CN109252657A - A kind of novel rapid-installation method for preparing template - Google Patents
A kind of novel rapid-installation method for preparing template Download PDFInfo
- Publication number
- CN109252657A CN109252657A CN201811312623.7A CN201811312623A CN109252657A CN 109252657 A CN109252657 A CN 109252657A CN 201811312623 A CN201811312623 A CN 201811312623A CN 109252657 A CN109252657 A CN 109252657A
- Authority
- CN
- China
- Prior art keywords
- guide rod
- rod structure
- stencil body
- attachment base
- installation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/38—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/50—Girders, beams, or the like as supporting members for forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/50—Girders, beams, or the like as supporting members for forms
- E04G2011/505—Girders, beams, or the like as supporting members for forms with nailable or screwable inserts
Abstract
The invention discloses a kind of novel rapid-installation method for preparing template, including stencil body and guide rod structure, the stencil body and guide rod structure are arranged in parallel, the joint of stencil body described in every two is welded with attachment base, the attachment base is internally provided with screw hole, the inside of the screw hole is interspersed with stud, the outside of the stud is fixed with nut, one end of the attachment base is connected by limiting annulus with the guide rod structure, the inside of the limit annulus includes shaft and ring body, and ring body is set as symmetrical two parts by shaft, the both ends of the ring body are correspondingly arranged on fixed block, and the inside of one of fixed block is equipped with screw assembly.The present invention passes through setting stencil body, attachment base, stud, guide rod structure, limit annulus, pedestal, substrate, drill steel, mounting plate, screw assembly and card slot, the problem of fast-assembling template solved at this stage is not easy to construction and installation, and stability is bad and its flatness is difficult to ensure.
Description
Technical field
The present invention relates to build concrete mould plate technique field, specially a kind of novel rapid-installation method for preparing template.
Background technique
Currently, building template is the formwork and bracket of concreting forming, building wood pattern can be divided by the property of material
Plate, building wood glue plate, film coated plate, multi-layer board, two-sided laminated construction formwork etc..Building template can be divided into existing by construction technology condition
Pouring concrete template, pre-assembled template, climbing form etc..Building template is a kind of temporary supporting structure, by design requirement system
Make, shapes concrete structure, component by defined position and geometric dimension, keep its correct position, and bear building template
The external loads of self weight and effect on it.The purpose for carrying out form work engineering is to guarantee concrete engineering quality and construction safety
Under the premise of accelerate construction progress and reduce engineering cost.
Through retrieving, patent announcement number is that 203021899 U of CN is related to a kind of concrete terrace construction fast-assembling plate device,
Including channel steel and rod bolt, the channel steel is equipped with the identical channel steel up and down of size in upper and lower two slots arm center position and bores
Hole lays front end steel pipe, the rod bolt insertion channel steel drilling and front end steel pipe between the two slot arms up and down of the channel steel
Pipe orifice and squeeze into ground.
Disadvantage possessed by a kind of concrete terrace construction fast-assembling plate device is insufficient in the prior art:
1. convenience is poor when fast-assembling template for building at this stage uses, it is not easy to the operation of construction personnel, delays operation construction period,
Influence construction efficiency, while waste of manpower cost;
2. stability and safety are bad, it is be easy to cause the deformation and breaking-up of support construction, using effect is bad;
3. formwork structure lacks limiting device, the template set in a row cannot guarantee its flatness well, influence construction quality.
Summary of the invention
(1) the technical issues of solving
The purpose of the present invention is to provide a kind of novel rapid-installation method for preparing template, the fast-assembling template solved at this stage is not easy to
The problem of construction and installation, stability is bad and its flatness is difficult to ensure.
(2) technical solution
To achieve the above object, the invention provides the following technical scheme: a kind of novel rapid-installation method for preparing template, including template sheet
Body and guide rod structure, the stencil body and guide rod structure are arranged in parallel, and the joint of stencil body described in every two is welded
There is attachment base, the attachment base is internally provided with screw hole, and the inside of the screw hole is interspersed with stud, and the outside of the stud is solid
Surely there is nut, one end of the attachment base is connected by limiting annulus with the guide rod structure.
Preferably, the inside of the limit annulus includes shaft and ring body, and ring body is set as symmetrical two by shaft
Part.
Preferably, the both ends of the ring body are correspondingly arranged on fixed block, and the inside of one of fixed block is equipped with spiral shell
Screw assembly.
Preferably, the outside of the guide rod structure is equipped with fixator by pedestal.
Preferably, one end of the guide rod structure is provided with mounting plate, and the outside of mounting plate is connected with base by drill steel
Plate, and the outside of drill steel is socketed with drill steel set.
Preferably, the both ends of the stencil body are provided with card slot, pass through card between every two adjacent stencil body
Slot connects.
A kind of novel rapid-installation method for preparing template, comprising the following steps:
S1: hollow billet is made using steel ingot perforated in guide rod structure, and then finished product is made in hot rolling, cold rolling or cold group, specific to prepare
When, it according to engineering demand by guide rod structure cutting at different length, when cutting, can be made up of automatic gas cutting machine, using leading
Fixator is arranged at intervals on the outer wall of guide rod structure by pedestal later, is specifically made as form stable system by rod structure
The spacing distance of fixator is according to circumstances arranged in used time;
S2: substrate, mounting plate by metal material by normalizing integral molding, when use using plasma cutting machine cutting at
Isometric rectangle, and the inside of substrate, mounting plate when guide rod structure is installed, passes through there are the through-hole passed through for drill steel
Guide rod structure is mounted on specific position by the effect of substrate and drill steel by horizontally or vertically direction, passes through fixator
Effect carries out further installation to guide rod structure and fixes, and enhances fastness, prevents from deforming;
S3: stencil body is made of plastic-wood material, and plastic-wood material is using natural fiber and high molecular material and some must add
Add agent high temperature extrusion molding, is cut using automatic gas cutting machine is equidistant to material progress, form stencil body one by one;
S4: opening up card slot by both ends of the groover to stencil body later, complete the preparation of stencil body, when specifically used,
It is fixedly connected between every two stencil body by card slot, direct splicing, one side stationarity is good, secondly also facilitates construction personnel
Operation, after splicing, the limit annulus of attachment base one end is fixed on the outer wall of guide rod structure, ring body is adjusted by shaft
Rotation, and installation fixation is carried out by the fixed block of end and screw assembly, it completes between stencil body and guide rod structure
Connection;Stud and nut are subjected to installation fixation, complete the fixation between two neighboring attachment base.
(3) beneficial effect
The present invention provides a kind of novel rapid-installation method for preparing template, have it is following the utility model has the advantages that
1, the present invention passes through setting stencil body, attachment base, stud, guide rod structure, limit annulus, substrate, drill steel and installation
Plate, fast-assembling formwork structure prepared by the present invention have a good service performance when in use, and when installation is very easy, greatly save
The difficulty of construction of worker, can shorten commencement date, and then save time and human cost, solve fast-assembling at this stage
Guide rod structure is first carried out installation fixation by the inconvenient problem of template installation, when use on demand, is applied later to stencil body
Work industry, can directly be spliced by card slot between every two stencil body, passes through the limit of attachment base one end after splicing
Guide rod structure is fixed in annulus, and is attached by stud, guarantees its stability with this, easy to use.
2, the present invention by setting stencil body, attachment base, stud, guide rod structure, limit annulus, substrate, drill steel and
Mounting plate, this fast-assembling template stability when in use and fastness are very good, do not have to worry template displacement or support portion
The problem of dividing deformation, solve the problems, such as that fast-assembling template stability at this stage is bad, the present invention is provided with guide rod structure, guide rod
Structure is mountable on ground or beam body, and stencil body is fixed by attachment base, limit annulus, stud, can be effective
Guarantee its stability, meanwhile, guide rod structure is integral type molding, it will not be there is a situation where falling apart or deforming, stability is good.
3, the present invention by setting stencil body, attachment base, stud, guide rod structure, limit annulus, substrate, drill steel and
Mounting plate, this fast-assembling template can be very good to guarantee its flatness when in use, and limiting stencil body to the full extent will not
Deformation, the surface evenness for guaranteeing that it is bonded with wall is good, guarantees construction quality with this, has and uses use well.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram that annulus is limited in the present invention;
Fig. 3 is the sectional view of attachment base in the present invention;
Fig. 4 is the structural schematic diagram of stencil body in the present invention;
Fig. 5 is flow chart of the invention.
In figure: 1, stencil body;2, attachment base;3, stud;4, nut;5, guide rod structure;6, annulus is limited;7, fixed
Device;8, pedestal;9, substrate;10, drill steel;11, mounting plate;12, drill steel set;13, shaft;14, ring body;15, fixed block;16, spiral shell
Screw assembly;17, screw hole;18, card slot.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figs. 1-5, a kind of embodiment provided by the invention: a kind of novel rapid-installation method for preparing template, including template
Ontology 1 and guide rod structure 5, stencil body 1 and guide rod structure 5 are arranged in parallel, and the both ends of stencil body 1 are provided with card slot 18,
Connected between every two adjacent stencil body 1 by card slot 18, it is easy for installation, and the joint of every two stencil body 1
It is welded with attachment base 2, attachment base 2 is internally provided with screw hole 17, and the inside of screw hole 17 is interspersed with stud 3, the outside of stud 3
It is fixed with nut 4, in use, completing the connection between two connected attachment bases 2 by the effect of stud 3 and nut 4, simultaneously
One end of attachment base 2 is connected by limiting annulus 6 with guide rod structure 5, and the inside for limiting annulus 6 includes shaft 13 and ring body 14,
And ring body 14 is set as symmetrical two parts by shaft 13, the both ends of ring body 14 are correspondingly arranged on fixed block 15, and wherein one
The inside of a fixed block 15 is equipped with screw assembly 16, and the outside of guide rod structure 5 is equipped with fixator 7, guide rod knot by pedestal 8
One end of structure 5 is provided with mounting plate 11, and the outside of mounting plate 11 is connected with substrate 9 by drill steel 10, and the outside of drill steel 10
It is socketed with drill steel set 12.
A kind of novel rapid-installation method for preparing template, comprising the following steps:
S1: hollow billet is made using steel ingot perforated in guide rod structure 5, and then finished product is made in hot rolling, cold rolling or cold group, specific to prepare
When, it according to engineering demand by 5 cutting of guide rod structure at different length, when cutting, can be made up of automatic gas cutting machine, using leading
Rod structure 5 is used as form stable system, is later arranged at intervals on the outer wall of guide rod structure 5 fixator 7 by pedestal 8, has
The spacing distance of fixator 7 is according to circumstances set when body use;
S2: by metal material by normalizing integral molding, when use, is cut out using plasma cutting machine for substrate 9, mounting plate 11
It is cut into isometric rectangle, and the inside of substrate 9, mounting plate 11, there are the through-hole passed through for drill steel 10, guide rod structure 5 is pacified
When dress, guide rod structure 5 is mounted on by horizontally or vertically direction by specific position by the effect of substrate 9 and drill steel 10
On, guide rod structure 5 further install by the effect of fixator 7 and is fixed, enhances fastness, prevents from deforming;
S3: stencil body 1 is made of plastic-wood material, and plastic-wood material is using natural fiber and high molecular material and some must add
Add agent high temperature extrusion molding, is cut using automatic gas cutting machine is equidistant to material progress, form stencil body 1 one by one;
S4: opening up card slot 18 by both ends of the groover to stencil body 1 later, completes the preparation of stencil body 1, specifically used
When, it is fixedly connected by card slot 18 between every two stencil body 1, direct splicing, one side stationarity is good, secondly also conveniently applies
After splicing, the limit annulus 6 of 2 one end of attachment base is fixed on the outer wall of guide rod structure 5 for the operation of worker person, by turning
Axis 13 adjusts ring body 14 and rotates, and carries out installation fixation by the fixed block 15 of end and screw assembly 16, completes template sheet
Connection between body 1 and guide rod structure 5;Stud 3 and nut 4 are subjected to installation fixation, completed between two neighboring attachment base 2
Fixation.
When in use, guide rod structure 5 is subjected to installation fixation by the effect of drill steel 10, mounting plate 11, it can be according to requiring
It is mounted to ramp-like, vertical shape or horizontal, further fixing for guide rod structure 5 is completed by the effect of fixator 7 later, Gu
Determining device 7 can be fixed on the bracket in outside, and fixator 7 plays the role of being connected and fixed between two objects when in use, is
Known technological means later installs stencil body 1, directly assembled by card slot 18 between every two stencil body 1,
Quickly and easily, after every two adjacent 1 assembly of stencil body, the limit annulus 6 of 2 one end of attachment base is fixed on guide rod structure
On 5 outer wall, limit annulus 6 can be opened and closed when in use by shaft 13, pass through fixed block 15 and screw assembly 16
Effect be fixed, being connected and fixed between two attachment bases 2 is completed by the effect of stud 3 later, it is fast to complete this with this
The use of decking.
It can to sum up obtain, the present invention passes through setting stencil body 1, attachment base 2, stud 3, guide rod structure 5, limit annulus 6, bottom
Seat 8, substrate 9, drill steel 10, mounting plate 11, screw assembly 16 and card slot 18, the fast-assembling template solved at this stage are not easy to apply
The problem of work installation, stability is bad and its flatness is difficult to ensure.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (7)
1. a kind of novel rapid-installation method for preparing template, including stencil body (1) and guide rod structure (5), it is characterised in that: the mould
Plate ontology (1) and guide rod structure (5) are arranged in parallel, and the joint of stencil body described in every two (1) is welded with attachment base
(2), the attachment base (2) is internally provided with screw hole (17), and the inside of the screw hole (17) is interspersed with stud (3), the spiral shell
The outside of column (3) is fixed with nut (4), and one end of the attachment base (2) passes through limit annulus (6) and the guide rod structure (5)
It is connected.
2. a kind of novel rapid-installation method for preparing template according to claim 1, it is characterised in that: the limit annulus (6)
Inside include shaft (13) and ring body (14), and ring body (14) is set as symmetrical two parts by shaft (13).
3. a kind of novel rapid-installation method for preparing template according to claim 2, it is characterised in that: the two of the ring body (14)
End is correspondingly arranged on fixed block (15), and the inside of one of fixed block (15) is equipped with screw assembly (16).
4. a kind of novel rapid-installation method for preparing template according to claim 1, it is characterised in that: the guide rod structure (5)
Outside fixator (7) are installed by pedestal (8).
5. a kind of novel rapid-installation method for preparing template according to claim 1, it is characterised in that: the guide rod structure (5)
One end be provided with mounting plate (11), and the outside of mounting plate (11) is connected with substrate (9) by drill steel (10), and drill steel (10)
Outside be socketed with drill steel set (12).
6. a kind of novel rapid-installation method for preparing template according to claim 1, it is characterised in that: the stencil body (1)
Both ends be provided with card slot (18), connected between every two adjacent stencil body (1) by card slot (18).
7. a kind of novel rapid-installation method for preparing template, which comprises the following steps:
S1: hollow billet is made using steel ingot perforated in guide rod structure (5), and then finished product is made in hot rolling, cold rolling or cold group, specific to make
When standby, according to engineering demand by guide rod structure (5) cutting at different length, when cutting, it can be made up, adopt of automatic gas cutting machine
It uses guide rod structure (5) as form stable system, fixator (7) is arranged at intervals on guide rod structure (5) by pedestal (8) later
Outer wall on, the spacing distance of fixator (7) is according to circumstances set when specifically used;
S2: by metal material by normalizing integral molding, when use, uses plasma cut for substrate (9), mounting plate (11)
Machine cutting is at isometric rectangle, and the inside of substrate (9), mounting plate (11) is there are the through-hole passed through for drill steel (10),
When guide rod structure (5) is installed, by the effect of substrate (9) and drill steel (10) by guide rod structure (5) by horizontally or vertically side
To being mounted on specific position, further installation is carried out to guide rod structure (5) by the effect of fixator (7) and is fixed, is increased
Strong fastness prevents from deforming;
S3: stencil body (1) is made of plastic-wood material, and plastic-wood material is using natural fiber and high molecular material and some necessary
Additive high temperature extrusion molding cuts using automatic gas cutting machine is equidistant to material progress, forms stencil body one by one
(1);
S4: opening up card slot (18) by both ends of the groover to stencil body (1) later, completes the preparation of stencil body (1), tool
Body between every two stencil body (1) by card slot (18) in use, be fixedly connected, and direct splicing, one side stationarity is good,
The limit annulus (6) of attachment base (2) one end after splicing, is fixed on guide rod structure (5) by the secondary operation for also facilitating construction personnel
Outer wall on, by shaft (13) adjustment ring body (14) rotation, and pass through the fixed block of end (15) and screw assembly (16)
Installation fixation is carried out, the connection between stencil body (1) and guide rod structure (5) is completed;Stud (3) and nut (4) are carried out
Installation is fixed, and the fixation between two neighboring attachment base (2) is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811312623.7A CN109252657A (en) | 2018-11-06 | 2018-11-06 | A kind of novel rapid-installation method for preparing template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811312623.7A CN109252657A (en) | 2018-11-06 | 2018-11-06 | A kind of novel rapid-installation method for preparing template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109252657A true CN109252657A (en) | 2019-01-22 |
Family
ID=65043928
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811312623.7A Pending CN109252657A (en) | 2018-11-06 | 2018-11-06 | A kind of novel rapid-installation method for preparing template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109252657A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0382768U (en) * | 1989-12-15 | 1991-08-22 | ||
FR2745839A1 (en) * | 1995-08-08 | 1997-09-12 | Lee Wen Yuan | FIXING DEVICE FOR FLOOR FORM MOUNTING |
CN2494861Y (en) * | 2000-12-28 | 2002-06-12 | 何玉良 | Split form |
CN201087551Y (en) * | 2007-08-31 | 2008-07-16 | 北京住总集团有限责任公司 | Template sealing butt joint edge and unified adjustable structure |
CN201460198U (en) * | 2009-05-25 | 2010-05-12 | 江苏铭豪建设工程有限公司 | Concrete poured template |
CN202081636U (en) * | 2010-03-15 | 2011-12-21 | 山西惠丰型材有限公司 | PVC (polyvinyl chloride) plastic high-strength as-cast finish concrete building formwork |
CN204357111U (en) * | 2014-12-17 | 2015-05-27 | 江苏丰彩新型建材有限公司 | A kind of insulation compound exempts from demoulding exterior sheathing |
CN204510792U (en) * | 2015-03-27 | 2015-07-29 | 中冶建工集团有限公司 | A kind of steel form |
CN205999854U (en) * | 2016-08-23 | 2017-03-08 | 辽宁省水利水电科学研究院 | Lining canal thin-wall construction concrete Fast Modular builds device |
-
2018
- 2018-11-06 CN CN201811312623.7A patent/CN109252657A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0382768U (en) * | 1989-12-15 | 1991-08-22 | ||
FR2745839A1 (en) * | 1995-08-08 | 1997-09-12 | Lee Wen Yuan | FIXING DEVICE FOR FLOOR FORM MOUNTING |
CN2494861Y (en) * | 2000-12-28 | 2002-06-12 | 何玉良 | Split form |
CN201087551Y (en) * | 2007-08-31 | 2008-07-16 | 北京住总集团有限责任公司 | Template sealing butt joint edge and unified adjustable structure |
CN201460198U (en) * | 2009-05-25 | 2010-05-12 | 江苏铭豪建设工程有限公司 | Concrete poured template |
CN202081636U (en) * | 2010-03-15 | 2011-12-21 | 山西惠丰型材有限公司 | PVC (polyvinyl chloride) plastic high-strength as-cast finish concrete building formwork |
CN204357111U (en) * | 2014-12-17 | 2015-05-27 | 江苏丰彩新型建材有限公司 | A kind of insulation compound exempts from demoulding exterior sheathing |
CN204510792U (en) * | 2015-03-27 | 2015-07-29 | 中冶建工集团有限公司 | A kind of steel form |
CN205999854U (en) * | 2016-08-23 | 2017-03-08 | 辽宁省水利水电科学研究院 | Lining canal thin-wall construction concrete Fast Modular builds device |
Non-Patent Citations (2)
Title |
---|
刘方亮等: "《建筑设备》", 29 February 2016, 北京理工大学出版社 * |
彭国勋: "《物流运输包装设计》", 31 October 2006, 印刷工业出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090974B (en) | Roof quick-release supporting system and construction method thereof | |
CN108952165A (en) | A kind of prefabricated processing of sheath assembly in a row and pre-buried construction method | |
CN110835968B (en) | Occlusion type fast assembling outer wall and construction method thereof | |
CN112282360A (en) | Device for fixing shear wall and column and construction method thereof | |
CN109038397A (en) | Assembled arthitecutral structure and its installation method with electromechanical pipeline bracket | |
CN215926746U (en) | Independent steel pipe lattice column for supporting post-cast strip | |
CN209958206U (en) | Cast-in-situ box girder template | |
CN109252657A (en) | A kind of novel rapid-installation method for preparing template | |
CN112127638A (en) | Fixed support device for assembled wall | |
CN113123597A (en) | Assembled laminated slab splicing seam suspension type formwork structure and construction method thereof | |
CN110409320A (en) | A kind of the concrete cast-in-situ bracket and its construction method of adjustable slope | |
CN209469000U (en) | Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate | |
CN113123598B (en) | Mounting and fixing device for assembled building laminated slab splicing seam combined template | |
CN208088817U (en) | A kind of easy-to-dismount overhanging type scaffold bolt anchoring assembly | |
CN206768826U (en) | Transition side becomes circle template | |
CN208479077U (en) | Assembled arthitecutral structure with electromechanical pipeline bracket | |
CN220848753U (en) | Concrete placement template convenient to dismantle | |
CN208718092U (en) | A kind of assembled toilet being easily installed | |
CN111005591A (en) | Support frame for wafer plate and mounting method thereof | |
CN206888511U (en) | A kind of aluminum alloy formwork system for variable cross-section rectangular column | |
CN206016259U (en) | A kind of adjustable beam die plate reinforcing jacking device | |
CN109208890A (en) | Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate | |
CN205935706U (en) | A elevation controlling means for terrace construction | |
CN205875711U (en) | Steel wood stencil assembly | |
CN211446996U (en) | Footing crab-bolt built-in fitting installation fixed bolster and installation fixed knot construct thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190122 |