CN109272251A - A kind of management method of software test, device and equipment - Google Patents
A kind of management method of software test, device and equipment Download PDFInfo
- Publication number
- CN109272251A CN109272251A CN201811188702.1A CN201811188702A CN109272251A CN 109272251 A CN109272251 A CN 109272251A CN 201811188702 A CN201811188702 A CN 201811188702A CN 109272251 A CN109272251 A CN 109272251A
- Authority
- CN
- China
- Prior art keywords
- test
- assignment
- software
- test assignment
- competition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Stored Programmes (AREA)
Abstract
The invention discloses a kind of management methods of software test, software test application is first converted into test assignment list, it is split as multiple test assignments, and the Integral Rule of pre-set each test assignment, issuing test assignment list allows tester to carry out competition for orders to test assignment, and is scored according to Integral Rule corresponding with test assignment.Changing the passive acceptance test task of tester in the prior art is tester's active competition for orders, allows tester to select test assignment according to self-condition, makes test assignment obtain more reasonably distributing, to improve the quality and efficiency of software test.And each test assignment is evaluated using preset Integral Rule, compared with the prior art in manual examination and verification, the problem of avoiding artificial subjective erroneous judgement, improve the work incentive of tester, also further improve the quality and efficiency of software test.Invention additionally discloses a kind of device of software test and equipment, have above-mentioned beneficial effect.
Description
Technical field
The present invention relates to software test fields, more particularly to a kind of management method of software test, device and equipment.
Background technique
With the rapid development of informationized society, the project of software development is more and more, and framework becomes increasingly complex, and software produces
Also more and more frequently, the problem of bringing therewith is exactly more and more test assignments at this stage for the upgradings of product and renewal frequency, is
Guarantee speed measuring with software, it has to put into more and more testers and carry out demand management, Test Sample Design and comment
In the work such as careful, testing progress management, defect management, more and more manpower cost payouts are caused.
In software test procedure, it is necessary first to which solution is tester's problem, and especially increasingly heavy test is appointed
Contradiction between business, the requirement to the higher and higher quality of software product and tester's deficiency.It is a kind of solution contradiction that crowd, which surveys,
Means of testing and method, it can integrate all tester's resources, make each full-time or part-time tester can be direct
The test for participating in software product completes test assignment using itself professional test knowledge.The prior art is to test assignment in crowd's survey
Distribution need to rely on manual dispatching, this just needs more costs of labor, and tests very much the dispatching of distribution personnel, one
Denier unreasonable distribution will have a direct impact on the quality and efficiency of software test.
Therefore, how reasonable distribution crowd survey in test assignment, improve the quality and efficiency of software test, be this field skill
Art personnel's technical issues that need to address.
Summary of the invention
The object of the present invention is to provide a kind of management method of software test, device and equipment, survey for reasonable distribution crowd
In test assignment, improve the quality and efficiency of software test.
In order to solve the above technical problems, the present invention provides a kind of management method of software test, comprising:
Software test application is received, and the software test application is converted into test assignment column by preset conversion regime
Table;Wherein, the test assignment list includes test assignment, and Integral Rule corresponding with the test assignment;
The test assignment list is issued for competition for orders, and is issued according to time sequencing by the test assignment of competition for orders;
The test result for receiving each test assignment by competition for orders is advised by the integral of each test assignment by competition for orders
Then distribute corresponding integral.
Optionally, before the software test application is converted to test assignment list, further includes:
The software test application is audited, judges whether the software test application meets preset format;
If it is, into the described the step of software test application is converted to the test assignment list.
Optionally, it is described issued according to time sequencing by the test assignment of competition for orders after, further includes:
Receive the test plan uploaded;
Test assignment corresponding with the test plan is completed according to the test plan.
Optionally, it is described receive it is each it is described by the test result of the test assignment of competition for orders after, further includes:
It checks each test result, judges whether qualification;
If it is not, then issuing test assignment corresponding with the test result again.
Optionally, it is described receive it is each it is described by the test result of the test assignment of competition for orders after, further includes:
Save the test script and test log of each test assignment.
Optionally, it is described receive it is each it is described by the test result of the test assignment of competition for orders after, further includes:
It is for statistical analysis to the test result by preset dimension.
In order to solve the above technical problems, the present invention also provides a kind of managing devices of software test, comprising:
Converting unit turns the software test application for receiving software test application, and by preset conversion regime
It is changed to test assignment list;Wherein, the test assignment list includes test assignment, and product corresponding with the test assignment
Divider is then;
Release unit for issuing the test assignment list for competition for orders, and is issued according to time sequencing by competition for orders
Test assignment;
Score unit, for receiving the test result of each test assignment by competition for orders, by each survey by competition for orders
The Integral Rule of trial business distributes corresponding integral.
Optionally, further includes:
Storage unit, for saving the test script and test log of each test assignment.
Optionally, further includes:
Statistic unit, for for statistical analysis to the test result by preset dimension.
In order to solve the above technical problems, the present invention also provides a kind of management equipments of software test, comprising:
Memory, for storing instruction, described instruction include the management method of software test described in above-mentioned any one
Step;
Processor, for executing described instruction.
Software test application is first converted to test assignment list by the management method of software test provided by the present invention,
It is split as multiple test assignments, and the Integral Rule of pre-set each test assignment, test assignment list is issued and allows survey
Examination personnel carry out competition for orders to test assignment, and are scored according to Integral Rule corresponding with test assignment.Change in the prior art
The passive acceptance test task of tester is tester's active competition for orders, and tester is allowed to select to survey according to self-condition
Trial business, makes test assignment obtain more reasonably distributing, to improve the quality and efficiency of software test.And it uses default
Integral Rule each test assignment is evaluated, compared with the prior art in manual examination and verification, avoid artificial subjective erroneous judgement
The problem of, the work incentive of tester is improved, the quality and efficiency of software test are also further improved.The present invention is also
The device and equipment of a kind of software test are provided, there is above-mentioned beneficial effect, details are not described herein.
Detailed description of the invention
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art
Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the flow chart of the management method of the first software test provided in an embodiment of the present invention;
Fig. 2 is the flow chart of the management method of second of software test provided in an embodiment of the present invention;
Fig. 3 is the flow chart of the management method of the third software test provided in an embodiment of the present invention;
Fig. 4 is the flow chart of the management method of the 4th kind of software test provided in an embodiment of the present invention;
Fig. 5 is a kind of structural schematic diagram of the management method of software test provided in an embodiment of the present invention;
Fig. 6 is a kind of many Technical Architecture figures for surveying management system provided in an embodiment of the present invention;
Fig. 7 is a kind of structural schematic diagram of the management equipment of software test provided in an embodiment of the present invention.
Specific embodiment
Core of the invention is to provide management method, device and the equipment of a kind of software test, surveys for reasonable distribution crowd
In test assignment, improve the quality and efficiency of software test.
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is the flow chart of the management method of the first software test provided in an embodiment of the present invention.As shown in Figure 1, soft
Part test management method include:
S10: software test application is received, and software test application is converted into test assignment column by preset conversion regime
Table.
Wherein, test assignment list includes test assignment, and Integral Rule corresponding with test assignment.
Test promoter can initiate common test, the two kinds of test application of many survey work.Wherein common test and crowd
Publication class, construction two class of class can be subdivided into again by surveying work.After receiving test application, first testing requirement can be arranged
Classification (common test class, many survey work classes) common test class wouldn't do task processing directly filing.
Since most of software test task has repeatability and intercommunity, it is corresponding that each test assignment can be pre-designed
Integral Rule, it is convenient from software test application to the automatic conversion of test assignment list.Integral Rule can be according to test assignment
The dimensions such as urgency level, complexity, competition for orders response speed formulate.A kind of Integral Rule is as follows:
Assuming that the number of software test application is N, testing requirement benchmark is divided into S, and task urgency level is J, task difficulty
Coefficient is X, then benchmark integrates R1=(N × S) × (1+J%+X%);
Assuming that main task expected performance time is E1, main task assigns the time as S1, and submission result time of filing is E2, is robbed
Single time is S2, then main task working efficiency L=(E1-S1)/(E2-S2).Assuming that L >=150%, then working efficiency reward points
R2=R1+5;
Assuming that it is E3 that main task, which carries out test monitoring link time, main task assigns the time as S3, then main task competition for orders is rung
Answer timeliness T1=E3-S3;Assuming that T1 >=150%, then competition for orders responds failure reward points R3=R1+5;
Assuming that subtask expected performance time is E4, the time is assigned as S4 in subtask, and submission result time of filing is E5, is robbed
Single time is S5, then subtask working efficiency L1=(E4-S4)/(E5-S5);Assuming that L1 >=150%, then subtask work is imitated
Rate reward points R4=R+5;
Assuming that it is E6 that subtask, which carries out test monitoring link time, the time is assigned as S6 in subtask, then subtask competition for orders is rung
Answer timeliness T2=E6-S6;Assuming that T2 >=150%, then competition for orders responds failure reward points R4=R1+5.
Test assignment list is converted to for convenience of software test application, the format of software test application can be preset.Into
One step, before software test application is converted to test assignment list, further includes:
Software test application is audited, judges whether software test application meets preset format;
If it is, into the step of the software test application is converted to test assignment list.
Software is then rejected when software test application does not meet preset format when that is, system can not read whole key messages
Test application, promoter to be tested resubmit software test application.
The software test application that test promoter submits is received, when software test application meets preset format, by default
Conversion regime extract key message, split out test assignment, be associated with preset Integral Rule for each test assignment, thus will
Software test application is converted to test assignment list.
S11: publication test assignment list is issued according to time sequencing by the test assignment of competition for orders for competition for orders.
In the prior art, it after according to the test assignment of testing requirement decomposition, needs manually to be assigned to corresponding test department
Door or Test Engineer.But test assignment distribution personnel may can not the objective ability for understanding each Test Engineer and
It is good at field, and the task of Test Engineer is all to be assigned Personnel Appointment, can only passively be received, and can not directly select certainly
The task that oneself is good at.
Therefore in this step, test assignment list is published to platform disclosed in all Test Engineers, tests work
Cheng Shi can actively choose test assignment according to the field and free time that oneself is good at.
By the chronological order of competition for orders, test assignment is issued to the test work for getting test assignment at first by system automatically
Cheng Shi.Further, it, labeled as in execution, will be embodied as follows by the test assignment of competition for orders in systems:
For by the test assignment of competition for orders, backstage Web application obscure portions create jenkins job project, when according to job
Between expression formula, it is automatic to construct Jenkin task;
Change, which executes, records table status, by the state of the test assignment of competition for orders in execution in changed test task list;
Log analysis parses backstage log file status, and records the line number read every time;Update background state and synchronization
Backstage log;
For completed test assignment, the state for updating corresponding test assignment in test assignment list is to be completed,
Newly-increased execution information record sheet record, calls Git api, test log/report is uploaded to Git code storage.
In addition, being the test assignment that task is assigned for approach, specified test contact person can be transmitted directly to.It surveys
Examination contact person submits to operational trials responsible person after getting test assignment.
S12: receiving the test result of each test assignment by competition for orders, by the Integral Rule point of each test assignment by competition for orders
Send out integral corresponding.
After Test Engineer completes test assignment, test result is uploaded.The test result that Test Engineer uploads is received, is pressed
According to the speed of Test Engineer's competition for orders, complexity, the urgency level of test assignment, deadline etc. to the secondary test assignment into
Row scoring, and the Test Engineer is added under one's name in integral, the foundation as Workload Account.
Further, subsequent for convenience to check, call and analyze, in the test knot for receiving each test assignment by competition for orders
After fruit, further includes: save the test script and test log of each test assignment.Unification is carried out to the script data of test assignment
Management provides basic data support for automatic test, and simultaneity factor records the edition data of test script change, provides user
The function that content for script different editions is compared.
Automatic test script is voluntarily recorded furthermore it is also possible to provide by script transcripter to users such as Test Engineers
Function, script transcripter supports script modification, commissioning, playback, the functions such as export, and can real time inspection script running log,
Track script operation conditions.Test script library can be saved directly to by recording obtained test script simultaneously, facilitate automatic test
Data call.
Software test application is first converted to test assignment column by the management method of software test provided in an embodiment of the present invention
Table is split as multiple test assignments, and the Integral Rule of pre-set each test assignment, issues test assignment list and allow
Tester carries out competition for orders to test assignment, and is scored according to Integral Rule corresponding with test assignment.Change the prior art
The middle passive acceptance test task of tester is tester's active competition for orders, and tester is selected according to self-condition
Test assignment makes test assignment obtain more reasonably distributing, to improve the quality and efficiency of software test.And it uses pre-
If Integral Rule each test assignment is evaluated, compared with the prior art in manual examination and verification, avoid it is artificial subjective accidentally
The problem of sentencing, improves the work incentive of tester, also further improves the quality and efficiency of software test.
Fig. 2 is the flow chart of the management method of second of software test provided in an embodiment of the present invention.As shown in Fig. 2,
On the basis of above-described embodiment, in another embodiment, after step s 11, further includes:
S20: the test plan of upload is received.
Since many test assignments need the process for repeating, and repeating that can be completed by system.To accelerate to survey
The implementation of trial business, Test Engineer can upload test plan, determine how implementation by test assignment promoter.Receive test
The test plan that engineer uploads, and test assignment promoter end is sent by test plan, it is selected for test assignment promoter
It executes.
If test assignment by recording test script, can execute the script of recording to complete, then surveying automatically later
Examination engineer can upload the script recorded.
S21: test assignment corresponding with test plan is completed according to test plan.
According to the instruction triggers test plan of test assignment promoter, test assignment is completed by test plan.It can provide
User's triggering and system automatic trigger two ways.
Test assignment promoter can according to actual needs, and manually actively triggering a test plan executes operation, system
An automatic test assignment data can be generated in real time, which executes automatically immediately, by calling integrated third-party testing work
Has interface, test scene sequence according to schedule, the script information of real time execution in the works realizes holding automatically for test plan
Row, and implementation procedure and implementing result data are saved.
System is according to the test plan content of formulation, and generating one or more automatic test assignment data, (planning cycle is
The plan of non-single will all generate a plurality of automatic test assignment), the automatic running time of every test assignment is determined by planning cycle
It is fixed.After reaching the automatic running time of test assignment, system is held automatically by calling integrated third-party testing tool interface
The row secondary test assignment, and implementation procedure data and implementing result are saved.
The management method of software test provided in an embodiment of the present invention can repeat for some, not need whole process
The test assignment manually completed is relied on, the test plan that can be uploaded according to Test Engineer is completed, to improve software survey
The efficiency of examination, has saved manpower.
Fig. 3 is the flow chart of the management method of the third software test provided in an embodiment of the present invention.As shown in figure 3,
On the basis of above-described embodiment, in another embodiment, step S12 is specifically included:
S30: the test result of each test assignment by competition for orders is received.
S31: it checks each test result, judges whether qualification;If it is, to test assignment return step S11;If
It is no, then enter step S32.
S32: distribute corresponding integral by the Integral Rule of each test assignment by competition for orders.
In specific implementation, receive it is each by the test result of the test assignment of competition for orders after, can be to each test result
It is checked or is spot-check comprehensively, when finding underproof result, remembered that current test assignment does not complete, not integrate, and will
The test assignment is published to competition for orders platform again and waits competition for orders.
If test assignment needs to record script, test script can be audited, it is obstructed out-of-date when auditing, it returns to
Test Engineer records again, carries out test assignment when audit passes through, then by dependence test responsible person.
The management method of software test provided in an embodiment of the present invention will be audited not by auditing to test result
By test assignment issue again, further improve the completion quality of software test task.
Fig. 4 is the flow chart of the management method of the 4th kind of software test provided in an embodiment of the present invention.As shown in figure 4,
On the basis of above-described embodiment, in another embodiment, after step s 12, further includes:
S40: for statistical analysis to test result by preset dimension.
In order to preferably present software test as a result, can also by preset dimension to test result carry out statistical
Analysis is provided according to dimensions such as testing time, test macro, testing classifications, and presentation for statistical analysis to test quality index
Function.
The dimension of statistical analysis may include testing time, test macro, testing classification etc., the statistics of different testing classifications
Analysis indexes are different.
The statistical indicator of code check may include the total line number of code, BUG number, loophole number, code redundancies, code coverage
Rate, code annotation rate etc..
The statistical indicator of functional test may include that test case coverage rate, test case percent of pass (are counted by module
Coverage rate) etc..
The statistical indicator of performance test may include concurrent user number, the duration, average response duration, TPS, affairs at
Power, server resource occupancy situation (CPU usage, page exchange rate, network transmission rate) etc..
The statistical indicator of safety test may include safety problem number (high risk/risk/low-risk) etc..
Statistical analysis provides and penetrates look facility step by step, first presents according to testing time, test macro, testing classification and unites
The index sum generated in the class testing of the system in this time of meter, clicks the statistical indicator that can be penetrated into modules
Number, then penetrate it can be seen that test assignment collective data associated by the index value.
The corresponding each embodiment of management method of software test as detailed above, on this basis, invention additionally discloses
The managing device of software test corresponding with the above method.
Fig. 5 is a kind of structural schematic diagram of the management method of software test provided in an embodiment of the present invention.Fig. 6 is the present invention
A kind of many Technical Architecture figures for surveying management system that embodiment provides.
As shown in figure 5, the managing device of software test includes:
Converting unit 501 converts software test application for receiving software test application, and by preset conversion regime
For test assignment list;Wherein, test assignment list includes test assignment, and Integral Rule corresponding with test assignment;
Release unit 502 is issued for issuing test assignment list for competition for orders, and according to time sequencing by the survey of competition for orders
Trial business;
Score unit 503, for receiving the test result of each test assignment by competition for orders, by each test assignment by competition for orders
Integral Rule distribute corresponding integral.
A kind of many frames for surveying management system are as shown in fig. 6, test script passes through script transcripter by user's practical operation
It obtains, default standard format is JSON.Later, script Git server is submitted to save.Periodically updated from Git server
Script translates into java code, submits back Git server.Integration tool is automated by jenkins, has configured timing maven
Project.Timing renewal item java code from Git server, runs test script.
Many test tube platform accumulation layers add Git code storage mode using relevant database.Mysql stores relevant configuration
Data and test case log information.Git code storage for storing test script, and by file translation at java generation
Code.Sonatype Nexus is Maven private clothes, and packet is relied on needed for compilation run java test case code for storing.
Operating system presses server and test node, can be divided into two types, and the operating system of server uses
CentOS7, test node is due to needing to test IE browser, so win sequence of maneuvers system is used uniformly, according to IE version need
Select win7 or win10 version.
Since Git code storage has the characteristics that distributed, code is also stored on other test nodes.Therefore,
Without the concern for calamity for problem, data can be restored Git code storage from other nodes.Each test node, due to needing
Test the IE browser of different editions, it is therefore desirable to corresponding windows operating system.Since IE browser is unable to multi version
It installs simultaneously, therefore, a node can only test a kind of browser of version.
Application layer is compiled and is run all java programs using JDK1.8, and compiling building is using maven building specification.By
Jenkins does unified management scheduling.Test case controls IE by the Webdriver drive module in selenium-server
Or the behavior of Chrome browser, achieve the purpose that test automatically.
Jenkins is in center coordinative role in entire institution system.It is responsible for distributing configured test item
It is tested to corresponding test node.And provide corresponding JavaAPI and called for web application, except can control corresponding test
The operation and stopping of project are outer, can also inquire the essential information of corresponding test item, the relevant informations page such as test result information
Face is shown.
Optionally, converting unit 501 can also include:
First audit subelement judges whether software test application meets preset format for auditing software test application;
If it is, into the step of software test application is converted to the test assignment list.
Scoring unit 503 can also include:
Second instance nucleon unit judges whether qualification for checking each test result;If it is not, then notice publication
Unit 502 issues test assignment corresponding with test result again.
The managing device of software test can also include:
Receiving unit, for receiving the test plan uploaded;Test corresponding with test plan is completed according to test plan
Task.
The managing device of software test can also include:
Storage unit, for saving the test script and test log of each test assignment.
The managing device of software test can also include:
Statistic unit, for for statistical analysis to test result by preset dimension.
Since the embodiment of device part is corresponded to each other with the embodiment of method part, the embodiment of device part is asked
Referring to the description of the embodiment of method part, wouldn't repeat here.
Fig. 7 is a kind of structural schematic diagram of the management equipment of software test provided in an embodiment of the present invention.As shown in fig. 7,
The management equipment of the software test can generate bigger difference because configuration or performance are different, may include one or one with
Upper processor (centralprocessing units, CPU) 710 (for example, one or more processors) and memory
720, one or more storage application programs 733 or data 732 storage medium 730 (such as one or more sea
Amount storage equipment).Wherein, memory 720 and storage medium 730 can be of short duration storage or persistent storage.Storage is stored in be situated between
The program of matter 730 may include one or more modules (diagram does not mark), and each module may include to computing device
In series of instructions operation.Further, processor 710 can be set to communicate with storage medium 730, in software test
Management equipment 700 on execute storage medium 730 in series of instructions operation.
The management equipment 700 of software test can also include one or more power supplys 740, one or more have
Line or radio network interface 750, one or more input/output interfaces 770, and/or, one or more operation systems
System 731, such as Windows ServerTM, Mac OS XTM, UnixTM,LinuxTM, FreeBSDTMEtc..
Step in the management method of software test described in above-mentioned Fig. 1 to Fig. 4 by software test management equipment base
It is realized in the structure shown in Fig. 7.
It is apparent to those skilled in the art that for convenience and simplicity of description, the software of foregoing description
The management equipment of test and the specific work process of computer readable storage medium, can be with reference to pair in preceding method embodiment
Process is answered, details are not described herein.
In several embodiments provided herein, it should be understood that disclosed method, apparatus equipment and computer
Readable storage medium storing program for executing may be implemented in other ways.For example, Installation practice described above is only schematic
, for example, the division of module, only a kind of logical function partition, there may be another division manner in actual implementation, such as
Multiple module or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately
A bit, shown or discussed mutual coupling, direct-coupling or communication connection can be through some interfaces, device
Or the indirect coupling or communication connection of module, it can be electrical property, mechanical or other forms.Module as illustrated by the separation member
It may or may not be physically separated, the component shown as module may or may not be physics mould
Block, it can it is in one place, or may be distributed on multiple network modules.It can be selected according to the actual needs
In some or all of the modules achieve the purpose of the solution of this embodiment.
It, can also be in addition, can integrate in a processing module in each functional module in each embodiment of the application
It is that modules physically exist alone, can also be integrated in two or more modules in a module.Above-mentioned integrated mould
Block both can take the form of hardware realization, can also be realized in the form of software function module.
If integrated module is realized and when sold or used as an independent product in the form of software function module, can
To be stored in a computer readable storage medium.Based on this understanding, the technical solution of the application substantially or
Say that all or part of the part that contributes to existing technology or the technical solution can embody in the form of software products
Out, which is stored in a storage medium, including some instructions are used so that a computer equipment
The whole of (can be personal computer, funcall device or the network equipment etc.) execution each embodiment method of the application
Or part steps.And storage medium above-mentioned include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory,
ROM), random access memory (RandomAccess Memory, RAM), magnetic or disk etc. are various can store program generation
The medium of code.
A kind of management method of software test provided by the present invention, device and equipment are described in detail above.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other embodiments not
Same place, the same or similar parts in each embodiment may refer to each other.For the device disclosed in the embodiment, due to it
It corresponds to the methods disclosed in the examples, so being described relatively simple, reference may be made to the description of the method.It should
It points out, it for those skilled in the art, without departing from the principle of the present invention, can also be to this hair
Bright some improvement and modification can also be carried out, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by
One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning
Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that
A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged
Except there is also other identical elements in the process, method, article or apparatus that includes the element.
Claims (10)
1. a kind of management method of software test characterized by comprising
Software test application is received, and the software test application is converted into test assignment list by preset conversion regime;
Wherein, the test assignment list includes test assignment, and Integral Rule corresponding with the test assignment;
The test assignment list is issued for competition for orders, and is issued according to time sequencing by the test assignment of competition for orders;
The test result for receiving each test assignment by competition for orders, by the Integral Rule point of each test assignment by competition for orders
Send out integral corresponding.
2. management method according to claim 1, which is characterized in that appoint the software test application is converted to test
It is engaged in front of list, further includes:
The software test application is audited, judges whether the software test application meets preset format;
If it is, into the described the step of software test application is converted to the test assignment list.
3. management method according to claim 1, which is characterized in that issued according to time sequencing by the survey of competition for orders described
After trial business, further includes:
Receive the test plan uploaded;
Test assignment corresponding with the test plan is completed according to the test plan.
4. management method according to claim 1, which is characterized in that receive each test assignment by competition for orders described
Test result after, further includes:
It checks each test result, judges whether qualification;
If it is not, then issuing test assignment corresponding with the test result again.
5. management method according to claim 1, which is characterized in that receive each test assignment by competition for orders described
Test result after, further includes:
Save the test script and test log of each test assignment.
6. management method according to claim 1, which is characterized in that receive each test assignment by competition for orders described
Test result after, further includes:
It is for statistical analysis to the test result by preset dimension.
7. a kind of managing device of software test characterized by comprising
Converting unit is converted to the software test application for receiving software test application, and by preset conversion regime
Test assignment list;Wherein, the test assignment list includes test assignment, and integral corresponding with test assignment rule
Then;
Release unit for issuing the test assignment list for competition for orders, and is issued according to time sequencing by the test of competition for orders
Task;
Score unit, for receiving the test result of each test assignment by competition for orders, appoints by each test by competition for orders
The Integral Rule of business distributes corresponding integral.
8. managing device according to claim 7, which is characterized in that further include:
Storage unit, for saving the test script and test log of each test assignment.
9. managing device according to claim 7, which is characterized in that further include:
Statistic unit, for for statistical analysis to the test result by preset dimension.
10. a kind of management equipment of software test characterized by comprising
Memory, for storing instruction, described instruction include the manager of software test described in claim 1 to 6 any one
The step of method;
Processor, for executing described instruction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811188702.1A CN109272251A (en) | 2018-10-12 | 2018-10-12 | A kind of management method of software test, device and equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811188702.1A CN109272251A (en) | 2018-10-12 | 2018-10-12 | A kind of management method of software test, device and equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109272251A true CN109272251A (en) | 2019-01-25 |
Family
ID=65197061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811188702.1A Pending CN109272251A (en) | 2018-10-12 | 2018-10-12 | A kind of management method of software test, device and equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109272251A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109753439A (en) * | 2019-01-28 | 2019-05-14 | 平安科技(深圳)有限公司 | Task test method and system based on block chain technology |
CN110134581A (en) * | 2019-04-02 | 2019-08-16 | 浙江数链科技有限公司 | Method for testing software, device, computer equipment and storage medium |
CN111290959A (en) * | 2020-02-20 | 2020-06-16 | 中国建设银行股份有限公司 | Test task scheduling method and device, electronic equipment and storage medium |
CN112488329A (en) * | 2020-11-26 | 2021-03-12 | 南通市市政工程设计院有限责任公司 | Municipal works supervision information management system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070220341A1 (en) * | 2006-02-28 | 2007-09-20 | International Business Machines Corporation | Software testing automation framework |
CN103870348A (en) * | 2012-12-14 | 2014-06-18 | 中国电信股份有限公司 | Test method and system for concurrent user access |
CN107633355A (en) * | 2017-09-11 | 2018-01-26 | 苏州浦瑞融网络科技有限公司 | A kind of reward on total mark method for being used for commodity distribution under line and robbing single system |
CN107656872A (en) * | 2017-10-09 | 2018-02-02 | 平安普惠企业管理有限公司 | Method for testing software, device, equipment and computer-readable storage medium |
CN107767061A (en) * | 2017-10-27 | 2018-03-06 | 郑州云海信息技术有限公司 | A kind of system of software test Amount of work |
-
2018
- 2018-10-12 CN CN201811188702.1A patent/CN109272251A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070220341A1 (en) * | 2006-02-28 | 2007-09-20 | International Business Machines Corporation | Software testing automation framework |
CN103870348A (en) * | 2012-12-14 | 2014-06-18 | 中国电信股份有限公司 | Test method and system for concurrent user access |
CN107633355A (en) * | 2017-09-11 | 2018-01-26 | 苏州浦瑞融网络科技有限公司 | A kind of reward on total mark method for being used for commodity distribution under line and robbing single system |
CN107656872A (en) * | 2017-10-09 | 2018-02-02 | 平安普惠企业管理有限公司 | Method for testing software, device, equipment and computer-readable storage medium |
CN107767061A (en) * | 2017-10-27 | 2018-03-06 | 郑州云海信息技术有限公司 | A kind of system of software test Amount of work |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109753439A (en) * | 2019-01-28 | 2019-05-14 | 平安科技(深圳)有限公司 | Task test method and system based on block chain technology |
CN110134581A (en) * | 2019-04-02 | 2019-08-16 | 浙江数链科技有限公司 | Method for testing software, device, computer equipment and storage medium |
CN111290959A (en) * | 2020-02-20 | 2020-06-16 | 中国建设银行股份有限公司 | Test task scheduling method and device, electronic equipment and storage medium |
CN112488329A (en) * | 2020-11-26 | 2021-03-12 | 南通市市政工程设计院有限责任公司 | Municipal works supervision information management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109272251A (en) | A kind of management method of software test, device and equipment | |
Tahir et al. | A systematic literature review on software measurement programs | |
US10310968B2 (en) | Developing software project plans based on developer sensitivity ratings detected from monitoring developer error patterns | |
Staron et al. | Developing measurement systems: an industrial case study | |
CN109726132A (en) | A kind of method for testing software and software test automation management system | |
CN108984418A (en) | Software testing management method, device, electronic equipment and storage medium | |
CN110162471A (en) | A kind of method for testing pressure and system based on container cloud | |
CN107643981A (en) | A kind of automatic test platform and operation method of polynary operation flow | |
CN106411633A (en) | Web application compatibility testing method based on openstack and system thereof | |
CN110162481A (en) | A kind of method for testing software, device, equipment and storage medium | |
CN109857643A (en) | A kind of method and device of virtual platform performance automatic test | |
April et al. | A software maintenance maturity model (S3M): Measurement practices at maturity levels 3 and 4 | |
JP2017016507A (en) | Test management system and program | |
Tarhan et al. | Investigating the effect of variations in the test development process: a case from a safety-critical system | |
Silva et al. | Criteria for ERP selection using an AHP approach | |
CN116909936A (en) | Big data automatic test method, equipment and readable storage medium | |
CN117093250A (en) | One-stop management platform and method based on virus flow | |
CN109858792B (en) | Nuclear power station debugging test task management method and system based on test steps | |
Korhonen | Evaluating the effect of agile methods on software defect data and defect reporting practices-a case study | |
CN106933743A (en) | A kind of method of testing and device | |
CN115827469A (en) | Project test management method and system | |
CN116383061A (en) | Method and related device for testing basic platform interface of substation control system | |
Punyateera et al. | Study of service desk for NEdNet using incident management (Service Operation) of ITIL V. 3 | |
Zapata-Jaramillo et al. | On the relationship of ISO/IEC 9126 metrics and the alpha states of the SEMAT kernel | |
Harrer et al. | A pattern language for workflow engine conformance and performance benchmarking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190125 |