CN109246724A - A kind of method, apparatus, the network equipment and storage medium detecting antenna and work parameter evidence - Google Patents

A kind of method, apparatus, the network equipment and storage medium detecting antenna and work parameter evidence Download PDF

Info

Publication number
CN109246724A
CN109246724A CN201710554794.XA CN201710554794A CN109246724A CN 109246724 A CN109246724 A CN 109246724A CN 201710554794 A CN201710554794 A CN 201710554794A CN 109246724 A CN109246724 A CN 109246724A
Authority
CN
China
Prior art keywords
cell
work
antenna
main lobe
lobe direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710554794.XA
Other languages
Chinese (zh)
Other versions
CN109246724B (en
Inventor
王绍江
张晨红
孙凯文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201710554794.XA priority Critical patent/CN109246724B/en
Publication of CN109246724A publication Critical patent/CN109246724A/en
Application granted granted Critical
Publication of CN109246724B publication Critical patent/CN109246724B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Abstract

The embodiment of the invention discloses a kind of methods for detecting antenna and work parameter evidence, obtain the antenna main lobe direction of the cell including polymerizeing according to the location information of UE multiple in cell;Determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.In addition the invention also discloses a kind of method, apparatus, the network equipment and storage mediums for detecting antenna and work parameter evidence.Can there are reverse connection of antenna and the cell of work ginseng problem to screen for all automatically through the embodiment of the present invention, reduction is failed to judge, and is improved accuracy, is improved network quality.

Description

A kind of method, apparatus, the network equipment and storage medium detecting antenna and work parameter evidence
Technical field
The invention mainly relates to the communications field more particularly to a kind of method, apparatus, networks for detecting antenna and work parameter evidence Equipment and storage medium.
Technical background
During wireless network construction, inevitably reverse connection of antenna, practice of construction and engineering parameter be (referred to as " work ginseng ") the case where not being inconsistent, engineering parameter here includes the azimuth of antenna, latitude and longitude of base station etc..Reverse connection of antenna or work Journey performance and planning, which are not inconsistent, will lead to the covering of MPS process and planning and is not inconsistent, and cause covering cavity or covering uneven, Situations such as adjacent area leakage, mispairing, occurs, and influences network quality.Existing many network optimizations simultaneously all rely on matching for engineering parameter It sets, engineering parameter mistake also will affect the effect of the network optimization.
Currently, can check whether the covering of cell is inconsistent with the covering of planning by drive test in actual operation, so Arrange the methods of artificial upper station inspection that can check and correct reverse connection of antenna or the incorrect problem of work ginseng afterwards.It is a large amount of small having In the case where area, arrangement manually all carries out drive test for each cell and needs to expend a large amount of man power and material, and drive test Network optimization needs can not be unable to satisfy in this way comprising all scenes in network.
The scheme of existing some automatic detection antenna reverse problems has certain limitation.For example, calculating based on small When switch data between area makes a decision, the factors such as neighbor cell configuration, the work of neighboring community ginseng configuration accuracy can be to testing result There is larger impact.Main problem of the existing technology is that drive test is time-consuming and laborious, and detection accuracy is inadequate.
Summary of the invention
In order to meet the needs of the network optimization, the manpower and material resources of network optimization investment are reduced, problem cells detection is improved Accuracy.The embodiment of the present invention proposes method, apparatus, the network equipment and the storage Jie of a kind of detection antenna and work parameter evidence Matter.
The embodiment of the present invention provides a kind of method for detecting antenna and work parameter evidence, comprising:
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
Determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
Preferentially, it determines the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
In the case where the multiple UE is in indoor situation, the multiple UE is monitored from the cell and is switched to neighboring community Number;
Determine that the cell exists with from the number that the cell is switched to neighboring community according to the antenna main lobe direction Reverse connection of antenna or work staggering miss.
Preferably, it determines the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
Compared with azimuth is joined with pre-set work in the antenna main lobe direction;
Joining azimuthal difference in the antenna main lobe direction and pre-set work is more than preset value A, is determined described small There are reverse connection of antenna or work staggering to miss in area.
Preferably, it determines the cell there are reverse connection of antenna or work staggering and accidentally include:
The base station azimuth of cell and neighboring community, the base station of the cell are measured according to assisted global positioning system AGPS Azimuth is more than preset value B at the azimuth in the antenna main lobe direction of the neighboring community, determines that the cell is reverse connection of antenna;
It is polymerize respectively according to the UE in the cell of lower three different directions in base station and obtains the center of each cell, then root It polymerize to obtain the center of base station according to the center of each cell, if the center of base station is more than the position of work ginseng planning When distance is preset value C, confirmation work staggering is missed, wherein at least there are three the cells of different directions for the base station.
Preferably, include: according to the antenna main lobe direction that the location information of UE multiple in cell polymerize to obtain the cell
The location information that AGPS detects multiple UE in the cell is positioned by assisted global;
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of the multiple UE.
Preferably, the multiple UE received signal intensity is more than preset value D.
In addition, the embodiment of the invention also provides a kind of devices for detecting antenna and work parameter evidence, including,
Determining module: it is polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
Detection module: determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
Preferably, it determines the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
In the case where the multiple UE is in indoor situation, the multiple UE is monitored from the cell and is switched to neighboring community Number;
Determine that the cell exists with from the number that the cell is switched to neighboring community according to the antenna main lobe direction Reverse connection of antenna or work staggering miss.
Preferably, it determines the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
Compared with azimuth is joined with pre-set work in the antenna main lobe direction;
Joining azimuthal difference in the antenna main lobe direction and pre-set work is more than preset value A, is determined described small There are reverse connection of antenna or work staggering to miss in area.
Preferably, it determines the cell there are reverse connection of antenna or work staggering and accidentally include:
The base station azimuth of cell and neighboring community, the base station of the cell are measured according to assisted global positioning system AGPS Azimuth is more than preset value B at the azimuth in the antenna main lobe direction of the neighboring community, determines that the cell is reverse connection of antenna;
It is polymerize respectively according to the UE in the cell of lower three different directions in base station and obtains the center of each cell, then root It polymerize to obtain the center of base station according to the center of each cell, if the center of base station is more than the position of work ginseng planning When distance is preset value C, confirmation work staggering is missed, wherein at least there are three the cells of different directions for the base station.
Preferably, include: according to the antenna main lobe direction that the location information of UE multiple in cell polymerize to obtain the cell
The location information that AGPS detects multiple UE in the cell is positioned by assisted global;
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of the multiple UE.
Preferably, the multiple UE received signal intensity is more than preset value D.
In addition, the embodiment of the present invention also provides a kind of network equipment and computer storage medium.
The utility model has the advantages that through the embodiment of the present invention, the cell of all reverse connection of antenna and work ginseng problem can be screened automatically Out, reduction is failed to judge, and improves accuracy.The man power and material that the network optimization can be reduced in this way, improves network quality, and improves work The accuracy of journey parameter promotes the effect of other network optimization measures based on engineering parameter.
Figure of description
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
The method schematic diagram of a kind of the detection antenna and work parameter evidence of Fig. 1 embodiment of the present invention;
The method flow diagram of a kind of the detection antenna and work parameter evidence of Fig. 2 embodiment of the present invention;
The schematic device of a kind of the detection antenna and work parameter evidence of Fig. 3 embodiment of the present invention;
Fig. 4 embodiment of the present invention checks the principle signal of the whether problematic method of cell based on the UE for having location information Figure;
Fig. 5 embodiment of the present invention is checked in the whether problematic method of cell based on the switch data between cell and adjacent area Select the schematic illustration of adjacent area;
Schematic diagram of Fig. 6 embodiment of the present invention based on AGPS identification reverse connection of antenna problem;
Schematic diagram of Fig. 7 embodiment of the present invention based on AGPS identification longitude and latitude Problem-Error;
Specific embodiment
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and in combination with Examples.It should be noted that not conflicting In the case of, the features in the embodiments and the embodiments of the present application can be combined with each other.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.
Embodiment of the method
As described above, the present invention implements to provide a kind of method for detecting antenna and work parameter evidence, real through the invention Apply example, it is possible to reduce the man power and material of the network optimization improves network quality, and improves the accuracy of engineering parameter, is promoted other The effect of network optimization measure based on engineering parameter.
The method schematic diagram of a kind of the detection antenna and work parameter evidence of Fig. 1 embodiment of the present invention, as shown in Figure 1, step packet It includes
S101: it is polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
S102: determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
Specifically, determining the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
In the case where the multiple UE is in indoor situation, the multiple UE is monitored from the cell and is switched to neighboring community Number;
Determine that the cell exists with from the number that the cell is switched to neighboring community according to the antenna main lobe direction Reverse connection of antenna or work staggering miss.
Optionally, it determines the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
Compared with azimuth is joined with pre-set work in the antenna main lobe direction;
In the case where the antenna main lobe direction and pre-set work join azimuthal difference and be greater than 90 degree, institute is determined Stating cell, there are reverse connection of antenna or work staggering to miss.
Optionally, it determines the cell there are reverse connection of antenna or work staggering and accidentally include:
The base station azimuth of cell and neighboring community, the base station of the cell are measured according to assisted global positioning system AGPS Azimuth is greater than preset value at the azimuth in the antenna main lobe direction of the neighboring community, determines that the cell is reverse connection of antenna;
The site location that the cell Yu the neighboring community are measured according to AGPS judges the orientation of the site location Whether difference between angle and the azimuth of work ginseng determination in the case where the judgment result is yes, determines work staggering more than 90 degree Accidentally, wherein the azimuth of the site location is polymerize by the center of the different multiple cells in AGPS measurement azimuth It arrives.
Optionally, include: according to the antenna main lobe direction that the location information of UE multiple in cell polymerize to obtain the cell
The location information that AGPS detects multiple UE in the cell is positioned by assisted global;
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of the multiple UE.
Optionally, the multiple UE received signal intensity is more than -100db.
The method flow diagram of a kind of the detection antenna and work parameter evidence of Fig. 2 embodiment of the present invention.Specific steps include:
S201 starts the AGPS measurement of basic UE;
S202 starts the measurement judgement of UE and judges with the handoff relation of adjacent area;
The azimuth that S203, detection antenna main lobe direction and work are joined and the judgement with adjacent area handoff relation;
S204, determining has the concrete type of antenna and work staggering accidentally;
Check whether cell is problematic specifically, measuring according to the AGPS of UE.
Mainly it polymerize to obtain more than the location information of the UE of certain thresholding according to the signal strength for receiving cell signal The center of cell is to determine whether this cell is problematic.The thresholding of the cell UE is defaulted as -100dBm.
Specifically: it polymerize to obtain according to the location information that the signal strength for receiving cell signal is more than the UE of certain thresholding The center of cell is the deflection of starting point to the center as the true bearing angle of cell using cell site location, If the azimuth angle error on the true bearing angle and engineering parameter is more than certain thresholding, it is usually set to 90 degree.So this is small There may be reverse connection of antenna, perhaps the work ginseng Problem-Error work staggering accidentally refers to azimuth mistake or longitude and latitude mistake in area.
Wherein, UE received signal strength may is that for gsm system be RSSI, for UMTS system be RSCP (or CPICH Ec/No), it is RSRP (or RSRQ) for LTE system.Location information, that is, latitude and longitude information is obtained by AGPS measurement. It polymerize to obtain the center of cell according to the location information that received signal strength in cell is more than the UE of certain thresholding, polymerize Method can be but not limited to: the longitude and latitude of all UE for meeting condition is averaged to obtain respectively.
True bearing angle is the direction that cellular-site location is directed toward the center that measurement result polymerize, cell base station Position is obtained according to engineering parameter.
Specifically, checking whether cell is problematic according to the switch data of cell and neighboring interval.
It the adjacent area largely switched mainly should not occur according to this but has occurred a large amount of switchings between this cell to know Whether other cell is problematic.
Specifically: in the switching times an of adjacent area and this cell more than certain thresholding, 200 are defaulted as, and account for this cell The ratio of total switching times is defaulted as 5% when being more than certain thresholding, if the adjacent area is more than certain thresholding with this cell distance, And cell azimuth mutually deviates from more than certain angle, then it is assumed that there are reverse connection of antenna or work to join Problem-Error, institute for this cell It states work staggering and accidentally refers to azimuth mistake or longitude and latitude mistake.
The cell azimuth, which mutually deviates from, refers to " angle that serving cell deviates from adjacent area " and " adjacent area more than certain angle Away from the angle of serving cell " it is greater than certain thresholding, it is defaulted as 150 degree, in which:
" angle that serving cell deviates from adjacent area " is the angle of line between the azimuth and cell pair of serving cell;
" angle that adjacent area deviates from serving cell " is the angle of line between the azimuth and cell pair of adjacent area.
The position of cell and adjacent area is obtained according to engineering parameter.
The cell pair for needing to be traversed for the cell and its all adjacent areas composition, checks whether cell deposits according to switch data respectively In problem.
Specifically, comprehensive Step1, checking the problematic number of cell to determine the problematic possibility system of cell in 2 Number.
Wherein, cell by the scheme based on measurement check come when and by based on switching be examined come out can have it is different Possible property coefficient, for example being examined a possibility that coming out coefficient increment based on measurement is DeltaProbabilityMR, and by base Check that a possibility that coming coefficient increment is DeltaProbabilityHO in the scheme of switching statistics.The final cell is problematic A possibility that coefficient calculation method include but is not limited to following method:
Scheme 1: the problematic problematic possibility of then cell between cell and some adjacent area is gone out based on switching check-up through statistical means Property coefficient will add an increment, the i.e. problematic possible property coefficient of the cell are as follows:
DeltaProbabilityMR*i+DeltaProbabilityHO*j
Wherein,
I:0 or 1, the i=1 when cell is checked problematic based on measurement result, is otherwise 0.
J: when checking this cell, the number of problematic cell pair is checked.I.e. using this cell as serving cell, check Have to meet between j adjacent area and the serving cell and problematic condition is checked based on switching.
Scheme 2:DeltaProbabilityHO indicates all satisfactions and can produce away from the adjacent area of angle and distance condition The problematic possible property coefficient of raw maximum possible property coefficient increment, the i.e. cell are as follows:
DeltaProbabilityMR*i+DeltaProbabilityHO*(j/K)
Wherein,
I:0 or 1, the i=1 when cell is checked problematic based on measurement result, is otherwise 0.
J: when checking this cell, the number of problematic cell pair is checked.I.e. using this cell as serving cell, check Have to meet between j adjacent area and the serving cell and problematic condition is checked based on switching.
K: indicating as described in Step2, and deviation degree relationship and distance between this cell are met in all adjacent areas of cell The adjacent area number of relationship.
Optionally, based on " cell problematic possible property coefficient " to Step1~2 check come cell do further sieve Choosing.Screening technique, which may is that, is only real problematic cell when " the problematic possible property coefficient of cell " is greater than a thresholding.
Optionally, small to determine according to the information such as the number of problematic cell and AGPS measurement result in a website The problem of area type:
(1) if gone wrong in a website there are two cell, and two cells report gathering for the UE of AGPS measurement Conjunction center respectively on the azimuth of other side (the antenna in cell main lobe in planning) direction (tolerance is within certain thresholding), Then think that the problem of reverse connection of antenna occurs in this website.
When (2) websites have the cell of at least three different orientations, AGPS that each cell is reported according to UE respectively Measurement obtains the center of each cell, and then the center again based on multiple cells polymerize to obtain the physical location of website, Polymerization includes but is not limited to respectively to be averaged longitude and latitude.If obtained website physical location and based in work ginseng The work ginseng positional distance that longitude and latitude obtains is larger, is defaulted as 500M, then it is assumed that it is problematic that work joins longitude and latitude.
Installation practice
A kind of detection antenna and work ginseng data set are additionally provided in the present embodiment, and the device is for realizing above-mentioned implementation Example and preferred embodiment, the descriptions that have already been made will not be repeated.As used below, term " module " may be implemented pre- Determine the combination of the software and/or hardware of function.Although device described in following embodiment is preferably realized with software, The realization of the combination of hardware or software and hardware is also that may and be contemplated.
The schematic device of a kind of the detection antenna and work parameter evidence of Fig. 3 embodiment of the present invention;The device is implemented on base station It is interior.As shown in figure 3, the device includes:
Determining module 301: it is polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
Detection module 302: determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
Specifically, determining the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
In the case where the multiple UE is in indoor situation, the multiple UE is monitored from the cell and is switched to neighboring community Number;
Determine that the cell exists with from the number that the cell is switched to neighboring community according to the antenna main lobe direction Reverse connection of antenna or work staggering miss.
Optionally, it determines the cell according to the antenna main lobe direction there are reverse connection of antenna or work staggering and accidentally include:
Compared with azimuth is joined with pre-set work in the antenna main lobe direction;
In the case where the antenna main lobe direction and pre-set work join azimuthal difference and be greater than 90 degree, institute is determined Stating cell, there are reverse connection of antenna or work staggering to miss.
Optionally, it determines the cell there are reverse connection of antenna or work staggering and accidentally include:
The base station azimuth of cell and neighboring community, the base station of the cell are measured according to assisted global positioning system AGPS Azimuth is greater than preset value at the azimuth in the antenna main lobe direction of the neighboring community, determines that the cell is reverse connection of antenna;
The site location that the cell Yu the neighboring community are measured according to AGPS judges the orientation of the site location Whether difference between angle and the azimuth of work ginseng determination in the case where the judgment result is yes, determines work staggering more than 90 degree Accidentally, wherein the azimuth of the site location is polymerize by the center of the different multiple cells in AGPS measurement azimuth It arrives.
Optionally, include: according to the antenna main lobe direction that the location information of UE multiple in cell polymerize to obtain the cell
The location information that AGPS detects multiple UE in the cell is positioned by assisted global;
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of the multiple UE.
Optionally, the multiple UE received signal intensity is more than -100db.
Storage medium embodiment
The embodiments of the present invention also provide a kind of storage mediums.Optionally, in the present embodiment, above-mentioned storage medium can To be arranged to store the program code for executing following steps:
S103 polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
S104: determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
Optionally, in the present embodiment, above-mentioned storage medium can include but is not limited to: USB flash disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or The various media that can store program code such as CD.
Optionally, the specific example in the present embodiment can be with reference to described in above-described embodiment and optional embodiment Example, details are not described herein for the present embodiment.
Based on the identical technical concept of previous embodiment, a kind of network equipment provided in an embodiment of the present invention, the network Equipment includes: memory and processor;Various components are coupled by bus system.It is understood that bus system is for real Connection communication between these existing components.Bus system except include data/address bus in addition to, further include power bus, control bus and Status signal bus in addition.Wherein,
Wherein, memory, for storing the computer program that can be run on a processor;
Processor, for executing when running the computer program:
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
Determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
It is appreciated that the memory in the embodiment of the present invention can be volatile memory or nonvolatile memory, or It may include both volatile and non-volatile memories.Wherein, nonvolatile memory can be read-only memory (Read- Only Memory, ROM), programmable read only memory (Programmable ROM, PROM), the read-only storage of erasable programmable Device (Erasable PROM, EPROM), electrically erasable programmable read-only memory (Electrically EPROM, EEPROM) Or flash memory.Volatile memory can be random access memory (Random Access Memory, RAM), be used as outside Cache.By exemplary but be not restricted explanation, the RAM of many forms is available, such as static random access memory (Static RAM, SRAM), dynamic random access memory (Dynamic RAM, DRAM), synchronous dynamic random-access storage Device (Synchronous DRAM, SDRAM), double data speed synchronous dynamic RAM (Double Data Rate SDRAM, DDRSDRAM), it is enhanced Synchronous Dynamic Random Access Memory (Enhanced SDRAM, ESDRAM), same Step connection dynamic random access memory (Synchlink DRAM, SLDRAM) and direct rambus random access memory (Direct Rambus RAM, DRRAM).The memory of system and method described herein be intended to include but be not limited to these and The memory of any other suitable type.
And processor may be a kind of IC chip, the processing capacity with signal.During realization, above-mentioned side Each step of method can be completed by the integrated logic circuit of the hardware in processor or the instruction of software form.Above-mentioned place Reason device can be general processor, digital signal processor (Digital Signal Processor, DSP), dedicated integrated electricity Road (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components.It may be implemented or execute disclosed each method, step and the logic diagram in the embodiment of the present invention.It is general Processor can be microprocessor or the processor is also possible to any conventional processor etc..In conjunction with institute of the embodiment of the present invention The step of disclosed method, can be embodied directly in hardware decoding processor and execute completion, or with the hardware in decoding processor And software module combination executes completion.Software module can be located at random access memory, and flash memory, read-only memory may be programmed read-only In the storage medium of this fields such as memory or electrically erasable programmable memory, register maturation.The storage medium is located at The step of memory, processor reads the information in memory, completes the above method in conjunction with its hardware.
It is understood that embodiments described herein can with hardware, software, firmware, middleware, microcode or its Combination is to realize.For hardware realization, processing unit be may be implemented in one or more specific integrated circuit (Application Specific Integrated Circuits, ASIC), digital signal processor (Digital Signal Processing, DSP), digital signal processing appts (DSP Device, DSPD), programmable logic device (Programmable Logic Device, PLD), field programmable gate array (Field-Programmable GateArray, FPGA), general processor, control In device processed, microcontroller, microprocessor, other electronic units for executing herein described function or combinations thereof.
For software implementations, it can be realized herein by executing the module (such as process, function etc.) of function described herein The technology.Software code is storable in memory and is executed by processor.Memory can in the processor or It is realized outside processor.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (14)

1. a kind of method for detecting antenna and work parameter evidence characterized by comprising
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
Determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
2. the method as described in claim 1, which is characterized in that determining the cell according to the antenna main lobe direction, there are days Line is reversed or work staggering accidentally includes:
In the case where the multiple UE is in indoor situation, time that the multiple UE is switched to neighboring community from the cell is monitored Number;
According to the antenna main lobe direction, there are antennas with the cell is determined from the number that the cell is switched to neighboring community Reversed or work staggering misses.
3. the method as described in claim 1, which is characterized in that determining the cell according to the antenna main lobe direction, there are days Line is reversed or work staggering accidentally includes:
Compared with azimuth is joined with pre-set work in the antenna main lobe direction;
Joining azimuthal difference in the antenna main lobe direction and pre-set work is more than preset value A, determines that the cell is deposited It is missed in reverse connection of antenna or work staggering.
4. method as claimed in claim 2 or claim 3, which is characterized in that determining the cell, there are reverse connection of antenna or work staggering to miss Include:
The base station azimuth of cell and neighboring community, the base station orientation of the cell are measured according to assisted global positioning system AGPS Angle is more than preset value B at the azimuth in the antenna main lobe direction of the neighboring community, determines that the cell is reverse connection of antenna;
It is polymerize respectively according to the UE in the cell of lower three different directions in base station and obtains the center of each cell, further according to every The center of a cell polymerize to obtain the center of base station, if the center of base station is more than the positional distance of work ginseng planning When for preset value C, confirmation work staggering is missed, wherein at least there are three the cells of different directions for the base station.
5. method as claimed in claim 4, which is characterized in that polymerize to obtain according to the location information of UE multiple in cell described The antenna main lobe direction of cell includes:
The location information that AGPS detects multiple UE in the cell is positioned by assisted global;
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of the multiple UE.
6. method as claimed in claim 5, which is characterized in that the multiple UE received signal intensity is more than preset value D.
7. a kind of device for detecting antenna and work parameter evidence, which is characterized in that including,
Determining module: it is polymerize to obtain the antenna main lobe direction of the cell according to the location information of UE multiple in cell;
Detection module: determining the cell according to the antenna main lobe direction, there are reverse connection of antenna or work staggering to miss.
8. device as claimed in claim 7, which is characterized in that determining the cell according to the antenna main lobe direction, there are days Line is reversed or work staggering accidentally includes:
In the case where the multiple UE is in indoor situation, time that the multiple UE is switched to neighboring community from the cell is monitored Number;
According to the antenna main lobe direction, there are antennas with the cell is determined from the number that the cell is switched to neighboring community Reversed or work staggering misses.
9. device as claimed in claim 7, which is characterized in that determining the cell according to the antenna main lobe direction, there are days Line is reversed or work staggering accidentally includes:
Compared with azimuth is joined with pre-set work in the antenna main lobe direction;
It is more than preset value A that the antenna main lobe direction and pre-set work, which join azimuthal difference, determines that the cell exists Reverse connection of antenna or work staggering miss.
10. device as claimed in claim 8 or 9, which is characterized in that determining the cell, there are reverse connection of antenna or work staggering to miss Include:
The base station azimuth of cell and neighboring community, the base station orientation of the cell are measured according to assisted global positioning system AGPS Angle is more than preset value B at the azimuth in the antenna main lobe direction of the neighboring community, determines that the cell is reverse connection of antenna;
It is polymerize respectively according to the UE in the cell of lower three different directions in base station and obtains the center of each cell, further according to every The center of a cell polymerize to obtain the center of base station, if the center of base station is more than the positional distance of work ginseng planning When for preset value C, confirmation work staggering is missed, wherein at least there are three the cells of different directions for the base station.
11. device as claimed in claim 10, which is characterized in that polymerize to obtain institute according to the location information of UE multiple in cell The antenna main lobe direction for stating cell includes:
The location information that AGPS detects multiple UE in the cell is positioned by assisted global;
It is polymerize to obtain the antenna main lobe direction of the cell according to the location information of the multiple UE.
12. device as claimed in claim 11, which is characterized in that the multiple UE received signal intensity is more than preset value D.
13. a kind of network equipment, which is characterized in that including memory and processor, wherein memory and processor are coupled,
The memory is for storing the computer program that can be run on the processor;
The processor is used for when running the computer program, and perform claim requires any one of 1-6 method and step.
14. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program quilt When execution, any one of claim 1-6 method and step is realized.
CN201710554794.XA 2017-07-10 2017-07-10 Method, device, network equipment and storage medium for detecting antenna and working parameter data Active CN109246724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710554794.XA CN109246724B (en) 2017-07-10 2017-07-10 Method, device, network equipment and storage medium for detecting antenna and working parameter data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710554794.XA CN109246724B (en) 2017-07-10 2017-07-10 Method, device, network equipment and storage medium for detecting antenna and working parameter data

Publications (2)

Publication Number Publication Date
CN109246724A true CN109246724A (en) 2019-01-18
CN109246724B CN109246724B (en) 2022-11-25

Family

ID=65082792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710554794.XA Active CN109246724B (en) 2017-07-10 2017-07-10 Method, device, network equipment and storage medium for detecting antenna and working parameter data

Country Status (1)

Country Link
CN (1) CN109246724B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113938229A (en) * 2021-09-03 2022-01-14 中国联合网络通信集团有限公司 Antenna direction angle evaluation method and device
CN114258066A (en) * 2021-12-21 2022-03-29 中国联合网络通信集团有限公司 Azimuth angle anomaly detection method, device, equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102264085A (en) * 2011-03-31 2011-11-30 中兴通讯股份有限公司 Antenna inverse connection determination method and apparatus thereof
CN102355690A (en) * 2011-06-29 2012-02-15 北京拓明科技有限公司 Method for assessing reverse antenna feeder between cells of base stations
CN103079228A (en) * 2012-12-20 2013-05-01 上海大唐移动通信设备有限公司 Antenna wiring direction detection method and device
US20140152513A1 (en) * 2012-11-30 2014-06-05 Kabushiki Kaisha Tokai Rika Denki Seisakusho Vehicle antenna device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102264085A (en) * 2011-03-31 2011-11-30 中兴通讯股份有限公司 Antenna inverse connection determination method and apparatus thereof
CN102355690A (en) * 2011-06-29 2012-02-15 北京拓明科技有限公司 Method for assessing reverse antenna feeder between cells of base stations
US20140152513A1 (en) * 2012-11-30 2014-06-05 Kabushiki Kaisha Tokai Rika Denki Seisakusho Vehicle antenna device
CN103079228A (en) * 2012-12-20 2013-05-01 上海大唐移动通信设备有限公司 Antenna wiring direction detection method and device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113938229A (en) * 2021-09-03 2022-01-14 中国联合网络通信集团有限公司 Antenna direction angle evaluation method and device
CN114258066A (en) * 2021-12-21 2022-03-29 中国联合网络通信集团有限公司 Azimuth angle anomaly detection method, device, equipment and storage medium
CN114258066B (en) * 2021-12-21 2023-05-09 中国联合网络通信集团有限公司 Azimuthal anomaly detection method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN109246724B (en) 2022-11-25

Similar Documents

Publication Publication Date Title
CN102480742B (en) A kind ofly detect method and the device that wireless network crosses covering
US8903403B2 (en) Method and apparatus for evaluating cross-cell coverage
CN109495913B (en) Interference evaluation method and device
CN102355690B (en) Method for assessing reverse antenna feeder between cells of base stations
CN103929775A (en) Service cell coverage direction rationality detection method and device
CN109257125B (en) Method and device for detecting reverse connection of antenna feeder of base station
CN104113858B (en) A kind of determination method, base station and the network system of antenna bearingt angular displacement
US10517007B2 (en) Received signal strength based interferer classification of cellular network cells
CN109246724A (en) A kind of method, apparatus, the network equipment and storage medium detecting antenna and work parameter evidence
CN103781093A (en) Wireless network optimization method and terminal based on virtual switching
CN112839340A (en) Over-coverage area detection method, device, equipment and storage medium
CN110649981B (en) MOD3 interference processing method and equipment
CN102883332A (en) Method and device for determining base station site
CN110461005B (en) Cell optimization method, device, equipment and storage medium
CN112969192A (en) Cell weak coverage analysis method, device, equipment and storage medium
CN103079228B (en) A kind of antenna connection direction detection method and device
CN111866847B (en) Mobile communication network data analysis method, equipment and computer storage medium
CN105744554A (en) GSM network switching failure management method and system
JP2018514983A (en) Method and system for cross antenna feed detection
CN107734516B (en) Neighbor cell optimization method and device
CN109788504B (en) Antenna reverse connection detection method and device
CN102171532B (en) Antenna azimuth detection device, detection method and device for reversal of antenna
CN112637770A (en) Cell state judgment method and device based on minimization of drive tests and computing equipment
CN102884836A (en) Method and apparatus for processing network configuration, and radio network controller
CN105101263A (en) Method and device for determining performance parameters of antenna feed system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant