CN109255197A - A kind of method of inspection, device and the equipment of Boolean calculation result - Google Patents
A kind of method of inspection, device and the equipment of Boolean calculation result Download PDFInfo
- Publication number
- CN109255197A CN109255197A CN201811148810.6A CN201811148810A CN109255197A CN 109255197 A CN109255197 A CN 109255197A CN 201811148810 A CN201811148810 A CN 201811148810A CN 109255197 A CN109255197 A CN 109255197A
- Authority
- CN
- China
- Prior art keywords
- bim model
- horizontal member
- boolean
- inspection
- calculation result
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
- G06T19/20—Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Software Systems (AREA)
- Computer Graphics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses the method for inspection, device and the equipment of a kind of Boolean calculation result, this method comprises: the whole BIM model after obtaining Boolean calculation;Wherein, whole BIM model includes horizontal member BIM model and there are prefabricated components BIM models and/or site concrete BIM model that boolean is superimposed with horizontal member BIM model;Default inspection processing is carried out to horizontal member BIM model, to show that prefabricated components BIM model and/or site concrete BIM model carry out the part that boolean is superimposed with horizontal member BIM model;The present invention is by carrying out default inspection processing to horizontal member BIM model, the prefabricated components BIM model and/or site concrete BIM model that script reviewer can not be directly viewable the part that boolean is superimposed can be carried out with horizontal member BIM model to show, the workload for reducing reviewer improves the checkability of Boolean calculation result.
Description
Technical field
The present invention relates to building engineering field, in particular to a kind of the method for inspection, device and the equipment of Boolean calculation result.
Background technique
With the development of modern society's science and technology, the component design drawing of building engineering field more and more uses three-dimensional
BIM model, this allows for the Boolean calculation for carrying out the stack combinations between component and component, via the Boolean calculation of X-Y scheme
Develop to the Boolean calculation of 3-D graphic.Wherein, Boolean calculation is the logical deduction by reasoning method of numerical chracter, including joint, intersection,
Subtract each other.This logical calculation method is quoted in graphics processing operation can make simple fundamental figure combination generate new shape
Body.
In the prior art, the Boolean calculation result of two figures needs completely by desk checking, but desk checking calculates
It is complex, it is also not easy to operate;And a large amount of Boolean calculation is usually contained in complete model, if only by manually voluntarily examining
It tests, needs to spend a large amount of manpower, and inefficient.Therefore, the checkability of Boolean calculation result how is improved, reduces and examines
The workload of personnel, be now urgent need to resolve the problem of.
Summary of the invention
The object of the present invention is to provide the method for inspection, device and the equipment of a kind of Boolean calculation result, to improve boolean's fortune
The checkability for calculating result, reduces the workload of reviewer.
In order to solve the above technical problems, the present invention provides a kind of method of inspection of Boolean calculation result, comprising:
Obtain the whole BIM model after Boolean calculation;Wherein, the entirety BIM model includes horizontal member BIM mould
Type and there are prefabricated components BIM models and/or site concrete BIM model that boolean is superimposed with the horizontal member BIM model;
Default inspection processing is carried out to the horizontal member BIM model, with show the prefabricated components BIM model and/or
The site concrete BIM model carries out the part that boolean is superimposed with the horizontal member BIM model.
It is optionally, described that default inspection processing is carried out to the horizontal member BIM model, comprising:
Transparency process is carried out to the horizontal member BIM model.
It is optionally, described that default inspection processing is carried out to the horizontal member BIM model, comprising:
Mobile processing is carried out to the horizontal member BIM model.
It is optionally, described that mobile processing is carried out to the horizontal member BIM model, comprising:
The horizontal member BIM model is risen or fallen into preset height;Wherein, the preset height is greater than or equal to institute
State the thickness of horizontal member BIM model.
Optionally, described that default inspection processing is carried out to the horizontal member BIM model, to show the prefabricated components
After BIM model and/or the site concrete BIM model carry out the part that boolean is superimposed with the horizontal member BIM model, also
Include:
Highlight the prefabricated components BIM model and/or the site concrete BIM model and the horizontal member BIM
The part of model progress boolean's superposition.
Optionally, described that default inspection processing is carried out to the horizontal member BIM model, to show the prefabricated components
After BIM model and/or the site concrete BIM model carry out the part that boolean is superimposed with the horizontal member BIM model, also
Include:
Receive the problem of human-computer interaction device sends build directives;
It obtains and records the corresponding entirety BIM model of described problem build directives, horizontal member BIM model, prefabricated components
The attribute information of BIM model and/or site concrete BIM model;Wherein, the attribute information include component number information and/or
Location information.
Optionally, after the problem of reception human-computer interaction device is sent build directives, further includes:
It obtains and records the corresponding user processing information of described problem build directives;The user processing information includes user
At least one of name information, temporal information and problem information.
The present invention also provides a kind of verifying attachments of Boolean calculation result, comprising:
Obtain module, for obtaining Boolean calculation after whole BIM model;Wherein, the entirety BIM model includes
Horizontal member BIM model and the prefabricated components BIM model being superimposed with the horizontal member BIM model there are boolean and/or cast-in-place
Component BIM model;
Inspection module, for carrying out default inspection processing to the horizontal member BIM model, to show the prefabricated components
BIM model and/or the site concrete BIM model carry out the part that boolean is superimposed with the horizontal member BIM model.
Optionally, the device further include:
Receiving module, for receiving the problem of human-computer interaction device sends build directives;
Logging modle, for obtaining and recording the corresponding entirety BIM model of described problem build directives, horizontal member BIM
The attribute information of model, prefabricated components BIM model and/or site concrete BIM model;Wherein, the attribute information includes component
Number information and/or location information.
In addition, the present invention also provides a kind of inspection equipment of Boolean calculation result, comprising:
Memory, for storing computer program;
Processor realizes the inspection of Boolean calculation result as described in any one of the above embodiments when for executing the computer program
The step of proved recipe method.
The method of inspection of a kind of Boolean calculation result provided by the present invention, comprising: whole after acquisition Boolean calculation
Body BIM model;Wherein, whole BIM model includes horizontal member BIM model and there are boolean to be superimposed with horizontal member BIM model
Prefabricated components BIM model and/or site concrete BIM model;Default inspection processing is carried out to horizontal member BIM model, with aobvious
Show that prefabricated components BIM model and/or site concrete BIM model carry out the part that boolean is superimposed with horizontal member BIM model;
As it can be seen that the present invention is handled by carrying out default inspection to horizontal member BIM model, can by script reviewer without
The prefabricated components BIM model and/or site concrete BIM model that method is directly viewable carry out boolean with horizontal member BIM model and are superimposed
Part show, facilitate reviewer to test the Boolean calculation result of whole BIM model, reduce reviewer
Workload, improve the checkability of Boolean calculation result.In addition, the present invention also provides a kind of inspections of Boolean calculation result
Experiment device and equipment equally have above-mentioned beneficial effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis
The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of flow chart of the method for inspection of Boolean calculation result provided by the embodiment of the present invention;
Fig. 2 is a kind of structure chart of the verifying attachment of Boolean calculation result provided by the embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Referring to FIG. 1, Fig. 1 is a kind of process of the method for inspection of Boolean calculation result provided by the embodiment of the present invention
Figure.This method may include:
Step 101: obtaining the whole BIM model after Boolean calculation;Wherein, whole BIM model includes horizontal member
BIM model and there are prefabricated components BIM models and/or site concrete BIM model that boolean is superimposed with horizontal member BIM model.
It is understood that the horizontal member BIM model in this step can be the BIM mould of the horizontal member such as floor
Type;Prefabricated components BIM model can be the BIM model of prefabricated components, wherein prefabricated components can be preparatory in factory or scene
The component of production, such as wall, beam, column, floor, stair, balcony, awning;Site concrete BIM model can be site concrete
BIM model, wherein site concrete can be the component made in such a way that cement pours at the scene as traditional architecture,
Such as the windowsill of the float window and the window that floats that are opened up on prefabricated wall.Whole BIM model in this step can be horizontal member BIM mould
After type and prefabricated components BIM model and/or site concrete BIM model carry out Boolean calculation, it is superimposed a global facility of composition
BIM model.
Specifically, for the specific choice of horizontal member BIM model, it can be by designer according to practical scene and user
(reviewer) demand self-setting, if horizontal member BIM model can be the BIM mould of the horizontal prefabricated components such as floor
Type, or the BIM model of other horizontal components, the present embodiment do not do any restrictions to this.
It should be noted that since the purpose of the present embodiment is by the horizontal member BIM model in whole BIM model
Default inspection processing is carried out, with the prefabricated components BIM model and/or site concrete BIM model and water in display entirety BIM model
Flat component BIM model carries out the part of boolean's superposition, such as showing the BIM model of horizontal member floor and the BIM of prefabricated components wall
The part that boolean is superimposed between model.Therefore, the whole BIM model in this step need to preserve prefabricated components BIM model and/
Or site concrete BIM model carries out the BIM model or BIM model information for the part that boolean is superimposed with horizontal member BIM model, such as
When horizontal member BIM model and prefabricated components BIM model and/or site concrete BIM model carry out Boolean calculation, original can be retained
This horizontal member BIM model and prefabricated components BIM model and/or site concrete BIM model.
It is corresponding, it, can be by designer according to practical scene for the particular content of the whole BIM model in this step
With user demand self-setting, such as including a horizontal member BIM model and the prefabricated structure that boolean is superimposed only can be carried out with it
Part BIM model and/or site concrete BIM model;Also may include multiple horizontal member BIM models and with each horizontal member
BIM model carries out the prefabricated components BIM model and/or site concrete BIM model of boolean's superposition, i.e. reviewer can pass through this
Method provided by embodiment, while the Boolean calculation result of multiple horizontal member BIM models is detected.The present embodiment pair
This is not intended to be limited in any.Likewise, for the specific acquisition modes of the whole BIM model in this step, it can be by designer
According to practical scene and user demand self-setting, testing staff sends or testing staff such as can be directly received from database
The whole BIM model of middle selection;It can also be by existing boolean operation method, to horizontal member BIM model and corresponding pre-
Component BIM model and/or site concrete BIM model processed carries out Boolean calculation, obtains entirety BIM model.As long as available cloth
Whole BIM model after your operation, the present embodiment do not do any restrictions equally to this.
Step 102: default inspection processing is carried out to horizontal member BIM model, with show prefabricated components BIM model and/or
Site concrete BIM model carries out the part that boolean is superimposed with horizontal member BIM model.
Wherein, the purpose of this step can be shown prefabricated for by carrying out default inspection processing to horizontal member BIM model
Component BIM model and/or site concrete BIM model carry out the part that boolean is superimposed with horizontal member BIM model, facilitate detection people
Detection of the member to Boolean calculation result.For carrying out the default specific side for examining processing to horizontal member BIM model in this step
Formula can such as carry out horizontal member BIM model saturating by designer according to practical scene and user demand self-setting
Brightization processing, to show that it is folded that prefabricated components BIM model and/or site concrete BIM model and horizontal member BIM model carry out boolean
The part added;Mobile processing can also be carried out, to horizontal member BIM model to show prefabricated components BIM model and/or cast-in-place structure
Part BIM model carries out the part that boolean is superimposed with horizontal member BIM model, such as carries out lifting processing to horizontal member BIM model
And/or processing is moved horizontally, make itself and prefabricated components BIM model and/or site concrete BIM model separation.As long as can pass through
Default inspection processing shows that prefabricated components BIM model and/or site concrete BIM model and horizontal member BIM model carry out boolean
The part of superposition, the present embodiment do not do any restrictions to this.
Specifically, for carrying out the default detailed process for examining processing, Ke Yiyou to horizontal member BIM model in this step
Designer can automatically carry out horizontal member BIM model according to practical scene and user demand self-setting, such as this step
Default inspection processing can be directly to the water in whole BIM model when carrying out transparency process to horizontal member BIM model
Flat component BIM model carries out transparency process;It, can be directly by whole BIM when carrying out mobile processing to horizontal member BIM model
Horizontal member BIM model in model rises or falls preset height, by prefabricated components BIM model and/or site concrete BIM
Model is partially separated with what horizontal member BIM model progress boolean was superimposed.This step can also be according to testing staff in man-machine friendship
The control instruction that mutual equipment is sent carries out default inspection processing to horizontal member BIM model, i.e., to horizontal member BIM model into
When row transparency process, transparency process can be carried out by the horizontal member BIM model that human-computer interaction device selects to user;
When carrying out mobile processing to horizontal member BIM model, the horizontal member BIM mould that user can be selected by human-computer interaction device
Type carries out mobile processing, the shifting that can also be carried out according to user by horizontal member BIM model of the human-computer interaction device to selection
Dynamic operation carries out corresponding mobile processing to horizontal member BIM model, as testing staff can pass through the horizontal structure of mouse drag
Part BIM model.As long as can by default inspection processing, show prefabricated components BIM model and/or site concrete BIM model with
Horizontal member BIM model carries out the part of boolean's superposition, and the present embodiment does not do any restrictions to this.
It is corresponding, default inspection processing, whole BIM mould are carried out to horizontal member BIM model automatically in order to facilitate this step
It may include the class of such as horizontal member, prefabricated components and site concrete of horizontal member BIM model or each BIM model in type
Type information allows processor to directly determine the horizontal member BIM model in whole BIM model.
It is understood that this step automatically to horizontal member BIM model carry out it is default examine processing when, can will be horizontal
Component BIM model rises or falls preset height, to show prefabricated components BIM model and/or site concrete BIM model and level
The part of component BIM model progress boolean's superposition.Specific setting for preset height, can be by designer according to practical field
Scape and user demand self-setting can such as be configured according to the thickness of horizontal member BIM model correspondence, that is, be set greater than
Or the numerical value of the thickness equal to horizontal member BIM model;It can also be according to prefabricated components BIM model and/or site concrete BIM mould
Type and horizontal member BIM model carry out that the position of part of boolean's superposition is corresponding to be configured.As long as can guarantee horizontal structure
After part BIM model rises or falls preset height, prefabricated components BIM model and/or site concrete BIM model and water can be shown
Flat component BIM model carries out the part of boolean's superposition, and the present embodiment does not do any restrictions to this.
Further, in order to facilitate testing staff to prefabricated components BIM model and/or site concrete BIM model and level
Component BIM model carries out the detection of the part of boolean's superposition, can also include: to be set after this step by highlighted setting or color
The mode set, highlights prefabricated components BIM model and/or site concrete BIM model and horizontal member BIM model carries out boolean
The step of part of superposition.
It should be noted that this step is handled by carrying out the default inspection of lifting processing such as to horizontal member BIM model,
Three-dimensional lift can be carried out according to the information for the feature for the actual (real) thickness information for containing each component in BIM design drawing
Height lifting improves manual inspection efficiency.It can be in order to further determine the inspection result of Boolean calculation result, after this step
According to the instruction that user is sent by human-computer interaction device, the step of obtaining corresponding inspection result, man-machine friendship such as can receive
The problem of mutual equipment is sent build directives;It obtains and records the corresponding entirety BIM model of problem build directives, horizontal member BIM
The attribute information of model, prefabricated components BIM model and/or site concrete BIM model;Wherein, attribute information includes component number
The location information of information and/or such as floor information.
That is, testing staff can be to the prefabricated components BIM model and/or site concrete of display after this step
BIM model carries out the part that boolean is superimposed with horizontal member BIM model and carries out desk checking;If problematic, mouse can be passed through
The problematic BIM model such as prefabricated components BIM model is clicked, sends problem build directives, corresponding, processor to processor
Can the corresponding BIM model of problem build directives based on the received, obtain the BIM model and/or related to the BIM model automatically
BIM model attribute information, the attribute information for the prefabricated components BIM model that such as not only available user clicks can be with
The attribute for carrying out horizontal member BIM model and entirety BIM model that boolean is superimposed with prefabricated components BIM model is obtained to believe
Breath carries out corresponding issue handling operation to determine the problematic whole models of Boolean calculation after convenient.
It is corresponding, after receiving the problem of human-computer interaction device sends build directives, it can also obtain and record problem component
Instruct corresponding user processing information;User processing information include in user's name information, temporal information and problem information at least
One.It is, pass through the processing information of records tests personnel, it, can when carrying out corresponding issue handling operation later to facilitate
Where preferably finding problem, convenient for processing.Further, it can also include whether what processing was completed in user processing information
Information, i.e. reviewer can solve the problems in Boolean calculation result, and recorded by manual adjustment mode.
In the present embodiment, the embodiment of the present invention is handled by carrying out default inspection to horizontal member BIM model, can will be former
The prefabricated components BIM model and/or site concrete BIM model and horizontal member BIM model that this reviewer can not be directly viewable
The part for carrying out boolean's superposition is shown, is facilitated reviewer to test the Boolean calculation result of whole BIM model, is subtracted
The workload for having lacked reviewer improves the checkability of Boolean calculation result.
Referring to FIG. 2, Fig. 2 is a kind of structure of the verifying attachment of Boolean calculation result provided by the embodiment of the present invention
Figure.The apparatus may include:
Obtain module 100, for obtaining Boolean calculation after whole BIM model;Wherein, whole BIM model includes
Horizontal member BIM model and there are prefabricated components BIM models and/or site concrete that boolean is superimposed with horizontal member BIM model
BIM model;
Inspection module 200, for carrying out default inspection processing to horizontal member BIM model, to show prefabricated components BIM mould
Type and/or site concrete BIM model carry out the part that boolean is superimposed with horizontal member BIM model.
Optionally, inspection module 200 may include:
Transparence submodule, for carrying out transparency process to horizontal member BIM model.
Optionally, inspection module 200 may include:
Mobile submodule, for carrying out mobile processing to horizontal member BIM model.
Optionally, mobile submodule may include:
Lifting unit, for horizontal member BIM model to be risen or fallen preset height;Wherein, preset height be greater than or
Equal to the thickness of horizontal member BIM model.
Optionally, which can also include:
Module is highlighted, for highlighting prefabricated components BIM model and/or site concrete BIM model and horizontal structure
The part of part BIM model progress boolean's superposition.
Optionally, which can also include:
Receiving module, for receiving the problem of human-computer interaction device sends build directives;
Logging modle, for obtain and record the corresponding entirety BIM model of problem build directives, horizontal member BIM model,
The attribute information of prefabricated components BIM model and/or site concrete BIM model;Wherein, attribute information includes component number information
And/or location information.
Optionally, which can also include:
User processing information logging modle, for obtaining and recording the corresponding user processing information of problem build directives;With
It includes at least one of user's name information, temporal information and problem information that family, which handles information,.
In the present embodiment, the embodiment of the present invention carries out at default inspection horizontal member BIM model by inspection module 200
Reason, can be by prefabricated components BIM model and/or site concrete BIM model that script reviewer can not be directly viewable and horizontal
The part that component BIM model carries out boolean's superposition is shown, facilitates reviewer to the Boolean calculation result of whole BIM model
It tests, reduces the workload of reviewer, improve the checkability of Boolean calculation result.
In addition, the embodiment of the invention also provides a kind of inspection equipment of Boolean calculation result, comprising: memory is used for
Store computer program;Processor realizes the Boolean calculation knot as provided by above-described embodiment when for executing computer program
The step of method of inspection of fruit.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities
The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment and
For equipment, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method portion
It defends oneself bright.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor
The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
The method of inspection, device and the equipment of Boolean calculation result provided by the present invention are described in detail above.
Used herein a specific example illustrates the principle and implementation of the invention, and the explanation of above embodiments is only used
In facilitating the understanding of the method and its core concept of the invention.It should be pointed out that for those skilled in the art,
Without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention, these improvement and modification
It falls into the protection scope of the claims in the present invention.
Claims (10)
1. a kind of method of inspection of Boolean calculation result characterized by comprising
Obtain the whole BIM model after Boolean calculation;Wherein, the entirety BIM model include horizontal member BIM model and
There are prefabricated components BIM models and/or site concrete BIM model that boolean is superimposed with the horizontal member BIM model;
Default inspection processing is carried out to the horizontal member BIM model, to show the prefabricated components BIM model and/or described
Site concrete BIM model carries out the part that boolean is superimposed with the horizontal member BIM model.
2. the method for inspection of Boolean calculation result according to claim 1, which is characterized in that described to the horizontal member
BIM model carries out default inspection processing, comprising:
Transparency process is carried out to the horizontal member BIM model.
3. the method for inspection of Boolean calculation result according to claim 1, which is characterized in that described to the horizontal member
BIM model carries out default inspection processing, comprising:
Mobile processing is carried out to the horizontal member BIM model.
4. the method for inspection of Boolean calculation result according to claim 3, which is characterized in that described to the horizontal member
BIM model carries out mobile processing, comprising:
The horizontal member BIM model is risen or fallen into preset height;Wherein, the preset height is greater than or equal to the water
The thickness of flat component BIM model.
5. the method for inspection of Boolean calculation result according to claim 1, which is characterized in that described to the horizontal member
BIM model carries out default inspection processing, to show the prefabricated components BIM model and/or the site concrete BIM model and institute
After the part for stating the progress boolean's superposition of horizontal member BIM model, further includes:
Highlight the prefabricated components BIM model and/or the site concrete BIM model and the horizontal member BIM model
Carry out the part of boolean's superposition.
6. the method for inspection of Boolean calculation result according to any one of claims 1 to 5, which is characterized in that described to institute
It states horizontal member BIM model and carries out default inspection processing, to show the prefabricated components BIM model and/or the site concrete
BIM model is carried out with the horizontal member BIM model after the part that boolean is superimposed, further includes:
Receive the problem of human-computer interaction device sends build directives;
It obtains and records the corresponding entirety BIM model of described problem build directives, horizontal member BIM model, prefabricated components BIM mould
The attribute information of type and/or site concrete BIM model;Wherein, the attribute information includes component number information and/or position letter
Breath.
7. the method for inspection of Boolean calculation result according to claim 6, which is characterized in that the reception human-computer interaction dress
After the problem of setting transmission build directives, further includes:
It obtains and records the corresponding user processing information of described problem build directives;The user processing information includes user's name
At least one of information, temporal information and problem information.
8. a kind of verifying attachment of Boolean calculation result characterized by comprising
Obtain module, for obtaining Boolean calculation after whole BIM model;Wherein, the entirety BIM model includes level
Component BIM model and there are prefabricated components BIM models and/or site concrete that boolean is superimposed with the horizontal member BIM model
BIM model;
Inspection module, for carrying out default inspection processing to the horizontal member BIM model, to show the prefabricated components BIM
Model and/or the site concrete BIM model carry out the part that boolean is superimposed with the horizontal member BIM model.
9. the verifying attachment of Boolean calculation result according to claim 8, which is characterized in that further include:
Receiving module, for receiving the problem of human-computer interaction device sends build directives;
Logging modle, for obtain and record the corresponding entirety BIM model of described problem build directives, horizontal member BIM model,
The attribute information of prefabricated components BIM model and/or site concrete BIM model;Wherein, the attribute information includes component number letter
Breath and/or location information.
10. a kind of inspection equipment of Boolean calculation result characterized by comprising
Memory, for storing computer program;
Processor realizes Boolean calculation result as described in any one of claim 1 to 7 when for executing the computer program
The method of inspection the step of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811148810.6A CN109255197A (en) | 2018-09-29 | 2018-09-29 | A kind of method of inspection, device and the equipment of Boolean calculation result |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811148810.6A CN109255197A (en) | 2018-09-29 | 2018-09-29 | A kind of method of inspection, device and the equipment of Boolean calculation result |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109255197A true CN109255197A (en) | 2019-01-22 |
Family
ID=65044848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811148810.6A Withdrawn CN109255197A (en) | 2018-09-29 | 2018-09-29 | A kind of method of inspection, device and the equipment of Boolean calculation result |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109255197A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111757658A (en) * | 2019-03-28 | 2020-10-09 | 成都鼎桥通信技术有限公司 | Manufacturing method of shielding cover |
-
2018
- 2018-09-29 CN CN201811148810.6A patent/CN109255197A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111757658A (en) * | 2019-03-28 | 2020-10-09 | 成都鼎桥通信技术有限公司 | Manufacturing method of shielding cover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10607163B2 (en) | LOD work package | |
CN109388877A (en) | A kind of method of inspection, device and the equipment of Boolean calculation result | |
Bratvedt et al. | Streamline computations for porous media flow including gravity | |
JP2008530595A (en) | Method and apparatus for improving digital elevation model (DEM) for terrain modeling | |
CN105684047A (en) | Dynamically updating compartments representing one or more geological structures | |
NO20101037A1 (en) | Geological modeling without grid | |
CA2947533C (en) | Integrating external algorithms into a flexible framework for imaging visualization data | |
CN113538706B (en) | Digital sand table-based house scene display method, device, equipment and storage medium | |
JP2008530594A (en) | Method and apparatus for distinguishing buildings from vegetation for terrain modeling | |
CN110634187B (en) | House point cloud model generation method and device based on house type graph | |
CN113420355B (en) | Floor processing method and device and electronic equipment | |
CN104375211B (en) | A kind of weather forecast isogram update method and system | |
CN109255197A (en) | A kind of method of inspection, device and the equipment of Boolean calculation result | |
CN103970955A (en) | Dynamic display method for parametric modeling and previewing of ship lock | |
KR101251549B1 (en) | System and Method of Analyzing a Structure Using CAD data Connected with Property data | |
KR20140118477A (en) | Module and method for inputting property value of realtime automatic reviewable bim tool | |
CN112184896B (en) | Three-dimensional building modeling method, device and system based on floor and open line assistance | |
CN118235167A (en) | Method and system for point cloud processing and viewing | |
Beever et al. | Assisting Serious Games Level Design with an Augmented Reality Application and Workflow. | |
CN111950134A (en) | BIM-based geological disaster assessment method and device and computer-readable storage medium | |
KR101089256B1 (en) | Geographic Information analysis method using of programing Invisible Depth Analysis | |
KR101661529B1 (en) | Three-dimensional visibility analysis, three-dimensional visibility analyzing program, server system and computer saved the program | |
Liu et al. | Modeling analysis of carbon sequestration in visual forests | |
US20030107567A1 (en) | Oriented three-dimensional editing glyphs | |
CN117635829A (en) | Three-dimensional visual expression method of multi-scale geological structure model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190122 |