CN109252670A - A kind of metal plate construction technique of the narrow top surface infiltration of anti-parapet - Google Patents

A kind of metal plate construction technique of the narrow top surface infiltration of anti-parapet Download PDF

Info

Publication number
CN109252670A
CN109252670A CN201811202983.1A CN201811202983A CN109252670A CN 109252670 A CN109252670 A CN 109252670A CN 201811202983 A CN201811202983 A CN 201811202983A CN 109252670 A CN109252670 A CN 109252670A
Authority
CN
China
Prior art keywords
metal plate
mainboard
subplate
parapet
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811202983.1A
Other languages
Chinese (zh)
Other versions
CN109252670B (en
Inventor
史寸琳
李旭
黄长军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811202983.1A priority Critical patent/CN109252670B/en
Publication of CN109252670A publication Critical patent/CN109252670A/en
Application granted granted Critical
Publication of CN109252670B publication Critical patent/CN109252670B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings

Abstract

The invention discloses a kind of metal plate construction techniques of anti-narrow top surface infiltration of parapet, comprising the following steps: prepares several metal plates in advance according to actual needs;Metal plate includes the mainboard and subplate being parallel to each other, and the junction of mainboard and subplate is arc chord angle, offers the first mounting hole on mainboard and subplate;The first sealant layer is respectively provided in each second mounting hole;It is respectively provided with expansion sleeve in each second mounting hole, the first sealant layer is between the second mounting hole and expansion sleeve at this time;The second sealant layer is respectively provided in each expansion sleeve;Insertion expansion sleeve is after connected nail is passed through each first mounting hole opened up on a metal plate to which metal plate and base to be attached;Each two pieces of adjacent metal plates form vacancy by mainboard and subplate, and third sealant layer is arranged in empty place.The cracking in parapet of construction method effective solution through the invention leads to the problem of infiltration, to prevent from seeping water.

Description

A kind of metal plate construction technique of the narrow top surface infiltration of anti-parapet
Technical field
The present invention relates to a kind of metal plate construction techniques of anti-narrow top surface infiltration of parapet.
Background technique
Parapet is the parapet of building roof all around.When in use, parapet is narrow for the wall manufactured in the prior art It narrow top face can be because of the problem of cracking seeps water.
Therefore those skilled in the art be dedicated to developing one kind can effectively solve the problem that due to the narrow top surface cracking of parapet and Lead to the construction technique of seepage problem.
Summary of the invention
In view of the above drawbacks of the prior art, technical problem to be solved by the invention is to provide one kind effectively to solve The certainly construction technique of the narrow top surface seepage problem of parapet.
To achieve the above object, the present invention provides a kind of metal plate construction technology sides of anti-narrow top surface infiltration of parapet Method, comprising the following steps:
S1: several metal plates are prepared in advance according to actual needs;
Metal plate includes the mainboard and subplate being parallel to each other, and the junction of mainboard and subplate is arc chord angle, mainboard and subplate On offer the first mounting hole;
S2: several the second mounting holes being used cooperatively with the first mounting hole are opened up in base;
S3: the dust in each second mounting hole is cleared up;
S4: the first sealant layer is respectively provided in each second mounting hole;
S5: being respectively provided with expansion sleeve in each second mounting hole, and the first sealant layer is located at the second mounting hole and expansion at this time Between set;
S6: the second sealant layer is respectively provided in each expansion sleeve;
S7: connected nail is passed through after opening up each first mounting hole on a metal plate insertion expansion sleeve to by metal plate with Base is attached;
S8: each two pieces of adjacent metal plates form vacancy by mainboard and subplate, and third sealant is arranged in empty place Layer.
Preferably, the dust in the second mounting hole is blown out by high pressure gas, in S3 thus by the second mounting hole Dust clean out.
Preferably, offering the first groove on mainboard, offers on adjacent metal plate subplate and be used cooperatively with mainboard The second groove, lightning rod be arranged between the first groove and the second groove;Lightning rod is located at two adjacent metal plates at this time On mainboard and subplate interconnection at;Lightning rod and the first groove and the second groove junction are provided with the 4th sealant Layer;
Mainboard and subplate junction are provided at least two connected nails, and lightning rod is located between two connected nails.
Preferably, the first sealant layer, the second sealant layer, third sealant layer and the 4th sealant layer are weather-proof Sealant.
Preferably, mainboard and subplate with a thickness of 3mm, the spacing on subplate top and mainboard top is 4mm-5mm;Third Sealant layer with a thickness of 1mm-2mm.
Preferably, metal plate is made of aluminum alloy material.
Preferably, metal plate is made of stainless steel material.
Preferably, being provided with screed-coat on the outside of the base, adhesive layer, the bonding are provided on the outside of the screed-coat Layer outside is provided with EPS sheet, is provided with protective facing on the outside of the EPS sheet, finish coat is arranged on protective facing.
Preferably, the two sides of mainboard and subplate are provided with baffle, pre-drilled cavity is offered on each baffle, and The bottom of each baffle is provided with olecranon.
Preferably, mainboard on each two adjacent metal plates and the subplate pass through described pre- open by self-plugging rivet Hole is fixedly connected.
The beneficial effects of the present invention are: the present invention by parapet top surface be arranged metal plate, metal plate will not cracking from And would not seep water, while construction method through the invention is installed, effective solution cracking in parapet causes to seep water The problem of, to effectively prevent from seeping water.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the invention.
Fig. 2 is the structural schematic diagram of metal plate of the present invention.
Fig. 3 is structural schematic diagram when metal plate is used alone in the present invention.
Fig. 4 is that metal plate splicing uses structural schematic diagram in Fig. 2.
Fig. 5 be in Fig. 4 A-A to schematic cross-sectional view.
Fig. 6 is the schematic perspective view in Fig. 4.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
As shown in Figures 1 to 6, the metal plate construction technique of the narrow top surface infiltration of a kind of anti-parapet, including it is following Step:
S1: several metal plates 1 are prepared in advance according to actual needs;
Metal plate 1 includes the mainboard 2 and subplate 3 that are parallel to each other, and the junction of mainboard 2 and subplate 3 is arc chord angle, mainboard 2 With the first mounting hole 5 is offered on subplate 3;
S2: several the second mounting holes 7 being used cooperatively with the first mounting hole 5 are opened up in base 10;
S3: the dust in each second mounting hole 7 is cleared up;In the present embodiment, second is installed by high pressure gas Dust blowout in hole, so that the dust in the second mounting hole be cleaned out.
S4: the first sealant layer is respectively provided in each second mounting hole 7;
S5: being respectively provided with expansion sleeve in each second mounting hole 7, at this time the first sealant layer be located at the second mounting hole 7 with it is swollen Between expansion set;
S6: the second sealant layer is respectively provided in each expansion sleeve;
S7: insertion expansion sleeve is thus by metal after connected nail 8 is passed through each first mounting hole 5 being provided on metal plate 1 Plate 1 is attached with base 10;
S8: each two pieces of adjacent metal plates 1 form vacancy 6 by mainboard 2 and subplate 3, and setting third is close at vacancy 6 Adhesive layer.
When if you need to install lightning rod, the first groove is offered on mainboard 2, is offered on adjacent 1 subplate 3 of metal plate and master The second groove that plate 2 is used cooperatively, lightning rod are arranged between the first groove and the second groove;Lightning rod and the first groove and Two groove junctions are provided with the 4th sealant layer;In the present embodiment, the master on two adjacent metal plates 1 is arranged in lightning rod At the interconnection of plate 2 and subplate 3.
Mainboard 2 and 3 junction of subplate are provided at least two connected nails 8, and lightning rod is located between two connected nails 8.
The first sealant layer, the second sealant layer, third sealant layer and the 4th sealant layer in the present invention are resistance to Wait sealant.
Mainboard 2 and subplate 3 with a thickness of 3mm, the spacing on 3 top of subplate and 2 top of mainboard is 4mm-5mm;Third sealing Glue-line with a thickness of 1mm-2mm.The spacing on subplate top and mainboard top in the present embodiment is 4mm;Third sealant layer With a thickness of 1mm.
Aluminium alloy can be used in metal plate 1 in the present invention or stainless steel material is made, and in the present embodiment, metal plate 1 uses aluminium Alloy material is made, and can be coated with powdery paints.In the present embodiment, the two sides of mainboard 2 and subplate 3 are provided with baffle 20, each institute It states and offers pre-drilled cavity 30 on baffle 20, and the bottom of each baffle 20 is provided with olecranon 21.When the combination of muti-piece metal plate 1 makes It is used time, adjacent by two pieces by connected nail also cross the pre-drilled cavity 30 on mainboard 2 on two neighboring metal plate 1 and subplate 3 Baffle 20 on metal plate 1 is attached, to improve stability when muti-piece metal plate 1 is applied in combination.Preferably, this reality It applies in example, the mainboard 2 on each two adjacent metal plates 1 and subplate 3 are passed through the pre-drilled cavity 30 and fixed and connected by self-plugging rivet It connects.
It is provided with screed-coat 11 on the outside of the base 10, adhesive layer 12, the bonding are provided on the outside of the screed-coat 11 12 outside of layer is provided with EPS sheet 13, is provided with protective facing on the outside of the EPS sheet 13, finish coat 16 is arranged on protective facing.
As shown in figure 3, the metal plate 1 in the present invention just only needs mainboard 2 to can be used when not needing overlap joint.It is taking It connects in use, each metal plate 1 can form a circle, each ending of metal plate 1 is made to be connected.By parapet when in order to avoid constructing Body is broken, and connected nail is not less than 60mm away from civil engineering end.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical solution, all should be within the scope of protection determined by the claims.

Claims (10)

1. a kind of metal plate construction technique of the narrow top surface infiltration of anti-parapet, it is characterized in that: the following steps are included:
S1: several metal plates (1) are prepared in advance according to actual needs;
The metal plate (1) includes the mainboard (2) and subplate (3) being parallel to each other, the company of the mainboard (2) and the subplate (3) Meeting place is arc chord angle, offers the first mounting hole (5) on the mainboard (2) and the subplate (3);
S2: several the second mounting holes (7) being used cooperatively with first mounting hole (5) are opened up on base (10);
S3: the dust in each second mounting hole (7) is cleared up;
S4: the first sealant layer is respectively provided in each second mounting hole (7);
S5: it is respectively provided with expansion sleeve in each second mounting hole (7), the first sealant layer is located at second mounting hole (7) at this time Between the expansion sleeve;
S6: the second sealant layer is respectively provided in each expansion sleeve;
S7: by connected nail (8) pass through each first mounting hole (5) for being provided on the metal plate (1) be inserted into expansion sleeve afterwards thus Metal plate (1) and base (10) are attached;
S8: each two pieces of adjacent metal plates (1) form vacancy (6) by mainboard (2) and subplate (3), and at the vacancy (6) Third sealant layer is set.
2. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: described In S3, the dust in the second mounting hole (7) is blown out by high pressure gas, so that the dust in the second mounting hole (7) be cleared up Completely.
3. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: described The first groove is offered on mainboard (2), offering on adjacent metal plate (1) subplate (3) makes with the mainboard (2) cooperation Second groove, lightning rod are arranged between first groove and second groove;Lightning rod is located at adjacent at this time At the interconnection of mainboard (2) on two metal plates (1) and subplate (3);The lightning rod and first groove and described Second groove junction is provided with the 4th sealant layer;
The mainboard (2) and the subplate (3) junction are provided at least two connected nails (8), and the lightning rod is located at two Between connected nail (8).
4. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as claimed in claim 3, it is characterized in that: described First sealant layer, the second sealant layer, third sealant layer and the 4th sealant layer are weather proofing sealant.
5. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: described Mainboard (2) and the subplate (3) with a thickness of 3mm, the spacing on subplate (3) top and the mainboard (2) top is 4mm- 5mm;The third sealant layer with a thickness of 1mm-2mm.
6. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: described Metal plate (1) is made of aluminum alloy material.
7. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: described Metal plate (1) is made of stainless steel material.
8. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: described It is provided with screed-coat (11) on the outside of base (10), is provided with adhesive layer (12), the adhesive layer on the outside of the screed-coat (11) (12) outside is provided with EPS sheet (13), is provided with protective facing on the outside of the EPS sheet (13), facing is arranged on protective facing Layer (16).
9. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: described The two sides of mainboard (2) and the subplate (3) are provided with baffle (20), offer pre-drilled cavity on each baffle (20) (30), olecranon (21) and in the bottom of each baffle (20) are provided with.
10. the metal plate construction technique of the narrow top surface infiltration of anti-parapet as described in claim 1, it is characterized in that: respectively Mainboard (2) and the subplate (3) on two adjacent metal plates (1) is fixed across the pre-drilled cavity (30) by self-plugging rivet Connection.
CN201811202983.1A 2018-10-16 2018-10-16 Metal plate construction process method for preventing narrow top surface of parapet from water seepage Active CN109252670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811202983.1A CN109252670B (en) 2018-10-16 2018-10-16 Metal plate construction process method for preventing narrow top surface of parapet from water seepage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811202983.1A CN109252670B (en) 2018-10-16 2018-10-16 Metal plate construction process method for preventing narrow top surface of parapet from water seepage

Publications (2)

Publication Number Publication Date
CN109252670A true CN109252670A (en) 2019-01-22
CN109252670B CN109252670B (en) 2022-02-18

Family

ID=65046257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811202983.1A Active CN109252670B (en) 2018-10-16 2018-10-16 Metal plate construction process method for preventing narrow top surface of parapet from water seepage

Country Status (1)

Country Link
CN (1) CN109252670B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2193982A (en) * 1986-08-08 1988-02-24 Allfor Investment Limited Gutter joint
CN205077748U (en) * 2015-09-21 2016-03-09 北京北方空间建筑科技股份有限公司 There is parapet post gable node construction system
CN205531055U (en) * 2016-01-17 2016-08-31 温州市长城建设监理有限公司 Metal sheet parapet that bears down on one
CN205918005U (en) * 2016-08-25 2017-02-01 中启胶建集团有限公司 Construction structures drips in parapet keeps warm
CN106906962B (en) * 2017-03-14 2019-10-08 中冶建工集团有限公司 A kind of building roof parapet flashing construction technology
CN213087123U (en) * 2020-08-11 2021-04-30 中建(天津)工业化建筑工程有限公司 Combined parapet

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2193982A (en) * 1986-08-08 1988-02-24 Allfor Investment Limited Gutter joint
CN205077748U (en) * 2015-09-21 2016-03-09 北京北方空间建筑科技股份有限公司 There is parapet post gable node construction system
CN205531055U (en) * 2016-01-17 2016-08-31 温州市长城建设监理有限公司 Metal sheet parapet that bears down on one
CN205918005U (en) * 2016-08-25 2017-02-01 中启胶建集团有限公司 Construction structures drips in parapet keeps warm
CN106906962B (en) * 2017-03-14 2019-10-08 中冶建工集团有限公司 A kind of building roof parapet flashing construction technology
CN213087123U (en) * 2020-08-11 2021-04-30 中建(天津)工业化建筑工程有限公司 Combined parapet

Also Published As

Publication number Publication date
CN109252670B (en) 2022-02-18

Similar Documents

Publication Publication Date Title
US10683660B2 (en) Exterior wall system
US20100107352A1 (en) Exterior insulation and finish system and method and tool for installing same
EP3619373B1 (en) Panel comprising a mesh seam connection element
US20140109500A1 (en) Modular roof panels
CN103074905A (en) Rear replaceable type waterproof device for deformation joint of basement and installation method thereof
CN110295697A (en) Facade hollow brick mounting structure and its mounting process
AU2015306073A1 (en) Insulated and prefinished wall panel and wall cladding assembly
CN105298054A (en) AEPS (class-A expandable polystyrene) zinc-magnesium steel plate fireproof insulation decorative integrated board and construction process thereof
CN109252670A (en) A kind of metal plate construction technique of the narrow top surface infiltration of anti-parapet
CN111549986B (en) Waterproof construction method for parapet flashing and dry-hanging stone coping buckle joint
WO2021051817A1 (en) Method for blocking special-shaped opening of conduit shaft not permitting suspended mold construction
CN211312891U (en) Processing structure for deformation joint of curtain wall
CN211421493U (en) Short cantilever type dry-hanging ceramic plate curtain wall top sealing node
CN101324085B (en) Panelling for construction and gas generation groove circular arc top cover thereof
CN212743450U (en) Wall body water stopping device, wall and building
BID Addendum No. 2
CN205637183U (en) Seam node structure in double -U -shaped groove and applied double -U -shaped groove
CN205742663U (en) A kind of element type bright frame glass curtain wall system
CN216740147U (en) External thermal insulation system for external wall of expanded and vitrified small ball thermal insulation board
CN100427702C (en) Paneling for construction and arc top cover of gas generation tank using the same
CN109537767A (en) A kind of cell board and window integrated system and preparation method thereof
JPS5858358A (en) Remodeling of external wall of existing building
CN216616304U (en) Waterproof assembly between precast beam and plate of railway passenger station
CN108035502A (en) Ceramic tile dried hanging method
CN110965897B (en) Method for mounting near-zero energy consumption building door and window

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant