CN109257777A - A kind of switching method, first base station, terminal and computer readable storage medium - Google Patents

A kind of switching method, first base station, terminal and computer readable storage medium Download PDF

Info

Publication number
CN109257777A
CN109257777A CN201710573702.2A CN201710573702A CN109257777A CN 109257777 A CN109257777 A CN 109257777A CN 201710573702 A CN201710573702 A CN 201710573702A CN 109257777 A CN109257777 A CN 109257777A
Authority
CN
China
Prior art keywords
base station
preference
source
request
master base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710573702.2A
Other languages
Chinese (zh)
Other versions
CN109257777B (en
Inventor
李娜
刘亮
谢芳
陈卓
杨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Communications Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Communications Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Communications Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201710573702.2A priority Critical patent/CN109257777B/en
Priority to PCT/CN2018/095263 priority patent/WO2019011271A1/en
Publication of CN109257777A publication Critical patent/CN109257777A/en
Application granted granted Critical
Publication of CN109257777B publication Critical patent/CN109257777B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/24Reselection being triggered by specific parameters
    • H04W36/30Reselection being triggered by specific parameters by measured or perceived connection quality data
    • H04W36/304Reselection being triggered by specific parameters by measured or perceived connection quality data due to measured or perceived resources with higher communication quality
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0011Control or signalling for completing the hand-off for data sessions of end-to-end connection
    • H04W36/0027Control or signalling for completing the hand-off for data sessions of end-to-end connection for a plurality of data sessions of end-to-end connections, e.g. multi-call or multi-bearer end-to-end data connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0083Determination of parameters used for hand-off, e.g. generation or modification of neighbour cell lists
    • H04W36/00837Determination of triggering parameters for hand-off
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/08Reselecting an access point

Abstract

The embodiment of the invention provides a kind of switching method, first base station, terminal and computer readable storage medium, which includes: to obtain terminal UE measurement result and UE preference;The second base station is determined according to UE measurement result and UE preference, sends switching request to second base station;Wherein, the UE measurement result is that UE according to the measurement that the first base station issues reports relevant parameter measurement to obtain, and it be the first base station based on UE preference is that the UE is configured that the measurement, which reports relevant parameter,.It realizes the switching based on UE preference, UE is made preferentially to be switched to the base station that can guarantee its high data rate.

Description

A kind of switching method, first base station, terminal and computer readable storage medium
Technical field
The present invention relates to field of communication technology more particularly to a kind of switching method, first base station, terminals and computer-readable Storage medium.
Background technique
With the rapid development of the emerging communication technology such as mobile Internet, cloud computing, Internet of Things, machine type communication, letter Breath society enters the big data era of networking.The quickly global mobile data of universal Intelligent mobile terminal applies boosting Flow increases substantially.It is expected that 5G (the 5th third-generation mobile communication technology) is achievable faster by ten than 4G (fourth generation mobile communication technology) Times or more transmission rate, i.e. the transmission rate of 5G will reach 1Gb/s.
In order to guarantee higher transmission rate, a kind of possible solution be allow terminal remain multi-connection or Dual link makes terminal be difficult to be switched on the carrier wave for not supporting dual link.By doubly-linked connection technology, terminal can be connected in parallel to Bit-rate performance is improved by multiple downstream data flows, while improving signal strength in two base stations.
And in existing handoff technique, the switching flow for guaranteeing UE (terminal) high data rate is not provided.
Summary of the invention
In view of above-mentioned technical problem, the embodiment of the present invention provides a kind of switching method, first base station, terminal and computer can Storage medium is read, UE is made preferentially to be switched to the base station that can guarantee its high data rate.
The first aspect of embodiment according to the present invention provides a kind of switching method, is applied to first base station, packet It includes:
Obtain UE measurement result and UE preference;
The second base station is determined according to UE measurement result and UE preference, sends switching request to second base station.
Optionally, the first base station is source master base station, and second base station is purpose base station;The switching request is used for Indicate the switching flow that the purpose base station triggers execute source master base station and source prothetic group station is switched to purpose base station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate It is constant that the purpose master base station triggering execution keeps UE to connect with source prothetic group station, and source master base station is only switched to purpose master base station Process;Or
The first base station is source master base station, and second base station is source prothetic group station;The switching request is used to indicate institute State the process that the auxiliary base station triggers in source execute the role exchange switched between source master base station and source prothetic group station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate The purpose master base station triggering, which is executed from the dual link at source master base station and source prothetic group station, is switched to purpose master base station and purpose prothetic group The process for the new dual link stood.
Optionally, source master base station is carried in the switching request and discharges request message, which discharges request message It is used to indicate whether source of release master base station.
Optionally, the acquisition UE preference, comprising:
Preference PowerPrefIndication of the UE to power consumption, the preference to high data rate and right are sent to UE One or more preference requests in the preference of dual link;
Obtain the preference to power consumption, the preference to high data rate and to one in the preference of dual link that UE is reported Item is multinomial.
Optionally, the preference request is handed down to UE by RRC reconfiguration message;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
Optionally, the acquisition UE is reported the preference to power consumption, the preference to high data rate and to multi-connection Preference in it is one or more, comprising:
By receive terminal auxiliary information UEAssistanceInformation obtain UE report to the inclined of power consumption It is one or more in the good, preference to high data rate and the preference to multi-connection;Or
By receive terminal ability information UECapabilityInformation message obtain UE report to power consumption Preference, one or more in the preference to high data rate and the preference to multi-connection.
Optionally, the switching method further include:
The UE preference reported according to UE reports relevant parameter for UE configuration measurement;
Relevant parameter is reported to be sent to UE the measurement configured for UE.
The second aspect according to an embodiment of the present invention additionally provides a kind of switching method, is applied to UE, comprising:
UE measurement result and UE preference are sent to first base station;
Wherein, the UE measurement result is that UE is reported according to the measurement based on the configuration of UE preference that the first base station issues Relevant parameter measurement obtains.
It is optionally, described to send UE preference to first base station, comprising:
UE that the first base station is sent is received to preference PowerPrefIndication, UE of power consumption to high number According to the preference and UE of rate to one or more preference requests in the preference of dual link;
The preference to power consumption, the preference to high data rate are sent to the first base station and to the preference of dual link In it is one or more.
Optionally, the preference request carries in RRC reconfiguration message;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
Optionally, described to send the preference to power consumption, the preference to high data rate and right to the first base station It is one or more in the preference of dual link, comprising:
It is sent to the first base station to power consumption by terminal auxiliary information UEAssistanceInformation It is one or more in preference, the preference to high data rate and the preference to dual link;Or
It is sent to the first base station to function by receiving terminal ability information UECapabilityInformation message It is one or more in preference, the preference to high data rate and the preference to multi-connection that rate consumes.
In terms of third according to an embodiment of the present invention, a kind of first base station is additionally provided, comprising: first processor, the One receiver and the first transmitter, wherein
First receiver is for obtaining terminal UE measurement result and UE preference;
First transmitter, for determining the second base station according to UE measurement result and UE preference, to second base station Send switching request;
Optionally, the first base station is source master base station, and second base station is purpose base station;The switching request is used for Indicate the switching flow that the purpose base station triggers execute source master base station and source prothetic group station is switched to purpose base station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate It is constant that the purpose master base station triggering execution keeps UE to connect with source prothetic group station, and source master base station is only switched to purpose master base station Process;Or
The first base station is source master base station, and second base station is source prothetic group station;The switching request is used to indicate institute State the process that the auxiliary base station triggers in source execute the role exchange switched between source master base station and source prothetic group station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate The purpose master base station triggering, which is executed from the dual link at source master base station and source prothetic group station, is switched to purpose master base station and purpose prothetic group The process for the new dual link stood.
Optionally, source master base station is carried in the switching request and discharges request message, which discharges request message It is used to indicate whether source of release master base station.
Optionally, first transmitter is further used for: for sending UE to the preference of power consumption to UE One or more preferences in PowerPrefIndication, the preference to high data rate and the preference to dual link are asked It asks;
First receiver is further used for: for obtaining that UE reports to the preference of power consumption, to high data speed The preference of rate and to one or more in the preference of dual link.
Optionally, the preference request is handed down to UE by RRC reconfiguration message;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
Optionally, the first processor is used for from the received terminal auxiliary information of first receiver In UEAssistanceInformation obtain UE report the preference to power consumption, the preference to high data rate and To one or more in the preference of multi-connection;Or
The first processor is used for from the received terminal ability information of the first receiver UECapabilityInformation message obtain UE report the preference to power consumption, the preference to high data rate with And to one or more in the preference of multi-connection.
Optionally, the UE preference that the first processor is also used to be reported according to UE reports related ginseng for UE configuration measurement Number;
First transmitter is also used to relevant parameter will be reported to be sent to UE for the measurement of UE configuration.
The 4th aspect according to an embodiment of the present invention, additionally provides a kind of terminal UE, comprising: second receiver, second Transmitter and second processor, in which:
Second transmitter is used to send UE measurement result and UE preference to first base station.
Optionally, the second receiver is used to receive preference of the UE to power consumption of the first base station transmission PowerPrefIndication, UE are to the preference of high data rate and UE to one or more inclined in the preference of dual link Good request;
Second transmitter is also used to send to the first base station to the preference of power consumption, to high data rate Preference and to one or more in the preference of dual link.
Optionally, the preference request carries in RRC reconfiguration message;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
Optionally, second transmitter be also used to by terminal auxiliary information UEAssistanceInformation to The first base station send the preference to power consumption, the preference to high data rate and to one in the preference of dual link or It is multinomial;Or
Second transmitter be also used to by receive terminal ability information UECapabilityInformation message to Preference of the first base station to power consumption, the preference to high data rate and to one or more in the preference of multi-connection ?.
5th aspect of embodiment according to the present invention, additionally provides a kind of first base station, comprising: memory, processing It device and saves on a memory and the computer program that can run on a processor, when processor execution described program is realized Step in switching method as described above.
The 6th of embodiment according to the present invention aspect, additionally provides a kind of terminal, comprising: memory, processor and The computer program that can be run on a memory and on a processor is stored, the processor is realized as above when executing described program Step in the switching method.
7th aspect of embodiment according to the present invention, additionally provides a kind of computer readable storage medium, the meter It is stored with computer program on calculation machine readable storage medium storing program for executing, is realized when the computer program is executed by processor as described above Step in switching method.
A technical solution in above-mentioned technical proposal has the following advantages that or the utility model has the advantages that first base station is measured according to UE As a result, one or more in UE ability and UE preference, it determines the second base station, sends switching request to second base station; Wherein, UE measurement result is that UE according to the measurement that first base station issues reports relevant parameter measurement to obtain, and measurement reports correlation It is UE configuration that parameter, which is first base station based on UE preference, realizes the switching based on UE preference, being switched to UE preferentially can protect Demonstrate,prove the base station of its high data rate.Further, the preference to power consumption that is reported based on UE, the preference to high data rate or To the preference of dual link, guarantees that UE is preferentially switched to high data rate frequency (such as 5G frequency), ensure that the data rate of UE.
Detailed description of the invention
Fig. 1 is the flow chart of the switching method in one embodiment of the invention;
Fig. 2 is the flow chart of the switching method in another embodiment of the present invention;
Fig. 3 is the flow diagram that single connection is switched to by dual link in one embodiment of the invention;
Fig. 4 is that the holding S-SeNB connection in one embodiment of the invention is constant, and S-MeNB is only switched to T-MeNB's Flow diagram;
Fig. 5 is the major-minor base station role exchange flow diagram in one embodiment of the present of invention;
Fig. 6 is the structural block diagram of the first base station in one embodiment of the invention;
Fig. 7 is the structural block diagram of the UE in one embodiment of the invention;
Fig. 8 is the structural block diagram of the first base station in another embodiment of the present invention;
Fig. 9 is the structural block diagram of the UE in another embodiment of the present invention.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
To guarantee rationally switching, base station can be adjacent area frequency/specific biasing (Ofn/Ocn) of cell setting, or be clothes Specific biasing (Ofs/Ocs) is arranged in frequency/cell of being engaged in, to help terminal to be switched to best cell.
By taking A3 event as an example, A3 event are as follows: adjacent cell is better than serving cell, this event occurs to be used to determine that UE is It is no to be switched to adjacent cell, when adjacent cell than serving cell quality be higher than a thresholding (Neighbour > Serving+Offset), The switching between interior/frequency frequently can just be triggered.The decision threshold of A3 event is as follows:
Event entry condition: Mn+Ofn+Ocn-Hys > Ms+Ofs+Ocs+Off
Event leaves condition: Mn+Ofn+Ocn+Hys < Ms+Ofs+Ocs+Off
Wherein:
Mn: the measurement result of adjacent cell does not consider to calculate any biasing;
Ofn: the adjacent area frequency specifically biases;
Ocn: the Cell Individual Offset of the adjacent area, while if being not neighbor cell configuration, it is set as 0;
Ms: the measurement result of the serving cell under any biasing is not calculated;
Ofs: frequency specifically biases on service frequency;
Ocs: the Cell Individual Offset of serving cell is set as 0 if do not configured for serving cell;
Hys: the lag parameter of the event;
Off: for the offset parameter of the event;
In the prior art, when configuring measurement parameter for UE, there is no the preferences for considering UE for base station, such as to data speed Rate/multi-connection preference.
It can guarantee UE higher data speed to make terminal not switch on the carrier wave for not supporting dual link or be switched to as far as possible On the carrier wave of rate, base station can be the lesser Ofn and/or Ocn value of carrier wave setting for not supporting dual link, or be server carrier Ofs and/or Ocs is set, or biggish Hys and/or Off is set for current event.In order to which assistant base station does reasonable measurement Parameter configuration is reported, UE needs to report it to high data rate/dual link preference.
Referring to Fig. 1, a kind of process of switching method is shown in figure, the executing subject of this method can be first base station, Specific step is as follows:
Step 101 obtains UE (terminal) measurement result and UE preference;
In the present embodiment, UE measurement result is that UE according to the measurement that first base station issues reports relevant parameter measurement to obtain , it be the first base station based on UE preference is UE configuration which, which reports relevant parameter, which reports relevant parameter packet It includes but is not limited to: Ofn, Ocn, Ofs and/or Ocs.
In the present embodiment, UE preference is for indicating that UE wishes to keep high data rate always, it is desirable alternatively to remain Dual link.
Optionally, which includes: to the preference (PowerPrefIndication) of power consumption, to high data speed The preference (HighDataRatePrefIndication) of rate or the preference of p- dual link (DualConnectivityPrefIndication), it is also not limited to this certainly.
Optionally, in a step 101, first base station to UE send UE to the preference of power consumption, high data rate it is inclined One or more preference requests in the good and preference of dual link;First base station obtain UE report to the inclined of power consumption It is one or more in the good, preference to high data rate and the preference to dual link.
Such as: the preference request can be handed down to UE by RRC reconfiguration message, such as pass through RRC (Radio Resource Control, wireless heterogeneous networks) otherConfig (other configurations) of reconfiguration message is handed down to UE;Or The preference request inquires (UECapabilityEnquiry) message by terminal capability and is handed down to UE.
Such as: by receive terminal auxiliary information (UEAssistanceInformation) obtain UE report to power It is one or more in the preference of consumption, the preference to high data rate and the preference to dual link;Or by receiving terminal Ability information UECapabilityInformation message obtain UE report to the preference of power consumption, to high data rate Preference and to one or more in the preference of multi-connection.
If UE preference is requested by RRC reconfiguration message in base station, UE passes through UEAssistanceInformation UE preference is fed back to base station by message;
If base station is passed through by UECapabilityEnquiry message request UE preference, UE UE preference is fed back to base station by UECapabilityInformation message.
If the PowerPrefIndication of UE feedback is lowPowerConsumption (low power consumption), table Show that UE loses interest in high data rate or multi-connection;The whatever or existing normal of multiplexing is newly increased, indicates that UE wishes Realize high data rate/dual link;
If the HighDataRatePrefIndication/DualConnectivityPrefIndicatio n of UE feedback For TURE (or other values, such as HighDataRateRequired (high data rate demand)/KeepDualConnectivity (keeping doubly-linked bridged connectivity)), then it represents that UE wishes to realize high data rate/dual link.
Step 102 determines the second base station according to UE measurement result and UE preference, sends switching to second base station and asks It asks.
Above-mentioned second base station refers to the base station for meeting UE measurement result and UE preference.
In the present embodiment, according to the type of first base station and the second base station, switching request is for triggering different switchings Process:
(1) first base station is source master base station (Source MeNB, hereinafter referred to as S-MeNB), for the purpose of second base station Base station (Target eNB, hereinafter referred to as T-eNB);The switching request is used to indicate the purpose base station triggers and executes the main base in source It stands and is switched to the switching flow of purpose base station with source prothetic group station, belong to the switching mode that dual link is switched to single connection.
Such situation is suitable for the case where UE loses interest in multi-connection, and it is interested in high data rate to be also applied for UE (single connection base station can provide data rate more higher than dual link) or the case where lose interest in.
(2) first base station is source master base station (S-MeNB), and second base station is purpose master base station (T-MeNB);It is described to cut It changes request and is used to indicate purpose master base station triggering and execute that keep UE to connect with source prothetic group station (S-SeNB) constant, by source master Base station (S-MeNB) is switched to the process of purpose master base station (T-MeNB), belongs to the switching mode that dual link is switched to dual link.
Such situation is suitable for UE and wishes the case where supporting multi-connection, and high data speed can be provided by being also applied for S-SeNB The case where rate and S-MeNB cannot provide higher data rate.
(3) first base station is source master base station (S-MeNB), and second base station is source prothetic group station (S-SeNB);The switching Request is used to indicate the process that the auxiliary base station triggers in the source execute the role exchange switched between source master base station and source prothetic group station;
Further, source master base station is carried in the switching request discharge request message (S-MeNB release Request), source master base station release request message is used to indicate whether source of release master base station (S-MeNB release request)。
Such situation is suitable for UE and wishes the case where supporting multi-connection, and high data speed can be provided by being also applied for S-SeNB Rate, S-MeNB cannot provide higher data rate and UE does not search the case where can provide high data rate T-MeNB.When When carrying S-MeNB release request in Role Exchange Request, which can realize S-MeNB to S- The switching of SeNB and a kind of doubly-linked are connected to the switching mode of single connection.
(4) first base station is source master base station (S-MeNB), and second base station is purpose master base station (T-MeNB);It is described to cut It changes request and is used to indicate purpose master base station triggering and executes from the dual link at source master base station and source prothetic group station and be switched to purpose master The process of the new dual link of base station and purpose prothetic group station (T-SeNB) belongs to the switching mode that dual link is switched to dual link.
Such situation is suitable for UE and wishes the case where supporting multi-connection, and being also applied for T-MeNB and T-SeNB can provide more The case where high data rate.
In the present embodiment, optionally, the switching method further include: the UE preference reported according to UE is surveyed for UE configuration Amount reports relevant parameter;It reports relevant parameter to be sent to UE the measurement configured for UE, is reported by the UE according to the measurement Relevant parameter measures to obtain UE measurement result.The measurement reports relevant parameter can be by RRC reconfiguration message MeasConfig is handed down to UE.
Further, it includes but is not limited to one or more groups in Ofn, Ocn, Ofs and Ocs that measurement, which reports relevant parameter, It closes.
In the present embodiment, first base station determines the second base station according to UE measurement result and UE preference, to second base It stands and sends switching request;Wherein, UE measurement result is that UE according to the measurement that first base station issues reports relevant parameter measurement to obtain , it be first base station based on UE preference is that UE is configured that measurement, which reports relevant parameter, realizes the switching for being directed to dual link, realization base In the switching of UE preference, UE is made preferentially to be switched to the base station that can guarantee its high data rate.Further, pair reported based on UE The preference of power consumption, the preference to high data rate or the preference to dual link guarantee that UE is preferentially switched to high data rate Frequency (such as 5G frequency), ensure that the data rate of UE.
Referring to fig. 2, the process of switching method is shown in figure, the executing subject of this method can be terminal (UE), specifically Steps are as follows:
Step 201 sends UE measurement result and UE preference to first base station, by the first base station according to UE measurement result The second base station is determined with UE preference, and sends switching request to second base station;
Wherein, the UE measurement result is that UE according to the measurement that the first base station issues reports relevant parameter measurement to obtain , it be the first base station based on UE preference is that the UE is configured that the measurement, which reports relevant parameter,.
In the present embodiment, UE measurement result is that UE according to the measurement that first base station issues reports relevant parameter measurement to obtain , it be the first base station based on UE preference is UE configuration which, which reports relevant parameter, which reports relevant parameter packet It includes but is not limited to: Ofn, Ocn, Ofs and/or Ocs.
In the present embodiment, UE preference is for indicating that UE wishes to keep high data rate always, it is desirable alternatively to remain Dual link.
Optionally, which includes: to the preference (PowerPrefIndicationConfig) of power consumption, to height The preference (HighDataRatePrefIndicationConfig) of data rate or the preference to dual link (DualConnectivityPrefIndicationConfig), it is also not limited to this certainly.
In the present embodiment, UE preference can be sent to first base station in the following manner:
UE that the first base station is sent is received to preference PowerPrefIndication, UE of power consumption to high number According to the preference HighDataRatePrefIndication and UE of rate to the preference of dual link One or more preference requests in DualConnectivityPrefIndication, optionally, request are carried in RRC weight It configures in message;Or the request is handed down to UE by terminal capability inquiry (UECapabilityEnquiry) message.
Then, to the first base station transmission preference to power consumption, the preference to high data rate and to dual link Preference in it is one or more.
Such as it is sent to the first base station to power by terminal auxiliary information (UEAssistanceInformation) It is one or more in the preference of consumption, the preference to high data rate and the preference to dual link;Or by receiving terminal Ability information (UECapabilityInformation) message obtain that UE reports to the preference of power consumption, to high data speed The preference of rate and to one or more in the preference of multi-connection.
In the present embodiment, according to the type of first base station and the second base station, switching request is for triggering different switchings Process:
(1) first base station is source master base station (Source MeNB, hereinafter referred to as S-MeNB), for the purpose of second base station Base station (Target eNB, hereinafter referred to as T-eNB);The switching request is used to indicate the purpose base station triggers and executes the main base in source It stands and is switched to the switching flow of purpose base station with source prothetic group station, belong to the switching mode that dual link is switched to single connection.
Such situation is suitable for the case where UE loses interest in multi-connection, and it is interested in high data rate to be also applied for UE (single connection base station can provide data rate more higher than dual link) or the case where lose interest in.
(2) first base station is source master base station (S-MeNB), and second base station is purpose master base station (T-MeNB);It is described to cut It changes request and is used to indicate purpose master base station triggering and execute that keep UE to connect with source prothetic group station (S-SeNB) constant, by source master Base station (S-MeNB) is switched to the process of purpose master base station (T-MeNB), belongs to the switching mode that dual link is switched to dual link.
Such situation is suitable for UE and wishes the case where supporting multi-connection, and high data speed can be provided by being also applied for S-SeNB The case where rate and S-MeNB cannot provide higher data rate.
(3) first base station is source master base station (S-MeNB), and second base station is source prothetic group station (S-SeNB);The switching Request is used to indicate the process that the auxiliary base station triggers in the source execute the role exchange switched between source master base station and source prothetic group station;
Further, source master base station is carried in the switching request discharge request message (S-MeNB release Request), source master base station release request message is used to indicate whether source of release master base station (S-MeNB release request)。
Such situation is suitable for UE and wishes the case where supporting multi-connection, and high data speed can be provided by being also applied for S-SeNB Rate, S-MeNB cannot provide higher data rate and UE does not search the case where can provide high data rate T-MeNB.When When carrying S-MeNB release request in Role Exchange Request, which can realize S-MeNB to S- The switching of SeNB and a kind of doubly-linked are connected to the switching mode of single connection.
(4) first base station is source master base station (S-MeNB), and second base station is purpose master base station (T-MeNB);It is described to cut It changes request and is used to indicate purpose master base station triggering and executes from the dual link at source master base station and source prothetic group station and be switched to purpose master The process of the new dual link of base station and purpose prothetic group station (T-SeNB) belongs to the switching mode that dual link is switched to dual link.
Such situation is suitable for UE and wishes the case where supporting multi-connection, and being also applied for T-MeNB and T-SeNB can provide more The case where high data rate.
In the present embodiment, first base station is according to one or more in UE measurement result, UE ability and UE preference, It determines the second base station, sends switching request to second base station;Wherein, UE measurement result is that UE is issued according to first base station Measurement reports relevant parameter measurement to obtain, and it be first base station based on UE preference is that UE is configured that measurement, which reports relevant parameter, reality It is now directed to the switching of dual link, realizes the switching based on UE preference, its high data rate can be guaranteed by being switched to UE preferentially Base station.Further, the preference to power consumption that is reported based on UE, the preference to high data rate or to the preference of dual link, Guarantee that UE is preferentially switched to high data rate frequency (such as 5G frequency), ensure that the data rate of UE.
Embodiment one: by dual link switching base station to single connection base station, referring to Fig. 3, the specific steps are as follows:
Step 1, S-MeNB (source master base station) send RRCconnectionReconfiguration (RRC to UE (terminal) Connection reconfiguration is set) message, it may include in the RRCconnectionReconfiguration message HighDataRatePrefIndicationConfig (configuration of high data rate preference);
Step 2, UE send UEAssistanceInformation (terminal auxiliary information) to S-MeNB, should UEAssistanceInformation includes HighDataRatePrefIndication (high data rate preference);
Step 3, S-MeNB send RRCconnectionreconfiguration message to UE, should It may include MeasConfig (measuring configuration) in RRCconnectionreconfiguration message;
Step 4, UE send MeasurementReport (measurement report) to S-MeNB;
Step 5, S-MeNB send Handover Request (switching request) message to T-eNB (purpose base station);
Step 6, T-eNB send Handover Request Acknowledge (switching request response) to S-MeNB and disappear Breath;
(release of prothetic group station is asked to S-SeNB (source prothetic group station) transmission SeNB Release Request by step 7, S-MeNB Ask) message;
Step 8, S-MeNB send RRCConnectionReconfiguration message to UE;
Step 9 carries out Random Access Procedure (random access procedure) between UE and T-eNB;
Step 10, UE send RRCConnectionReconfigurationComplete (RRC connection reconfiguration to T-eNB Set completion) message;
Step 11, T-eNB send Path Switch Request (path switching request) to S-GW (gateway) and disappear Breath;
Step 12 carries out Bearer Modification (bearing modification) in S-GW and MME;
Step 13, MME send Path Swtich Request Acknowledge (path switching request response) to S-GW Message;
Step 14, T-eNB notice S-MeNB UE Context Release (terminal contexts release);
Step 15, S-MeNB notify S-SeNB UE Context Release.
Embodiment two: keeping S-SeNB connection constant, S-MeNB is only switched to T-MeNB, referring to fig. 4, specific steps are such as Under:
Step 1, S-MeNB (source master base station) send RRCconnectionReconfiguration (RRC to UE (terminal) Connection reconfiguration is set) message, it may include in the RRCconnectionReconfiguration message HighDataRatePrefIndicationConfig (configuration of high data rate preference);
Step 2, UE send UEAssistanceInformation (terminal auxiliary information) to S-MeNB, should UEAssistanceInformation includes HighDataRatePrefIndication (high data rate preference);
Step 3, S-MeNB send RRCconnectionreconfiguration message to UE, should It may include MeasConfig (measuring configuration) in RRCconnectionreconfiguration message;
Step 4, UE send MeasurementReport (measurement report) to S-MeNB;
Step 5, S-MeNB send Handover Request (switching request) message to T-MeNB (purpose base station);
Step 6, T-MeNB send SeNB Addition Request (SeNB additional request) to SeNB (prothetic group station);
Step 7, SeNB send SeNB Addition Request ACK (response of SeNB additional request) to T-MeNB;
Step 8, T-MeNB send Handover Request Acknowledge (switching request response) to S-MeNB;
Step 9, S-MeNB send SeNB Release Request (SeNB release request) to SeNB;
Step 10, S-MeNB send RRCConnectionReconfiguration to UE;
Step 11 carries out Random Access Procedure (random access procedure) between UE and T-MeNB;
Step 12, UE send RRCConnectionReconfigurationComplete (RRC connection reconfiguration to T-MeNB Set completion) message;
Step 13 carries out Random Access Procedure (random access procedure) between UE and SeNB;
Step 14, T-MeNB send SeNB Reconfiguration Complete to SeNB (SeNB reconfigures completion) Message;
Step 15, T-MeNB send Path Switch Request (path switching request) message to MME;
Step 16 carries out Bearer Modification (bearing modification) in S-GW and MME;
(path switching request is answered to T-MeNB transmission Path Swtich Request Acknowledge by step 17, MME Answer) message;
Step 18, T-MeNB notice S-MeNB UE Context Release (terminal contexts release);
Step 19, S-MeNB notify SeNB UE Context Release.
Embodiment three: S-MeNB and S-SeNB role exchange
S-MeNB according to UE measurement result and combine PowerPrefIndication or HighDataRatePrefIndication or DualConnectivityPrefIndication sends Role to S-SeNB Exchange Request (role exchange request) carries out MeNB and SeNB role exchange.Such situation is believed suitable for S-MeNB It is number second-rate, S-SeNB signal quality is preferable, while UE does not search out other and supports multi-connection, the better frequency point of signal.
In the present embodiment, need to carry switching-related parameters, such as Target cell in Role Exchange Request ID, KeNB, AS configuration, E-RAB context;
Further, also need to carry the configuration of source MCG in Role Exchange Request;
Further, it is also possible to carry S-MeNB release request in Role Exchange Request, this disappears Breath is used to indicate whether release S-MeNB;When S-SeNB receives S-MeNB release request, S-SeNB can also give S- MeNB sends a UE Context Release message, informs that S-MeNB discharges UE context.
Referring to Fig. 5, the specific steps are as follows:
Step 1, S-MeNB or T-SeNB send RRCconnectionReconfiguration (RRC connection weight to UE Configuration) message, it may include in the RRCconnectionReconfiguration message HighDataRatePrefIndicationConfig (configuration of high data rate preference);
Step 2, UE send UEAssistanceInformation (terminal auxiliary information) to S-MeNB or T-SeNB, The UEAssistanceInformation includes HighDataRatePrefIndication (high data rate preference);
Step 3, S-MeNB or T-SeNB send RRCconnectionreconfiguration message to UE, should It may include MeasConfig (measuring configuration) in RRCconnectionReconfiguration message;
Step 4, UE send MeasurementReport (measurement report) to S-MeNB or T-SeNB;
Step 5, S-MeNB or T-SeNB send the (angle Role Exchange Request to S-SeNB or T-MeNB Color exchanges request) message, Role Exchange Request message includes: HO (HandOver, switching) relevant parameter, S-MCG Configuration, it is also possible to including S-MeNB release request message.
Step 6, S-SeNB or T-MeNB send Role Exchange Request to S-MeNB or T-SeNB Acknowledge (role exchange request-reply) message;
Step 7, S-MeNB or T-SeNB send RRCconnectionReconfiguration message to UE;
Step 8, UE send RRCconnectionReconfigurationComplete to S-SeNB or T-MeNB and disappear Breath;
Step 9, S-SeNB or T-MeNB send Path Switch Request to MME;
Step 10 carries out Bearer Modification (bearing modification) in S-GW and MME;
Step 11, MME send the (path Path Swtich Request Acknowledge to S-SeNB or T-MeNB Switching request response) message;
Step 12, S-SeNB or T-MeNB notice S-MeNB T-SeNB UE Context Release are (in terminal It hereafter discharges);
Step 13, S-MeNB or T-SeNB notify S-SeNB T-MeNB UE Context Release.
A kind of first base station is additionally provided in the embodiment of the present invention, the principle solved the problems, such as due to the first base station and this hair Switching method is similar in bright embodiment FIG. 1 to FIG. 5, therefore the implementation of the first base station may refer to the implementation of method, repetition Place no longer applies and states.
Referring to Fig. 6, the block diagram of first base station is shown in figure, which includes: first processor 601, first Receiver 602 and the first transmitter 603, in which:
First receiver 602 is for obtaining terminal UE measurement result and UE preference;
First transmitter 603 is used to determine the second base station according to UE measurement result and UE preference, send out to second base station Send switching request;
Wherein, the UE measurement result is that UE is reported according to the measurement based on the configuration of UE preference that the first base station issues Relevant parameter measurement obtains.
In the present embodiment, optionally, the first base station is source master base station, and second base station is purpose base station;Institute It states switching request and is used to indicate the switching that the purpose base station triggers execute source master base station and source prothetic group station is switched to purpose base station Process;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate It is constant that the purpose master base station triggering execution keeps UE to connect with source prothetic group station, and source master base station is only switched to purpose master base station Process;Or
The first base station is source master base station, and second base station is source prothetic group station;The switching request is used to indicate institute State the process that the auxiliary base station triggers in source execute the role exchange switched between source master base station and source prothetic group station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate The purpose master base station triggering, which is executed from the dual link at source master base station and source prothetic group station, is switched to purpose master base station and purpose prothetic group The process for the new dual link stood.
In the present embodiment, optionally, the main base in source is executed when the switching request is used to indicate second base station triggers Stand the role exchange switched between the prothetic group station of source process when, master base station release request in source is carried in the switching request and is disappeared Breath, source master base station release request message are used to indicate whether source of release master base station.
In the present embodiment, optionally, first transmitter 603: for sending UE to the preference of power consumption to UE PowerPrefIndication, to the preference HighDataRatePrefIndication of high data rate and to dual link One or more preference requests in preference DualConnectivityPrefIndication;
First receiver 602 is further used for: for obtaining that UE reports to the preference of power consumption, to high data The preference of rate and to one or more in the preference of dual link.
In the present embodiment, optionally, the preference request is handed down to UE by RRC reconfiguration message;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
In the present embodiment, optionally, first processor 601 is used for auxiliary from the received terminal of first receiver 602 Supplementary information UEAssistanceInformation obtains the preference to power consumption, the preference to high data rate that UE is reported And to one or more in the preference of multi-connection;Or
The first processor 601 is used for from the received terminal ability information of first receiver 602 UECapabilityInformation message obtain UE report the preference to power consumption, the preference to high data rate with And to one or more in the preference of multi-connection.
If first base station requests UE preference by RRC reconfiguration message, UE passes through UE preference is fed back to first base station by UEAssistanceInformation message;
If first base station is passed through by UECapabilityEnquiry message request UE preference, UE UE preference is fed back to first base station by UECapabilityInformation message.
In the present embodiment, optionally, the UE preference that first processor 601 is also used to be reported according to UE is surveyed for UE configuration Amount reports relevant parameter;
First transmitter 603 is also used to relevant parameter will be reported to be sent to UE for the measurement of UE configuration, by the UE Relevant parameter is reported to measure to obtain UE measurement result according to the measurement.
First base station provided in this embodiment can execute above method embodiment, implementing principle and technical effect class Seemingly, details are not described herein again for the present embodiment.
A kind of UE is additionally provided in the embodiment of the present invention, due to the UE principle solved the problems, such as and Fig. 2 of the embodiment of the present invention Middle switching method is similar, therefore the implementation of the device may refer to the implementation of method, no longer applies and states in place of repeating.
Referring to Fig. 7, the block diagram of UE is shown in figure, which includes: second receiver 701,702 and of the second transmitter Second processor 703, in which:
Second transmitter 702 is used to send UE measurement result and UE preference to first base station, by the first base station according to UE measurement result and UE preference determine the second base station, and send switching request to second base station;
Wherein, the UE measurement result is that UE is reported according to the measurement based on the configuration of UE preference that the first base station issues Relevant parameter measurement obtains.
In the present embodiment, optionally, the first base station is source master base station, and second base station is purpose base station;Institute It states switching request and is used to indicate the switching that the purpose base station triggers execute source master base station and source prothetic group station is switched to purpose base station Process;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate It is constant that the purpose master base station triggering execution keeps UE to connect with source prothetic group station, and source master base station is only switched to purpose master base station Process;Or
The first base station is source master base station, and second base station is source prothetic group station;The switching request is used to indicate institute State the process that the auxiliary base station triggers in source execute the role exchange switched between source master base station and source prothetic group station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate The purpose master base station triggering, which is executed from the dual link at source master base station and source prothetic group station, is switched to purpose master base station and purpose prothetic group The process for the new dual link stood.
In the present embodiment, optionally, the main base in source is executed when the switching request is used to indicate second base station triggers Stand the role exchange switched between the prothetic group station of source process when, master base station release request in source is carried in the switching request and is disappeared Breath, source master base station release request message are used to indicate whether source of release master base station.
In the present embodiment, optionally, the second receiver 701 is used to receive the UE of the first base station transmission to function Preference of preference PowerPrefIndication, UE of rate consumption to high data rate HighDataRatePrefIndication and UE is in the preference DualConnectivityPrefIndication of dual link One or more preference requests;
Second transmitter 702 is also used to send to the first base station to the preference of power consumption, to high data rate Preference and to one or more in the preference of dual link.
In the present embodiment, optionally, the preference request carries in RRC reconfiguration message;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
In the present embodiment, optionally, second transmitter 702 is also used to through terminal auxiliary information UEAssistanceInformation sends the preference to power consumption, the preference to high data rate to the first base station With it is one or more in the preference to dual link;Or by receiving terminal ability information UECapabilityInformation message is sent to the first base station to the preference of power consumption, to high data rate Preference and to one or more in the preference of multi-connection.
The hardware structural diagram of a kind of first base station and terminal is also provided in following embodiments.
Referring to Fig. 8, it is the structure chart of the base station of application of the embodiment of the present invention, can be realized and FIG. 1 to FIG. 5 corresponding embodiment In switching method details, and reach identical effect.As shown in figure 8, base station 800 includes: processor 801, transceiver 802, memory 803, user interface 804 and bus interface, in which:
In embodiments of the present invention, base station 800 further include: storage 803 and can be run on processor 801 on a memory Computer program, computer program by processor 801, execute when realize following steps: obtain terminal UE measurement result and UE Preference;The second base station is determined according to UE measurement result and UE preference, sends switching request to second base station.
In fig. 8, bus architecture may include the bus and bridge of any number of interconnection, specifically be represented by processor 801 One or more processors and the various circuits of memory that represent of memory 803 link together.Bus architecture can be with Various other circuits of such as peripheral equipment, voltage-stablizer and management circuit or the like are linked together, these are all these Well known to field, therefore, it will not be further described herein.Bus interface provides interface.Transceiver 802 can be Multiple element includes transmitter and receiver, provides the unit for communicating over a transmission medium with various other devices.Needle To different user equipmenies, user interface 804, which can also be, external the interface for needing equipment is inscribed, and the equipment of connection includes But be not limited to keypad, display, loudspeaker, microphone, control stick etc..
Processor 801, which is responsible for management bus architecture and common processing, memory 803, can store processor 801 and is holding Used data when row operation.
Optionally, following steps be can also be achieved when computer program is executed by processor 803: sending UE to UE and disappear to power The preference PowerPrefIndication of consumption, to the preference HighDataRatePrefIndication of high data rate and right One or more preference requests in the preference DualConnectivityPrefIndication of dual link;UE is obtained to report The preference to power consumption, the preference to high data rate and to one or more in the preference of dual link.
Optionally, following steps be can also be achieved when computer program is executed by processor 803: by receiving terminal auxiliary letter Breath UEAssistanceInformation obtain UE report the preference to power consumption, the preference to high data rate and To one or more in the preference of multi-connection;Or
By receive terminal ability information UECapabilityInformation message obtain UE report to power consumption Preference, one or more in the preference to high data rate and the preference to multi-connection.
Optionally, following steps be can also be achieved when computer program is executed by processor 803:
The UE preference reported according to UE reports relevant parameter for UE configuration measurement;
Relevant parameter is reported to be sent to UE the measurement configured for UE.
Fig. 9 be another embodiment of the present invention provides terminal structural schematic diagram.As shown in figure 9, terminal shown in Fig. 9 900 include: at least one processor 901, memory 902, at least one network interface 904 and user interface 903.Terminal 900 In various components be coupled by bus system 905.It is understood that bus system 905 is for realizing between these components Connection communication.Bus system 905 further includes that power bus, control bus and status signal are total in addition to including data/address bus Line.But for the sake of clear explanation, various buses are all designated as bus system 905 in Fig. 9.
Wherein, user interface 903 may include display, keyboard or pointing device (for example, mouse, trace ball (trackball), touch-sensitive plate or touch screen etc..
It is appreciated that the memory 902 in the embodiment of the present invention can be volatile memory or nonvolatile memory, It or may include both volatile and non-volatile memories.Wherein, nonvolatile memory can be read-only memory (Read- OnlyMemory, ROM), programmable read only memory (ProgrammableROM, PROM), Erasable Programmable Read Only Memory EPROM (ErasablePROM, EPROM), electrically erasable programmable read-only memory (ElectricallyEPROM, EEPROM) dodge It deposits.Volatile memory can be random access memory (RandomAccessMemory, RAM), and it is slow to be used as external high speed It deposits.By exemplary but be not restricted explanation, the RAM of many forms is available, such as static random access memory (StaticRAM, SRAM), dynamic random access memory (DynamicRAM, DRAM), Synchronous Dynamic Random Access Memory (SynchronousDRAM, SDRAM), double data speed synchronous dynamic RAM (DoubleDataRate SDRAM, DDRSDRAM), enhanced Synchronous Dynamic Random Access Memory (Enhanced SDRAM, ESDRAM), synchronized links Dynamic random access memory (SynchlinkDRAM, SLDRAM) and direct rambus random access memory (DirectRambusRAM, DRRAM).The memory 902 of the system and method for description of the embodiment of the present invention is intended to include but unlimited In the memory of these and any other suitable type.
In some embodiments, memory 902 saves following element, executable modules or data structures, or Their subset of person or their superset: operating system 9021 and application program 9022.
Wherein, operating system 9021 include various system programs, such as ccf layer, core library layer, driving layer etc., are used for Realize various basic businesses and the hardware based task of processing.Application program 9022 includes various application programs, such as media Player (MediaPlayer), browser (Browser) etc., for realizing various applied business.Realize embodiment of the present invention side The program of method may be embodied in application program 9022.
In embodiments of the present invention, by the program or instruction of calling memory 902 to save, specifically, can be application The program or instruction saved in program 9022, processor 901 can execute method performed by above-mentioned terminal.
The method that the embodiments of the present invention disclose can be applied in processor 901, or be realized by processor 901. Processor 901 may be a kind of IC chip, the processing capacity with signal.During realization, the above method it is each Step can be completed by the integrated logic circuit of the hardware in processor 901 or the instruction of software form.Above-mentioned processing Device 901 can be general processor, digital signal processor (DigitalSignalProcessor, DSP), specific integrated circuit (ApplicationSpecific IntegratedCircuit, ASIC), ready-made programmable gate array (FieldProgrammableGateArray, FPGA) either other programmable logic device, discrete gate or transistor logic Device, discrete hardware components.It may be implemented or execute disclosed each method, step and the logical box in the embodiment of the present invention Figure.General processor can be microprocessor or the processor is also possible to any conventional processor etc..In conjunction with the present invention The step of method disclosed in embodiment, can be embodied directly in hardware decoding processor and execute completion, or use decoding processor In hardware and software module combination execute completion.Software module can be located at random access memory, and flash memory, read-only memory can In the preservation medium of this fields such as program read-only memory or electrically erasable programmable memory, register maturation.The preservation Medium is located at memory 902, and processor 901 reads the information in memory 902, and the step of the above method is completed in conjunction with its hardware Suddenly.
It is understood that the embodiment of the present invention description these embodiments can with hardware, software, firmware, middleware, Microcode or combinations thereof is realized.For hardware realization, processing unit be may be implemented in one or more specific integrated circuits (ApplicationSpecificIntegratedCircuits, ASIC), digital signal processor (DigitalSignalProcessing, DSP), digital signal processing appts (DSPDevice, DSPD), programmable logic device (ProgrammableLogicDevice, PLD), field programmable gate array (Field-ProgrammableGateArray, FPGA), general processor, controller, microcontroller, microprocessor, other electronics lists for executing function of the present invention In member or combinations thereof.
For software implementations, can by execute the embodiment of the present invention described in function module (such as process, function etc.) come Realize technology described in the embodiment of the present invention.Software code can be reserved in memory and be executed by processor.Memory can With portion realizes in the processor or outside the processor.
Specifically, program or instruction that processor 901 can call memory 902 to save execute following below scheme: to first Base station sends UE measurement result and UE preference, wherein the UE measurement result be UE according to the first base station issue based on The measurement of UE preference configuration reports relevant parameter measurement to obtain.
Specifically, program or instruction that processor 901 can call memory 902 to save execute following below scheme:
UE that the first base station is sent is received to preference PowerPrefIndication, UE of power consumption to high number According to the preference HighDataRatePrefIndication and UE of rate to the preference of dual link One or more preference requests in DualConnectivityPrefIndication;
The preference to power consumption, the preference to high data rate are sent to the first base station and to the preference of dual link In it is one or more.
Specifically, program or instruction that processor 901 can call memory 902 to save execute following below scheme: passing through end Auxiliary information UEAssistanceInformation is held to send to the first base station to the preference of power consumption, to high data The preference of rate and to one or more in the preference of dual link;Or by receiving terminal ability information UECapabilityInformation message is sent to the first base station to the preference of power consumption, to high data rate Preference and to one or more in the preference of multi-connection.
The embodiment of the invention also provides a kind of computer readable storage medium, deposited on the computer readable storage medium Computer program is contained, the computer program is realized when being executed by processor in the embodiment of data switching method as described above The step of.
It should be understood that " one embodiment " or " embodiment " that specification is mentioned in the whole text mean it is related with embodiment A particular feature, structure, or characteristic is included at least one embodiment of the present invention.Therefore, occur everywhere in the whole instruction " in one embodiment " or " in one embodiment " not necessarily refer to identical embodiment.In addition, these specific features, knot Structure or characteristic can combine in any suitable manner in one or more embodiments.
In various embodiments of the present invention, it should be appreciated that magnitude of the sequence numbers of the above procedures are not meant to execute suitable Sequence it is successive, the execution of each process sequence should be determined by its function and internal logic, the implementation without coping with the embodiment of the present invention Process constitutes any restriction.
In addition, the terms " system " and " network " are often used interchangeably herein.
It should be understood that the terms "and/or", only a kind of incidence relation for describing affiliated partner, expression can deposit In three kinds of relationships, for example, A and/or B, can indicate: individualism A exists simultaneously A and B, these three situations of individualism B. In addition, character "/" herein, typicallys represent the relationship that forward-backward correlation object is a kind of "or".
In embodiment provided herein, it should be appreciated that " B corresponding with A " indicates that B is associated with A, can be with according to A Determine B.It is also to be understood that determine that B is not meant to determine B only according to A according to A, it can also be according to A and/or other information Determine B.
In several embodiments provided herein, it should be understood that disclosed method and apparatus, it can be by other Mode realize.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only For a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components can combine Or it is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed phase Coupling, direct-coupling or communication connection between mutually can be through some interfaces, the INDIRECT COUPLING or communication of device or unit Connection can be electrical property, mechanical or other forms.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that the independent physics of each unit includes, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of hardware adds SFU software functional unit.
The above-mentioned integrated unit being realized in the form of SFU software functional unit can store and computer-readable deposit at one In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or network side equipment etc.) executes transmitting-receiving side described in each embodiment of the present invention The part steps of method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, letter Claim ROM), random access memory (Random Access Memory, abbreviation RAM), magnetic or disk etc. is various to deposit Store up the medium of program code.
Above-described is the preferred embodiment of the present invention, it should be pointed out that the ordinary person of the art is come It says, several improvements and modifications can also be made under the premise of not departing from principle of the present invention, these improvements and modifications also exist In protection scope of the present invention.

Claims (25)

1. a kind of switching method is applied to first base station characterized by comprising
Obtain terminal UE measurement result and UE preference;
The second base station is determined according to UE measurement result and UE preference, sends switching request to second base station.
2. switching method according to claim 1, which is characterized in that
The first base station is source master base station, and second base station is purpose base station;The switching request is used to indicate the mesh Base station triggers execute the switching flow that source master base station and source prothetic group station are switched to purpose base station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate described It is constant that the triggering execution of purpose master base station keeps UE to connect with source prothetic group station, and source master base station is only switched to the stream of purpose master base station Journey;Or
The first base station is source master base station, and second base station is source prothetic group station;The switching request is used to indicate the source Auxiliary base station triggers execute the process of the role exchange switched between source master base station and source prothetic group station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate described The triggering of purpose master base station, which is executed from the dual link at source master base station and source prothetic group station, is switched to purpose master base station and purpose prothetic group station The process of new dual link.
3. switching method according to claim 2, which is characterized in that carry master base station release in source in the switching request and ask Message is sought, source master base station release request message is used to indicate whether source of release master base station.
4. switching method according to claim 1, which is characterized in that the acquisition UE preference, comprising:
To UE transmission UE to the preference PowerPrefIndication of power consumption, to the preference of high data rate and to doubly-linked One or more preference requests in the preference connect;
Obtain the preference to power consumption, the preference to high data rate that UE reports and to one in the preference of dual link or It is multinomial.
5. switching method according to claim 4, which is characterized in that the preference request passes through under RRC reconfiguration message Issue UE;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
6. switching method according to claim 4, which is characterized in that the acquisition UE report to the inclined of power consumption It is one or more in the good, preference to high data rate and the preference to multi-connection, comprising:
By receive that terminal auxiliary information UEAssistanceInformation obtains that UE reports to the preference of power consumption, Preference to high data rate and to one or more in the preference of multi-connection;Or
By receive terminal ability information UECapabilityInformation message obtain UE report to the inclined of power consumption It is one or more in the good, preference to high data rate and the preference to multi-connection.
7. switching method according to claim 1, which is characterized in that the switching method further include:
The UE preference reported according to UE reports relevant parameter for UE configuration measurement;
Relevant parameter is reported to be sent to UE the measurement configured for UE.
8. a kind of switching method is applied to terminal UE characterized by comprising
UE measurement result and UE preference are sent to first base station;
Wherein, to be UE report correlation according to the measurement based on the configuration of UE preference that the first base station issues to the UE measurement result What parameter measurement obtained.
9. switching method according to claim 8, which is characterized in that described to send UE preference to first base station, comprising:
It is fast to high data to preference PowerPrefIndication, UE of power consumption to receive the UE that the first base station is sent The preference and UE of rate are to one or more preference requests in the preference of dual link;
The preference to power consumption, the preference to high data rate are sent to the first base station and in the preference of dual link It is one or more.
10. switching method according to claim 9, which is characterized in that the preference request is carried in RRC reconfiguration message In;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
11. switching method according to claim 9, which is characterized in that described to disappear to first base station transmission to power It is one or more in the preference of consumption, the preference to high data rate and the preference to dual link, comprising:
It is sent to the first base station to the inclined of power consumption by terminal auxiliary information UEAssistanceInformation It is one or more in the good, preference to high data rate and the preference to dual link;Or
Disappeared to first base station transmission to power by receiving terminal ability information UECapabilityInformation message It is one or more in the preference of consumption, the preference to high data rate and the preference to multi-connection.
12. a kind of first base station characterized by comprising first processor, the first receiver and the first transmitter, wherein
First receiver is for obtaining terminal UE measurement result and UE preference;
First transmitter is sent for determining the second base station according to UE measurement result and UE preference to second base station Switching request.
13. first base station according to claim 12, which is characterized in that
The first base station is source master base station, and second base station is purpose base station;The switching request is used to indicate the mesh Base station triggers execute the switching flow that source master base station and source prothetic group station are switched to purpose base station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate described It is constant that the triggering execution of purpose master base station keeps UE to connect with source prothetic group station, and source master base station is only switched to the stream of purpose master base station Journey;Or
The first base station is source master base station, and second base station is source prothetic group station;The switching request is used to indicate the source Auxiliary base station triggers execute the process of the role exchange switched between source master base station and source prothetic group station;Or
The first base station is source master base station, and second base station is purpose master base station;The switching request is used to indicate described The triggering of purpose master base station, which is executed from the dual link at source master base station and source prothetic group station, is switched to purpose master base station and purpose prothetic group station The process of new dual link.
14. first base station according to claim 13, which is characterized in that carry master base station release in source in the switching request Request message, source master base station release request message are used to indicate whether source of release master base station.
15. first base station according to claim 12, which is characterized in that
First transmitter is further used for: for sending UE to the preference of power consumption to UE One or more preferences in PowerPrefIndication, the preference to high data rate and the preference to dual link are asked It asks;
First receiver is further used for: for obtaining that UE reports to the preference of power consumption, to high data rate Preference and to one or more in the preference of dual link.
16. first base station according to claim 15, which is characterized in that the preference request passes through RRC reconfiguration message It is handed down to UE;Or
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
17. first base station according to claim 15, which is characterized in that the first processor from described first for connecing Receive obtain that UE reports in the received terminal auxiliary information UEAssistanceInformation of device to the preference of power consumption, Preference to high data rate and to one or more in the preference of multi-connection;Or
The first processor is used for from the received terminal ability information of the first receiver UECapabilityInformation message obtain UE report the preference to power consumption, the preference to high data rate with And to one or more in the preference of multi-connection.
18. first base station according to claim 12, which is characterized in that
The UE preference that the first processor is also used to be reported according to UE reports relevant parameter for UE configuration measurement;
First transmitter is also used to relevant parameter will be reported to be sent to UE for the measurement of UE configuration.
19. a kind of terminal UE characterized by comprising second receiver, the second transmitter and second processor, in which:
Second transmitter is used to send UE measurement result and UE preference to first base station, the UE measurement result be UE according to The measurement based on the configuration of UE preference that the first base station issues reports relevant parameter measurement to obtain.
20. UE according to claim 19, which is characterized in that
The second receiver is used to receive preference of the UE to power consumption of the first base station transmission PowerPrefIndication, UE are to the preference of high data rate and UE to one or more inclined in the preference of dual link Good request;
Second transmitter is also used to send the preference to power consumption, the preference to high data rate to the first base station With it is one or more in the preference to dual link.
21. UE according to claim 20, which is characterized in that the preference request carries in RRC reconfiguration message;Or Person
The preference request inquires UECapabilityEnquiry message by terminal capability and is handed down to UE.
22. UE according to claim 21, which is characterized in that
Second transmitter is also used to through terminal auxiliary information UEAssistanceInformation to the first base station Send the preference to power consumption, the preference to high data rate and to one or more in the preference of dual link;Or
Second transmitter is also used to by receiving terminal ability information UECapabilityInformation message to described Preference of the first base station to power consumption, the preference to high data rate and to one or more in the preference of multi-connection.
23. a kind of first base station characterized by comprising memory, processor and save on a memory and can be in processor The computer program of upper operation, the processor realize switching as described in any one of claims 1 to 7 when executing described program Step in method.
24. a kind of terminal characterized by comprising memory, processor and storage can transport on a memory and on a processor Capable computer program, the processor realize such as the described in any item switching sides of claim 8~11 when executing described program Step in method.
25. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program, the computer program realize the step in switching method as described in any one of claims 1 to 7 when being executed by processor Suddenly, it or realizes such as the step in the described in any item switching methods of claim 8~11.
CN201710573702.2A 2017-07-14 2017-07-14 Switching method, first base station, terminal and computer readable storage medium Active CN109257777B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710573702.2A CN109257777B (en) 2017-07-14 2017-07-14 Switching method, first base station, terminal and computer readable storage medium
PCT/CN2018/095263 WO2019011271A1 (en) 2017-07-14 2018-07-11 Handover method, first base station, terminal and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710573702.2A CN109257777B (en) 2017-07-14 2017-07-14 Switching method, first base station, terminal and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN109257777A true CN109257777A (en) 2019-01-22
CN109257777B CN109257777B (en) 2021-01-15

Family

ID=65001124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710573702.2A Active CN109257777B (en) 2017-07-14 2017-07-14 Switching method, first base station, terminal and computer readable storage medium

Country Status (2)

Country Link
CN (1) CN109257777B (en)
WO (1) WO2019011271A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111836379A (en) * 2019-08-15 2020-10-27 维沃移动通信有限公司 Auxiliary information reporting method, configuration method, terminal and network side equipment
CN112702768A (en) * 2019-10-22 2021-04-23 中国移动通信有限公司研究院 Dual-connection switching method, device, base station and terminal
CN113766558A (en) * 2019-05-16 2021-12-07 Oppo广东移动通信有限公司 Network mode control method, terminal and storage medium
WO2022027449A1 (en) * 2020-08-06 2022-02-10 Zte Corporation Valuation for ue assistance information
CN115209488A (en) * 2021-04-09 2022-10-18 中国移动通信有限公司研究院 Dual-connection auxiliary node recovery method and device
WO2023220927A1 (en) * 2022-05-17 2023-11-23 Lenovo (Beijing) Limited Handover to an energy saving network

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200114758A (en) * 2019-03-29 2020-10-07 삼성전자주식회사 Method and apparatus for maximum transmission power adjustment of uplink transmission in wireless communication systems
CN111065131B (en) * 2019-12-16 2023-04-18 深圳大学 Switching method and device and electronic equipment

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101553016A (en) * 2009-05-14 2009-10-07 华为技术有限公司 Method and apparatus for cell switching
CN101835213A (en) * 2009-03-13 2010-09-15 中兴通讯股份有限公司 Reporting method of measurement report and cell switching method
CN102065501A (en) * 2011-01-17 2011-05-18 大唐移动通信设备有限公司 Method and equipment for switching cells
CN102695228A (en) * 2012-06-07 2012-09-26 中国科学技术大学 Pre-switching method, network system and home enhanced Node B (HeNB)
US20140242988A1 (en) * 2013-02-27 2014-08-28 Qualcomm Incorporated Updating a base reference power for high speed data resumption
CN104581849A (en) * 2015-01-08 2015-04-29 重庆邮电大学 Residential quarter switch method
CN104640148A (en) * 2010-01-15 2015-05-20 华为技术有限公司 Measurement reporting method, device and system
CN104684018A (en) * 2013-11-29 2015-06-03 中国移动通信集团公司 Cell measuring method and device and cell measuring result reporting method and device
US20150181495A1 (en) * 2013-12-23 2015-06-25 Qualcomm Incorporated Involving traffic-to-pilot ratio in measurement reports and in layer-1 procedures for improved call performance
CN104754677A (en) * 2015-03-24 2015-07-01 广东欧珀移动通信有限公司 Mobile equipment network connecting switching control method and device
CN104822169A (en) * 2014-01-30 2015-08-05 上海贝尔股份有限公司 Method for providing service for switching of user equipment, base station and dual connectivity system
CN104883712A (en) * 2014-02-27 2015-09-02 中国电信股份有限公司 Cell switching method and system
CN105517085A (en) * 2015-12-15 2016-04-20 中国联合网络通信集团有限公司 Cell reselection method and device
WO2016090124A1 (en) * 2014-12-05 2016-06-09 Qualcomm Incorporated Low latency and/or enhanced component carrier discovery for services and handover

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014198295A1 (en) * 2013-06-11 2014-12-18 Nokia Solutions And Networks Oy Layered mobility
US9854496B2 (en) * 2015-08-20 2017-12-26 Mediatek Inc. Method of high-efficiency connected mode cell re-selection

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101835213A (en) * 2009-03-13 2010-09-15 中兴通讯股份有限公司 Reporting method of measurement report and cell switching method
CN101553016A (en) * 2009-05-14 2009-10-07 华为技术有限公司 Method and apparatus for cell switching
CN104640148A (en) * 2010-01-15 2015-05-20 华为技术有限公司 Measurement reporting method, device and system
CN102065501A (en) * 2011-01-17 2011-05-18 大唐移动通信设备有限公司 Method and equipment for switching cells
CN102695228A (en) * 2012-06-07 2012-09-26 中国科学技术大学 Pre-switching method, network system and home enhanced Node B (HeNB)
US20140242988A1 (en) * 2013-02-27 2014-08-28 Qualcomm Incorporated Updating a base reference power for high speed data resumption
CN104684018A (en) * 2013-11-29 2015-06-03 中国移动通信集团公司 Cell measuring method and device and cell measuring result reporting method and device
US20150181495A1 (en) * 2013-12-23 2015-06-25 Qualcomm Incorporated Involving traffic-to-pilot ratio in measurement reports and in layer-1 procedures for improved call performance
CN104822169A (en) * 2014-01-30 2015-08-05 上海贝尔股份有限公司 Method for providing service for switching of user equipment, base station and dual connectivity system
CN104883712A (en) * 2014-02-27 2015-09-02 中国电信股份有限公司 Cell switching method and system
WO2016090124A1 (en) * 2014-12-05 2016-06-09 Qualcomm Incorporated Low latency and/or enhanced component carrier discovery for services and handover
CN104581849A (en) * 2015-01-08 2015-04-29 重庆邮电大学 Residential quarter switch method
CN104754677A (en) * 2015-03-24 2015-07-01 广东欧珀移动通信有限公司 Mobile equipment network connecting switching control method and device
CN105517085A (en) * 2015-12-15 2016-04-20 中国联合网络通信集团有限公司 Cell reselection method and device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113766558A (en) * 2019-05-16 2021-12-07 Oppo广东移动通信有限公司 Network mode control method, terminal and storage medium
CN113766559A (en) * 2019-05-16 2021-12-07 Oppo广东移动通信有限公司 Network mode control method, terminal and storage medium
US11930455B2 (en) 2019-05-16 2024-03-12 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method for controlling network connection, terminal and non-transitory storage medium
CN111836379A (en) * 2019-08-15 2020-10-27 维沃移动通信有限公司 Auxiliary information reporting method, configuration method, terminal and network side equipment
CN111836379B (en) * 2019-08-15 2023-10-27 维沃移动通信有限公司 Auxiliary information reporting method, configuration method, terminal and network equipment
CN112702768A (en) * 2019-10-22 2021-04-23 中国移动通信有限公司研究院 Dual-connection switching method, device, base station and terminal
WO2022027449A1 (en) * 2020-08-06 2022-02-10 Zte Corporation Valuation for ue assistance information
CN115209488A (en) * 2021-04-09 2022-10-18 中国移动通信有限公司研究院 Dual-connection auxiliary node recovery method and device
WO2023220927A1 (en) * 2022-05-17 2023-11-23 Lenovo (Beijing) Limited Handover to an energy saving network

Also Published As

Publication number Publication date
CN109257777B (en) 2021-01-15
WO2019011271A1 (en) 2019-01-17

Similar Documents

Publication Publication Date Title
CN109257777A (en) A kind of switching method, first base station, terminal and computer readable storage medium
CN105813195B (en) A kind of method and device selecting mobility management mechanism for terminal on demand
CN106231626B (en) A kind of method and device sending measurement report
CN109788492A (en) Measure the configuration method and equipment at interval
CN109996332A (en) Resident method and apparatus
CN102215526B (en) The report method of measuring results under multicarrier system, system and subscriber equipment
CN113068240A (en) Method for converting return path, wireless relay, network side node and terminal
WO2017084005A1 (en) Method for cell measurement report and user equipment
CN103220711B (en) Terminal reports FGI abilities and network side to configure the method and system of measurement task
CN109392034A (en) A kind of motion management method, user equipment and network side equipment
CN104936245B (en) Implementation method, system and the terminal of SRVCC
CN108810955B (en) A kind of configuration method, node and the terminal at measurement interval
CN108282837A (en) A kind of cell switching method, relevant device and system
CN102204344A (en) Method and terminal for avoiding cell pingpong reselection
CN109890056A (en) Wireless communication system and with method in a wireless communication system
WO2020132905A1 (en) Cell signal quality measurement method and apparatus, device, and system
CN109246745A (en) A kind of method of mobile management, network side equipment and terminal
CN109391955A (en) A kind of method and apparatus of converted measurement mode
CN109803280A (en) Measurement method, device and the user side equipment of disconnected state user side equipment
CN108882266A (en) Wireless resource management RRM measurement method, network side equipment and terminal
CN109309900A (en) A kind of measurement method and user terminal
CN104936246B (en) The SRVCC measurement method and terminal of terminal
Li et al. A first look at unstable mobility management in cellular networks
TWI551162B (en) A method, system, and device for reporting mobile information
JP2024513924A (en) Method for switching between private network and public network based on cloud communication and cloud communication terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant