CN109272251A - A kind of management method of software test, device and equipment - Google Patents

A kind of management method of software test, device and equipment Download PDF

Info

Publication number
CN109272251A
CN109272251A CN201811188702.1A CN201811188702A CN109272251A CN 109272251 A CN109272251 A CN 109272251A CN 201811188702 A CN201811188702 A CN 201811188702A CN 109272251 A CN109272251 A CN 109272251A
Authority
CN
China
Prior art keywords
test
assignment
software
test assignment
competition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811188702.1A
Other languages
Chinese (zh)
Inventor
陈晓江
龙震岳
沈桂泉
刘晔
黄浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Information Center of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Information Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Information Center of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201811188702.1A priority Critical patent/CN109272251A/en
Publication of CN109272251A publication Critical patent/CN109272251A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a kind of management methods of software test, software test application is first converted into test assignment list, it is split as multiple test assignments, and the Integral Rule of pre-set each test assignment, issuing test assignment list allows tester to carry out competition for orders to test assignment, and is scored according to Integral Rule corresponding with test assignment.Changing the passive acceptance test task of tester in the prior art is tester's active competition for orders, allows tester to select test assignment according to self-condition, makes test assignment obtain more reasonably distributing, to improve the quality and efficiency of software test.And each test assignment is evaluated using preset Integral Rule, compared with the prior art in manual examination and verification, the problem of avoiding artificial subjective erroneous judgement, improve the work incentive of tester, also further improve the quality and efficiency of software test.Invention additionally discloses a kind of device of software test and equipment, have above-mentioned beneficial effect.

Description

A kind of management method of software test, device and equipment
Technical field
The present invention relates to software test fields, more particularly to a kind of management method of software test, device and equipment.
Background technique
With the rapid development of informationized society, the project of software development is more and more, and framework becomes increasingly complex, and software produces Also more and more frequently, the problem of bringing therewith is exactly more and more test assignments at this stage for the upgradings of product and renewal frequency, is Guarantee speed measuring with software, it has to put into more and more testers and carry out demand management, Test Sample Design and comment In the work such as careful, testing progress management, defect management, more and more manpower cost payouts are caused.
In software test procedure, it is necessary first to which solution is tester's problem, and especially increasingly heavy test is appointed Contradiction between business, the requirement to the higher and higher quality of software product and tester's deficiency.It is a kind of solution contradiction that crowd, which surveys, Means of testing and method, it can integrate all tester's resources, make each full-time or part-time tester can be direct The test for participating in software product completes test assignment using itself professional test knowledge.The prior art is to test assignment in crowd's survey Distribution need to rely on manual dispatching, this just needs more costs of labor, and tests very much the dispatching of distribution personnel, one Denier unreasonable distribution will have a direct impact on the quality and efficiency of software test.
Therefore, how reasonable distribution crowd survey in test assignment, improve the quality and efficiency of software test, be this field skill Art personnel's technical issues that need to address.
Summary of the invention
The object of the present invention is to provide a kind of management method of software test, device and equipment, survey for reasonable distribution crowd In test assignment, improve the quality and efficiency of software test.
In order to solve the above technical problems, the present invention provides a kind of management method of software test, comprising:
Software test application is received, and the software test application is converted into test assignment column by preset conversion regime Table;Wherein, the test assignment list includes test assignment, and Integral Rule corresponding with the test assignment;
The test assignment list is issued for competition for orders, and is issued according to time sequencing by the test assignment of competition for orders;
The test result for receiving each test assignment by competition for orders is advised by the integral of each test assignment by competition for orders Then distribute corresponding integral.
Optionally, before the software test application is converted to test assignment list, further includes:
The software test application is audited, judges whether the software test application meets preset format;
If it is, into the described the step of software test application is converted to the test assignment list.
Optionally, it is described issued according to time sequencing by the test assignment of competition for orders after, further includes:
Receive the test plan uploaded;
Test assignment corresponding with the test plan is completed according to the test plan.
Optionally, it is described receive it is each it is described by the test result of the test assignment of competition for orders after, further includes:
It checks each test result, judges whether qualification;
If it is not, then issuing test assignment corresponding with the test result again.
Optionally, it is described receive it is each it is described by the test result of the test assignment of competition for orders after, further includes:
Save the test script and test log of each test assignment.
Optionally, it is described receive it is each it is described by the test result of the test assignment of competition for orders after, further includes:
It is for statistical analysis to the test result by preset dimension.
In order to solve the above technical problems, the present invention also provides a kind of managing devices of software test, comprising:
Converting unit turns the software test application for receiving software test application, and by preset conversion regime It is changed to test assignment list;Wherein, the test assignment list includes test assignment, and product corresponding with the test assignment Divider is then;
Release unit for issuing the test assignment list for competition for orders, and is issued according to time sequencing by competition for orders Test assignment;
Score unit, for receiving the test result of each test assignment by competition for orders, by each survey by competition for orders The Integral Rule of trial business distributes corresponding integral.
Optionally, further includes:
Storage unit, for saving the test script and test log of each test assignment.
Optionally, further includes:
Statistic unit, for for statistical analysis to the test result by preset dimension.
In order to solve the above technical problems, the present invention also provides a kind of management equipments of software test, comprising:
Memory, for storing instruction, described instruction include the management method of software test described in above-mentioned any one Step;
Processor, for executing described instruction.
Software test application is first converted to test assignment list by the management method of software test provided by the present invention, It is split as multiple test assignments, and the Integral Rule of pre-set each test assignment, test assignment list is issued and allows survey Examination personnel carry out competition for orders to test assignment, and are scored according to Integral Rule corresponding with test assignment.Change in the prior art The passive acceptance test task of tester is tester's active competition for orders, and tester is allowed to select to survey according to self-condition Trial business, makes test assignment obtain more reasonably distributing, to improve the quality and efficiency of software test.And it uses default Integral Rule each test assignment is evaluated, compared with the prior art in manual examination and verification, avoid artificial subjective erroneous judgement The problem of, the work incentive of tester is improved, the quality and efficiency of software test are also further improved.The present invention is also The device and equipment of a kind of software test are provided, there is above-mentioned beneficial effect, details are not described herein.
Detailed description of the invention
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the flow chart of the management method of the first software test provided in an embodiment of the present invention;
Fig. 2 is the flow chart of the management method of second of software test provided in an embodiment of the present invention;
Fig. 3 is the flow chart of the management method of the third software test provided in an embodiment of the present invention;
Fig. 4 is the flow chart of the management method of the 4th kind of software test provided in an embodiment of the present invention;
Fig. 5 is a kind of structural schematic diagram of the management method of software test provided in an embodiment of the present invention;
Fig. 6 is a kind of many Technical Architecture figures for surveying management system provided in an embodiment of the present invention;
Fig. 7 is a kind of structural schematic diagram of the management equipment of software test provided in an embodiment of the present invention.
Specific embodiment
Core of the invention is to provide management method, device and the equipment of a kind of software test, surveys for reasonable distribution crowd In test assignment, improve the quality and efficiency of software test.
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is the flow chart of the management method of the first software test provided in an embodiment of the present invention.As shown in Figure 1, soft Part test management method include:
S10: software test application is received, and software test application is converted into test assignment column by preset conversion regime Table.
Wherein, test assignment list includes test assignment, and Integral Rule corresponding with test assignment.
Test promoter can initiate common test, the two kinds of test application of many survey work.Wherein common test and crowd Publication class, construction two class of class can be subdivided into again by surveying work.After receiving test application, first testing requirement can be arranged Classification (common test class, many survey work classes) common test class wouldn't do task processing directly filing.
Since most of software test task has repeatability and intercommunity, it is corresponding that each test assignment can be pre-designed Integral Rule, it is convenient from software test application to the automatic conversion of test assignment list.Integral Rule can be according to test assignment The dimensions such as urgency level, complexity, competition for orders response speed formulate.A kind of Integral Rule is as follows:
Assuming that the number of software test application is N, testing requirement benchmark is divided into S, and task urgency level is J, task difficulty Coefficient is X, then benchmark integrates R1=(N × S) × (1+J%+X%);
Assuming that main task expected performance time is E1, main task assigns the time as S1, and submission result time of filing is E2, is robbed Single time is S2, then main task working efficiency L=(E1-S1)/(E2-S2).Assuming that L >=150%, then working efficiency reward points R2=R1+5;
Assuming that it is E3 that main task, which carries out test monitoring link time, main task assigns the time as S3, then main task competition for orders is rung Answer timeliness T1=E3-S3;Assuming that T1 >=150%, then competition for orders responds failure reward points R3=R1+5;
Assuming that subtask expected performance time is E4, the time is assigned as S4 in subtask, and submission result time of filing is E5, is robbed Single time is S5, then subtask working efficiency L1=(E4-S4)/(E5-S5);Assuming that L1 >=150%, then subtask work is imitated Rate reward points R4=R+5;
Assuming that it is E6 that subtask, which carries out test monitoring link time, the time is assigned as S6 in subtask, then subtask competition for orders is rung Answer timeliness T2=E6-S6;Assuming that T2 >=150%, then competition for orders responds failure reward points R4=R1+5.
Test assignment list is converted to for convenience of software test application, the format of software test application can be preset.Into One step, before software test application is converted to test assignment list, further includes:
Software test application is audited, judges whether software test application meets preset format;
If it is, into the step of the software test application is converted to test assignment list.
Software is then rejected when software test application does not meet preset format when that is, system can not read whole key messages Test application, promoter to be tested resubmit software test application.
The software test application that test promoter submits is received, when software test application meets preset format, by default Conversion regime extract key message, split out test assignment, be associated with preset Integral Rule for each test assignment, thus will Software test application is converted to test assignment list.
S11: publication test assignment list is issued according to time sequencing by the test assignment of competition for orders for competition for orders.
In the prior art, it after according to the test assignment of testing requirement decomposition, needs manually to be assigned to corresponding test department Door or Test Engineer.But test assignment distribution personnel may can not the objective ability for understanding each Test Engineer and It is good at field, and the task of Test Engineer is all to be assigned Personnel Appointment, can only passively be received, and can not directly select certainly The task that oneself is good at.
Therefore in this step, test assignment list is published to platform disclosed in all Test Engineers, tests work Cheng Shi can actively choose test assignment according to the field and free time that oneself is good at.
By the chronological order of competition for orders, test assignment is issued to the test work for getting test assignment at first by system automatically Cheng Shi.Further, it, labeled as in execution, will be embodied as follows by the test assignment of competition for orders in systems:
For by the test assignment of competition for orders, backstage Web application obscure portions create jenkins job project, when according to job Between expression formula, it is automatic to construct Jenkin task;
Change, which executes, records table status, by the state of the test assignment of competition for orders in execution in changed test task list;
Log analysis parses backstage log file status, and records the line number read every time;Update background state and synchronization Backstage log;
For completed test assignment, the state for updating corresponding test assignment in test assignment list is to be completed, Newly-increased execution information record sheet record, calls Git api, test log/report is uploaded to Git code storage.
In addition, being the test assignment that task is assigned for approach, specified test contact person can be transmitted directly to.It surveys Examination contact person submits to operational trials responsible person after getting test assignment.
S12: receiving the test result of each test assignment by competition for orders, by the Integral Rule point of each test assignment by competition for orders Send out integral corresponding.
After Test Engineer completes test assignment, test result is uploaded.The test result that Test Engineer uploads is received, is pressed According to the speed of Test Engineer's competition for orders, complexity, the urgency level of test assignment, deadline etc. to the secondary test assignment into Row scoring, and the Test Engineer is added under one's name in integral, the foundation as Workload Account.
Further, subsequent for convenience to check, call and analyze, in the test knot for receiving each test assignment by competition for orders After fruit, further includes: save the test script and test log of each test assignment.Unification is carried out to the script data of test assignment Management provides basic data support for automatic test, and simultaneity factor records the edition data of test script change, provides user The function that content for script different editions is compared.
Automatic test script is voluntarily recorded furthermore it is also possible to provide by script transcripter to users such as Test Engineers Function, script transcripter supports script modification, commissioning, playback, the functions such as export, and can real time inspection script running log, Track script operation conditions.Test script library can be saved directly to by recording obtained test script simultaneously, facilitate automatic test Data call.
Software test application is first converted to test assignment column by the management method of software test provided in an embodiment of the present invention Table is split as multiple test assignments, and the Integral Rule of pre-set each test assignment, issues test assignment list and allow Tester carries out competition for orders to test assignment, and is scored according to Integral Rule corresponding with test assignment.Change the prior art The middle passive acceptance test task of tester is tester's active competition for orders, and tester is selected according to self-condition Test assignment makes test assignment obtain more reasonably distributing, to improve the quality and efficiency of software test.And it uses pre- If Integral Rule each test assignment is evaluated, compared with the prior art in manual examination and verification, avoid it is artificial subjective accidentally The problem of sentencing, improves the work incentive of tester, also further improves the quality and efficiency of software test.
Fig. 2 is the flow chart of the management method of second of software test provided in an embodiment of the present invention.As shown in Fig. 2, On the basis of above-described embodiment, in another embodiment, after step s 11, further includes:
S20: the test plan of upload is received.
Since many test assignments need the process for repeating, and repeating that can be completed by system.To accelerate to survey The implementation of trial business, Test Engineer can upload test plan, determine how implementation by test assignment promoter.Receive test The test plan that engineer uploads, and test assignment promoter end is sent by test plan, it is selected for test assignment promoter It executes.
If test assignment by recording test script, can execute the script of recording to complete, then surveying automatically later Examination engineer can upload the script recorded.
S21: test assignment corresponding with test plan is completed according to test plan.
According to the instruction triggers test plan of test assignment promoter, test assignment is completed by test plan.It can provide User's triggering and system automatic trigger two ways.
Test assignment promoter can according to actual needs, and manually actively triggering a test plan executes operation, system An automatic test assignment data can be generated in real time, which executes automatically immediately, by calling integrated third-party testing work Has interface, test scene sequence according to schedule, the script information of real time execution in the works realizes holding automatically for test plan Row, and implementation procedure and implementing result data are saved.
System is according to the test plan content of formulation, and generating one or more automatic test assignment data, (planning cycle is The plan of non-single will all generate a plurality of automatic test assignment), the automatic running time of every test assignment is determined by planning cycle It is fixed.After reaching the automatic running time of test assignment, system is held automatically by calling integrated third-party testing tool interface The row secondary test assignment, and implementation procedure data and implementing result are saved.
The management method of software test provided in an embodiment of the present invention can repeat for some, not need whole process The test assignment manually completed is relied on, the test plan that can be uploaded according to Test Engineer is completed, to improve software survey The efficiency of examination, has saved manpower.
Fig. 3 is the flow chart of the management method of the third software test provided in an embodiment of the present invention.As shown in figure 3, On the basis of above-described embodiment, in another embodiment, step S12 is specifically included:
S30: the test result of each test assignment by competition for orders is received.
S31: it checks each test result, judges whether qualification;If it is, to test assignment return step S11;If It is no, then enter step S32.
S32: distribute corresponding integral by the Integral Rule of each test assignment by competition for orders.
In specific implementation, receive it is each by the test result of the test assignment of competition for orders after, can be to each test result It is checked or is spot-check comprehensively, when finding underproof result, remembered that current test assignment does not complete, not integrate, and will The test assignment is published to competition for orders platform again and waits competition for orders.
If test assignment needs to record script, test script can be audited, it is obstructed out-of-date when auditing, it returns to Test Engineer records again, carries out test assignment when audit passes through, then by dependence test responsible person.
The management method of software test provided in an embodiment of the present invention will be audited not by auditing to test result By test assignment issue again, further improve the completion quality of software test task.
Fig. 4 is the flow chart of the management method of the 4th kind of software test provided in an embodiment of the present invention.As shown in figure 4, On the basis of above-described embodiment, in another embodiment, after step s 12, further includes:
S40: for statistical analysis to test result by preset dimension.
In order to preferably present software test as a result, can also by preset dimension to test result carry out statistical Analysis is provided according to dimensions such as testing time, test macro, testing classifications, and presentation for statistical analysis to test quality index Function.
The dimension of statistical analysis may include testing time, test macro, testing classification etc., the statistics of different testing classifications Analysis indexes are different.
The statistical indicator of code check may include the total line number of code, BUG number, loophole number, code redundancies, code coverage Rate, code annotation rate etc..
The statistical indicator of functional test may include that test case coverage rate, test case percent of pass (are counted by module Coverage rate) etc..
The statistical indicator of performance test may include concurrent user number, the duration, average response duration, TPS, affairs at Power, server resource occupancy situation (CPU usage, page exchange rate, network transmission rate) etc..
The statistical indicator of safety test may include safety problem number (high risk/risk/low-risk) etc..
Statistical analysis provides and penetrates look facility step by step, first presents according to testing time, test macro, testing classification and unites The index sum generated in the class testing of the system in this time of meter, clicks the statistical indicator that can be penetrated into modules Number, then penetrate it can be seen that test assignment collective data associated by the index value.
The corresponding each embodiment of management method of software test as detailed above, on this basis, invention additionally discloses The managing device of software test corresponding with the above method.
Fig. 5 is a kind of structural schematic diagram of the management method of software test provided in an embodiment of the present invention.Fig. 6 is the present invention A kind of many Technical Architecture figures for surveying management system that embodiment provides.
As shown in figure 5, the managing device of software test includes:
Converting unit 501 converts software test application for receiving software test application, and by preset conversion regime For test assignment list;Wherein, test assignment list includes test assignment, and Integral Rule corresponding with test assignment;
Release unit 502 is issued for issuing test assignment list for competition for orders, and according to time sequencing by the survey of competition for orders Trial business;
Score unit 503, for receiving the test result of each test assignment by competition for orders, by each test assignment by competition for orders Integral Rule distribute corresponding integral.
A kind of many frames for surveying management system are as shown in fig. 6, test script passes through script transcripter by user's practical operation It obtains, default standard format is JSON.Later, script Git server is submitted to save.Periodically updated from Git server Script translates into java code, submits back Git server.Integration tool is automated by jenkins, has configured timing maven Project.Timing renewal item java code from Git server, runs test script.
Many test tube platform accumulation layers add Git code storage mode using relevant database.Mysql stores relevant configuration Data and test case log information.Git code storage for storing test script, and by file translation at java generation Code.Sonatype Nexus is Maven private clothes, and packet is relied on needed for compilation run java test case code for storing.
Operating system presses server and test node, can be divided into two types, and the operating system of server uses CentOS7, test node is due to needing to test IE browser, so win sequence of maneuvers system is used uniformly, according to IE version need Select win7 or win10 version.
Since Git code storage has the characteristics that distributed, code is also stored on other test nodes.Therefore, Without the concern for calamity for problem, data can be restored Git code storage from other nodes.Each test node, due to needing Test the IE browser of different editions, it is therefore desirable to corresponding windows operating system.Since IE browser is unable to multi version It installs simultaneously, therefore, a node can only test a kind of browser of version.
Application layer is compiled and is run all java programs using JDK1.8, and compiling building is using maven building specification.By Jenkins does unified management scheduling.Test case controls IE by the Webdriver drive module in selenium-server Or the behavior of Chrome browser, achieve the purpose that test automatically.
Jenkins is in center coordinative role in entire institution system.It is responsible for distributing configured test item It is tested to corresponding test node.And provide corresponding JavaAPI and called for web application, except can control corresponding test The operation and stopping of project are outer, can also inquire the essential information of corresponding test item, the relevant informations page such as test result information Face is shown.
Optionally, converting unit 501 can also include:
First audit subelement judges whether software test application meets preset format for auditing software test application; If it is, into the step of software test application is converted to the test assignment list.
Scoring unit 503 can also include:
Second instance nucleon unit judges whether qualification for checking each test result;If it is not, then notice publication Unit 502 issues test assignment corresponding with test result again.
The managing device of software test can also include:
Receiving unit, for receiving the test plan uploaded;Test corresponding with test plan is completed according to test plan Task.
The managing device of software test can also include:
Storage unit, for saving the test script and test log of each test assignment.
The managing device of software test can also include:
Statistic unit, for for statistical analysis to test result by preset dimension.
Since the embodiment of device part is corresponded to each other with the embodiment of method part, the embodiment of device part is asked Referring to the description of the embodiment of method part, wouldn't repeat here.
Fig. 7 is a kind of structural schematic diagram of the management equipment of software test provided in an embodiment of the present invention.As shown in fig. 7, The management equipment of the software test can generate bigger difference because configuration or performance are different, may include one or one with Upper processor (centralprocessing units, CPU) 710 (for example, one or more processors) and memory 720, one or more storage application programs 733 or data 732 storage medium 730 (such as one or more sea Amount storage equipment).Wherein, memory 720 and storage medium 730 can be of short duration storage or persistent storage.Storage is stored in be situated between The program of matter 730 may include one or more modules (diagram does not mark), and each module may include to computing device In series of instructions operation.Further, processor 710 can be set to communicate with storage medium 730, in software test Management equipment 700 on execute storage medium 730 in series of instructions operation.
The management equipment 700 of software test can also include one or more power supplys 740, one or more have Line or radio network interface 750, one or more input/output interfaces 770, and/or, one or more operation systems System 731, such as Windows ServerTM, Mac OS XTM, UnixTM,LinuxTM, FreeBSDTMEtc..
Step in the management method of software test described in above-mentioned Fig. 1 to Fig. 4 by software test management equipment base It is realized in the structure shown in Fig. 7.
It is apparent to those skilled in the art that for convenience and simplicity of description, the software of foregoing description The management equipment of test and the specific work process of computer readable storage medium, can be with reference to pair in preceding method embodiment Process is answered, details are not described herein.
In several embodiments provided herein, it should be understood that disclosed method, apparatus equipment and computer Readable storage medium storing program for executing may be implemented in other ways.For example, Installation practice described above is only schematic , for example, the division of module, only a kind of logical function partition, there may be another division manner in actual implementation, such as Multiple module or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately A bit, shown or discussed mutual coupling, direct-coupling or communication connection can be through some interfaces, device Or the indirect coupling or communication connection of module, it can be electrical property, mechanical or other forms.Module as illustrated by the separation member It may or may not be physically separated, the component shown as module may or may not be physics mould Block, it can it is in one place, or may be distributed on multiple network modules.It can be selected according to the actual needs In some or all of the modules achieve the purpose of the solution of this embodiment.
It, can also be in addition, can integrate in a processing module in each functional module in each embodiment of the application It is that modules physically exist alone, can also be integrated in two or more modules in a module.Above-mentioned integrated mould Block both can take the form of hardware realization, can also be realized in the form of software function module.
If integrated module is realized and when sold or used as an independent product in the form of software function module, can To be stored in a computer readable storage medium.Based on this understanding, the technical solution of the application substantially or Say that all or part of the part that contributes to existing technology or the technical solution can embody in the form of software products Out, which is stored in a storage medium, including some instructions are used so that a computer equipment The whole of (can be personal computer, funcall device or the network equipment etc.) execution each embodiment method of the application Or part steps.And storage medium above-mentioned include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (RandomAccess Memory, RAM), magnetic or disk etc. are various can store program generation The medium of code.
A kind of management method of software test provided by the present invention, device and equipment are described in detail above. Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other embodiments not Same place, the same or similar parts in each embodiment may refer to each other.For the device disclosed in the embodiment, due to it It corresponds to the methods disclosed in the examples, so being described relatively simple, reference may be made to the description of the method.It should It points out, it for those skilled in the art, without departing from the principle of the present invention, can also be to this hair Bright some improvement and modification can also be carried out, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.

Claims (10)

1. a kind of management method of software test characterized by comprising
Software test application is received, and the software test application is converted into test assignment list by preset conversion regime; Wherein, the test assignment list includes test assignment, and Integral Rule corresponding with the test assignment;
The test assignment list is issued for competition for orders, and is issued according to time sequencing by the test assignment of competition for orders;
The test result for receiving each test assignment by competition for orders, by the Integral Rule point of each test assignment by competition for orders Send out integral corresponding.
2. management method according to claim 1, which is characterized in that appoint the software test application is converted to test It is engaged in front of list, further includes:
The software test application is audited, judges whether the software test application meets preset format;
If it is, into the described the step of software test application is converted to the test assignment list.
3. management method according to claim 1, which is characterized in that issued according to time sequencing by the survey of competition for orders described After trial business, further includes:
Receive the test plan uploaded;
Test assignment corresponding with the test plan is completed according to the test plan.
4. management method according to claim 1, which is characterized in that receive each test assignment by competition for orders described Test result after, further includes:
It checks each test result, judges whether qualification;
If it is not, then issuing test assignment corresponding with the test result again.
5. management method according to claim 1, which is characterized in that receive each test assignment by competition for orders described Test result after, further includes:
Save the test script and test log of each test assignment.
6. management method according to claim 1, which is characterized in that receive each test assignment by competition for orders described Test result after, further includes:
It is for statistical analysis to the test result by preset dimension.
7. a kind of managing device of software test characterized by comprising
Converting unit is converted to the software test application for receiving software test application, and by preset conversion regime Test assignment list;Wherein, the test assignment list includes test assignment, and integral corresponding with test assignment rule Then;
Release unit for issuing the test assignment list for competition for orders, and is issued according to time sequencing by the test of competition for orders Task;
Score unit, for receiving the test result of each test assignment by competition for orders, appoints by each test by competition for orders The Integral Rule of business distributes corresponding integral.
8. managing device according to claim 7, which is characterized in that further include:
Storage unit, for saving the test script and test log of each test assignment.
9. managing device according to claim 7, which is characterized in that further include:
Statistic unit, for for statistical analysis to the test result by preset dimension.
10. a kind of management equipment of software test characterized by comprising
Memory, for storing instruction, described instruction include the manager of software test described in claim 1 to 6 any one The step of method;
Processor, for executing described instruction.
CN201811188702.1A 2018-10-12 2018-10-12 A kind of management method of software test, device and equipment Pending CN109272251A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811188702.1A CN109272251A (en) 2018-10-12 2018-10-12 A kind of management method of software test, device and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811188702.1A CN109272251A (en) 2018-10-12 2018-10-12 A kind of management method of software test, device and equipment

Publications (1)

Publication Number Publication Date
CN109272251A true CN109272251A (en) 2019-01-25

Family

ID=65197061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811188702.1A Pending CN109272251A (en) 2018-10-12 2018-10-12 A kind of management method of software test, device and equipment

Country Status (1)

Country Link
CN (1) CN109272251A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109753439A (en) * 2019-01-28 2019-05-14 平安科技(深圳)有限公司 Task test method and system based on block chain technology
CN110134581A (en) * 2019-04-02 2019-08-16 浙江数链科技有限公司 Method for testing software, device, computer equipment and storage medium
CN111290959A (en) * 2020-02-20 2020-06-16 中国建设银行股份有限公司 Test task scheduling method and device, electronic equipment and storage medium
CN112488329A (en) * 2020-11-26 2021-03-12 南通市市政工程设计院有限责任公司 Municipal works supervision information management system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070220341A1 (en) * 2006-02-28 2007-09-20 International Business Machines Corporation Software testing automation framework
CN103870348A (en) * 2012-12-14 2014-06-18 中国电信股份有限公司 Test method and system for concurrent user access
CN107633355A (en) * 2017-09-11 2018-01-26 苏州浦瑞融网络科技有限公司 A kind of reward on total mark method for being used for commodity distribution under line and robbing single system
CN107656872A (en) * 2017-10-09 2018-02-02 平安普惠企业管理有限公司 Method for testing software, device, equipment and computer-readable storage medium
CN107767061A (en) * 2017-10-27 2018-03-06 郑州云海信息技术有限公司 A kind of system of software test Amount of work

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070220341A1 (en) * 2006-02-28 2007-09-20 International Business Machines Corporation Software testing automation framework
CN103870348A (en) * 2012-12-14 2014-06-18 中国电信股份有限公司 Test method and system for concurrent user access
CN107633355A (en) * 2017-09-11 2018-01-26 苏州浦瑞融网络科技有限公司 A kind of reward on total mark method for being used for commodity distribution under line and robbing single system
CN107656872A (en) * 2017-10-09 2018-02-02 平安普惠企业管理有限公司 Method for testing software, device, equipment and computer-readable storage medium
CN107767061A (en) * 2017-10-27 2018-03-06 郑州云海信息技术有限公司 A kind of system of software test Amount of work

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109753439A (en) * 2019-01-28 2019-05-14 平安科技(深圳)有限公司 Task test method and system based on block chain technology
CN110134581A (en) * 2019-04-02 2019-08-16 浙江数链科技有限公司 Method for testing software, device, computer equipment and storage medium
CN111290959A (en) * 2020-02-20 2020-06-16 中国建设银行股份有限公司 Test task scheduling method and device, electronic equipment and storage medium
CN112488329A (en) * 2020-11-26 2021-03-12 南通市市政工程设计院有限责任公司 Municipal works supervision information management system

Similar Documents

Publication Publication Date Title
CN109272251A (en) A kind of management method of software test, device and equipment
Tahir et al. A systematic literature review on software measurement programs
US10310968B2 (en) Developing software project plans based on developer sensitivity ratings detected from monitoring developer error patterns
Staron et al. Developing measurement systems: an industrial case study
CN109726132A (en) A kind of method for testing software and software test automation management system
CN108984418A (en) Software testing management method, device, electronic equipment and storage medium
CN110162471A (en) A kind of method for testing pressure and system based on container cloud
CN107643981A (en) A kind of automatic test platform and operation method of polynary operation flow
CN106411633A (en) Web application compatibility testing method based on openstack and system thereof
CN110162481A (en) A kind of method for testing software, device, equipment and storage medium
CN109857643A (en) A kind of method and device of virtual platform performance automatic test
April et al. A software maintenance maturity model (S3M): Measurement practices at maturity levels 3 and 4
JP2017016507A (en) Test management system and program
Tarhan et al. Investigating the effect of variations in the test development process: a case from a safety-critical system
Silva et al. Criteria for ERP selection using an AHP approach
CN116909936A (en) Big data automatic test method, equipment and readable storage medium
CN117093250A (en) One-stop management platform and method based on virus flow
CN109858792B (en) Nuclear power station debugging test task management method and system based on test steps
Korhonen Evaluating the effect of agile methods on software defect data and defect reporting practices-a case study
CN106933743A (en) A kind of method of testing and device
CN115827469A (en) Project test management method and system
CN116383061A (en) Method and related device for testing basic platform interface of substation control system
Punyateera et al. Study of service desk for NEdNet using incident management (Service Operation) of ITIL V. 3
Zapata-Jaramillo et al. On the relationship of ISO/IEC 9126 metrics and the alpha states of the SEMAT kernel
Harrer et al. A pattern language for workflow engine conformance and performance benchmarking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190125