CN109268068A - Method for predicting surface subsidence control value caused by subway tunnel construction in frozen soil area - Google Patents

Method for predicting surface subsidence control value caused by subway tunnel construction in frozen soil area Download PDF

Info

Publication number
CN109268068A
CN109268068A CN201811102508.7A CN201811102508A CN109268068A CN 109268068 A CN109268068 A CN 109268068A CN 201811102508 A CN201811102508 A CN 201811102508A CN 109268068 A CN109268068 A CN 109268068A
Authority
CN
China
Prior art keywords
caused
frozen
ground
tunnel
surface subsidence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811102508.7A
Other languages
Chinese (zh)
Inventor
孙礼超
张壮
徐红
秦拥军
孟宪国
董福龙
王国利
马佳
杨子甲
罗明山
于江
于广明
刘洪源
王建虎
梁芮
王翀
曾宪坤
李影
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Urumqi Urban Rail Group Co ltd
Xinjiang University
Qingdao University of Technology
Original Assignee
Urumqi Urban Rail Group Co ltd
Xinjiang University
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urumqi Urban Rail Group Co ltd, Xinjiang University, Qingdao University of Technology filed Critical Urumqi Urban Rail Group Co ltd
Priority to CN201811102508.7A priority Critical patent/CN109268068A/en
Publication of CN109268068A publication Critical patent/CN109268068A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to the technical field of subway tunnel engineering, in particular to a method for predicting a control value of surface subsidence caused by subway tunnel construction in a frozen soil area, which comprises the following steps: determining the surface subsidence W (1) caused by tunnel excavation; the second step is that: calculating the ground rise W caused by freezing2(X); the third step: calculating the surface subsidence W caused by the melting of the frozen soil3(X); the fourth step: by using the sinking of the earth's surface W (1) caused by tunnel excavation and the rising of the earth's surface W caused by freezing2(X) surface subsidence W caused by thawing frozen soil3(X) calculating the final surface subsidence W (X) of each point of the surface. The method and the device complete the prediction of the surface subsidence caused by the subway tunnel construction in the frozen soil region, comprehensively consider the factors such as the stability of surrounding rocks, surface buildings, underground pipelines and the like, respectively determine the allowable surface subsidence values, take the minimum value as a control reference value, improve the accuracy and the reliability of the prediction of the surface subsidence caused by the subway tunnel construction in the frozen soil region, and are more favorable for providing reliable data reference for actual construction.

Description

Frozen Ground Area constructing metro tunnel causes the prediction technique of surface settlement control value
Technical field
It is that a kind of Frozen Ground Area constructing metro tunnel causes earth's surface the present invention relates to a kind of Metro Tunnel technical field The prediction technique of raft foundation stress.
Background technique
With the rapid development of society, urban population is intensive, and space is crowded, traffic jam, and development and utilization Urban Underground is empty Between be 21 century urban development the only way which must be passed, in the world many scholars will 21 century be referred to as " underground space development Century ", at present in rejuvenating the northeast and the construction tide of development of the West Regions, extremely frigid zones will will appear it is more and more building or The tunnel in cold area built up.Cold area's permafrost tunnel is more sensitive to water and heat due to forming with special country rock, can generate Many diseases.Such as since soil layer freezes frost heave to be occurred, causing land upheaval, melting when frozen soil thaws will appear thaw collapse again, Cause surface subsidence, so that frost heave and thaw collapse phenomenon can generate adverse effect to the construction in tunnel.Various countries are in construction Han Qu many years Serious disease was all once encountered in frozen soil tunnel, construction unit can take a substantial amount of time in treatment procedure, while also increase Construction cost is added.
Summary of the invention
The present invention provides the prediction techniques that a kind of Frozen Ground Area constructing metro tunnel causes surface settlement control value, overcome The deficiency of the above-mentioned prior art, can effectively solve existing in the prior art cannot draw Frozen Ground Area constructing metro tunnel Play the problem of ground settlement is predicted, is unfavorable for practice of construction.
The technical scheme is that being realized by following measures: a kind of Frozen Ground Area constructing metro tunnel causes ground The prediction technique of table raft foundation stress, comprising the following steps:
Step 1: determine surface subsidence W (1) caused by tunnel excavation, it is specific as follows:
(1) the ground settlement value S at tunnel center line lateral distance x is calculatedX, calculation formula is shown below:
Wherein, V is tunnel excavation unit length Stratum Loss amount;
(2) earth's surface maximum settlement value S is calculated according to earth's surface sedimentation valueMAX, calculation formula is shown below:
(3) surface subsidence curve inflection point is taken as at a distance from far point, determines subsider spread factor;
Wherein, Φ is the internal friction angle of the soil body, and H is distance of the tunnel vault to earth's surface, and R is tunnel radius;
(4) formula (1) is brought into formula (2), calculates surface subsidence W (1) caused by tunnel excavation;
Step 2: calculating the ground caused by freezing rises W2(X);
Step 3: calculating frozen soil melts caused surface subsidence W3(X);
Step 4: using surface subsidence W (1) caused by tunnel excavation, freezing caused ground rising W2(X) melt with frozen soil Surface subsidence W caused by changing3(X) the final surface subsidence W (X) of earth's surface each point is calculated, calculation formula is as follows
W (X)=W (1)+W2(X)+W3(X)。
Here is the further optimization and/or improvements to invention technology described above scheme:
Above-mentioned second step calculates the protuberance W of the ground each point caused by freezing2(X) detailed process is as follows:
(1) frozen-heave coefficient ε is calculated1, calculation formula is as follows:
Wherein: h freezes length for ground;△ h is the frost heaving amount of ground;
(2) one dot element of earth's surface generated when ground is excavated away from the underground unit expander d ε d η at earth's surface η is calculated Swell We(X), calculation formula is as follows:
(3) one dot element of earth's surface caused by each unit expansion d ε d η swells We(X) it is overlapped in earth's surface, Freezing stratum as rapid Caused ground rises W2(X) as follows:
Wherein: Ω is frozen region.
Above-mentioned third step calculates frozen soil and melts caused surface subsidence W3(X) detailed process is as follows:
(1) frozen-heave coefficient ε is calculated2, calculation formula is as follows:
Wherein: h is the melt layer thickness of frozen soil;△ h is that the stabilization of frozen soil melts contracting amount;
(2) tunnel excavation section is set as circle, and initial radium A, tunnel builds up rear radius uniform shrinkage △ A;Ground When layer freezes to complete, the outer radius for freezing ring is R, and after tunnel is built up, the outer radius of ring is freezed on stratum after the completion of freezing before thawing R3It is as follows to melt contracting amount △ R difference for the radial direction of frozen soil after thawing with stratum:
R3=R- Δ A (9)
Δ R=ε2(R3-A) (10)
(3) it calculates frozen soil and melts caused surface subsidence W3(X);
Wherein: r1=R- Δ A- ε2(R-ΔA-A);r2=R- Δ A;θ1=0;θ2=2 π.
The present invention by surface subsidence W (1) caused by tunnel excavation, freeze caused by ground rise W2(X) melt with frozen soil Caused surface subsidence W3(X) it is overlapped, determines the final surface subsidence W during the constructing metro tunnel of Frozen Ground Area (X), so as to complete causing the prediction of ground settlement to Frozen Ground Area constructing metro tunnel, and comprehensively considered adjoining rock stability, The factors such as surface buildings, underground utilities determine that it allows ground settlement value respectively, and take its minimum value as control benchmark Value, improves the accuracy and reliability for causing Ground surface settlement to Frozen Ground Area constructing metro tunnel, is more advantageous to as reality Border construction provides reliable data reference.
Detailed description of the invention
Attached drawing 1 is flow chart of the invention.
Attached drawing 2 is that cell cube of the invention expands land upheaval schematic diagram.
Attached drawing 3 is frozen soil thaw collapse surface subsidence schematic diagram of the invention.
Specific embodiment
The present invention is not limited by the following examples, can determine according to the technique and scheme of the present invention with actual conditions specific Embodiment.
Below with reference to examples and drawings, the invention will be further described:
Embodiment 1: as shown in attached drawing 1,2, which causes the prediction of surface settlement control value Method, it is characterised in that the following steps are included:
Step 1: determine surface subsidence W (1) caused by tunnel excavation, it is specific as follows:
(1) the ground settlement value S at tunnel center line lateral distance x is calculatedX, calculation formula is shown below:
Wherein, V is tunnel excavation unit length Stratum Loss amount;
(2) earth's surface maximum settlement value S is calculated according to earth's surface sedimentation valueMAX, calculation formula is shown below:
(3) surface subsidence curve inflection point is taken as at a distance from far point, determines subsider spread factor;
Wherein, Φ is the internal friction angle of the soil body, and H is distance of the tunnel vault to earth's surface, and R is tunnel radius;
(4) formula (1) is brought into formula (2), calculates surface subsidence W (1) caused by tunnel excavation;
Step 2: calculating the ground caused by freezing rises W2(X);
Step 3: calculating frozen soil melts caused surface subsidence W3(X);
Step 4: using surface subsidence W (1) caused by tunnel excavation, freezing caused ground rising W2(X) melt with frozen soil Surface subsidence W caused by changing3(X) the final surface subsidence W (X) of earth's surface each point is calculated, calculation formula is as follows
W (X)=W (1)+W2(X)+W3(X)。
According to China " railway tunnel shotcrete bolt construction method technical specification " (TB10108-2002), " anchor sprayed concrete branch Protect technical specification " (GB50086-2001) and " vcehicular tunnel design specification " (JTGD70-2004), and by referring to external related Data and to the measured data of some engineerings in China it is for statistical analysis on the basis of, determine that permission phase is enclosed in hole as shown in Table 1 To shift value, i.e. the opposite convergency value of permission is enclosed in hole;1) relative displacement refers to measured displacements value and two side points apart from it in table 1 Than or the ratio between crown displacement value and tunnel width;2) hard surrounding rock gets the small value, and weak surrounding rock takes large values.
When it is implemented, the actual measurement relative displacement of tunnel perimeter arbitrary point should be less than specified value, therefore when displacement speed When rate is without being decreased obviously, actual measurement relative displacement has been approached specified value in table, or when supporting concrete surface has occurred obviously When crack, it is necessary to take reinforcement measure, and change construction method;General convergence management reference value is set to: convergent deformation speed 3mm/d to 4mm/d, maximum deformation value 20mm to 50mm;
The domestic and international subway engineering construction metric data administrative standard table of comparisons as shown in Table 2 can be established from above, according to this Surface subsidence W (1) caused by tunnel excavation can be set as 30MM by table, the present invention.
The present invention by surface subsidence W (1) caused by tunnel excavation, freeze caused by ground rise W2(X) melt with frozen soil Caused surface subsidence W3(X) it is overlapped, determines the final surface subsidence W during the constructing metro tunnel of Frozen Ground Area (X), so as to complete causing the prediction of ground settlement to Frozen Ground Area constructing metro tunnel, and comprehensively considered adjoining rock stability, The factors such as surface buildings, underground utilities determine that it allows ground settlement value respectively, and take its minimum value as control benchmark Value, improves the accuracy and reliability for causing Ground surface settlement to Frozen Ground Area constructing metro tunnel, is more advantageous to as reality Border construction provides reliable data reference.
Here is the further optimization and/or improvements to invention technology described above scheme:
As shown in Figure 1, 2, second step calculates the protuberance W of the ground each point caused by freezing2(X) detailed process is as follows:
(1) frozen-heave coefficient ε is calculated1, calculation formula is as follows:
Wherein: h freezes length for ground;△ h is the frost heaving amount of ground;
Above-mentioned frozen-heave coefficient ε1For the index for reflecting ground frost heave power, it refers to that frost heave caused by unit frost heave length increases It measures, the soil body power that frost heave is displaced and deforms in appearance is indicated in the present invention.
(2) one dot element of earth's surface generated when ground is excavated away from the underground unit expander d ε d η at earth's surface η is calculated Swell We(X), calculation formula is as follows:
Here ground generates frost heave after freezing in stratum, and ground volume is caused to increase, and frost heave action is reacted to ground surface, i.e., Cause land upheaval.As shown in Fig. 2, under the conditions of plane deformation, the ground away from the underground unit expander d ε d η generation at earth's surface η One dot element of table swells We(X) as shown in formula (6).
(3) one dot element of earth's surface caused by each unit expansion d ε d η swells We(X) it is overlapped in earth's surface, Freezing stratum as rapid Caused ground rises W2(X) it is shown below:
Wherein: Ω is frozen region.
Set frozen-heave coefficient ε1, when Freezing stratum as rapid is completed, freeze the outer radius of ring from R1It is expanded to R, therefore Freezing stratum as rapid is drawn The ground risen rises W2(X) it can be deformed into following formula:
Wherein: r1=R1;r2=R;θ1=0;θ2=2 π.
Ground caused by above-mentioned Freezing stratum as rapid rises in aqueous topsoil or weathered rocks, when temperature is reduced to Freezing temperature or it is lower when, most of water freezes and is cemented to solid particle in Rock And Soil, forms frozen soil;The formation of frozen soil Journey, the process of crack water freezing and cementing solid particle actually in the soil body;In soil water can be divided into absorption water, film water and Free water, adsorbs water and film water content in soil is seldom, and absorption water, which will arrive -180 DEG C, can just freeze, and film water will arrive -20 DEG C Could all it freeze to -30 DEG C;And Free water is present in ground gap, as light water, freezes at normal atmospheric pressure Point is 0 DEG C;Therefore in construction freezing method, mainly freeze Free water, it in rock-soil layer content number, directly affect and freeze Effect;At normal atmospheric pressure, water volume of build-uping ice will increase 9%, and the soil body is when freezing, original crevice water in the one side soil body Glaciation, in addition for the moisture of non-frozen fraction constantly to the migration of peak face, aggregation is freezed, water freezing causes ground volume expansion, Frost heave action of this phenomenon soil, abbreviation frost heave.The frost heave of ground is that Free water is build-up ice caused ground in freezing process The sum of reexpansion caused by expansion and water translocation.
The many factors such as frost heave and soil body grain diameter, the mineral composition of the soil body and the water content of soil are related, also with soil Freezing speed it is related.It is generally not in apparent frost heaving for sand, this kind of stratum of gravel;Frost heave mainly occurs In the freezing process of sticky soil property.For weak soil, soil nature mainly has silt clay, clay and silty clay etc., contains Water is generally higher, has stronger frost heaving characteristic.
As shown in Figure 1,3, third step calculates surface subsidence W caused by frozen soil thawing3(X) detailed process is as follows:
(1) frozen-heave coefficient ε is calculated2, calculation formula is as follows:
Wherein: h is the melt layer thickness of frozen soil;△ h is that the stabilization of frozen soil melts contracting amount;
(2) as shown in figure 3, setting tunnel excavation section as circle, initial radium A, tunnel builds up rear radius and uniformly receives Contracted △ A;When Freezing stratum as rapid is completed, the outer radius for freezing ring is R, and after tunnel is built up, stratum is freezed before thawing after the completion of freezing The outer radius R of ring3It is as follows to melt contracting amount △ R difference for the radial direction of frozen soil after thawing with stratum:
R3=R- Δ A (9)
Δ R=ε2(R3-A) (10)
(3) it calculates frozen soil and melts caused surface subsidence W3(X);
Wherein: r1=R- Δ A- ε2(R-ΔA-A);r2=R- Δ A;θ1=0;θ2=2 π.
The above technical characteristic constitutes highly preferred embodiment of the present invention, with stronger adaptability and best implementation effect Fruit can increase and decrease non-essential technical characteristic, according to actual needs to meet the needs of different situations.
Enclose the opposite convergency value of permission in 1 hole of table
The domestic and international subway engineering of the table 2 construction metric data administrative standard table of comparisons

Claims (3)

1. the prediction technique that a kind of Frozen Ground Area constructing metro tunnel causes surface settlement control value, it is characterised in that including following Step:
Step 1: determine surface subsidence W (1) caused by tunnel excavation, it is specific as follows:
(1) the ground settlement value S at tunnel center line lateral distance x is calculatedX, calculation formula is shown below:
Wherein, V is tunnel excavation unit length Stratum Loss amount;
(2) earth's surface maximum settlement value S is calculated according to earth's surface sedimentation valueMAX, calculation formula is shown below:
(3) surface subsidence curve inflection point is taken as at a distance from far point, determines subsider spread factor;
Wherein, Φ is the internal friction angle of the soil body, and H is distance of the tunnel vault to earth's surface, and R is tunnel radius;
(4) formula (1) is brought into formula (2), calculates surface subsidence W (1) caused by tunnel excavation;
Step 2: calculating the ground caused by freezing rises W2(X);
Step 3: calculating frozen soil melts caused surface subsidence W3(X);
Step 4: using surface subsidence W (1) caused by tunnel excavation, freezing caused ground rising W2(X) and frozen soil melts institute Caused surface subsidence W3(X) the final surface subsidence W (X) of earth's surface each point is calculated, calculation formula is as follows
W (X)=W (1)+W2(X)+W3(X)。
2. Frozen Ground Area constructing metro tunnel according to claim 1 causes the prediction technique of surface settlement control value, It is characterized in that second step calculates the protuberance W of the ground each point caused by freezing2(X) detailed process is as follows:
(1) frozen-heave coefficient ε is calculated1, calculation formula is as follows:
Wherein: h freezes length for ground;△ h is the frost heaving amount of ground;
(2) it calculates when ground excavates, swells W away from one dot element of earth's surface that the underground unit expander d ε d η at earth's surface η is generatede (X), calculation formula is as follows:
(3) one dot element of earth's surface caused by each unit expansion d ε d η swells We(X) it is overlapped in earth's surface, caused by Freezing stratum as rapid Ground rises W2(X) as follows:
Wherein: Ω is frozen region.
3. Frozen Ground Area constructing metro tunnel according to claim 1 or 2 causes the prediction technique of surface settlement control value, It is characterized in that third step, which calculates frozen soil, melts caused surface subsidence W3(X) detailed process is as follows:
(1) frozen-heave coefficient ε is calculated2, calculation formula is as follows:
Wherein: h is the melt layer thickness of frozen soil;△ h is that the stabilization of frozen soil melts contracting amount;
(2) tunnel excavation section is set as circle, and initial radium A, tunnel builds up rear radius uniform shrinkage △ A;Stratum is frozen When knot is completed, the outer radius for freezing ring is R, and after tunnel is built up, the outer radius R of ring is freezed on stratum after the completion of freezing before thawing3With It is as follows to melt contracting amount △ R difference for the radial direction of frozen soil after stratum thaws:
R3=R- Δ A (9)
Δ R=ε2(R3-A) (10)
(3) it calculates frozen soil and melts caused surface subsidence W3(X);
Wherein: r1=R- Δ A- ε2(R-ΔA-A);r2=R- Δ A;θ1=0;θ2=2 π.
CN201811102508.7A 2018-09-20 2018-09-20 Method for predicting surface subsidence control value caused by subway tunnel construction in frozen soil area Pending CN109268068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811102508.7A CN109268068A (en) 2018-09-20 2018-09-20 Method for predicting surface subsidence control value caused by subway tunnel construction in frozen soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811102508.7A CN109268068A (en) 2018-09-20 2018-09-20 Method for predicting surface subsidence control value caused by subway tunnel construction in frozen soil area

Publications (1)

Publication Number Publication Date
CN109268068A true CN109268068A (en) 2019-01-25

Family

ID=65197252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811102508.7A Pending CN109268068A (en) 2018-09-20 2018-09-20 Method for predicting surface subsidence control value caused by subway tunnel construction in frozen soil area

Country Status (1)

Country Link
CN (1) CN109268068A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113515880A (en) * 2021-03-11 2021-10-19 中国市政工程中南设计研究总院有限公司 Freeze swelling and thaw collapse deformation mechanism research method and device based on deep learning near-sea large shield tunnel freezing method
CN115114709A (en) * 2022-06-13 2022-09-27 安徽理工大学 Prediction method for three-dimensional melting-sinking deformation of subway tunnel freezing method construction stratum

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015402A (en) * 2012-12-27 2013-04-03 南京林业大学 Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN104965994A (en) * 2015-07-17 2015-10-07 青岛理工大学 Method for measuring and estimating characteristic parameters of surface subsidence caused by subway tunnel construction
CN106934251A (en) * 2017-04-25 2017-07-07 浙江大学城市学院 A kind of calculation of ground surface settlement method in class rectangle shield tunnel construction
CN107153770A (en) * 2017-05-16 2017-09-12 宁波市交通建设工程试验检测中心有限公司 A kind of Forecasting Methodology of Unevenly-pressured shallow tunnel ground settlement deformation
CN107560596A (en) * 2017-08-21 2018-01-09 上海山南勘测设计有限公司 A kind of method for measuring settlement difference

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015402A (en) * 2012-12-27 2013-04-03 南京林业大学 Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN104965994A (en) * 2015-07-17 2015-10-07 青岛理工大学 Method for measuring and estimating characteristic parameters of surface subsidence caused by subway tunnel construction
CN106934251A (en) * 2017-04-25 2017-07-07 浙江大学城市学院 A kind of calculation of ground surface settlement method in class rectangle shield tunnel construction
CN107153770A (en) * 2017-05-16 2017-09-12 宁波市交通建设工程试验检测中心有限公司 A kind of Forecasting Methodology of Unevenly-pressured shallow tunnel ground settlement deformation
CN107560596A (en) * 2017-08-21 2018-01-09 上海山南勘测设计有限公司 A kind of method for measuring settlement difference

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蔡海兵: "地铁隧道水平冻结工程地层冻胀融沉的预测方法及工程应用", 《《中国博士学位论文全文数据库 工程科技Ⅱ辑》》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113515880A (en) * 2021-03-11 2021-10-19 中国市政工程中南设计研究总院有限公司 Freeze swelling and thaw collapse deformation mechanism research method and device based on deep learning near-sea large shield tunnel freezing method
CN115114709A (en) * 2022-06-13 2022-09-27 安徽理工大学 Prediction method for three-dimensional melting-sinking deformation of subway tunnel freezing method construction stratum
CN115114709B (en) * 2022-06-13 2024-04-19 安徽理工大学 Prediction method for three-dimensional thawing deformation of subway tunnel freezing method construction stratum

Similar Documents

Publication Publication Date Title
Kang et al. Combined freeze-sealing and New Tubular Roof construction methods for seaside urban tunnel in soft ground
Chou et al. Predictions of ground deformations in shallow tunnels in clay
Lin et al. Key techniques and important issues for slurry shield under-passing embankments: a case study of Hangzhou Qiantang River Tunnel
Liu et al. Geological investigation and treatment measures against water inrush hazard in karst tunnels: A case study in Guiyang, southwest China
CN105804761B (en) Construction method suitable for liquefied sand stratum shield near-distance passing through building
CN108560568A (en) A kind of high roadbed tunnel off-load safeguard structure and its construction method
CN108843328A (en) A kind of Metro Connection Passage excavation construction support construction method
CN109236367A (en) A kind of tunnel structure and its frozen construction method with antiseepage drain function
Wen et al. Managing ice-rich permafrost exposed during cutting excavation along Qinghai–Tibetan railway: Experiences and implementation
CN109268068A (en) Method for predicting surface subsidence control value caused by subway tunnel construction in frozen soil area
Rui et al. Full-scale model test on prevention of frost heave of L-type retaining wall
Wang et al. Thermal and mechanical response of soil and tunnel during replacement of shield tail brush by freezing method
Hu et al. Numerical simulation of temperature field at the active freeze period in tunnel construction using freeze-sealing pipe roof method
CN101768960B (en) Bored concrete pile construction method of permafrost layer
Guo et al. Two-phase closed thermosyphon-induced frost jacking of piles and foundation instability in a thawed permafrost area
CN207919567U (en) High roadbed tunnel off-load safeguard structure
CN110528539A (en) A kind of Construction of Civil Engineering method quickly handling mud-rock flow, landslide collapsing using weatherability woven bag
CN217354369U (en) Rich water sandy stratum shield tunnel originated and made a start freezing reinforced structure
Yu et al. Particularity and prediction method of ground settlement caused by subway tunnel construction in permafrost area
CN208416542U (en) A kind of flare sidewall horizontal for 8 pilot tunnel PBA engineering methods makes bottom basin shape and freezes water sealing structure
Kyrou et al. The first 30 years of Lefkara Dam
Kudryavtsev et al. Geotechnical forecast of the construction of structures in conditions of degrading permafrost soils
Rykaart et al. Frozen Core Tailings Dam: Part 2, Long-Term Creep Deformation
Tanaka et al. Expansion of existing TBM tunnel by ground freezing method
Meng et al. Characteristics of deformation and defect of shield tunnel in coastal structured soil in China

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190125