computer program, phase are realized when program is executed by processor using store etc.
Answer function.The computer readable storage medium of the present embodiment, which is used to store, is put in storage the spatial data that uses of planning industry
Device, embodiment 1 to 3 is realized when being executed by processor, and any one will plan the side that the spatial data that uses of industry is put in storage
Method.
Although some specific embodiments of the invention are described in detail by example, the skill of this field
Art personnel it should be understood that example above merely to being illustrated, the range being not intended to be limiting of the invention.The skill of this field
Art personnel are it should be understood that can without departing from the scope and spirit of the present invention modify to above embodiments.This hair
Bright range is defined by the following claims.
Claims (10)
1. a kind of method that will plan that the spatial data that industry uses is put in storage characterized by comprising
Acquisition is converted to spatial data to be put in storage by CAD data file;
Inquire all graphical elements of the spatial data;
Several small short-terms are determined in all graphical elements;
For small short-term described in each, topological analysis is carried out in range of tolerable variance to the small short-term, find out with it is described small
The corresponding reference line of short-term, wherein the small short-term is consistent with the attribute of the reference line;
The small short-term is handled, wherein when the small short-term and the reference line are parallel to each other, judge described small short
Whether the length of line is greater than scheduled length threshold, when the length of the small short-term is less than or equal to scheduled length threshold,
The small short-term is deleted wait be put in storage in spatial data described, when the length of the small short-term is less than or equal to scheduled length
When threshold value, the small short-term is merged with the reference line, it, will be described small when the small short-term and the reference line are not parallel
Short-term is merged with the reference line;
Each small short-term will be completed treated the GML data storage to database.
2. the method according to claim 1 that will plan that the spatial data that industry uses is put in storage, which is characterized in that
The method also includes: construct the corresponding configuration file of the spatial data, wherein the configuration file includes the sky
Between in data graphical element map data mining platform, attribute information and identification information;
Topological analysis is carried out in range of tolerable variance to the small short-term, finds out the step of reference line corresponding with the small short-term
Suddenly include: the graphical element searched in the range of tolerable variance of the small short-term, obtain the element group being made of several graphical elements;
By information of each graphical element in the configuration file in the element group, with the small short-term in the configuration file
Information is compared, and determines that being located at same figure layer and the identical image-element of attribute information with the small short-term is the ginseng
Examine line.
3. the method according to claim 2 that will plan that the spatial data that industry uses is put in storage, which is characterized in that institute
Stating attribute information is CASS code.
4. the method according to claim 1 that will plan that the spatial data that industry uses is put in storage, which is characterized in that
The step of determining several small short-terms in all graphical elements include:
Found out in all graphical elements suspension, without closure or only with close on line occlusion line segment as described small
Short-term.
5. the method according to claim 1 that will plan that the spatial data that industry uses is put in storage, which is characterized in that institute
Stating spatial data is SHP data.
6. the method according to claim 1 that will plan that the spatial data that industry uses is put in storage, which is characterized in that
After the step of handling the small short-term, the method also includes generating mabage report, wherein the processing
Report includes the item number of the small short-term of the file information and each figure layer process.
7. a kind of device that will plan that the spatial data that industry uses is put in storage characterized by comprising
Module is obtained, is converted to spatial data to be put in storage by CAD data file for obtaining;
Enquiry module, for inquiring all graphical elements of the spatial data;
Determining module, for determining several small short-terms in all graphical elements;
Analysis module carries out topological analysis to the small short-term in range of tolerable variance, looks into for being directed to each described small short-term
Find out reference line corresponding with the small short-term, wherein the small short-term is consistent with the attribute of the reference line;
Processing module, for handling the small short-term, wherein when the small short-term is parallel to each other with the reference line
When, judge whether the length of the small short-term is greater than scheduled length threshold, when the length of the small short-term is less than or equal in advance
When fixed length threshold, the small short-term is deleted wait be put in storage in spatial data described, when the length of the small short-term is less than
Or when being equal to scheduled length threshold, the small short-term is merged with the reference line, when the small short-term and the reference line
When not parallel, the small short-term is merged with the reference line;
Transmission module, treated for will the complete each small short-term GML data storage to database.
8. the device according to claim 7 that will plan that the spatial data that industry uses is put in storage, which is characterized in that
Described device further include: memory module, for storing the corresponding configuration file of the spatial data, wherein the configuration
File includes the map data mining platform of graphical element, attribute information and identification information in the spatial data;
The analysis module includes: searching unit, for searching the graphical element in the range of tolerable variance of the small short-term, is obtained
The element group being made of several graphical elements;Comparing unit, for each graphical element in the element group is literary in the configuration
Information in part is compared with information of the small short-term in the configuration file, determines to be located at the small short-term
The same figure layer and identical image-element of attribute information is the reference line.
9. a kind of computer equipment, the computer equipment include memory, processor and storage on a memory and can be
The computer program run on processor, which is characterized in that realize that right is wanted when the processor executes the computer program
The step of seeking any one of 1 to 6 the method.
10. a kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that: the computer program
The step of any one of claim 1 to 6 the method is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811239918.6A CN109299205B (en) | 2018-10-23 | 2018-10-23 | Method and device for warehousing spatial data used by planning industry |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811239918.6A CN109299205B (en) | 2018-10-23 | 2018-10-23 | Method and device for warehousing spatial data used by planning industry |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109299205A true CN109299205A (en) | 2019-02-01 |
CN109299205B CN109299205B (en) | 2021-02-09 |
Family
ID=65157658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811239918.6A Active CN109299205B (en) | 2018-10-23 | 2018-10-23 | Method and device for warehousing spatial data used by planning industry |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109299205B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110109997A (en) * | 2019-05-16 | 2019-08-09 | 洛阳众智软件科技股份有限公司 | Data processing storage method and equipment |
CN111966670A (en) * | 2020-07-08 | 2020-11-20 | 成都星时代宇航科技有限公司 | Remote sensing data distribution method and device based on mosaic data set and management platform |
WO2021184193A1 (en) * | 2020-03-17 | 2021-09-23 | Shucheng Technology Co., Ltd. | Computer-aided warehouse space planning |
US11797721B2 (en) | 2020-03-17 | 2023-10-24 | Industrial Artificial Intelligence Inc. | Computer-aided warehouse space planning |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5859643A (en) * | 1991-08-20 | 1999-01-12 | Fujitsu Limited | Lowering geometric drawing resolution by filtering out data based on threshold values to increase retrieval speed |
US7047014B1 (en) * | 2004-11-05 | 2006-05-16 | Airespace, Inc. | Raster-to-vector conversion operations adapted to modeling of RF propagation |
CN104798106A (en) * | 2012-11-15 | 2015-07-22 | 高通股份有限公司 | Generating a key-image from a medical image |
CN105279243A (en) * | 2015-09-28 | 2016-01-27 | 张新长 | Spatial data conversion method and system |
CN105868392A (en) * | 2016-04-18 | 2016-08-17 | 重庆市勘测院 | Method for lossless conversion and storage of massive complex planning data based on MicroStation |
CN106610957A (en) * | 2015-10-21 | 2017-05-03 | 星际空间(天津)科技发展有限公司 | Multi-source data integration method based on geographic information |
-
2018
- 2018-10-23 CN CN201811239918.6A patent/CN109299205B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5859643A (en) * | 1991-08-20 | 1999-01-12 | Fujitsu Limited | Lowering geometric drawing resolution by filtering out data based on threshold values to increase retrieval speed |
US7047014B1 (en) * | 2004-11-05 | 2006-05-16 | Airespace, Inc. | Raster-to-vector conversion operations adapted to modeling of RF propagation |
CN104798106A (en) * | 2012-11-15 | 2015-07-22 | 高通股份有限公司 | Generating a key-image from a medical image |
CN105279243A (en) * | 2015-09-28 | 2016-01-27 | 张新长 | Spatial data conversion method and system |
CN106610957A (en) * | 2015-10-21 | 2017-05-03 | 星际空间(天津)科技发展有限公司 | Multi-source data integration method based on geographic information |
CN105868392A (en) * | 2016-04-18 | 2016-08-17 | 重庆市勘测院 | Method for lossless conversion and storage of massive complex planning data based on MicroStation |
Non-Patent Citations (3)
Title |
---|
胡胜华 等: "AutoCAD与GIS数据转换的研究", 《测绘通报》 * |
连超: "基于NewMap的大比例尺居民地数据综合方法的研究", 《中国优秀硕士学位论文全文数据库 基础科学辑》 * |
陈能 等: "AutoCAD 地形图数据转换为GIS空间数据的技术研究与应用", 《测绘通报》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110109997A (en) * | 2019-05-16 | 2019-08-09 | 洛阳众智软件科技股份有限公司 | Data processing storage method and equipment |
CN110109997B (en) * | 2019-05-16 | 2021-11-12 | 洛阳众智软件科技股份有限公司 | Data processing and warehousing method and equipment |
WO2021184193A1 (en) * | 2020-03-17 | 2021-09-23 | Shucheng Technology Co., Ltd. | Computer-aided warehouse space planning |
US11797721B2 (en) | 2020-03-17 | 2023-10-24 | Industrial Artificial Intelligence Inc. | Computer-aided warehouse space planning |
CN111966670A (en) * | 2020-07-08 | 2020-11-20 | 成都星时代宇航科技有限公司 | Remote sensing data distribution method and device based on mosaic data set and management platform |
Also Published As
Publication number | Publication date |
---|---|
CN109299205B (en) | 2021-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109299205A (en) | The method and apparatus that will plan that the spatial data that industry uses is put in storage | |
CN106528165B (en) | Code generating method and code generating system | |
US8896597B2 (en) | System and method for modifying geometric relationships in a solid model | |
US9436734B2 (en) | Relative performance prediction of a replacement database management system (DBMS) | |
US9372765B2 (en) | System and method for recovering system status consistently to designed recovering time point in distributed database | |
US20100013833A1 (en) | System and method for modifying features in a solid model | |
CN102880780A (en) | Systems and methods for creating intuitive context for analysis data | |
CN110647318B (en) | Method, device, equipment and medium for creating instance of stateful application | |
CN112416957A (en) | Data increment updating method and device based on data model layer and computer equipment | |
CN109684393A (en) | Collecting method, computer readable storage medium and terminal device | |
CN112785248B (en) | Human resource data cross-organization interaction method, device, equipment and storage medium | |
CN104199743B (en) | Consistency checking method for historical data service interface of power distribution network | |
CN109213505A (en) | Server hard disc firmware method for refreshing and device | |
CN107368423A (en) | Interface automatic configuration system and the automatized script processing method carried out wherein | |
CN109388685A (en) | The method and apparatus that will plan that the spatial data that industry uses is put in storage | |
CN105677843A (en) | Method for automatically obtaining attribute of four boundaries of parcel | |
CN107766228B (en) | Multi-language-based automatic testing method and device | |
CN114564621A (en) | Method, device and equipment for associating data and readable storage medium | |
CN114186976A (en) | Workflow transfer method and device, computer equipment and storage medium | |
US9251023B2 (en) | Implementing automated memory address recording in constrained random test generation for verification of processor hardware designs | |
CN112463896A (en) | Archive cataloging data processing method and device, computing equipment and storage medium | |
CN104572649B (en) | The processing method of the data of distributed memory system, apparatus and system | |
CN106557030B (en) | Method of instructing operation and device based on entity | |
CN109815113A (en) | Test method and server based on Jmeter platform | |
CN117573199B (en) | Model difference comparison analysis method, device, equipment and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |