CN109281344A - A kind of road construction chisel stone device - Google Patents

A kind of road construction chisel stone device Download PDF

Info

Publication number
CN109281344A
CN109281344A CN201811313441.1A CN201811313441A CN109281344A CN 109281344 A CN109281344 A CN 109281344A CN 201811313441 A CN201811313441 A CN 201811313441A CN 109281344 A CN109281344 A CN 109281344A
Authority
CN
China
Prior art keywords
wall
hydraulic stem
pedestal
water
exterior walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811313441.1A
Other languages
Chinese (zh)
Inventor
史振荣
吕磊
张睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811313441.1A priority Critical patent/CN109281344A/en
Publication of CN109281344A publication Critical patent/CN109281344A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/30Auxiliary apparatus, e.g. for thawing, cracking, blowing-up, or other preparatory treatment of the soil

Abstract

The invention discloses a kind of road construction chisel stone devices, including pedestal, the top exterior walls of the pedestal are provided with damping spring, and the top exterior walls of damping spring are provided with water tank, the top exterior walls of water tank are provided with water inlet, the inner wall of water inlet is provided with filler, the top exterior walls of the pedestal are provided with rotating bar, and the side outer wall of rotating bar is connected with the second hydraulic stem by pivot pin, one end of second hydraulic stem is provided with mounting blocks, the bottom outer wall of mounting blocks is provided with hydraulic breaking hammer, the top exterior walls of the pedestal are provided with the 4th hydraulic stem, and the 4th one end of hydraulic stem be set to the side outer wall of rotating bar, the side outer wall of the rotating bar is provided with third hydraulic stem.The present invention can prevent the dust generated when chisel stone from drifting in air, and spend the working environment of staff, can play cooling effect to quartering hammer, improve the service life of quartering hammer, save manpower.

Description

A kind of road construction chisel stone device
Technical field
The present invention relates to technical field of engineering machinery more particularly to a kind of road construction chisel stone devices.
Background technique
Road construction generally requires evenness of road surface, but often encounters the stone of some protrusions in the construction process, can shadow Ring normal road construction, it is therefore desirable to stone is dug, since stone is more dispersed, and small volume, it is not available Large-scale excavator is dug, and man-hour manually hand-held Hydraulic pick is usually used and carries out chisel stone, this chisel cubic meter of stone formula needs artificial hand Hydraulic pick, as labor intensive are held, and a large amount of dust can be generated during digging stone and drifted in air, then leads to air Pollution, endangers staff's health, and the working environment of staff is poor, and when long-time digs stone, pick and stone it Between friction can generate a large amount of heat, will lead to the surface carbonation of pick, then pick caused to be easily broken off, pick use the longevity It orders short.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of road construction proposed chisel stone Device.
To achieve the goals above, present invention employs following technical solutions:
A kind of road construction use chisel stone device, including pedestal, the top exterior walls of the pedestal are provided with damping spring, and damping bullet The top exterior walls of spring are provided with water tank, and the top exterior walls of water tank are provided with water inlet, and the inner wall of water inlet is provided with filler, institute The top exterior walls for stating pedestal are provided with rotating bar, and the side outer wall of rotating bar is connected with the second hydraulic stem by pivot pin, and second One end of hydraulic stem is provided with mounting blocks, and the bottom outer wall of mounting blocks is provided with hydraulic breaking hammer, the top exterior walls of the pedestal The 4th hydraulic stem is provided with, and one end of the 4th hydraulic stem is set to the side outer wall of rotating bar, outside the side of the rotating bar Wall is provided with third hydraulic stem, and one end of third hydraulic stem is set to the side outer wall of the second hydraulic stem, and described second is hydraulic The outer wall of bar is provided with mounting plate, and the side outer wall of mounting plate is provided with nozzle, and the bottom outer wall of mounting plate is provided with watering Case.
Further, the side outer wall of the pedestal is provided with handle, and rubber sleeve is arranged in the outer wall of handle, pedestal Bottom outer wall quadrangle is provided with scroll wheel.
Further, the equal link in bottom outer wall quadrangle of the pedestal has support hydraulic pressure bar, and the bottom of support hydraulic pressure bar Outer wall is provided with support base, and the bottom outer wall of support base is provided with cone tooth.
Further, the top exterior walls of the pedestal are provided with limit case, and water tank is slidably connected to the inner wall of limit case.
Further, the top exterior walls of the water tank are provided with water pump, and the water inlet end of water pump is provided with drinking-water pipe, draws water Pipe is set to the water outlet of water tank, and the water outlet of water pump is provided with aqueduct.
Further, one end of the aqueduct is provided with dust-proof water pipe and cooling water pipe, and dust-proof water pipe is set to and spills The water inlet end of water tank, cooling water pipe are set to the water inlet end of nozzle.
Further, the water pump, support hydraulic pressure bar, the second hydraulic stem, hydraulic breaking hammer, third hydraulic stem and the 4th liquid Compression bar is respectively connected with switch, and switch is connected with power supply.
The invention has the benefit that
1, by setting sprinkler tank, during digging stone, water pump draw water from water tank and pass through sprinkler tank spray can increase it is broken The humidity for hammering surrounding air into shape prevents the dust generated when chisel stone from drifting in air, and has spent the working environment of staff.
2, by setting nozzle, nozzle is set in the side of quartering hammer, water pump draws water from water tank and passes through spray when digging stone Mouth is sprayed on the pick of quartering hammer, can be played cooling effect to quartering hammer, can be prevented quartering hammer from causing to damage using fever for a long time It is bad, improve the service life of quartering hammer.
3, by setting cart structure, quartering hammer is fixed on cart, cart is fixed on by ground by hydraulic stem Chisel stone is carried out, manpower is saved, and the bottom of support base is provided with cone tooth, the frictional force on support base and ground can be increased, is prevented Support base slides during only digging stone, improves stability.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that a kind of road construction proposed by the present invention digs stone device;
Fig. 2 is the A structural schematic diagram that a kind of road construction proposed by the present invention digs stone device;
Fig. 3 is the B structure schematic diagram that a kind of road construction proposed by the present invention digs stone device.
In figure: 1- pedestal, 2- scroll wheel, 3- support hydraulic pressure bar, 4- limit case, 5- handle, 6- water tank, the filler 7-, 8- Drinking-water pipe, 9- water pump, 10- rotating bar, 11- aqueduct, the second hydraulic stem of 12-, 13- hydraulic breaking hammer, 14- nozzle, 15- installation Plate, 16- third hydraulic stem, the 4th hydraulic stem of 17-, 18- damping spring, 19- cooling water pipe, 20- dust-proof water pipe, 21- sprinkler tank, 22- bores tooth, 23- support base.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For the convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning must have specific side Position is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
Referring to Fig.1-3, a kind of road construction is welded with damping with chisel stone device, including pedestal 1, the top exterior walls of pedestal 1 Spring 18, and the top exterior walls of damping spring 18 are welded with water tank 6, the top exterior walls of water tank 6 are provided with water inlet, water inlet it is interior Wall is welded with filler 7, and the top exterior walls of pedestal 1, which are connected by a hinge, rotating bar 10, and the side outer wall of rotating bar 10 is logical It crosses pivot pin and is connected with the second hydraulic stem 12, one end of the second hydraulic stem 12 is welded with mounting blocks, and the bottom outer wall of mounting blocks passes through Screw is connected with hydraulic breaking hammer 13, and the top exterior walls of pedestal 1, which are connected by a hinge, the 4th hydraulic stem 17, and the 4th hydraulic stem 17 one end is hinged through the hinge to the side outer wall of rotating bar 10, and the side outer wall of rotating bar 10 is connected by a hinge and has third Hydraulic stem 16, and one end of third hydraulic stem 16 is hinged through the hinge to the side outer wall of the second hydraulic stem 12, the second hydraulic stem 12 outer wall is welded with mounting plate 15, and the side outer wall of mounting plate 15 is connected with nozzle 14, the bottom of mounting plate 15 by bail Portion's outer wall has been connected by screw to sprinkler tank 21.
In the present invention, the side outer wall of pedestal 1 is welded with handle 5, and the outer wall of handle 5 is socketed rubber sleeve, pedestal 1 Bottom outer wall quadrangle is welded with scroll wheel 2, and the equal link in bottom outer wall quadrangle of pedestal 1 has support hydraulic pressure bar 3, and support hydraulic pressure The bottom outer wall of bar 3 is welded with support base 23, and the bottom outer wall of support base 23, which is welded with, bores tooth 22, outside the top of pedestal 1 Wall is welded with limit case 4, and water tank 6 is slidably connected to the inner wall of limit case 4, and the top exterior walls of water tank 6 have been connected by screw to Water pump 9, and the water inlet end of water pump 9 is plugged with drinking-water pipe 8, drinking-water pipe 8 is plugged in the water outlet of water tank 6, and the water outlet of water pump 9 is inserted It is connected to aqueduct 11, one end of aqueduct 11 is connected with dust-proof water pipe 20 and cooling water pipe 19 by plumbing shunt, and dust-proof Water pipe 20 is plugged in the water inlet end of sprinkler tank 21, and cooling water pipe 19 is plugged in the water inlet end of nozzle 14, water pump 9, support hydraulic pressure bar 3, the second hydraulic stem 12, hydraulic breaking hammer 13, third hydraulic stem 16 and the 4th hydraulic stem 17 are respectively connected with switch, and switch connection There is power supply.
Working principle: in use, by support hydraulic pressure bar 3, the second hydraulic stem 12, hydraulic breaking hammer 13, third hydraulic stem 16 It is all connected with hydraulic system with the 4th hydraulic stem 17, is pushed into need the side for the stone dug for the chisel stone device by handle 5, draw Stretching support hydraulic pressure bar 3 makes support base 23 be against ground to jack up pedestal 1, and cone tooth 22 can increase between support base 23 and ground Frictional force, prevent support base 23 during chisel stone from shifting, hydraulic breaking hammer can control by flexible 4th hydraulic stem 17 13 height can control the angle of hydraulic breaking hammer 13 by the third hydraulic stem 16 that stretches, so that hydraulic breaking hammer 13 is mobile Above to stone, and stone is dug by flexible second hydraulic stem 12, while the work of water pump 19 passes through drinking-water pipe 8 for water Water in case 6 is extracted out and passes through aqueduct 11 and respectively enters in cooling water pipe 19 and dust-proof water pipe 20, and by nozzle 14 and spills Water tank 21 sprays, and the water energy that nozzle 14 sprays carries out cooling down to the pick of quartering hammer 13, prevents 13 long-time work of quartering hammer Heat up and cause to damage, improve the service life of quartering hammer 13, at the same the water mist that sprays of sprinkler tank 21 will increase it is broken Air humidity around hammer 13, prevents the dust generated during digging stone from drifting pollution air, optimizes the work of staff Make environment, damping spring 18 can play cushioning effect to water tank 6, prevent the vibration of pedestal 1 during digging stone from causing to be fixed on water tank On water pump 9 damage.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of road construction chisel stone device, including pedestal (1), which is characterized in that the top exterior walls of the pedestal (1) are arranged Have damping spring (18), and the top exterior walls of damping spring (18) are provided with water tank (6), the top exterior walls of water tank (6) are provided with Water inlet, the inner wall of water inlet are provided with filler (7), and the top exterior walls of the pedestal (1) are provided with rotating bar (10), and are turned The side outer wall of lever (10) is connected with the second hydraulic stem (12) by pivot pin, and one end of the second hydraulic stem (12) is provided with installation Block, the bottom outer wall of mounting blocks are provided with hydraulic breaking hammer (13), and the top exterior walls of the pedestal (1) are provided with the 4th hydraulic stem (17), and one end of the 4th hydraulic stem (17) is set to the side outer wall of rotating bar (10), outside the side of the rotating bar (10) Wall is provided with third hydraulic stem (16), and one end of third hydraulic stem (16) is set to the side outer wall of the second hydraulic stem (12), The outer wall of second hydraulic stem (12) is provided with mounting plate (15), and the side outer wall of mounting plate (15) is provided with nozzle (14), the bottom outer wall of mounting plate (15) is provided with sprinkler tank (21).
2. a kind of road construction according to claim 1 chisel stone device, which is characterized in that the side of the pedestal (1) Outer wall is provided with handle (5), and rubber sleeve is arranged in the outer wall of handle (5), and the bottom outer wall quadrangle of pedestal (1) is provided with rolling Driving wheel (2).
3. a kind of road construction according to claim 2 chisel stone device, which is characterized in that the bottom of the pedestal (1) The equal link in outer wall quadrangle has support hydraulic pressure bar (3), and the bottom outer wall of support hydraulic pressure bar (3) is provided with support base (23), branch The bottom outer wall of support seat (23) is provided with cone tooth (22).
4. a kind of road construction according to claim 3 chisel stone device, which is characterized in that the top of the pedestal (1) Outer wall is provided with limit case (4), and water tank (6) is slidably connected to the inner wall of limit case (4).
5. a kind of road construction according to claim 1 chisel stone device, which is characterized in that the top of the water tank (6) Outer wall is provided with water pump (9), and the water inlet end of water pump (9) is provided with drinking-water pipe (8), and drinking-water pipe (8) is set to going out for water tank (6) Water end (W.E.), the water outlet of water pump (9) are provided with aqueduct (11).
6. a kind of road construction according to claim 5 chisel stone device, which is characterized in that the one of the aqueduct (11) End is provided with dust-proof water pipe (20) and cooling water pipe (19), and dust-proof water pipe (20) is set to the water inlet end of sprinkler tank (21), cold But water pipe (19) is set to the water inlet end of nozzle (14).
7. a kind of road construction according to claim 5 chisel stone device, which is characterized in that the water pump (9), support liquid Compression bar (3), the second hydraulic stem (12), hydraulic breaking hammer (13), third hydraulic stem (16) and the 4th hydraulic stem (17) are respectively connected with Switch, and switch is connected with power supply.
CN201811313441.1A 2018-11-06 2018-11-06 A kind of road construction chisel stone device Pending CN109281344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811313441.1A CN109281344A (en) 2018-11-06 2018-11-06 A kind of road construction chisel stone device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811313441.1A CN109281344A (en) 2018-11-06 2018-11-06 A kind of road construction chisel stone device

Publications (1)

Publication Number Publication Date
CN109281344A true CN109281344A (en) 2019-01-29

Family

ID=65174446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811313441.1A Pending CN109281344A (en) 2018-11-06 2018-11-06 A kind of road construction chisel stone device

Country Status (1)

Country Link
CN (1) CN109281344A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607815A (en) * 2019-09-16 2019-12-24 盐城创咏新能源投资有限公司 Irrigation canals and ditches excavating gear is used in hydraulic and hydroelectric engineering construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20108725U1 (en) * 2001-05-25 2001-08-30 Schenk Juergen Digging device with suction device
CN201865136U (en) * 2010-11-23 2011-06-15 安徽惊天液压智控股份有限公司 Movable crusher
CN105625156A (en) * 2016-03-07 2016-06-01 湖州中辰建设有限公司 Anti-splattering device for breaking hammer
CN107965271A (en) * 2017-12-26 2018-04-27 新昌县羽林街道星捷轴承厂 A kind of drilling machine in construction site
CN207878246U (en) * 2017-10-16 2018-09-18 郑州大学 A kind of shockproof road construction ground crushing plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20108725U1 (en) * 2001-05-25 2001-08-30 Schenk Juergen Digging device with suction device
CN201865136U (en) * 2010-11-23 2011-06-15 安徽惊天液压智控股份有限公司 Movable crusher
CN105625156A (en) * 2016-03-07 2016-06-01 湖州中辰建设有限公司 Anti-splattering device for breaking hammer
CN207878246U (en) * 2017-10-16 2018-09-18 郑州大学 A kind of shockproof road construction ground crushing plant
CN107965271A (en) * 2017-12-26 2018-04-27 新昌县羽林街道星捷轴承厂 A kind of drilling machine in construction site

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607815A (en) * 2019-09-16 2019-12-24 盐城创咏新能源投资有限公司 Irrigation canals and ditches excavating gear is used in hydraulic and hydroelectric engineering construction

Similar Documents

Publication Publication Date Title
CN109281344A (en) A kind of road construction chisel stone device
CN202252596U (en) Quickly-assembled water valve device
CN111287785B (en) Excavation device with dust fall function for tunnel construction
EP2345484B1 (en) Cleaning apparatus and method
CN217839649U (en) Line marking vehicle for landscaping construction
CN113843232B (en) Cleaning device for inner wall of pier casting steel pile casing
CN113898211B (en) Environment-friendly building is torn open and is built with equipment of tearing wall that has dust fall function
CN210584204U (en) Building site dust collector
CN212835602U (en) Spray dust-settling and cooling device for demolishing crushing machinery
CN2422060Y (en) Automatic knapsack type sprayer
CN212128755U (en) Highway engineering road surface is with quick evener
CN210874603U (en) Multifunctional dust falling device for construction engineering construction
CN214319570U (en) Construction site dust device for building engineering
CN217759840U (en) Wall surface leveling device for architectural decoration engineering
CN214143498U (en) Multipurpose municipal administration road sprays curing means
CN208619152U (en) A kind of wind power ganged dedusting of self-rotary tunneling boring is spraying
CN217783442U (en) Environment-friendly dust-settling side slope drilling tool
CN209243647U (en) Hydraulic engineering earth's surface cleaning plant
CN208810668U (en) A kind of high-pressure sewer flushing vehicle
CN216262245U (en) High-pressure spraying system for crawler mobile crushing and screening station
CN214007102U (en) Anchor eye high pressure wind-force washes hole device
CN214764220U (en) Dust device is used in civil engineering construction
CN219248774U (en) Automatic irrigation equipment of soil and water conservation plant side slope
CN220513732U (en) Spraying dust device
CN214143509U (en) Dust fall water cannon car is used in highway engineering construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190129