CN109256718A - A kind of Substation Electric Equipment monitoring management method - Google Patents
A kind of Substation Electric Equipment monitoring management method Download PDFInfo
- Publication number
- CN109256718A CN109256718A CN201811214681.6A CN201811214681A CN109256718A CN 109256718 A CN109256718 A CN 109256718A CN 201811214681 A CN201811214681 A CN 201811214681A CN 109256718 A CN109256718 A CN 109256718A
- Authority
- CN
- China
- Prior art keywords
- data
- processing system
- module
- management method
- acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B15/00—Supervisory desks or panels for centralised control or display
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
Abstract
The invention discloses a kind of Substation Electric Equipment monitoring management methods, its Substation Electric Equipment monitoring management method specific steps are as follows: step 1: the installation of monitoring-testing device: monitoring-testing device includes that data collection system, data are set from processing system, central processing system, and to baseline values;Step 2: the acquisition of data: data acquisition is monitored to every group of electrical equipment by every group of data collection system, the data of acquisition include temperature, humidity, smog and electronic tag;Step 3: data are handled certainly: being compared and analyzed from data of the processing system to acquisition with basic data by data;Step 4: the feedback of data: the data after comparative analysis feed back to central processing system again;Step 5: warning note: central processing system carries out drive control to alarm according to the information of feedback, and structure of the invention design rationally, convenient for being monitored management to the equipment in substation, reduces management difficulty.
Description
Technical field
The present invention relates to electrical equipment monitoring management technical field more particularly to a kind of Substation Electric Equipment monitoring managements
Method.
Background technique
Substation, which refers in electric system, converts voltage and current, receives electric energy and distributes the place of electric energy.?
Substation in power plant is primary substation, and effect is to be fed to high-voltage fence after the electric energy that generator issues boosts
In, the electrical equipment in substation is divided into primary equipment and secondary device.
Primary equipment refers to directly production, conveying, distribution and the equipment using electric energy, mainly includes transformer, high pressure open circuit
Device, disconnecting switch, mutual inductor (current transformer, voltage transformer), bus, arrester, capacitor, reactor etc..
The secondary device of substation refers to that the operating condition to primary equipment and system measures, monitors, controls and protect
The equipment of shield, it is mainly by including protective relaying device, automatic device, measure and control device, metering device, automated system and being
The DC equipment of secondary device offer power supply.
Since the electrical equipment of substation used is more, and it is incorporated into power transformation box and is carried out using and due to every mostly
Equipment working state and use environment in group power transformation box have differences, and then need to be monitored it management, and existing
Management method needs the more good equipment of data-handling capacity to be handled, and management method is more complicated, for this purpose, we mention
A kind of Substation Electric Equipment monitoring management method is gone out.
Summary of the invention
The present invention provides a kind of Substation Electric Equipment monitoring management methods, it is therefore intended that convenient for setting in substation
It is standby to be monitored management, reduce management difficulty.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
A kind of Substation Electric Equipment monitoring management method, Substation Electric Equipment monitoring management method specific steps are as follows:
Step 1: the installation of monitoring-testing device: monitoring-testing device include data collection system, data from processing system, in
Processing system is entreated, and baseline values are set;
Step 2: data acquisition, acquisition the acquisition of data: are monitored to every group of electrical equipment by every group of data collection system
Data include temperature, humidity, smog and electronic tag;
Step 3: data are handled certainly: being compared and analyzed from data of the processing system to acquisition with basic data by data;
Step 4: the feedback of data: the data after comparative analysis feed back to central processing system again, and central processing system is to data
It is arranged and is shown;
Step 5: warning note: central processing system carries out drive control to alarm according to the information of feedback.
Preferably, in above-mentioned Substation Electric Equipment monitoring management method, in the step 1, data collection system includes
Temperature sensor, humidity sensor, smoke sensor device, clock module and electronic tag.
Based on above-mentioned technical characteristic, pass through temperature sensor, humidity sensor, smoke sensor device, clock module and electronics
Label respectively to the temperature of the electrical equipment, humidity, smog, be acquired using time and electronic tag data.
Preferably, in above-mentioned Substation Electric Equipment monitoring management method, in the step 1, data collection system sum number
It is matched according to from processing system one-to-one correspondence, and data collection system and data are from the electrical equipment of processing system and the monitoring
It corresponds.
Based on above-mentioned technical characteristic, by data collection system and data from the electrical equipment one of processing system and the monitoring
One corresponding use, can make individual system be monitored individual equipment, so that monitoring data are more convenient, arrange number
According to decentralized, the efficiency of data processing is improved.
Preferably, in above-mentioned Substation Electric Equipment monitoring management method, in the step 1, data are from processing system packet
Data extraction module and data acquisition module are included, electrically output connection is micro- for the data processor module and data acquisition module
Processor, electrically output connection data contrast module, the data comparison module electrically export connection data to the microprocessor
Judgment module, electrically output connects data feedback module to the data judgment module.
Based on above-mentioned technical characteristic, the initial value that storage is inputted in memory is mentioned by data extraction module
It takes, extraction is acquired to the data acquired in data collection system by data acquisition module, microprocessor passes through data pair
The data of acquisition and the data of extraction are compared than module, data judgment module judges the data after comparison, most
Afterwards by data feedback module feedback to central processing system.
Preferably, in above-mentioned Substation Electric Equipment monitoring management method, in the step 1, baseline values include temperature
Maximum value, the maximum value of humidity, the comdemning period of the maintenance period of equipment and equipment.
Based on above-mentioned technical characteristic, processing is compared by the data of setting and the data of acquisition, to form alarm signal
Breath.
Preferably, in above-mentioned Substation Electric Equipment monitoring management method, in the step 1, central processing system includes
Central processing unit, input unit, display unit and alarm.
Based on above-mentioned technical characteristic, operation control is carried out convenient for administrative staff by input unit, just by display unit
It is shown in data, alarm reminds administrative staff.
The beneficial effects of the present invention are:
Structure of the invention design is reasonable, and first: every group of electrical equipment of substation can be managed by this management method,
Management service can be managed in time in this way;
Second: data being handled from processing system by every group of data, so that treatment effeciency is higher, and handle error more
It is small, while alleviating entire monitoring system processing labor intensity;
Third: by management method can more comprehensively, in time, effectively the working environment to every group of electrical equipment of substation and
Service life is managed.
Certainly, it implements any of the products of the present invention it is not absolutely required to while reaching above all advantages.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is data collection system functional block diagram of the invention;
Fig. 3 is data of the invention from processing system functional block diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
It please refers to shown in Fig. 1-3, the present embodiment is a kind of Substation Electric Equipment monitoring management method, and substation is electrical
Equipment monitoring management method specific steps are as follows:
Step 1: the installation of monitoring-testing device: monitoring-testing device include data collection system, data from processing system, in
Processing system is entreated, and baseline values are set, data collection system includes temperature sensor, humidity sensor, smog biography
Sensor, clock module and electronic tag, data from processing system include data extraction module and data acquisition module, the data
Processor module and the electrical output connecting microprocessor of data acquisition module, electrically output connects data pair to the microprocessor
Than module, data comparison module electrically exports connection number it is judged that module, electrically output connects data to the data judgment module
Feedback module, data collection system and data are matched from processing system one-to-one correspondence, and data collection system and data are certainly
Processing system and the electrical equipment of the monitoring correspond, and baseline values include the maximum value of temperature, the maximum value of humidity, equipment
Maintenance period and equipment comdemning period, central processing system includes central processing unit, input unit, display unit and alarm
Device;
Step 2: data acquisition, acquisition the acquisition of data: are monitored to every group of electrical equipment by every group of data collection system
Data include temperature, humidity, smog and electronic tag;
Step 3: data are handled certainly: being compared and analyzed from data of the processing system to acquisition with basic data by data;
Step 4: the feedback of data: the data after comparative analysis feed back to central processing system again, and central processing system is to data
It is arranged and is shown;
Step 5: warning note: central processing system carries out drive control to alarm according to the information of feedback.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention
In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example.
Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close
Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment
All details are described, also do not limit the specific embodiment that the invention is only.Obviously, according to the content of this specification, can make
Many modifications and variations.These embodiments are chosen and specifically described to this specification, is original in order to better explain the present invention
Reason and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only authorized
The limitation of sharp claim and its full scope and equivalent.
Claims (6)
1. a kind of Substation Electric Equipment monitoring management method, it is characterised in that: its Substation Electric Equipment monitoring management method
Specific steps are as follows:
Step 1: the installation of monitoring-testing device: monitoring-testing device include data collection system, data from processing system, in
Processing system is entreated, and baseline values are set;
Step 2: data acquisition, acquisition the acquisition of data: are monitored to every group of electrical equipment by every group of data collection system
Data include temperature, humidity, smog and electronic tag;
Step 3: data are handled certainly: being compared and analyzed from data of the processing system to acquisition with basic data by data;
Step 4: the feedback of data: the data after comparative analysis feed back to central processing system again, and central processing system is to data
It is arranged and is shown;
Step 5: warning note: central processing system carries out drive control to alarm according to the information of feedback.
2. Substation Electric Equipment monitoring management method according to claim 1, it is characterised in that: in the step 1,
Data collection system includes temperature sensor, humidity sensor, smoke sensor device, clock module and electronic tag.
3. Substation Electric Equipment monitoring management method according to claim 1, it is characterised in that: in the step 1,
Data collection system and data are matched from processing system one-to-one correspondence, and data collection system and data from processing system with
The electrical equipment of the monitoring corresponds.
4. Substation Electric Equipment monitoring management method according to claim 1, it is characterised in that: in the step 1,
Data from processing system include data extraction module and data acquisition module, the data processor module and data acquisition module
Electrical output connecting microprocessor, electrically output connects data contrast module, the data comparison module to the microprocessor
Electrically output connection number is it is judged that module, electrically output connects data feedback module to the data judgment module.
5. Substation Electric Equipment monitoring management method according to claim 1, it is characterised in that: in the step 1,
Baseline values include the maximum value of temperature, the maximum value of humidity, the comdemning period of the maintenance period of equipment and equipment.
6. Substation Electric Equipment monitoring management method according to claim 1, it is characterised in that: in the step 1,
Central processing system includes central processing unit, input unit, display unit and alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811214681.6A CN109256718A (en) | 2018-10-18 | 2018-10-18 | A kind of Substation Electric Equipment monitoring management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811214681.6A CN109256718A (en) | 2018-10-18 | 2018-10-18 | A kind of Substation Electric Equipment monitoring management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109256718A true CN109256718A (en) | 2019-01-22 |
Family
ID=65045890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811214681.6A Pending CN109256718A (en) | 2018-10-18 | 2018-10-18 | A kind of Substation Electric Equipment monitoring management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109256718A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109859448A (en) * | 2019-01-28 | 2019-06-07 | 武汉恒泰通技术有限公司 | A kind of communication link failure processing system and method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201813071U (en) * | 2010-05-06 | 2011-04-27 | 丁建新 | Node device for high voltage, low voltage and transformer vault environment (temperature, humidity and smoke) sensors of pre-installed substation |
CN202134825U (en) * | 2011-07-27 | 2012-02-01 | 河南省电力公司周口供电公司 | On-line intelligent monitoring system for monitoring internal environment of electrical cabinet |
CN104852295A (en) * | 2014-02-18 | 2015-08-19 | 南通市金石工贸有限公司 | High-low voltage switch cabinet with automatic monitoring function |
CN205646502U (en) * | 2016-05-17 | 2016-10-12 | 索凌电气有限公司 | High voltage distribution cabinet remote monitoring device |
CN106292582A (en) * | 2016-08-15 | 2017-01-04 | 许昌初心智能电气科技有限公司 | A kind of controller switching equipment intelligent diagnostics based on Internet of Things and delivery system |
CN206059923U (en) * | 2016-08-05 | 2017-03-29 | 高大鹏 | A kind of safety monitoring assembly of power distribution cabinet |
CN106602711A (en) * | 2015-10-14 | 2017-04-26 | 无锡宝丰电力设备有限公司 | Electric control system |
CN106655512A (en) * | 2016-12-28 | 2017-05-10 | 国网山东省电力公司临沂供电公司 | Substation monitoring system based on the Internet of things technology |
CN107946908A (en) * | 2017-11-15 | 2018-04-20 | 佛山杰致信息科技有限公司 | A kind of real-time monitoring system of low-voltage distribution cabinet |
-
2018
- 2018-10-18 CN CN201811214681.6A patent/CN109256718A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201813071U (en) * | 2010-05-06 | 2011-04-27 | 丁建新 | Node device for high voltage, low voltage and transformer vault environment (temperature, humidity and smoke) sensors of pre-installed substation |
CN202134825U (en) * | 2011-07-27 | 2012-02-01 | 河南省电力公司周口供电公司 | On-line intelligent monitoring system for monitoring internal environment of electrical cabinet |
CN104852295A (en) * | 2014-02-18 | 2015-08-19 | 南通市金石工贸有限公司 | High-low voltage switch cabinet with automatic monitoring function |
CN106602711A (en) * | 2015-10-14 | 2017-04-26 | 无锡宝丰电力设备有限公司 | Electric control system |
CN205646502U (en) * | 2016-05-17 | 2016-10-12 | 索凌电气有限公司 | High voltage distribution cabinet remote monitoring device |
CN206059923U (en) * | 2016-08-05 | 2017-03-29 | 高大鹏 | A kind of safety monitoring assembly of power distribution cabinet |
CN106292582A (en) * | 2016-08-15 | 2017-01-04 | 许昌初心智能电气科技有限公司 | A kind of controller switching equipment intelligent diagnostics based on Internet of Things and delivery system |
CN106655512A (en) * | 2016-12-28 | 2017-05-10 | 国网山东省电力公司临沂供电公司 | Substation monitoring system based on the Internet of things technology |
CN107946908A (en) * | 2017-11-15 | 2018-04-20 | 佛山杰致信息科技有限公司 | A kind of real-time monitoring system of low-voltage distribution cabinet |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109859448A (en) * | 2019-01-28 | 2019-06-07 | 武汉恒泰通技术有限公司 | A kind of communication link failure processing system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102879667B (en) | Lightning protection device on-line remote monitoring recorder | |
CN105510779B (en) | A kind of arrester on-line monitoring system and its application method | |
CN202276194U (en) | Online medium voltage switch cabinet monitoring device | |
CN109742862B (en) | Remote control system for safe power utilization | |
CN110348354B (en) | Power utilization load identification system, method and dormitory power utilization management system | |
CN102435871A (en) | On-line monitoring system for data collection of electric arresters based on GPS (Global Positioning System) synchronization | |
CN202929124U (en) | Substation high-voltage shunt capacitor intelligent online monitoring system | |
CN104701986A (en) | Intelligent terminal of box-type substation | |
CN106443144A (en) | Distributed transient overvoltage monitoring system for EHV (extra-high voltage) GIS | |
CN206148945U (en) | Intelligence dynamic filter power factor controller | |
CN109256718A (en) | A kind of Substation Electric Equipment monitoring management method | |
JP2016131470A (en) | Abnormality detection system for photovoltaic power generation facilities | |
CN209561923U (en) | Intelligent railway weak electric system power lightning protection distribution device | |
CN204989339U (en) | Monitoring device for high -voltage electric transmission line | |
CN104678910A (en) | Intelligent transformer and distribution comprehensive monitoring system | |
CN104678756A (en) | Novel intelligent comprehensive power transformation and distribution monitoring system | |
CN204462278U (en) | Based on the distribution transformer status monitoring information acquisition and processing system of IEC61850 standard | |
CN203787795U (en) | Safe low-voltage distribution box | |
CN100540750C (en) | AC power supply device in aluminum electrolysis shop computer on-line insulating monitoring and warning | |
CN102497015A (en) | Low voltage switchgear monitoring device | |
CN206773109U (en) | A kind of failure anticipation device of photovoltaic combiner box | |
CN206948027U (en) | A kind of Portable direct stream output device | |
CN208685059U (en) | A kind of long-range monitoring cabinet of collecting well group cathodic protection digitlization | |
CN207166138U (en) | A kind of subway station distribution system | |
CN106571675A (en) | Power management device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190122 |
|
WD01 | Invention patent application deemed withdrawn after publication |