CN109299071A - A kind of method that module is built in information system management - Google Patents

A kind of method that module is built in information system management Download PDF

Info

Publication number
CN109299071A
CN109299071A CN201811079982.2A CN201811079982A CN109299071A CN 109299071 A CN109299071 A CN 109299071A CN 201811079982 A CN201811079982 A CN 201811079982A CN 109299071 A CN109299071 A CN 109299071A
Authority
CN
China
Prior art keywords
module
build
building
information system
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811079982.2A
Other languages
Chinese (zh)
Inventor
何光辉
陆晓青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yi Ji Environmental Protection Technology (shanghai) Co Ltd
Original Assignee
Yi Ji Environmental Protection Technology (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yi Ji Environmental Protection Technology (shanghai) Co Ltd filed Critical Yi Ji Environmental Protection Technology (shanghai) Co Ltd
Priority to CN201811079982.2A priority Critical patent/CN109299071A/en
Publication of CN109299071A publication Critical patent/CN109299071A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0838Historical data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0029Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement being specially adapted for wireless interrogation of grouped or bundled articles tagged with wireless record carriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of methods that module is built in information system management, comprising: at least one of RFID chip and GPS module is arranged on building module, the RFID chip has the information data for building module;RFID transmitter is set, the information data of RFID chip is read by RFID transmitter;Central Information System is set, sends Central Information System for information data, GPS module sends the real-time position information for building module by wireless network to Central Information System;Central Information System carries out data statistics and analysis to information data and real-time position information.Method of the invention is by carrying out information-based record to the whole life cycle for building module, convenient for build module carry out digitization, scientific management, improve production and service efficiency that module is built in exhibition booth, save the cost is maximized while user-friendly, and greatly improves the feature of environmental protection that exhibition booth is built.

Description

A kind of method that module is built in information system management
Technical field
The present invention relates to exhibition booths and data analysis management technical field, and in particular, to mould is built in a kind of information system management The method of block.
Background technique
With the development of the times with the progress of science and technology, exhibitions is as business exchange, technology publication, personnel transfer and information biography The important means passed, has become more and more important, and all kinds of exhibitions emerge one after another.The development of exhibitions industry in recent years is very fast Speed, all trades and professions also more reinforce the attention degree of exhibition, by taking information industry as an example, each major company (such as Microsoft, Ying Te You etc.) other exhibition of company level can be all held regularly, major Technology-based Alliance (such as Android, ARM etc.) can also hold regularly scale Huge exhibition, for technology, the publication and publicity of product.
With gradually increasing for exhibition, the demand of exhibition booth is growing day by day, and current exhibition booth is all first to build frame, then Decoration panel is installed on frame, mode not only cumbersome inefficiency is built in this exhibition booth, but also builds at high cost, dismantles Journey is same cumbersome and generates a large amount of wastes, and the feature of environmental protection is poor, and essentially all of exhibition booth is built material and cannot be reused, therefore, Present applicant has invented exhibition booth and has built modular system, entire exhibition booth by it is multiple it is easy-to-mount build module composition, take Recycling can be repeated several times in modeling block, and all material for building module is also environmentally friendly recyclable materials, and client only needs It pays to build module rent exhibition booth can be completed and build, cost substantially reduces.
The information system management in field for exhibition booth or blank out are built in exhibition booth at present, carry out to nothing to module is built The technical solution of information system management, this causes the management for building module, and there are problems: can not obtain the use shape for respectively building module State, using the time, access times, service life, geographical location, haulage time, build the time, remove time, the information such as consumptive material, And then mould can not be built between respectively building the output of module, production time, the amount of storage that module is respectively built in warehouse, each warehouse It the dispatching distribution of block, the logistics leased and given back, build module for building module, the maintenance for building module and scraps, build mould Design improvement of block etc. is scientifically and rationally managed.
Summary of the invention
Based on above-described problems, the present invention proposes a kind of method that module is built in information system management, Neng Gouyou The above technical problem of the solution of effect is analyzed by data acquisition and data, carries out information to the whole life cycle for building module Change record, convenient for improving production and service efficiency that module is built in exhibition booth to module progress digitization, scientific management is built, Save the cost is maximized while user-friendly, and greatly improves the feature of environmental protection that exhibition booth is built.
Technical solution of the present invention are as follows:
A kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) first module is set on building module, first module has the information data for building module;
B) be arranged the second module, build module production, build module factory, build module return factory, build module scrap, Module storage is built, module outbound is built, builds module and wait renting, build module and hire out, build module and give back, build module and take Build, build module remove, build modular transportation logistics, build at least one situation of module maintenance under read by the second module The information data of first module;
C) Central Information System is set, send Central Information System for the information data;
D) Central Information System carries out data statistics and analysis to the information data.
Preferably, first module is RFID chip, and second module is RFID transmitter.
Preferably, in step b, other than reading the information data, also the information data is rewritten.
Preferably, the information data includes at least one of following information: model, production time, the time of making the product, storage When time, the place of production, place warehouse information, transport port of shipment, transport destination, accumulation access times, accumulation transport mileage, maintenance Between, maintenance frequency, expected failure time, the person of building, dismounting person, hirer, the person of giving back.
Preferably, the method also includes step e: life of the result obtained by step d statistics and analysis to module is built At least one produce, transport, lease, build, remove, give back, repair, scrap, designed is managed.
Preferably, it is described build module be build exhibition booth, stage, at least one of advertising platform used build module.
Another technical solution of the invention are as follows:
A kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) GPS module is set on building module;
B) Central Information System is set, the GPS module builds module to Central Information System transmission by wireless network Real-time position information.
Preferably, the method also includes step c: Central Information System carries out data statistics to the real-time position information And analysis.
Preferably, in step b, build module production, build module factory, build module return factory, build module scrap, Module storage is built, module outbound is built, builds module and wait renting, build module and hire out, build module and give back, build module and take It builds, builds module dismounting, build modular transportation logistics, build under at least one situation of module maintenance, the GPS module passes through Wireless network sends the real-time position information for building module to Central Information System.
Preferably, the method also includes step d: life of the result obtained by step c statistics and analysis to module is built At least one produce, transport, lease, build, remove, give back, repair, scrap, designed is managed.
Preferably, it is described build module be build exhibition booth, stage, at least one of advertising platform used build module.
Using the present invention has the advantages that
1, by means of the invention it is also possible to very obtain quickly the producer, network operator, designer that build module Respectively build the use state of module, using the time, access times, service life, geographical location, haulage time, transportation route, take It builds the time, remove time, the information such as consumptive material, and then can be easily to respectively building the output of module, production time, in warehouse It respectively builds and builds the dispatching distribution of module between the amount of storage of module, each warehouse, build leasing and give back, building module for module Logistics, build module maintenance with scrap, build module design improvement etc. scientifically and rationally managed.
2, by means of the invention it is also possible to carry out information-based record to the whole life cycle for building module, convenient for pair It builds module and carries out digitization, scientific management, the production and service efficiency for building module in exhibition booth are farthest improved, in side Just save the cost is maximized while user's use, is understood simultaneously due to that can make to build module producer by means of the present invention The yield for controlling each model module, can greatly reduce the possibility excessively produced, to greatly improve the feature of environmental protection that exhibition booth is built.
Specific embodiment
The following examples are only intended to illustrate the technical solution of the present invention more clearly, therefore is intended only as example, without It can be limited the scope of the invention with this.
Embodiment 1
A kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) RFID chip is set on building module, the RFID chip has the information data for building module, institute Stating information data includes following information: model, production time, the time of making the product, entry time, the place of production, place warehouse information, transport Port of shipment, accumulation access times, accumulation transport mileage, maintenance time, maintenance frequency, expected failure time, is taken at transport destination The person of building, dismounting person, hirer, the person of giving back;
B) RFID transmitter is set, building module production, building module factory, build module and return factory, build module report It gives up, builds module storage, builds module outbound, building module and wait renting, build module and hire out, build module and give back, build module It builds, build under module removes, builds modular transportation logistics, building at least one situation of module maintenance through RFID transmitter Read the information data of the RFID chip;
C) Central Information System is set, send Central Information System for the information data;
D) Central Information System carries out data statistics and analysis to the information data.
Embodiment 2
A kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) RFID chip is set on building module, the RFID chip has the information data for building module, institute Stating information data includes following information: model, production time, the time of making the product, entry time, the place of production, place warehouse information, transport Port of shipment, accumulation access times, accumulation transport mileage, maintenance time, maintenance frequency, expected failure time, is taken at transport destination The person of building, dismounting person, hirer, the person of giving back;
B) RFID transmitter is set, building module production, building module factory, build module and return factory, build module report It gives up, builds module storage, builds module outbound, building module and wait renting, build module and hire out, build module and give back, build module It builds, build under module removes, builds modular transportation logistics, building at least one situation of module maintenance through RFID transmitter Read and rewrite the information data of the RFID chip;
C) Central Information System is set, send Central Information System for the information data;
D) Central Information System carries out data statistics and analysis to the information data;
E) result obtained by step d statistics and analysis is to building the production of module, transport, lease, build, remove, return Also, at least one repair, scrap, designed is managed.
Embodiment 3
A kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) GPS module is set on building module;
B) Central Information System is set, building module production, building module factory, build module and return factory, build module It scraps, builds module storage, builds module outbound, building module and wait renting, build module and hire out, build module and give back, build mould Block is built, builds module dismounting, build modular transportation logistics, build under at least one situation of module maintenance, the GPS module The real-time position information for building module is sent to Central Information System by wireless network;
C) Central Information System carries out data statistics and analysis to the real-time position information.
Embodiment 4
A kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) RFID chip and GPS module are set on building module, the RFID chip has the letter for building module Data are ceased, the information data includes following information: model, production time, the time of making the product, entry time, the place of production, place storehouse Information, transport port of shipment, transport destination, accumulation access times, accumulation transport mileage, maintenance time, maintenance frequency, expected report Useless time, the person of building, dismounting person, hirer, the person of giving back;
B) RFID transmitter is set, building module production, building module factory, build module and return factory, build module report It gives up, builds module storage, builds module outbound, building module and wait renting, build module and hire out, build module and give back, build module It builds, build under module removes, builds modular transportation logistics, building at least one situation of module maintenance through RFID transmitter Read and rewrite the information data of the RFID chip;
C) Central Information System is set, send Central Information System for the information data;And build module production, Module factory is built, module is built and returns factory, builds module and scrap, build module storage, build module outbound, build module and wait for Rent, build module hire out, build module give back, build module build, build module remove, build modular transportation logistics, build Under at least one situation of module maintenance, the GPS module builds module to Central Information System transmission by wireless network Real-time position information;
D) Central Information System carries out data statistics and analysis to the information data and real-time position information;
E) result obtained by step d statistics and analysis is to building the production of module, transport, lease, build, remove, return Also, at least one repair, scrap, designed is managed.
The beneficial effects of the present invention are:
1, by means of the invention it is also possible to very obtain quickly the producer, network operator, designer that build module Respectively build the use state of module, using the time, access times, service life, geographical location, haulage time, transportation route, take It builds the time, remove time, the information such as consumptive material, and then can be easily to respectively building the output of module, production time, in warehouse It respectively builds and builds the dispatching distribution of module between the amount of storage of module, each warehouse, build leasing and give back, building module for module Logistics, build module maintenance with scrap, build module design improvement etc. scientifically and rationally managed.
2, by means of the invention it is also possible to carry out information-based record to the whole life cycle for building module, convenient for pair It builds module and carries out digitization, scientific management, the production and service efficiency for building module in exhibition booth are farthest improved, in side Just save the cost is maximized while user's use, is understood simultaneously due to that can make to build module producer by means of the present invention The yield for controlling each model module, can greatly reduce the possibility excessively produced, to greatly improve the feature of environmental protection that exhibition booth is built.
3, with the method for the invention it is achieved that the big data management in recyclable economic lower exhibition booth field.
It is understood that other than applying method of the invention on building module, on whole exhibition booth, advertising platform Method of the invention can be applied.
In specification of the invention, numerous specific details are set forth.It is to be appreciated, however, that the embodiment of the present invention can be with It practices without these specific details.In some instances, well known method, structure and skill is not been shown in detail Art, so as not to obscure the understanding of this specification.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it is still It is possible to modify the technical solutions described in the foregoing embodiments, or some or all of the technical features is carried out Equivalent replacement;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution various embodiments of the present invention technical side The range of case should all cover within the scope of the claims and the description of the invention.

Claims (10)

1. a kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) first module is set on building module, first module has the information data for building module;
B) second module is set, building module production, building module factory, build module and return factory, build module and scrap, build Module storage builds module outbound, builds module and wait renting, build module and hire out, build module and give back, build module and build, take Described in modeling block is read under removing, build modular transportation logistics, building at least one situation of module maintenance by the second module The information data of first module;
C) Central Information System is set, send Central Information System for the information data;
D) Central Information System carries out data statistics and analysis to the information data.
2. the method according to claim 1, wherein first module is RFID chip, second module For RFID transmitter.
3. also right other than reading the information data the method according to claim 1, wherein in step b The information data is rewritten.
4. the method according to claim 1, wherein the information data includes at least one of following information: Model, production time, the time of making the product, entry time, the place of production, place warehouse information, transport port of shipment, transport destination, accumulation Access times, maintenance time, maintenance frequency, expected failure time, the person of building, dismounting person, hirer, are returned at accumulation transport mileage Also.
5. the method according to claim 1, wherein the method also includes step e: being counted and divided by step d The result obtained is analysed at least one for building the production of module, transporting, leasing, build, remove, give back, repair, scrap, design Kind is managed.
6. a kind of method that module is built in information system management, it is characterised in that: the following steps are included:
A) GPS module is set on building module;
B) Central Information System is set, the GPS module sends the reality for building module by wireless network to Central Information System When location information.
7. according to the method described in claim 6, it is characterized in that, the method also includes step c: Central Information System is to institute It states real-time position information and carries out data statistics and analysis.
8. according to the method described in claim 6, it is characterized in that, the method also includes: in step b, building, module is raw Produce, build module factory, build module return factory, build module scrap, build module storage, build module outbound, build module It hired out wait rent, build module, build module and give back, build module and build, build module and remove, build modular transportation logistics, take It builds under at least one situation of module maintenance, the GPS module builds module to Central Information System transmission by wireless network Real-time position information.
9. the method according to the description of claim 7 is characterized in that the method also includes step d: being counted and divided by step c The result obtained is analysed at least one for building the production of module, transporting, leasing, build, remove, give back, repair, scrap, design Kind is managed.
10. method according to claim 1 or 6, which is characterized in that the module of building is to build exhibition booth, stage, advertisement At least one of platform used builds module.
CN201811079982.2A 2018-09-13 2018-09-13 A kind of method that module is built in information system management Withdrawn CN109299071A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811079982.2A CN109299071A (en) 2018-09-13 2018-09-13 A kind of method that module is built in information system management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811079982.2A CN109299071A (en) 2018-09-13 2018-09-13 A kind of method that module is built in information system management

Publications (1)

Publication Number Publication Date
CN109299071A true CN109299071A (en) 2019-02-01

Family

ID=65163220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811079982.2A Withdrawn CN109299071A (en) 2018-09-13 2018-09-13 A kind of method that module is built in information system management

Country Status (1)

Country Link
CN (1) CN109299071A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056335A (en) * 2016-06-02 2016-10-26 国家电网公司 Intelligent asset management method
CN106778952A (en) * 2016-11-30 2017-05-31 长威信息科技发展股份有限公司 A kind of storehouse raw material full life cycle management method and system
CN107203862A (en) * 2017-04-17 2017-09-26 襄阳风神物流有限公司 A kind of auto parts machinery WMS
CN108057254A (en) * 2017-11-06 2018-05-22 浙江大丰实业股份有限公司 Interactive processing system inside and outside module stage field
CN108510154A (en) * 2018-02-12 2018-09-07 黑龙江省科学院自动化研究所 A kind of Internet of Things cognitive method towards Furniture Flexible Production

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056335A (en) * 2016-06-02 2016-10-26 国家电网公司 Intelligent asset management method
CN106778952A (en) * 2016-11-30 2017-05-31 长威信息科技发展股份有限公司 A kind of storehouse raw material full life cycle management method and system
CN107203862A (en) * 2017-04-17 2017-09-26 襄阳风神物流有限公司 A kind of auto parts machinery WMS
CN108057254A (en) * 2017-11-06 2018-05-22 浙江大丰实业股份有限公司 Interactive processing system inside and outside module stage field
CN108510154A (en) * 2018-02-12 2018-09-07 黑龙江省科学院自动化研究所 A kind of Internet of Things cognitive method towards Furniture Flexible Production

Similar Documents

Publication Publication Date Title
CN105005289B (en) A kind of industrial platform of internet of things
Kulak et al. A complete cellular manufacturing system design methodology based on axiomatic design principles
CN104408600A (en) Cold-chain logistics information platform system
CN103164754A (en) Method and manufacturing execution system (MES) framework for production management and control process of clothing industry
CN102004964A (en) FRID based public warehouse real-time information management system and management method thereof
CN108399519A (en) A kind of concrete mixing plant Information Management System
CN105069604A (en) Tobacco logistics information collaborative management system based on Internet of Things
US20140122347A1 (en) System for Life-Cycle Tracking of Recycle Commodities
CN104537511A (en) Novel logistics management and control system
JP2006309577A (en) Production plan preparation system
CN104463479A (en) Electronic shelf label management information system
Oh Development of a smart supply-chain management solution based on logistics standards utilizing artificial intelligence and the internet of things
CN111882275A (en) Trade big data management method and system based on industrial identification analysis
CN111898979A (en) Industrial innovation practice center system based on Internet
Li Development of intelligent logistics in china
CN104504539A (en) Full life cycle management system of internet of things in discrete manufacturing industry
CN110245852A (en) A kind of supply chain logistics network efficiency analysis and assessment method based on hybrid simulation
CN109299071A (en) A kind of method that module is built in information system management
CN104392326B (en) Iron-contained solid waste circulation utilization monitoring method for iron and steel enterprise
Pirim et al. Supply Chain Management and Optimization in Manufacturing
Luyster et al. Creating your lean future state
CN103927618A (en) BOM material processing method
Al Robaaiy et al. Application the Kanban Cards and the Value Stream Map (Vsm) to Rationalize Inventory Costs and to Improve The Company's Performance and Oversight Applied Research in Electrical Cables Factory/Ur State Company For Electrical Industries
CN113448693A (en) SAAS cloud platform of digital factory
Qiu et al. Supply hubs in industrial parks (SHIP): Research perspectives

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 200245 D2, No. 2988, Dongchuan Road, Minhang District, Shanghai

Applicant after: Yita Environmental Technology (Shanghai) Co., Ltd.

Address before: 200443 Shanghai Baoshan District intelligence Industrial Park 2 phase 16 Hulan West Road 100

Applicant before: Yita Environmental Technology (Shanghai) Co., Ltd.

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190201