CN109296122A - The construction method of the prefabricated concrete structure Side fascia for building equipped with prefabricated window frame - Google Patents
The construction method of the prefabricated concrete structure Side fascia for building equipped with prefabricated window frame Download PDFInfo
- Publication number
- CN109296122A CN109296122A CN201710606277.2A CN201710606277A CN109296122A CN 109296122 A CN109296122 A CN 109296122A CN 201710606277 A CN201710606277 A CN 201710606277A CN 109296122 A CN109296122 A CN 109296122A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- window
- window frame
- door
- mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/46—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/62—Tightening or covering joints between the border of openings and the frame or between contiguous frames
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/62—Tightening or covering joints between the border of openings and the frame or between contiguous frames
- E06B2001/626—Tightening or covering joints between the border of openings and the frame or between contiguous frames comprising expanding foam strips
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Door And Window Frames Mounted To Openings (AREA)
Abstract
The invention discloses a kind of construction methods of prefabricated concrete structure Side fascia for building equipped with prefabricated window frame, the following steps are included: making door and window according to the size of component drawing, prefabricated doors and windows hole and door and window mouth fixing mould, mold is assembled fixed in die station, in mould inside brush interleaving agent, the installation of sash is carried out according to drawing, gap between window frame, gap foaming agent foam joint filling between window frame and mold, casting concrete, offline installation door and window fan and handware after maintenance, remove the wooden box of finished product protection, construction is completed, top out or most of workload complete before install in advance, save construction speed, improve working security.
Description
Technical field
It is for building equipped with prefabricated window frame that the present invention relates generally to building fields more particularly to a kind of prefabricated concrete structure
Side fascia construction method.
Background technique
Erection of doors and windows on the Side fascia of existing prefabricated concrete structure building is used reserves door and window on prefabricated panel
Hole, the installation of sash is then carried out before main structure completes to carry out thick decoration construction, to be stitched after being installed
Plastering inside and outside the foaming joint filling of gap and hole surrounding.
Problems and disadvantages existing for existing technology are to install sash after the technique elder generation box out, cause framework and structure it
Between there are gap, though easily there is the hidden danger of leakage due to being field worker manual operations in foamed dose of plastering processing
Or quality problems, and the construction speed for influencing subsequent handling is installed again after the completion of topping out or most of workload.Mesh
More or less there is the phenomenon that erection of doors and windows progress lag in preceding architectural engineering.And high altitude operation is installed, safe wind
It is dangerous also to greatly improve.
Summary of the invention
In view of drawbacks described above in the prior art or deficiency, it is intended to provide a kind of assembly highly-safe, construction speed is fast
The construction method of the formula concrete structure Side fascia for building equipped with prefabricated window frame.
In a first aspect, a kind of construction method of prefabricated concrete structure Side fascia for building equipped with prefabricated window frame, packet
Include following steps:
Door and window is made according to the size of component drawing,
Prefabricated doors and windows hole and door and window mouth fixing mould,
Mold is assembled fixed in die station, in mould inside brush interleaving agent, the installation of sash is carried out according to drawing,
Gap, window frame between window frame and the foaming agent foam joint filling of the gap between mold,
Casting concrete, offline installation door and window fan and handware after maintenance,
The wooden box of finished product protection is removed, construction is completed.
The utility model has the advantages that the construction party of the prefabricated concrete structure of the invention Side fascia for building equipped with prefabricated window frame
Method solves the backwardness technique of installation sash after first box out, thoroughly eliminates between framework and structure due to gap, foaming and smearing
Still easily there is hidden leakage defect in ash processing, saved the complaint of a large amount of maintenance expense and society.Topping out or
Most of workload is installed in advance before completing, and is saved construction speed, be can produce 40 yuan of every square metre of door and window areas of economic benefit.
Current architectural engineering is overcome more or less to there is the phenomenon that erection of doors and windows progress lag.High-altitude working safety is improved, from
For this respect, the direct benefit and social benefit of generation are very huge.
Specific embodiment
The application is described in further detail below with reference to embodiment.It is understood that tool described herein
Body embodiment is used only for explaining related invention, rather than the restriction to the invention.
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The application is described in detail below in conjunction with embodiment.
The invention discloses a kind of construction method of prefabricated concrete structure Side fascia for building equipped with prefabricated window frame,
The following steps are included:
Door and window (can be the materials such as aluminium alloy or plastic-steel) is made in advance according to the size of component drawing.
According to the dedicated door-window opening of integrated prefabricated Process configuration and door and window mouth fixing mould.
Mold in die station assembly with regard to bit correction reinforce after, special separating agent is brushed in advance, according to typesetting in mold
Design carries out the installation of sash.
The gap special-purpose foaming agent foaming joint filling between mold, prevents from generating spillage when concreting between window frame.
Casting concrete, it is offline after maintenance to enter component repository, door and window fan and handware are installed.
Stringent finished product protection is carried out, prevents door and window contaminated and damage.
It is the wooden box for removing finished product protection to handing over, entire door and window work is disposably completed.
The construction method of the prefabricated concrete structure of the invention Side fascia for building equipped with prefabricated window frame, solution are first stayed
The backwardness technique of sash is installed behind hole, is thoroughly eliminated due to gap between framework and structure, in foaming and plastering processing still pole
Easily there are problems that hidden leakage defect, has saved the complaint of a large amount of maintenance expense and society.It is topping out or is largely working
Amount is installed in advance before completing, and is saved construction speed, be can produce 40 yuan of every square metre of door and window areas of economic benefit.Overcome current
More or less there is the phenomenon that erection of doors and windows progress lag in architectural engineering.High-altitude working safety is improved, for this respect,
The direct benefit and social benefit of generation are very huge.
Above description is only the preferred embodiment of the application and the explanation to institute's application technology principle.Those skilled in the art
Member is it should be appreciated that invention scope involved in the application, however it is not limited to technology made of the specific combination of above-mentioned technical characteristic
Scheme, while should also cover in the case where not departing from the inventive concept, it is carried out by above-mentioned technical characteristic or its equivalent feature
Any combination and the other technical solutions formed.Such as features described above has similar function with (but being not limited to) disclosed herein
Can technical characteristic replaced mutually and the technical solution that is formed.
Claims (1)
1. a kind of construction method of prefabricated concrete structure Side fascia for building equipped with prefabricated window frame, which is characterized in that packet
Include following steps:
Door and window is made according to the size of component drawing,
Prefabricated doors and windows hole and door and window mouth fixing mould,
Mold is assembled fixed in die station, in mould inside brush interleaving agent, the installation of sash is carried out according to drawing,
Gap, window frame between window frame and the foaming agent foam joint filling of the gap between mold,
Casting concrete, offline installation door and window fan and handware after maintenance,
The wooden box of finished product protection is removed, construction is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710606277.2A CN109296122A (en) | 2017-07-24 | 2017-07-24 | The construction method of the prefabricated concrete structure Side fascia for building equipped with prefabricated window frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710606277.2A CN109296122A (en) | 2017-07-24 | 2017-07-24 | The construction method of the prefabricated concrete structure Side fascia for building equipped with prefabricated window frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109296122A true CN109296122A (en) | 2019-02-01 |
Family
ID=65167536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710606277.2A Pending CN109296122A (en) | 2017-07-24 | 2017-07-24 | The construction method of the prefabricated concrete structure Side fascia for building equipped with prefabricated window frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109296122A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111321842A (en) * | 2020-02-26 | 2020-06-23 | 中国十七冶集团有限公司 | Preparation and installation method of door and window integrated plate |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032888A (en) * | 2014-06-24 | 2014-09-10 | 黄涛 | Integrally prefabricated multifunctional composite external wall panel and industrial building external wall |
CN205242729U (en) * | 2015-12-17 | 2016-05-18 | 上海宝岳住宅工业有限公司 | Fast assembly's precast concrete coincide wallboard |
-
2017
- 2017-07-24 CN CN201710606277.2A patent/CN109296122A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032888A (en) * | 2014-06-24 | 2014-09-10 | 黄涛 | Integrally prefabricated multifunctional composite external wall panel and industrial building external wall |
CN205242729U (en) * | 2015-12-17 | 2016-05-18 | 上海宝岳住宅工业有限公司 | Fast assembly's precast concrete coincide wallboard |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111321842A (en) * | 2020-02-26 | 2020-06-23 | 中国十七冶集团有限公司 | Preparation and installation method of door and window integrated plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203977690U (en) | A kind of superimposed wallboard of waterproof of Novel belt prefabricated windows | |
CN102409926B (en) | Heat preservation doors and windows with conveniently-dismounted attached frames of doors and windows | |
CN104153485A (en) | Outer-wall tongue groove capable of preventing water seepage of window and construction method of outer-wall tongue groove | |
CN107255007A (en) | A kind of broken-bridge aluminum alloy exterior window closing in construction method | |
CN105064553B (en) | Flexible prefabricated assembling shear wall exterior window integrated construction system and its construction method | |
CN104047427A (en) | Anti-seepage and thermal-insulation construction method for external wall and external window | |
CN109296122A (en) | The construction method of the prefabricated concrete structure Side fascia for building equipped with prefabricated window frame | |
CN103015542A (en) | External heat insulation construction method of cast-in-place foam external wall | |
CN105317320A (en) | Door and window auxiliary frame applicable to aluminum alloy formwork construction and installing method | |
CN105672651B (en) | A kind of pre-buried mould of window frame and its construction method | |
CN206888506U (en) | The cast-in-place system of formwork structure and shear wall of shear wall angle node | |
CN102561691A (en) | Method for eliminating cracking of joint between fair-faced concrete shear wall and masonry | |
CN203822057U (en) | Aluminum alloy window structure | |
CN111075309A (en) | Method for mounting aluminum alloy door and window | |
CN204551843U (en) | The outer broken line type frame-supported glass curtain wall choosing glass wing of band | |
CN205530830U (en) | Outer aluminium fire prevention glass partition wall of interior steel | |
CN202718566U (en) | Double-break-bridge heat insulation door and window | |
CN109441116A (en) | A kind of exterior wall tongue and groove for preventing window from seeping water | |
CN206016050U (en) | A kind of integrated prefabricated Exterior Wall Components of exterior wall door and window fine fitment | |
CN204081126U (en) | A kind of exterior wall tongue and groove preventing window from seeping water | |
CN205604721U (en) | Pre -buried mould of window frame | |
CN204175103U (en) | A kind of door and window auxiliary frame being applicable to aluminum alloy mould plate construction | |
CN204252291U (en) | The waterproof construction of the prefabricated out-hung panel with window opening | |
CN204175124U (en) | A kind of rear installed sliding sash | |
CN209837363U (en) | Shear wall window opening structure based on GAT composite heat-insulation external template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190201 |
|
RJ01 | Rejection of invention patent application after publication |