CN109254850A - memory resource management method and system - Google Patents
memory resource management method and system Download PDFInfo
- Publication number
- CN109254850A CN109254850A CN201811158440.4A CN201811158440A CN109254850A CN 109254850 A CN109254850 A CN 109254850A CN 201811158440 A CN201811158440 A CN 201811158440A CN 109254850 A CN109254850 A CN 109254850A
- Authority
- CN
- China
- Prior art keywords
- memory resource
- collection process
- current
- dormant state
- program
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5011—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resources being hardware resources other than CPUs, Servers and Terminals
- G06F9/5022—Mechanisms to release resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/485—Task life-cycle, e.g. stopping, restarting, resuming execution
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/5022—Workload threshold
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/508—Monitor
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Memory System (AREA)
Abstract
This application discloses a kind of memory resource management method, system, computer equipment and computer readable storage mediums, the method comprise the steps that the collection process of starting memory resource;Judge whether current memory resource is sufficient;If current memory resource is sufficient, it is judged whether or not preset high priority program is in request memory resource;If controlling the collection process in request memory resource currently without preset high priority program and entering dormant state, and the collection process is made to keep dormant state in the sleep period with predetermined sleep time;After the sleep period, controls the collection process and release the dormant state and enter working condition to recycle memory resource.The method efficiently reduces the working hour of collection process under the premise of ensuring still can recycle memory resource in time, prevents from occupying multi-system resource in the collection process short time.
Description
Technical field
The present invention relates to computer storage tubes to manage technical field, in particular to a kind of memory resource management method and is
System.
Background technique
In computer system, when operation program is more lead to Installed System Memory deficiency when, can by collection process backstage
Available memory resource is recycled, operation program is released in time and uses.Such as in linux system, recycling can be passed through
Process Kswapd is recycling the page being of little use from the background, and the memory resource for releasing these pages occupancy makes for other programs
With.
However, in the prior art, collection process will continuously carry out recycling memory once opening from the background
The operation of resource.In this working method, collection process will occupy a large amount of system resource for a long time, this may result in it in this way
His program cannot get enough system resource, and then cause computer system to occur Caton at work, even collapse etc. of crashing
Problem.
Summary of the invention
The present invention provides a kind of memory resource management method and systems, for solving in existing computer system
Collection process can occupy the problem of a large amount of system resources for a long time.
Embodiment according to the present invention provides a kind of memory resource management method, comprising:
Start the collection process of memory resource;
Judge whether current memory resource is sufficient;
If current memory resource is inadequate, it is judged whether or not preset high priority program is stored in request
Device resource;
If controlling the collection process entrance in request memory resource currently without preset high priority program and stopping
Dormancy state, and the collection process is made to keep dormant state in the sleep period with predetermined sleep time;
After the sleep period, control the collection process release the dormant state and enter working condition with
Recycle memory resource.
Preferably, detecting current memory resource, whether Chong Zu method includes:
The total capacity of current free storage is compared with preset capacity threshold;
If the total capacity of current free storage is higher than preset capacity threshold, judge that current memory resource fills
Foot;If the total capacity of current free storage is lower than the capacity threshold, judge that current memory resource is inadequate.
Preferably, the memory resource management method further include:
If current memory resource is sufficient, the collection process is closed.
Preferably, the memory resource management method further include:
If current memory resource is inadequate, and currently has preset high priority program in request memory money
Source then controls the collection process and does not enter dormant state and immediately enter working condition to recycle memory resource.
Preferably, the memory resource management method further include:
After controlling the collection process and entering working condition to recycle memory resource, make the collection process pre-
Working condition is kept in fixed working hour;
After the working hour, whether sufficient current memory resource is detected;
If current memory resource is sufficient, the collection process is closed.
Preferably, detecting current memory resource, whether Chong Zu method includes:
The total capacity of current free storage is compared with preset capacity threshold;
If the total capacity of current free storage is higher than preset capacity threshold, judge that current memory resource fills
Foot;If the total capacity of current free storage is lower than the capacity threshold, judge that current memory resource is inadequate.
Preferably, the memory resource management method is further comprising the steps of:
If current memory resource is inadequate, the collection process is controlled again and enters working condition to recycle storage
Then device resource makes the collection process keep working condition within scheduled working hour;Or rejudge it is current whether
There is preset high priority program in request memory resource, if currently without preset high priority program in request memory
Resource then controls the collection process and enters dormant state, and makes the collection process in the suspend mode with predetermined sleep time
Dormant state is kept in period.
Embodiments of the present invention also provide a kind of memory resource management system comprising resource reclaim module, resource
Detection module and Programmable detection module;The resources detection module is used for: judging whether current memory resource is sufficient;It is described
Programmable detection module is used for: if current memory resource is inadequate, it is judged whether or not preset high priority program
In request memory resource;The resource reclaim module is used for: starting the collection process of memory resource;If currently without default
High priority program request memory resource, then control the collection process and enter dormant state, and make it is described recycle into
Journey keeps dormant state in the sleep period with predetermined sleep time;After the sleep period, control is described to be returned
Journey is taken in release the dormant state and enter working condition to recycle memory resource.
Embodiments of the present invention also provide a kind of computer equipment, and the computer equipment includes memory and processing
Device, the memory run the computer program so that the computer is set for storing computer program, the processor
It is standby to execute the memory resource management method according to above-mentioned each embodiment.
Embodiments of the present invention also provide a kind of computer readable storage medium, are stored in above-mentioned computer equipment
The computer program for storing and using.
According to above-mentioned embodiment, memory resource management method, system and corresponding calculating provided by the invention
Machine equipment and computer readable storage medium can more reasonably control the collection process of memory resource, ensure still may be used
Under the premise of recycling memory resource in time, the working time of collection process is efficiently reduced, prevents the collection process short time
Multi-system resource was inside occupied, effectively further prevents computer system at work because collection process occupies system money
There is Caton, crashes and even collapse in source and leading to problems such as.
Detailed description of the invention
Fig. 1 shows the process of the key step of the memory resource management method of an embodiment of the invention offer
Schematic diagram.
Fig. 2 shows the streams of the key step of the memory resource management method of another embodiment of the invention offer
Journey schematic diagram.
Fig. 3 shows the schematical structure side of the memory resource management system of an embodiment of the invention offer
Block diagram.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, referring to the drawings in conjunction with the embodiments, right
The present invention is further described.
Referring to Fig. 1, an embodiment of the invention provides a kind of memory resource management method, this method is available
In in common computer system (such as Windows system, linux system, Apple Macintosh operating system etc.), in department of computer science
The program use that memory resource is provided with demand is recycled in the course of work of system, to prevent the program of operation is more from causing in system
Deficiency is deposited, causes the Caton of computer, crash and even collapse.The memory resource management method may include following specific
Step:
S1 starts the collection process of memory resource.
In this step, in the course of work of computer system, start the collection process of memory resource.The recycling into
Journey can be the memory resource collection process carried in existing computer system, such as kswapd process.The collection process
Starting mode can be to be determined to meet by the central controller (Central Processing Unit, CPU) of computer system
Start automatically when certain entry condition, such as the collection process, Huo Zhe can be started automatically in the scheduled starting time
Judge that current memory resource is insufficient and (judges whether Chong Zu specific method can use hereinafter current memory resource
The method of detailed description) when start the collection process automatically;It is of course also possible to be manually controlled at any time by user according to subjective desire
The computer system starting collection process.
S2 judges whether current memory resource is sufficient.
In step S2, the CPU of such as computer system can use to judge whether current memory resource fills
Foot.Judge whether Chong Zu specific method may include following means to current memory resource:
The total capacity of current free storage is compared with preset capacity threshold.The preset capacity threshold can
Be in existing computer system commonly for judge free storage total capacity whether Chong Zu memory capacity threshold value,
Such as the memory capacity threshold value for the state that judges whether free storage total capacity is in " High Watermark ".
If the total capacity of current free storage is higher than preset capacity threshold, judge that current memory resource fills
Foot;If the total capacity of current free storage is lower than the capacity threshold, judge that current memory resource is inadequate.
According to the judging result of step S2, next this method can choose has respectively entered following step S3a or S3.
S3a, if the judging result of the step S2 be it is yes, close the collection process.
If the judging result of the step S2 be it is yes, that is, judge that current memory resource is sufficient, then do not recycle at this time
Necessity of free storage resources, therefore the collection process can be closed to prevent collection process occupying system resources, it waits
Next time again since above-mentioned steps S1.
S3, if the judging result of the step S2 is no, it is judged whether or not preset high priority program is being asked
Seek memory resource.
If the judging result of the step S2 be it is no, that is, judge that current memory resource is inadequate, then at this time may need
The program use that memory resource is provided with demand is recycled by the collection process.It is well known that including kind in computer system
The numerous program of class is likely to have multiple programs at this time while all having demand to memory resource.In order to ensure the storage of recycling
Device resource can be first provided to it is most important, most it is necessary to maintain operate normally program use, starting recycling storage
Before device resource, it can first determine whether currently with the presence or absence of preset high priority program in request memory resource.This place
It states high priority program and refers to that when requesting memory resource in general the program of priority with higher can be
In computer system maintain groundwork state necessary to program, such as basic control software program, display software program,
Network protection software program etc. is also possible to be related to the important procedure of user benefit, such as on-line payment software program, voice
Or video calling software program etc..
In step s3, it can use the CPU of such as computer system to determine whether there are preset high priorities
Program maintains program necessary to groundwork state in computer system as escribed above or is related to the weight of user benefit
Program is wanted, in request memory resource.According to the judging result of step S3, next this method can choose and have respectively entered down
The step S4a or S4 stated.
S4a, if the judging result of the step S3 be it is yes, control the collection process and do not enter dormant state and immediately
Into working condition to recycle memory resource.
If the judging result of the step S3 be it is yes, i.e., currently to be not only memory resource inadequate for judgement, but also deposits
There is preset high priority program in request memory resource, then at this time in order to meet the needs of high priority program as early as possible,
It can use the CPU of such as computer system and do not enter dormant state to control the collection process, but immediately enter work
State receives and keeps memory resource back and forth.The specific method of collection process recycling memory resource can be it is known, such as
In linux system, it can be recycled by kswapd process and be judged as text that is idle or being of little use according to existing standard
Part caches (file cache).The memory resource of recycling can be supplied to high priority program according to existing method in real time
It uses.
S4, if the judging result of the step S3 be it is no, control the collection process and enter dormant state, and make described
Collection process keeps dormant state in the sleep period with predetermined sleep time.
If the judging result of the step S3 be it is no, i.e. judgement is not deposited in request there is no preset high priority program currently
Memory resource, then collection process for a long time or in large quantities occupying system resources in order to prevent at this time, can not be eager to make at once
Memory resource is received and kept back and forth with collection process, does not need more that collection process is maintained working condition for a long time.Therefore, at this
In embodiment, in this case preferably using discontinuously, regularly control collection process recycles the work of memory resource
Mode.Specifically, in step S4, once it is determined that the judging result of the step S3 be it is no, then be not eager to control first
Collection process recycles memory resource, but first controls the collection process and enter dormant state, and the collection process is made to exist
Dormant state is kept in sleep period with predetermined sleep time.Can be effectively prevented in this way collection process for a long time or
Occupying system resources in large quantities.The duration of the sleep period can be such as 1 second, 5 seconds, 10 seconds, 30 seconds, these durations can
Manufacturer to be computer system is preset, is also possible to by user's self-setting.After sleep period terminates, the party
Method will enter following step S5, and collection process is begun to use to receive and keep memory resource back and forth, to prevent prolonged memory from providing
The inadequate state in source generates damage to computer system.
S5 controls the collection process and releases the dormant state and enter work shape after the sleep period
State is to recycle memory resource.
In step S5, the CPU of such as computer system can use to control the collection process and release described stop
Dormancy state simultaneously enters working condition to recycle memory resource.The specific method of collection process recycling memory resource can be with
It is known, such as in linux system, can be judged as by the recycling of kswapd process according to existing standard idle
Or the file cache (file cache) being of little use.The memory resource of recycling can be provided in real time according to existing method
To the program that all pairs of memory resources have demand carry out using.In this way it is prevented that the insufficient state of memory resource is held
Continue the too long time and damage is generated to computer system.
Preferably, after the step S5, the memory resource management method can with the following steps are included:
S6 makes the collection process after controlling the collection process and entering working condition to recycle memory resource
Working condition is kept within scheduled working hour.
In step S6, the CPU of such as computer system can use to control the collection process in scheduled work
Make to keep working condition in the period, recycles the program use that memory resource is provided with demand, continuously to fill as far as possible
The memory resource for dividing ground to be of little use using idle sum thoroughly eliminates the insufficient situation of memory resource as far as possible.It is described
Working hour can be preset with certain duration, such as can be 1 second, 5 seconds, 10 seconds, 30 seconds etc., these durations can be calculating
The manufacturer of machine system is preset, is also possible to by user's self-setting, working hour after continuing the preset duration
Terminate.The working hour can also be preset with certain task quantity, such as can be recycling memory resource total amount
Reach 512M, 1G, 2G etc., the manufacturer that these task quantity can be computer system is preset, be also possible to by with
Family self-setting, the working hour terminates after completing the default working quantity.
Whether sufficient S7 detects current memory resource after the working hour.
After the working hour, collection process for a long time or in large quantities occupying system resources, need in order to prevent
It determines whether to close collection process.Therefore in step S7, after the working hour, it can use and for example count
Whether the CPU of calculation machine system is sufficient to detect current memory resource.Detect current memory resource whether Chong Zu tool
Body method may include means below, the means such as this can with judge whether current memory resource fills in abovementioned steps S2
The means of foot are similar:
The total capacity of current free storage is compared with preset capacity threshold.The preset capacity threshold can
Be in existing computer system commonly for judge free storage total capacity whether Chong Zu memory capacity threshold value,
Such as the memory capacity threshold value for the state that judges whether free storage total capacity is in " High Watermark ".
If the total capacity of current free storage is higher than preset capacity threshold, judge that current memory resource fills
Foot;If the total capacity of current free storage is lower than the capacity threshold, judge that current memory resource is inadequate.
According to the judging result of step S7, next this method can choose has respectively entered different steps:
S8, if the judging result of the step S7 be it is yes, close the collection process.
If the judging result of the step S7 be it is yes, show that current memory resource is sufficient, then do not recycle at this time
Necessity of free storage resources, therefore the collection process can be closed to prevent collection process occupying system resources, it waits
Next time again since above-mentioned steps S1.
Alternatively, if the judging result of the step S7 be it is no, return to the step S6.
If the judging result of the step S7 be it is no, show that the recycling of a working hour has been carried out in collection process deposits
After memory resource work, current memory resource is still inadequate, it may be necessary to carry out one again using the collection process
The recycling memory resource work of section time.Therefore, it can control again the collection process with return step S6 at this time and enter
Then working condition makes the collection process keep working condition within scheduled working hour to recycle memory resource.According to
According to the concrete operations means of step S6 as described above, protect the collection process still within another scheduled working hour
Working condition is held, so as to the memory resource being more fully of little use using idle sum, thoroughly eliminates memory as far as possible
The insufficient situation of resource.
As shown in Fig. 2, in other preferred embodiments, if the judging result of the step S7 be it is no, can also be with
Selection returns to the step S3, and whether rejudge currently has preset high priority program in request memory resource;If working as
The high priority program of preceding Non-precondition request memory resource, then according to step S4, control again the collection process into
Enter dormant state, and the collection process is made to keep dormant state in the sleep period with predetermined sleep time.In this way may be used
More efficiently to detect whether high priority program is badly in need of memory resource, if high priority program there is not memory resource
There is urgent need, then makes collection process more suspend mode some periods, as far as possible saving system resource as far as possible.
In addition, the memory resource management method can also include following step in further preferred embodiment
It is rapid:
After the step S4a, into the step S6.
The meaning of the step is, is beginning to use collection process recycling memory resource and by the memory resource of recycling
It is supplied to after high priority program use, in order to fully meet the needs of high priority program as far as possible, it is necessary to make institute
It states collection process and keeps working condition within certain period.It is therefore preferable that S6 is also entered step after the step S4a, this
Sample can control the collection process and keep working condition within the scheduled working hour, in this way can be in the work
Memory resource is continuously recycled in period and is supplied to high priority program, fully meets high priority program pair as far as possible
The demand of memory resource.
Referring to Fig. 3, embodiments of the present invention also provide a kind of memory resource management system 100 comprising resource
Recycling module 10, resources detection module 20 and Programmable detection module 30;The resources detection module 20 is used for: judging current deposit
Whether memory resource is sufficient;Described program detection module 30 is used for: if current memory resource is inadequate, judge be currently
It is no to have preset high priority program in request memory resource;The resource reclaim module 10 is used for: starting memory resource
Collection process;If currently without preset high priority program request memory resource, control the collection process into
Enter dormant state, and the collection process is made to keep dormant state in the sleep period with predetermined sleep time;Described
After sleep period, controls the collection process and release the dormant state and enter working condition to recycle memory money
Source.In this way, the memory resource management system 100 may be used for realizing depositing for above-mentioned embodiments of the present invention offer
Memory resource management method.
Embodiments of the present invention also provide a kind of computer equipment, and the computer equipment includes memory and processing
Device, the memory run the computer program so that the computer is set for storing computer program, the processor
It is standby to execute the memory resource management method according to above-mentioned each embodiment.
Embodiments of the present invention also provide a kind of computer readable storage medium, are stored in above-mentioned computer equipment
The computer program for storing and using.
According to above-mentioned embodiment, memory resource management method, system and corresponding calculating provided by the invention
Machine equipment and computer readable storage medium can more reasonably control the collection process of memory resource, ensure still may be used
Under the premise of recycling memory resource in time, the working time of collection process is efficiently reduced, prevents the collection process short time
Multi-system resource was inside occupied, effectively further prevents computer system at work because collection process occupies system money
There is Caton, crashes and even collapse in source and leading to problems such as.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through
Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and structure in attached drawing
Figure shows the system frame in the cards of the device of multiple embodiments according to the present invention, method and computer program product
Structure, function and operation.In this regard, each box in flowchart or block diagram can represent a module, section or code
A part, a part of the module, section or code includes one or more for implementing the specified logical function
Executable instruction.It should also be noted that function marked in the box can also be to be different from the implementation as replacement
The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes
It can execute in the opposite order, this depends on the function involved.It is also noted that in structure chart and/or flow chart
The combination of each box and the box in structure chart and/or flow chart, can function or movement as defined in executing it is dedicated
Hardware based system realize, or can realize using a combination of dedicated hardware and computer instructions.
In addition, each functional module or unit in each embodiment of the present invention can integrate one independence of formation together
Part, be also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module
It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words
The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be intelligence
Can mobile phone, personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or
Part steps.And storage medium above-mentioned include: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory),
Random access memory (RAM, Random Access Memory), magnetic or disk etc. be various to can store program code
Medium.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent substitution, improvement and etc. done be should be included within the scope of the present invention.
Claims (10)
1. a kind of memory resource management method characterized by comprising
Start the collection process of memory resource;
Judge whether current memory resource is sufficient;
If current memory resource is inadequate, it is judged whether or not preset high priority program is in request memory money
Source;
If controlling the collection process in request memory resource currently without preset high priority program and entering suspend mode shape
State, and the collection process is made to keep dormant state in the sleep period with predetermined sleep time;
After the sleep period, controls the collection process and release the dormant state and enter working condition to recycle
Memory resource.
2. memory resource management method as described in claim 1, which is characterized in that whether detect current memory resource
Sufficient method includes:
The total capacity of current free storage is compared with preset capacity threshold;
If the total capacity of current free storage is higher than preset capacity threshold, judge that current memory resource is sufficient;
If the total capacity of current free storage is lower than the capacity threshold, judge that current memory resource is inadequate.
3. memory resource management method as described in claim 1, which is characterized in that further include:
If current memory resource is sufficient, the collection process is closed.
4. memory resource management method as described in claim 1, which is characterized in that further include:
If current memory resource is inadequate, and currently has preset high priority program in request memory resource, then
The collection process is controlled not enter dormant state and immediately enter working condition to recycle memory resource.
5. the memory resource management method as described in any one in claim 1-4, which is characterized in that further include:
After controlling the collection process and entering working condition to recycle memory resource, make the collection process scheduled
Working condition is kept in working hour;
After the working hour, whether sufficient current memory resource is detected;
If current memory resource is sufficient, the collection process is closed.
6. memory resource management method as claimed in claim 5, which is characterized in that whether detect current memory resource
Sufficient method includes:
The total capacity of current free storage is compared with preset capacity threshold;
If the total capacity of current free storage is higher than preset capacity threshold, judge that current memory resource is sufficient;
If the total capacity of current free storage is lower than the capacity threshold, judge that current memory resource is inadequate.
7. memory resource management method as claimed in claim 5, which is characterized in that further include:
If current memory resource is inadequate, the collection process is controlled again and enters working condition to recycle memory money
Then source makes the collection process keep working condition within scheduled working hour;Or rejudge currently whether have it is pre-
If high priority program request memory resource, if currently without preset high priority program request memory money
Source then controls the collection process and enters dormant state, and makes the collection process when with the suspend mode of predetermined sleep time
Dormant state is kept in section.
8. a kind of memory resource management system, which is characterized in that the memory resource management system includes resource reclaim mould
Block, resources detection module and Programmable detection module;The resources detection module is used for: judging whether current memory resource fills
Foot;Described program detection module is used for: if current memory resource is inadequate, it is judged whether or not preset high preferential
Program is weighed in request memory resource;The resource reclaim module is used for: starting the collection process of memory resource;If not having currently
There is preset high priority program in request memory resource, then control the collection process and enter dormant state, and makes described
Collection process keeps dormant state in the sleep period with predetermined sleep time;After the sleep period, control
The collection process releases the dormant state and enters working condition to recycle memory resource.
9. a kind of computer equipment, it is characterised in that: the computer equipment includes memory and processor, the memory
For storing computer program, the processor runs the computer program so that the computer equipment is executed as right is wanted
Seek memory resource management method described in any one of 1-7.
10. a kind of computer readable storage medium, it is characterised in that: be stored with computer equipment as described in claim 9
Middle storage and the computer program used.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811158440.4A CN109254850A (en) | 2018-09-30 | 2018-09-30 | memory resource management method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811158440.4A CN109254850A (en) | 2018-09-30 | 2018-09-30 | memory resource management method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109254850A true CN109254850A (en) | 2019-01-22 |
Family
ID=65045039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811158440.4A Pending CN109254850A (en) | 2018-09-30 | 2018-09-30 | memory resource management method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109254850A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112148477A (en) * | 2020-08-28 | 2020-12-29 | 杭州安恒信息技术股份有限公司 | Service process processing method, electronic device and storage medium |
WO2021047398A1 (en) * | 2019-09-09 | 2021-03-18 | Oppo广东移动通信有限公司 | Method and device for storage block reclaiming, storage medium, and electronic device |
WO2024099017A1 (en) * | 2022-11-07 | 2024-05-16 | 蔚来移动科技有限公司 | Process management method, and electronic device and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1996258A (en) * | 2006-12-28 | 2007-07-11 | 武汉虹旭信息技术有限责任公司 | Method for implementing dynamic memory pool |
CN105224469A (en) * | 2014-06-16 | 2016-01-06 | 陈宏达 | Active Memory Storage |
CN105446814A (en) * | 2014-09-30 | 2016-03-30 | 青岛海信移动通信技术股份有限公司 | Cache recovery method and device |
CN105468441A (en) * | 2014-08-28 | 2016-04-06 | 中兴通讯股份有限公司 | Processing method and apparatus for task process |
CN105573842A (en) * | 2015-12-21 | 2016-05-11 | 北京奇虎科技有限公司 | Method and device for achieving process recycling in application |
US9507637B1 (en) * | 2013-08-08 | 2016-11-29 | Google Inc. | Computer platform where tasks can optionally share per task resources |
-
2018
- 2018-09-30 CN CN201811158440.4A patent/CN109254850A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1996258A (en) * | 2006-12-28 | 2007-07-11 | 武汉虹旭信息技术有限责任公司 | Method for implementing dynamic memory pool |
US9507637B1 (en) * | 2013-08-08 | 2016-11-29 | Google Inc. | Computer platform where tasks can optionally share per task resources |
CN105224469A (en) * | 2014-06-16 | 2016-01-06 | 陈宏达 | Active Memory Storage |
CN105468441A (en) * | 2014-08-28 | 2016-04-06 | 中兴通讯股份有限公司 | Processing method and apparatus for task process |
CN105446814A (en) * | 2014-09-30 | 2016-03-30 | 青岛海信移动通信技术股份有限公司 | Cache recovery method and device |
CN105573842A (en) * | 2015-12-21 | 2016-05-11 | 北京奇虎科技有限公司 | Method and device for achieving process recycling in application |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021047398A1 (en) * | 2019-09-09 | 2021-03-18 | Oppo广东移动通信有限公司 | Method and device for storage block reclaiming, storage medium, and electronic device |
CN112148477A (en) * | 2020-08-28 | 2020-12-29 | 杭州安恒信息技术股份有限公司 | Service process processing method, electronic device and storage medium |
WO2024099017A1 (en) * | 2022-11-07 | 2024-05-16 | 蔚来移动科技有限公司 | Process management method, and electronic device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109254850A (en) | memory resource management method and system | |
US9952903B2 (en) | Background task resource control | |
CN105302637B (en) | System process is operating abnormally restoration methods, device and the mobile terminal for causing Caton | |
US8601493B2 (en) | Application controlling apparatus and storage medium which stores software for the apparatus | |
CN100478898C (en) | Apparatus, system, and method for resolving computing resource deadlocks | |
CN106020967B (en) | A kind of automatic expansion method of hybrid cloud resource | |
US8677168B2 (en) | Allocating power in devices by reserving a static power allocation to be used by one or more predetermined subsystems and reserving a dynamic power allocation to be used when the static power allocation is insufficient | |
CN109783157B (en) | Method and related device for loading algorithm program | |
CN103218307B (en) | Internal storage management system and EMS memory management process | |
CN111625456B (en) | Clamping positioning method and device | |
CN106776113A (en) | A kind of virtual machine backup method and device | |
CN113934615A (en) | Data monitoring method, device and equipment | |
CN109558244A (en) | Junk information recovery method, device, equipment and computer readable storage medium | |
CN111475299B (en) | Memory allocation method and device, storage medium and electronic equipment | |
CN112395045A (en) | Virtual machine recovery and resource adjustment method thereof | |
CN114968304A (en) | OTA (over the air) upgrading method and device, storage medium and electronic equipment | |
CN109670932B (en) | Credit data accounting method, apparatus, system and computer storage medium | |
CN101625650A (en) | Controlling a computer system having a processor including a plurality of cores | |
CN106874064A (en) | A kind of management system of virtual machine | |
KR102301397B1 (en) | Apparatus and method for controlling standby power of mobile terminal | |
CN110852680A (en) | Data processing method, ERP system and computer storage medium | |
CN115617553A (en) | Fusing degradation protection method and device for database and electronic equipment | |
CN114987265A (en) | Parking charging method and device, electronic equipment and readable storage medium | |
CN115794306A (en) | Resource allocation method and device based on preemption instance, electronic equipment and medium | |
CN114706663A (en) | Computing resource scheduling method, medium and computing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190122 |