CN109269618A - The device and method thereof of gravimetric tank feed pipe - Google Patents

The device and method thereof of gravimetric tank feed pipe Download PDF

Info

Publication number
CN109269618A
CN109269618A CN201811209362.6A CN201811209362A CN109269618A CN 109269618 A CN109269618 A CN 109269618A CN 201811209362 A CN201811209362 A CN 201811209362A CN 109269618 A CN109269618 A CN 109269618A
Authority
CN
China
Prior art keywords
server
central column
controller
hoop
communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811209362.6A
Other languages
Chinese (zh)
Inventor
宋奇吼
冯洪高
陈莉
周昌松
徐百钏
王帅
徐媛媛
王雪钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Institute of Railway Technology
Original Assignee
Nanjing Institute of Railway Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Institute of Railway Technology filed Critical Nanjing Institute of Railway Technology
Priority to CN201811209362.6A priority Critical patent/CN109269618A/en
Publication of CN109269618A publication Critical patent/CN109269618A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G23/00Auxiliary devices for weighing apparatus
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41845Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by system universality, reconfigurability, modularity
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/06Lead-acid accumulators
    • H01M10/12Construction or manufacture
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M4/00Electrodes
    • H01M4/02Electrodes composed of, or comprising, active material
    • H01M4/14Electrodes for lead-acid accumulators
    • H01M4/16Processes of manufacture
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Automation & Control Theory (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Air Transport Of Granular Materials (AREA)

Abstract

A kind of device and method thereof of gravimetric tank feed pipe, feed pipe dock the structure formed by two pipelines are as follows: two pipeline is docked by conduit coupling;Server is arranged in machine box for server, and machine box for server includes shell, and the upper wall surface in shell is connected locating plate via connection item;The rate of travel for effectively preventing the conduit coupling that a pair of of semicanal pipe connecting is constituted in the prior art in conjunction with its method is little, the crisp folding of the long generation of two pipelines being connected with conduit coupling and shake, the exhaust cooling performance of exhaust outlet is not high can not to overcome the temperature in machine box for server to increase well, the serious appearance for resulting even in spontaneous combustion problems of server period long running, particulate contaminant in air-flow can also flow into machine box for server via exhaust outlet to be caused to corrode and be stained to server, result even in the defect for bursting out spark out when route is impaired to be powered.

Description

The device and method thereof of gravimetric tank feed pipe
Technical field
The present invention relates to gravimetric tank feed pipe technical fields, and in particular to a kind of equipment of gravimetric tank feed pipe and its side Method.
Background technique
Traditional accumulator plate is that lead plaster is coated on grid by plaster coating machine, is then fed into sour pond reaction, then carry out Baking and curing;Lead plaster be proportionally mixed by lead powder, water, sulfuric acid and additive and sent physics, chemical change and be made, When wherein lead powder is delivered to gravimetric tank from storage tank, is shaken due to existing, have the foreign matters such as nut, bearing bead once in a while and enter gravimetric tank And in lead plaster made of being mixed into, it is unqualified not only to will lead to the pole plate produced when being re-fed into plaster coating machine, results even in plaster coating machine Damage, someone adds magnet adsorption of foreign matter on the feed pipe of gravimetric tank, but can not handle non-magnetic foreign body, and be adsorbed Foreign matter cleaning is inconvenient;Had in the past it is a kind of increase vibrating screen device on feed pipe to filter the lead powder gravimetric tank of foreign matter, effectively sieve Except foreign matter, prevents it from entering gravimetric tank and be mixed into lead plaster, and then have an adverse effect to cream is applied, but the filtering of vibrating screen device Net is clamped between the both ends pipeline of feed pipe, can not know on filter screen whether there is foreign matter, pipeline must be removed by inspecting periodically Whole connection bolts, the pipeline on feed pipe top must can just remove by tools such as drag-line, crowbars, dismounting all very not sides Just, workload is very big, to put into more manpower and material resources, and check cost is high.Then pass through research and development just have such as application No. is " 201520482689.6 ", the applying date are " 2015.07.07 " and patent name is a kind of " lead powder weighing for being convenient to clean foreign matter The lead powder gravimetric tank feed pipe for being convenient to clean foreign matter of tank feed pipe ", this is convenient to clean the lead powder gravimetric tank feed pipe of foreign matter, institute It states at the top of feed pipe lower end connection gravimetric tank, is connected with vibrating screen device on the feed pipe, the vibrating screen device includes side Portion passes through the supporting plate of connecting rod connecting cross beam, and the supporting plate is equipped with vibrating motor and through-hole, and the through hole is equipped with filter screen, institute It states feed pipe to be made of the docking of two pipelines, the supporting plate and filter screen are clamped at two segment pipe docking, above the filter screen The pipeline of 20~30cm is equipped with the foreign matter cleaning pipe tilted upward, and the nozzle of the foreign matter cleaning pipe is blocked by blind plate.
The length of the foreign matter cleaning pipe is 20~30cm.
The connecting rod runs through crossbeam, and the upper end is equipped with nut, and spring is equipped between nut and crossbeam.
The filter screen is stainless steel electrowelding net.
Blind plate is opened when checking in this way, pipe is cleared up by foreign matter and clears up foreign matter, the pipeline for not needing to remove feed pipe connects Connecting bolt does not need to remove upper pipe yet, and inspection workload is greatly reduced, and inspection work can be completed in one, reduces manpower Material resources investment;The foreign matter of 20~30cm long clears up pipe, can reach into feed pipe crawl foreign matter, very convenient.
The structure that the feed pipe is docked by two pipelines is attached often by band of column shape conduit coupling, pipeline Connected two pipeline of connector is due to constructing and assembling offset, strain such problems after connection, and two pipelines is usually allowed to be sent out Raw offset, is unable to ensure alignment, during specific use, because the conduit coupling that a pair of of semicanal pipe connecting is constituted is opposite The problem of amount of movement is little, the crisp folding of the long generation of two pipelines being connected with conduit coupling and shake.
The revolving speed when armature spindle operation of the vibrating motor is obtained, must just be set on the armature spindle of the vibrating motor Speed probe is set, the speed probe is connect with controller, and the controller is also connect with communication module, the communication mould Block is connect with server, thus speed probe can be collected rotary speed information and is sent in controller, then via communication mould Block is transmitted in server, and server carries out storage after receiving rotary speed information and transmits paid-in response letter to controller Breath, thereby realizes the communication between controller and server;And when the quantity of the vibrating motor is multiple, the vibration The armature spindle of dynamic motor i.e. multiple, one speed probe of setting, an institute on the armature spindle of a vibrating motor It states speed probe to connect with a controller, a controller is connect with a communication module, multiple communication moulds Block connect with a server, and the information of the communication between controller and server is transmitted by way of message, communicates Granting period is the period that message communication is permitted between the whole controllers for executing communication with the server, is executed with server Information communication.The communication of message between server and controller all only executes in such communication granting period;Communication is forbidden Period is the period except the communication granting period in the whole period, that is to say, that during the period is forbidden in communication, control Device is exactly blocked state;So communication forbids the period also just to subtract when the communication granting period for possessing the whole period increases It is small, in addition, controller will not be in blocked state and can continuous service;So that is, in current message communication modes Under, message communicates the mode in all concentrating in communication granting period to execute;So communication granting period must be set to high Institute's palpus period is communicated in message, possessing the communication granting period in the whole period centainly just will increase, so, when communication is forbidden Section is reduced by;In this way, the period for blocked state is reduced because communication forbids the period to reduce, the duration of controller operation increases Greatly, so just having consumed controller resource and the power consumption of controller being made also to increase electric power.
Reach the needs of protection, server is arranged in the machine box for server of hollow rectangular-shape, however server Server in the cabinet temperature when operation can increase, and the temperature allowed in machine box for server in this way also increases, and causes to take The unstable problem of business device runnability, therefore current machine box for server is usually provided with exhaust outlet, the exhaust drop of right exhaust outlet Warm nature can not be high, can not overcome the raised defect of the temperature in machine box for server well, and server period long running is serious Result even in the appearance of spontaneous combustion problems;In addition the particulate contaminant in air-flow also can flow into machine box for server via exhaust outlet In, cause to be collected at server, server is caused to corrode and is stained, it is serious when resulting even in that route is impaired to be powered The problem of bursting out spark out.
Summary of the invention
To solve the above problems, being effectively prevented the present invention provides a kind of device and method thereof of gravimetric tank feed pipe The rate of travel for the conduit coupling that a pair of of semicanal pipe connecting is constituted in the prior art is little, is connected with conduit coupling The long not high temperature that can not be overcome well in machine box for server of exhaust cooling performance that crisp folding and shake, exhaust outlet occurs of two pipelines Degree raising, the serious appearance for resulting even in spontaneous combustion problems of server period long running, the particulate contaminant in air-flow also can It is flowed into machine box for server via exhaust outlet when causing to corrode and be stained to server, resulting even in that route is impaired to be powered The defect for bursting out spark out.
A kind of device and method thereof of gravimetric tank feed pipe in order to overcome the deficiencies in the prior art, the present invention provides Solution, specific as follows:
A kind of equipment of gravimetric tank feed pipe, the lead powder gravimetric tank feed pipe including being convenient to clean foreign matter, the feed pipe On be connected with vibrating screen device, the vibrating screen device includes the supporting plate that edge passes through connecting rod connecting cross beam, is set on the supporting plate There is vibrating motor, the feed pipe is made of the docking of two pipelines;
The feed pipe docks the structure formed by two pipelines are as follows: two pipeline is docked by conduit coupling;
The conduit coupling includes central column conduit coupling main body, plastic bar and protecting crust N3, the pipeline connection Part main body includes one N1 of central column hoop and two N2 of central column hoop, one N1 of central column hoop and two N2 shape of central column hoop Shape size is the same, and one N1 of central column hoop and two N2 of central column hoop are distributed in opposite directions, and the protecting crust N3 is socketed in ring In the outer periphery of one N1 of column hoop and two N2 of central column hoop, the protecting crust N3 is used to transmit one N1 of central column hoop and ring Effect between two N2 of column hoop remains sky between two N2 of central column hoop and the opposite face of one N1 of central column hoop Gap, one N1 of central column hoop it is corresponding in the outer periphery of two N2 of central column hoop be provided with it is multiple respectively along one N1 of central column hoop With the fan circular opening one of two N2 centerline direction of central column hoop.
Several fan circular openings two, the fan circular opening one and fan ring are accordingly provided on wall surface in the protecting crust N3 The interlocking mouth N5 of the inner surface composition plastic bar of shaped opening two.
The outer periphery of two N2 of central column hoop and one N1 of central column hoop respectively two N2 of central column hoop with It is cyclic annular for fan on the center line of one N1 of central column hoop.
The protecting crust N3 is central column.
The both sides that protecting crust N3 is in the conduit coupling main body are designed with a sheet barrier flaps, corresponding in barrier flaps The cyclic annular stop collar N4 for plastic bar is assembled in the position of the plastic bar, and the ring-type stop collar N4 is used to prevent plastic bar It slides.
Rubber seal ring is set respectively on one N1 of central column hoop and two N2 of central column hoop, is used to respectively in the ring Sealing structure is formed between one N1 of column hoop and rubber seal ring and between two N2 of central column hoop and rubber seal ring.
Speed probe is set on the armature spindle of the vibrating motor, and the speed probe is connect with controller, institute It states controller also to connect with communication module, the communication module is connect with server, speed probe can thus be collected Rotary speed information is sent in controller, then is transmitted in server via communication module, and it is laggard that server receives rotary speed information Row storage simultaneously transmits paid-in response message to controller, thereby realizes the communication between controller and server;And When the quantity of the vibrating motor is multiple, the armature spindle of the vibrating motor i.e. multiple a, vibrating motor Armature spindle on a speed probe is set, a speed probe connect with a controller, the control Device is connect with a communication module, and multiple communication modules are connect with a server, the communication between controller and server Information be to be transmitted by way of message, communication granting period is in the whole controllers for executing communication with the server Between permit message communication period, execute with server information communication.The communication of message between server and controller is all only It is executed in such communication granting period;Communication forbid the period be except the communication granting period in the whole period when Section, that is to say, that during the period is forbidden in communication, controller is exactly blocked state, and the server includes scheduler module.
The method of the equipment of the gravimetric tank feed pipe includes: by two N2 of central column hoop and one N1 of central column hoop Outer periphery is cyclic annular for fan on the center line of two N2 of central column hoop and one N1 of central column hoop respectively, allows a pair of hoop There is corresponding amount of movement with protecting crust N3, that is, two pipes being connected on two N2 of central column hoop and one N1 of central column hoop There is corresponding mobile space in road, reduces the concussion to plastic bar with this.
The method of the equipment of the gravimetric tank feed pipe further include: the communication of the message between the controller and server exists Start in communication granting period, however need not all realize communication in granting period communicating, it is incomplete in granting period communicating Under conditions of portion realizes the communication of message, and the controller of message communication is executed, can also be held after communication granting period faces It is continuous to execute message communication, it is just terminated until message transmissions are all realized;
In addition, when communication granting period faces, to the controller for being not carried out message communication, in communication granting period It is arranged to blocked state when facing.
In addition, just must concurrently be asked via transmitting before all controllers concurrently transmit rotary speed information to server Message is sought to construct concurrent link, that is, concurrent request message is transmitted to all controllers through server, all controllers are received After just constructing concurrent link after to the concurrent request message, the number for allowing the unit time of concurrent request message to transmit is reduced;? It is exactly the number that the unit time transmitting of the concurrent request message when constructing concurrent link is reduced to after constructing concurrent link 25% number, can also terminate the transmitting of concurrent request message to rely on demand and execute transmitting again.
The quantity of the controller of the server is connected to as a pair, one of them is controller one, another For controller two.
The controller one is connected to the controller of a server, the controller one and controller two with controller two Before executing message communication with the server, including such as under type:
1-1: giving server to be powered in advance, and server execution is listened to, and determines controller one and controller two phase therewith with this Even;
1-2: the I P address and communication granting period of server settings oneself, traffic control module;
1-3: being then powered to controller one, executes listening to for controller one;
It include: that originally, message is listened in the mass-sending of controller one in listening in mode for controller one;
1-4: it is located at the server for listening to message that can obtain the mass-sending of via controller one in this way towards controller one with point-to-point Mode issue the response message that message is listened to towards this;
1-5: controller one obtains this and listens to the response message of message towards this, in this way, controller one listens to server, Thus listening to for controller one is completed;
1-6: then, controller is once carrying out the link to the scheduler module of server;
The controller is once carrying out including: that originally, controller one is towards server to the link of the scheduler module of server Transmitting link in a point-to-point fashion requires message;
1-7: then, the link obtained derived from controller one requires the server of message towards controller one with point-to-point Mode transmits the response message that message is required for the link;
1-8: controller one obtains the response message that message is required for the link, reaches controller a pair of scheduling mould with this The link of block;
1-9: then, reaching between server and controller one and link, so, it can be held between server and controller one The communication of row message;
1-10: being powered to controller two, executes listening to for controller two;
1-11: listening to for controller two includes: that originally, message is listened in the mass-sending of controller two;
In this way, server and controller one be when obtaining this and listening to message, towards controller two by put to pair in a manner of pass Pass the response message that message is listened to this;
1-12: controller two obtains the response message that message is listened to this, so, controller two, which listens to, can be carried out communication Server and controller one;
1-13: in addition, by the principle of setting, the discrimination of the controller of weight size is executed;
1-14: controller two just carries out the link to the scheduler module of server;
Controller two just carries out including: originally that controller two is towards server with point to the link of the scheduler module of server Link is transmitted to the mode of point and requires message;
1-15: then, the link obtained derived from controller two requires the server of message towards controller two with point-to-point Mode transmits the response message that message is required towards the link;
1-16: controller two obtains this and requires the response message of message towards the link, then just realizes that controller two is right The link of scheduler module;
1-17: reaching between server and controller two and link, and then, can execute message between server and controller two Communication.
The server is arranged in machine box for server, and machine box for server includes shell 301, the upper wall surface in shell 301 It is connected locating plate 302 via connection item, in addition the both sides of 302 upper wall surface of locating plate are connected motor 303, motor 303 Shaft be connected sprocket wheel 1, in addition sprocket wheel 1 and sprocket wheel 2 305 are via chain sleeve-board around sprocket wheel 2 305 is socketed in roller Son 1, one of roller 1 is mutually screwed on the wall surface in shell 301, in addition the same limited block in the other end of roller 1 One side be mutually screwed on, sprocket wheel 2 305 is the same as between the opposite one side of limited block 307 and being on the wall surface of roller 1 and cover then Ring bodies 308;
The upper wall surface of the locating plate 302 is connected air exhauster 318, in addition the air exhauster import of air exhauster 318 and channel 319, the lower end in channel 319 penetrates locating plate 302 and is stretched over the lower section of locating plate 302, the lower end in channel 319 and shell 320 Inside communicate, in addition the air exhauster of air exhauster 318 exports and via channel is connected to container 321.
The both sides of 302 lower wall surface of locating plate are all connected limited block 307.
In addition the lower wall surface of the limited block 307 is connected with the lower wall surface in shell 301.
The wall surface of the ring bodies 308 is screwed on roller 2 309, and in addition roller 2 309 is apart from ring bodies 308 farther one Head is connected horizontal bar 310.
The horizontal bar 310 is through limited block 307 and is stretched over limited block 307 apart from the farther one side of roller 2 309, institute State horizontal bar 310 and be fixedly connected with sheet gusset piece 311 apart from roller 2 309 farther one, in addition sheet gusset piece 311 away from It is connected exhaust fan 312 from the farther one side of horizontal bar 310 via plate.
Ring-shaped guide rail 313 is provided on the wall surface of the limited block 307.
The lower wall surface of the container 321 is connected with the upper wall surface of locating plate 302, the lower part on 301 both sides of shell and shell 301 The both sides of lower wall surface be all provided with openings 314, in addition the inside of openings 314 is connected filter screen 315.
The both sides of 301 lower wall surface of shell, which are all connected, props up bar 316, and the lower wall surface in addition propping up bar 316 is connected Support 317, the upper wall surface of the shell 301 are connected ceiling 322 via vertical bar, and the lower wall surface in shell 301 is via connection Piece is connected server 323, and the antetheca of shell 301 is provided with lumen therethrough, cover board 324 is covered on lumen therethrough, in addition cover board 324 It is pivotally connected via hinge with shell 301, the wall surface of cover board 324, which is connected, helps handle 325.
The invention has the benefit that
By two N2 of central column hoop and one N1 of central column hoop outer periphery respectively two N2 of central column hoop with It is cyclic annular for fan on the center line of one N1 of central column hoop, allow a pair of hoop to have corresponding amount of movement with protecting crust N3, also It is connected to have corresponding mobile space with two pipelines on one N1 of central column hoop in two N2 of central column hoop, is reduced pair with this The concussion of plastic bar, it is therefore prevented that two pipelines can not move when one N1 of central column hoop and two N2 of central column hoop relative movement Occur, two pipelines are difficult to crisp folding, increase using the period for two pipelines, building expense is not high.
Server between controller one or controller two message communication in, set communication granting period, with this, In in message communication, the communication of message starts in communication granting period, however need not all realize in granting period communicating Communication under conditions of communicate in granting period the communication for not realizing messages all, and executes the controller that message communicates, can be with Message communication is also continuously carried out after communication granting period faces, is just terminated until message transmissions are all realized;
So communication granting period can be allowed to be less than the message communication modes having at present in this way, it is possible to reduce communication is permitted Period and corresponding increase, which communicate, forbids period i.e. controller to be located at the duration of blocked state, so, control can be reduced The operation duration of device can be truly realized the consume for reducing controller resource and the power consumption of controller is allowed also to reduce.
In addition, after constructing concurrent link, being reduced to concurrently asking when the concurrent link of building in the message means of communication 25% number of the number for asking the unit time of message to transmit can also terminate the transmitting of concurrent request message to rely on demand To execute transmitting again.
So caused by can really realizing that the communication of the concurrent request message of the not demand after concurrent link building comes The power consumption of controller.
Through being connected locating plate due to the upper wall surface in cabinet via connection item, in addition the both sides of locating plate upper wall surface are connected Motor, the shaft of motor be connected sprocket wheel one, then in this way via sprocket wheel two, roller two, connecting plate, ring bodies, exhaust fan Integrated structure, overcome the heating that current machine box for server temperature reduction performance is limited, and server period long running reaches, can not Conducive to the work of server, so that server efficiency is low, or even there is the defect of spontaneous combustion.It is connected via the upper wall surface of locating plate Air exhauster, the lower end in addition the air exhauster import of air exhauster and channel, channel through locating plate and be stretched under locating plate Side, the lower end in channel are communicated with the inside of shell, and in addition the air exhauster of air exhauster, which is exported, is connected to container via channel, container Lower wall surface is connected with the upper wall surface of locating plate, and the both sides of the lower wall surface of the lower part and shell on shell both sides are all provided with openings, separately The inside of outer openings is connected filter screen;Overcoming can gather on the server after particulate contaminant is led into machine box for server, So that server operational efficiency is low, the defect for bursting out spark out when route is impaired to be powered is resulted even in.
Detailed description of the invention
Fig. 1 is the structure chart of conduit coupling of the invention.
Fig. 2 is the side view of conduit coupling of the invention.
Fig. 3 is the positive structure schematic of machine box for server of the invention.
Fig. 4 is enlarged drawing at the B of Fig. 3.
Fig. 5 is the schematic diagram of guide rail of the invention.
Fig. 6 is front outer portion schematic diagram of the invention.
Specific embodiment
The present invention is described further below in conjunction with drawings and examples.
As shown in figs 1 to 6, the equipment of gravimetric tank feed pipe, including such as application No. is " 201520482689.6 ", applications Day is " 2015.07.07 " and patent name is described in " a kind of lead powder gravimetric tank feed pipe for being convenient to clean foreign matter " convenient for clear The lead powder gravimetric tank feed pipe of foreign matter is managed, the feed pipe lower end is connected at the top of gravimetric tank, is connected with vibration on the feed pipe Screen device, the vibrating screen device include edge by the supporting plate of connecting rod connecting cross beam, the supporting plate be equipped with vibrating motor and Through-hole, the through hole are equipped with filter screen, and the feed pipe is made of the docking of two pipelines, and the supporting plate and filter screen are clamped in two At segment pipe docking, the pipeline of 20~30cm is equipped with the foreign matter cleaning pipe tilted upward, the foreign matter above the filter screen The nozzle for clearing up pipe is blocked by blind plate;
The length of the foreign matter cleaning pipe is 20~30cm.
The connecting rod runs through crossbeam, and the upper end is equipped with nut, and spring is equipped between nut and crossbeam.
The filter screen is stainless steel electrowelding net.
The feed pipe docks the structure formed by two pipelines are as follows: two pipeline is docked by conduit coupling;
The conduit coupling includes central column conduit coupling main body, plastic bar and protecting crust N3, the pipeline connection Part main body includes one N1 of central column hoop and two N2 of central column hoop, one N1 of central column hoop and two N2 shape of central column hoop Shape size is the same, and one N1 of central column hoop and two N2 of central column hoop are distributed in opposite directions, and the protecting crust N3 is socketed in ring In the outer periphery of one N1 of column hoop and two N2 of central column hoop, the protecting crust N3 is used to transmit one N1 of central column hoop and ring Effect between two N2 of column hoop remains sky between two N2 of central column hoop and the opposite face of one N1 of central column hoop Gap is provided with to offset the assembly offset of a part one N1 of central column hoop is corresponding in the outer periphery of two N2 of central column hoop It is multiple respectively along the fan circular opening one of one N1 of central column hoop and two N2 centerline direction of central column hoop.
Several fan circular openings two, the fan circular opening one and fan ring are accordingly provided on wall surface in the protecting crust N3 The interlocking mouth N5 of the inner surface composition plastic bar of shaped opening two.
The outer periphery of two N2 of central column hoop and one N1 of central column hoop respectively two N2 of central column hoop with It is cyclic annular for fan on the center line of one N1 of central column hoop.
The protecting crust N3 is central column.
The both sides that protecting crust N3 is in the conduit coupling main body are designed with a sheet barrier flaps, corresponding in barrier flaps The cyclic annular stop collar N4 for plastic bar is assembled in the position of the plastic bar, and the ring-type stop collar N4 is used to prevent plastic bar It slides.
Rubber seal ring is set respectively on one N1 of central column hoop and two N2 of central column hoop, is used to respectively in the ring Sealing structure is formed between one N1 of column hoop and rubber seal ring and between two N2 of central column hoop and rubber seal ring.
By two N2 of central column hoop and one N1 of central column hoop outer periphery respectively two N2 of central column hoop with It is cyclic annular for fan on the center line of one N1 of central column hoop, allow a pair of hoop to have corresponding amount of movement with protecting crust N3, also It is connected to have corresponding mobile space with two pipelines on one N1 of central column hoop in two N2 of central column hoop, is reduced pair with this The concussion of plastic bar, it is therefore prevented that two pipelines can not move when one N1 of central column hoop and two N2 of central column hoop relative movement Occur, two pipelines are difficult to crisp folding, increase using the period for two pipelines, building expense is not high.
The revolving speed when armature spindle operation of the vibrating motor is obtained, is just arranged on the armature spindle of the vibrating motor Speed probe, the speed probe are connect with controller, and the controller is also connect with communication module, the communication module It is connect with server, thus speed probe can be collected rotary speed information and be sent in controller, then via communication module It being transmitted in server, server carries out storage after receiving rotary speed information and transmits paid-in response message to controller, Thereby realize the communication between controller and server;And when the quantity of the vibrating motor is multiple, the vibration The armature spindle of motor i.e. multiple, one speed probe of setting on the armature spindle of a vibrating motor, described in one Speed probe is connect with a controller, and a controller is connect with a communication module, multiple communication modules It connect with a server, the information of the communication between controller and server is transmitted by way of message, and communication is quasi- Perhaps the period is the period that message communication is permitted between the whole controllers for executing communication with the server, executes the letter with server Breath communication.The communication of message between server and controller all only executes in such communication granting period;When communication is forbidden Section is the period except the communication granting period in the whole period, that is to say, that during the period is forbidden in communication, controller It is exactly blocked state, the server includes scheduler module.
The method of the equipment of the gravimetric tank feed pipe are as follows: in vibrating motor operation, be arranged to by the enhancing section The rotating torque for allowing the enhancing section can bear is higher than the highest generated when vibrating motor operation to band of column shape conduit coupling Rotating torque, effective protection band of column shape conduit coupling can be played the role of.
The method of the equipment of the gravimetric tank feed pipe further include: the communication of the message between the controller and server exists Start in communication granting period, however need not all realize communication in granting period communicating, it is incomplete in granting period communicating Under conditions of portion realizes the communication of message, and the controller of message communication is executed, can also be held after communication granting period faces It is continuous to execute message communication, it is just terminated until message transmissions are all realized;
In addition, when communication granting period faces, to the controller for being not carried out message communication, in communication granting period It is arranged to blocked state when facing.
So communication granting period can be allowed to be less than the message communication modes having at present in this way, it is possible to reduce communication is permitted Period and corresponding increase, which communicate, forbids period i.e. controller to be located at the duration of blocked state, so, control can be reduced The operation duration of device can be truly realized the consume for reducing controller resource and the power consumption of controller is allowed also to reduce.
In addition, just must concurrently be asked via transmitting before all controllers concurrently transmit rotary speed information to server Message is sought to construct concurrent link, that is, concurrent request message is transmitted to all controllers through server, all controllers are received After just constructing concurrent link after to the concurrent request message, the number for allowing the unit time of concurrent request message to transmit is reduced;? It is exactly the number that the unit time transmitting of the concurrent request message when constructing concurrent link is reduced to after constructing concurrent link 25% number, can also terminate the transmitting of concurrent request message to rely on demand and execute transmitting again.
So caused by can really realizing that the communication of the concurrent request message of the not demand after concurrent link building comes The power consumption of controller.
The quantity of the controller of the server is connected to as a pair, one of them is controller one, another For controller two.
The controller one is connected to the controller of a server, the controller one and controller two with controller two Before executing message communication with the server, including such as under type:
1-1: giving server to be powered in advance, and server execution is listened to, and determines controller one and controller two phase therewith with this Even;
1-2: the I P address and communication granting period of server settings oneself, traffic control module;
1-3: being then powered to controller one, executes listening to for controller one;
It include: that originally, message is listened in the mass-sending of controller one in listening in mode for controller one;
1-4: it is located at the server for listening to message that can obtain the mass-sending of via controller one in this way towards controller one with point-to-point Mode issue the response message that message is listened to towards this;
1-5: controller one obtains this and listens to the response message of message towards this, in this way, controller one listens to server, Thus listening to for controller one is completed;
1-6: then, controller is once carrying out the link to the scheduler module of server;
The controller is once carrying out including: that originally, controller one is towards server to the link of the scheduler module of server Transmitting link in a point-to-point fashion requires message;
1-7: then, the link obtained derived from controller one requires the server of message towards controller one with point-to-point Mode transmits the response message that message is required for the link;
1-8: controller one obtains the response message that message is required for the link, reaches controller a pair of scheduling mould with this The link of block;
1-9: then, reaching between server and controller one and link, so, it can be held between server and controller one The communication of row message;
1-10: being powered to controller two, executes listening to for controller two;
1-11: listening to for controller two includes: that originally, message is listened in the mass-sending of controller two;
In this way, server and controller one be when obtaining this and listening to message, towards controller two by put to pair in a manner of pass Pass the response message that message is listened to this;
1-12: controller two obtains the response message that message is listened to this, so, controller two, which listens to, can be carried out communication Server and controller one;
1-13: in addition, by the principle of setting, the discrimination of the controller of weight size is executed;By the principle of setting, distinguish Not Chu controller second is that the bigger controller of one weight of priority ratio controller, then, controller two listens to completion.
Weight size can by with depending on the gap size of server, pass out listen to the controller of message order come Setting.Then, weight size is determined by the principle of setting, can quickly execute the building to scheduler module.Weight is got over Greatly, the communication between server and the controller will come more forwardly of order and be performed.Namely scheduler module is preferentially adjusted It is first communicated with the high controller of weight.
1-14: controller two just carries out the link to the scheduler module of server;
Controller two just carries out including: originally that controller two is towards server with point to the link of the scheduler module of server Link is transmitted to the mode of point and requires message;
1-15: then, the link obtained derived from controller two requires the server of message towards controller two with point-to-point Mode transmits the response message that message is required towards the link;
1-16: controller two obtains this and requires the response message of message towards the link, then just realizes that controller two is right The link of scheduler module;
1-17: reaching between server and controller two and link, and then, can execute message between server and controller two Communication.
Server between controller one or controller two message communication in, set communication granting period, with this, In in message communication, the communication of message starts in communication granting period, however need not all realize in granting period communicating Communication under conditions of communicate in granting period the communication for not realizing messages all, and executes the controller that message communicates, can be with Message communication is also continuously carried out after communication granting period faces, is just terminated until message transmissions are all realized;
So communication granting period can be allowed to be less than the message communication modes having at present in this way, it is possible to reduce communication is permitted Period and corresponding increase, which communicate, forbids period i.e. controller to be located at the duration of blocked state, so, control can be reduced The operation duration of device can be truly realized the consume for reducing controller resource and the power consumption of controller is allowed also to reduce.
In addition, after constructing concurrent link, being reduced to concurrently asking when the concurrent link of building in the message means of communication 25% number of the number for asking the unit time of message to transmit can also terminate the transmitting of concurrent request message to rely on demand To execute transmitting again.
So caused by can really realizing that the communication of the concurrent request message of the not demand after concurrent link building comes The power consumption of controller.
Server is arranged in machine box for server, and machine box for server includes the shell of hollow rectangular-shape, in shell 301 Upper wall surface be connected rectangular-shape locating plate 302 via column connection item, in addition the both sides of 302 upper wall surface of locating plate are connected Motor 303, the shaft of motor 303 are connected sprocket wheel 1, and in addition sprocket wheel 1 and sprocket wheel 2 305 are via chain sleeve-board around chain It takes turns 2 305 and is socketed in cylindric roller 1, one of roller 1 is mutually screwed on the wall surface in shell 301, in addition roller One 306 other end is mutually screwed on one side of limited block, and sprocket wheel 2 305 is the same as between the opposite one side of limited block 307 and being in roller Then cyclic rings shape body 308 is covered on the wall surface of son 1;The upper wall surface of locating plate 302 is connected air exhauster 318, is in addition evacuated The column-like paths 319 of the air exhauster import of machine 318 and both ends perforation, the lower end in channel 319, which penetrates locating plate 302 and is stretched over, determines The inside of the lower section of bit slice 302, the lower end in the channel 319 trapezoidal mesa-shaped shell 320 open and hollow with bottom communicates, shell 320 inside is also to communicate with its bottom opening, and the column that in addition the air exhauster outlet of air exhauster 318 is penetrated through via both ends is logical Road is connected to the hollow container 321 of rectangular-shape.The both sides of 302 lower wall surface of locating plate are all connected sheet limited block 307.Separately The lower wall surface of outer limited block 307 is connected with the lower wall surface in shell 301.The wall surface of ring bodies 308 is screwed on cylindric roller two 309, in addition roller 2 309 is apart from 308 farther column horizontal bars 310 that are connected of ring bodies.Horizontal bar 310 is through limit Block 307 is simultaneously stretched over limited block 307 apart from the farther one side of roller 2 309, and horizontal bar 310 is apart from roller 2 309 farther one Head is fixedly connected with sheet gusset piece 311, and in addition sheet gusset piece 311 joins apart from the farther one side of horizontal bar 310 via sheet Contact pin is connected exhaust fan 312.Ring-shaped guide rail 313 is provided on the wall surface of limited block 307.The same locating plate of the lower wall surface of container 321 302 upper wall surface is connected, and the both sides of the lower wall surface of the lower part and shell 301 on 301 both sides of shell are all provided with openings 314, in addition The inside of openings 314 is connected filter screen 315.The both sides of 301 lower wall surface of the shell strip that is all connected props up bar 316, in addition The lower wall surface for propping up bar 316 is connected rectangular-shape support 317, and the upper wall surface of shell 301 is connected top via column vertical bar Canopy 322, lower wall surface in shell 301 are connected server 323 via plate, and the antetheca of shell 301 is provided with lumen therethrough, is passing through Cover board 324 is covered on cavity, in addition cover board 324 is pivotally connected via hinge with shell 301, and the wall surface of cover board 324, which is connected, helps handle 325.When, motor 303 is just first run, one 304 turn of driving chain sprocket executes rotation via the band movable sprocket 2 305 of carrier bar It is dynamic, one 306 turn of roller is drawn with this, allows the also turn of ring bodies 308, allows company via the drive of roller 2 309 and horizontal bar 310 Fishplate bar 11 then runs exhaust fan 312 in the wall surface turn of limited block 307, executes the exhaust cooling outside to cabinet, in addition runs Air exhauster 318 gathers the particulate contaminant of 301 the inside of shell to container 321 via channel 319.
The present invention is described in a manner of being illustrated with embodiment above, it will be understood by those of skill in the art that this It is open to be not limited to embodiments described above, in the case of without departing from the scope of the present invention, it can make a variety of changes, change And replacement.

Claims (9)

1. a kind of equipment of gravimetric tank feed pipe, which is characterized in that the lead powder gravimetric tank feed pipe including being convenient to clean foreign matter, institute It states and is connected with vibrating screen device on feed pipe, the vibrating screen device includes the supporting plate that edge passes through connecting rod connecting cross beam, described Supporting plate is equipped with vibrating motor, and the feed pipe is made of the docking of two pipelines;
The feed pipe docks the structure formed by two pipelines are as follows: two pipeline is docked by conduit coupling;
The conduit coupling includes central column conduit coupling main body, plastic bar and protecting crust, the conduit coupling main body Including central column hoop one and central column hoop two, the central column hoop one is as two shape size of central column hoop, institute It states central column hoop one and central column hoop two is distributed in opposite directions, the protecting crust is socketed in central column hoop one and central column ring In the outer periphery of hoop two, the protecting crust is used to transmit the effect between central column hoop one and central column hoop two, the annulated column Gap is remain between shape hoop two and the opposite face of central column hoop one, in central column hoop one and central column hoop two It is accordingly provided in outer periphery multiple respectively along the fan circular opening one of central column hoop one and two centerline direction of central column hoop.
2. the equipment of gravimetric tank feed pipe according to claim 1, which is characterized in that phase on the wall surface in the protecting crust Several fan circular openings two should be provided with, the fan circular opening one and the inner surface for fanning circular opening two form the interlocking of plastic bar Mouthful.
3. the equipment of gravimetric tank feed pipe according to claim 1, which is characterized in that the central column hoop two and annulated column The outer periphery of shape hoop one is cyclic annular for fan on the center line of the central column hoop two and central column hoop one respectively.
4. the equipment of gravimetric tank feed pipe according to claim 1, which is characterized in that the protecting crust is central column;
The both sides that protecting crust is in the conduit coupling main body are designed with a sheet barrier flaps, the corresponding modeling in barrier flaps The cyclic annular stop collar for plastic bar is assembled in the position of material bar, and the ring-type stop collar is used to prevent plastic bar from sliding.
5. the equipment of gravimetric tank feed pipe according to claim 4, which is characterized in that the central column hoop one and annulated column Rubber seal ring is set respectively on shape hoop two, is used to respectively between the central column hoop one and rubber seal ring and annulated column Sealing structure is formed between shape hoop two and rubber seal ring.
6. the equipment of gravimetric tank feed pipe according to claim 4, which is characterized in that in the armature spindle of the vibrating motor Upper setting speed probe, the speed probe are connect with controller, and the controller is also connect with communication module, described logical Letter module is connect with server, thus speed probe can be collected rotary speed information and is sent in controller, then via logical Letter module is transmitted in server, and server carries out storage after receiving rotary speed information and transmits paid-in response to controller Information thereby realizes the communication between controller and server;And when the quantity of the vibrating motor is multiple, it is described The armature spindle of vibrating motor i.e. multiple, one speed probe of setting on the armature spindle of a vibrating motor, one The speed probe is connect with a controller, and a controller is connect with a communication module, multiple communications Module connect with a server, and the information of the communication between controller and server is transmitted by way of message, leads to News granting period is the period that message communication is permitted between the whole controllers for executing communication with the server, executes same server Information communication.The communication of message between server and controller all only executes in such communication granting period;Communication is prohibited Only the period is the period except the communication granting period in the whole period, that is to say, that during the period is forbidden in communication, control Device processed is exactly blocked state, and the server includes scheduler module.
7. the method for the equipment of gravimetric tank feed pipe according to claim 1 characterized by comprising rely on central column Hoop two and the outer periphery of central column hoop one are on the center line of the central column hoop two and central column hoop one respectively Fan is cyclic annular, allows a pair of hoop to have corresponding amount of movement with protecting crust, that is, be connected in central column hoop two and central column Two pipelines on hoop one have corresponding mobile space, reduce the concussion to plastic bar with this.
8. the method for the equipment of gravimetric tank feed pipe according to claim 7, which is characterized in that the server setting exists In machine box for server, machine box for server includes shell, and the upper wall surface in shell is connected locating plate via connection item, in addition described The both sides of locating plate upper wall surface are connected motor, and the shaft of motor is connected sprocket wheel one, and in addition sprocket wheel one and sprocket wheel two are via chain Sleeve-board is around sprocket wheel two is socketed in roller one, and one of roller one is mutually screwed on the wall surface in shell, in addition the other end of roller one One side with limited block is mutually screwed on, and sprocket wheel two is the same as between the opposite one side of limited block and being on the wall surface of roller one and cover then ring Shape body;
The upper wall surface of the locating plate is connected air exhauster, and in addition the air exhauster import of air exhauster and channel, the lower end in channel are saturating It crosses locating plate and is stretched over the lower section of locating plate, the lower end in channel is communicated with the inside of shell, and in addition the air exhauster of air exhauster goes out Mouth is connected to container via channel.
9. the method for the equipment of gravimetric tank feed pipe according to claim 8, which is characterized in that the locating plate lower wall surface Both sides be all connected limited block;
In addition the lower wall surface of the limited block is connected with the lower wall surface in shell;
The wall surface of the ring bodies is screwed on roller two, and in addition roller two is apart from the farther horizontal bar that is connected of ring bodies;
The horizontal bar is through limited block and is stretched over limited block apart from the farther one side of roller two, and the horizontal bar is apart from roller Two farther one be fixedly connected with sheet gusset piece, in addition sheet gusset piece is apart from the farther one side of horizontal bar via plate Be connected exhaust fan;
Ring-shaped guide rail is provided on the wall surface of the limited block.
CN201811209362.6A 2018-10-17 2018-10-17 The device and method thereof of gravimetric tank feed pipe Withdrawn CN109269618A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811209362.6A CN109269618A (en) 2018-10-17 2018-10-17 The device and method thereof of gravimetric tank feed pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811209362.6A CN109269618A (en) 2018-10-17 2018-10-17 The device and method thereof of gravimetric tank feed pipe

Publications (1)

Publication Number Publication Date
CN109269618A true CN109269618A (en) 2019-01-25

Family

ID=65192857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811209362.6A Withdrawn CN109269618A (en) 2018-10-17 2018-10-17 The device and method thereof of gravimetric tank feed pipe

Country Status (1)

Country Link
CN (1) CN109269618A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113639841A (en) * 2020-05-11 2021-11-12 梅特勒-托利多(常州)精密仪器有限公司 Integrated high-precision weighing module

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113639841A (en) * 2020-05-11 2021-11-12 梅特勒-托利多(常州)精密仪器有限公司 Integrated high-precision weighing module

Similar Documents

Publication Publication Date Title
CN204619587U (en) A kind of automatically cleaning filter screen
CN104740947A (en) Filter net dust removing structure
CN109269618A (en) The device and method thereof of gravimetric tank feed pipe
CN205093546U (en) Kelp cleaning machine
CN205312699U (en) Bucket wheel machine dust collecting installation
CN211641875U (en) Charger air-cooled heat dissipation device
CN206372764U (en) A kind of oscillatory type mixer
CN102528956A (en) Modular combined on-line recycling treatment system for drained slurry generated by cutting silicon crystal using multi-wire-saw
CN205570237U (en) Fodder stirring dust collector
CN204511912U (en) A kind of Double-impeller type proof submersible sand discharging pump
CN205797728U (en) A kind of particle sizer used in curdlan gel particle
CN202538663U (en) Linear cutting mortar preparation device
CN205762194U (en) A kind of rotary screen
CN206996354U (en) Mixer with the net wind apparatus of air draft
CN211677135U (en) Rotational flow anti-crystallization washing tower equipment
CN202245215U (en) Residual material cleaning device for engine base at tail part of self-cleaning type hoister
CN207102225U (en) Wet mixed type off-gas cleaning equipment
CN206660799U (en) A kind of sack cleaner
CN206560722U (en) A kind of skew screening liquid-solid separator
CN215506172U (en) Tunnel construction air purification device
CN205392336U (en) Pelletization sword
CN205223320U (en) Zinc hydrometallurgy purifies additive preprocessing device with washing function
CN214293327U (en) Cutting knife of feed additive processing usefulness
CN219363365U (en) Ship flue gas washing desulfurization wastewater treatment device
CN220766994U (en) Dry-type fermenting installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190125

WW01 Invention patent application withdrawn after publication