CN109246215A - For obtaining the method and terminal of the fault data of relay in electric system - Google Patents
For obtaining the method and terminal of the fault data of relay in electric system Download PDFInfo
- Publication number
- CN109246215A CN109246215A CN201811052916.6A CN201811052916A CN109246215A CN 109246215 A CN109246215 A CN 109246215A CN 201811052916 A CN201811052916 A CN 201811052916A CN 109246215 A CN109246215 A CN 109246215A
- Authority
- CN
- China
- Prior art keywords
- relay
- terminal
- fault data
- target
- source
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- H04L67/125—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
Abstract
The present invention relates to the methods and terminal for obtaining the fault data of relay in electric system, method includes: the acquisition instruction that a terminal for obtaining the fault data of relay in electric system receives user's input, includes the mark of at least one target relay in the acquisition instruction;The terminal sends transmission instruction according to described identify to the target relay, the transmission instruction sends the fault data that the target relay stores by a target PDI for triggering the target relay, and the target relay is located at substation different in the electric system from the terminal;The terminal receives the fault data.
Description
Technical field
The present invention relates to field of power systems, especially the method for obtaining the fault data of relay in electric system
With terminal.
Background technique
Electric power is the basis of national economy, is important pillar industry, and therefore, electric system must be safe and reliable.
Electric system is generally made of generator, transformer, bus, power line and electrical equipment.Each electrical component and system are usually located
In normal operating condition, it is also possible to failure or abnormal operating condition.
As the scale of electric system is increasing, structure becomes increasingly complex, and failure generates inevitable.Work as electric system
In when breaking down, the relay in electric system Zhong Ge substation can store fault data.If one section of power line breaks down,
Staff needs to obtain the fault data stored in the relay in the substation at the power line both ends, can pass through the event
Barrier data analyze failure, so as to follow-up maintenance.In the prior art, staff needs to connect physics at each substation
Device, to obtain the fault data in each relay.Since each substation has a very wide distribution, between usual Liang Ge substation between
Away from for 3-100km, it is greatly inconvenient to cause in this way to staff, wastes a lot of manpower and material resources.
Summary of the invention
In view of this, the invention proposes a kind of methods for being used for transmission the fault data of relay in protective relaying device
With terminal.
One aspect of the present invention provides the method for obtaining the fault data of relay in electric system, comprising:
One terminal for obtaining the fault data of relay in electric system receives the acquisition instruction of user's input, institute
State the mark in acquisition instruction including at least one target relay;
The terminal sends transmission instruction according to described identify to the target relay, and the transmission instruction is for triggering
The target relay sends the fault data of the target relay storage, the target relay by a target PDI
It is located at substation different in the electric system from the terminal;
The terminal receives the fault data.
According to the present embodiment, user can send transmission instruction to target relay by a terminal, to trigger target
Relay sends fault data to terminal, in this way, user becomes without being moved to where target relay by existing target PDI
Fault data can be obtained at power station, saves a large amount of time, and not will increase excessive cost.
According to method as described above, optionally, the terminal sends biography according to described identify to the target relay
Defeated instruction includes:
The terminal sends the transmission instruction to the target relay by a source PDI of a source relay,
So that the fault data is sent to the source PDI by the target relay, the terminal is used to connect with the source relay
It connects;
The terminal receives the fault data
The terminal receives the fault data by the source PDI.
According to the present invention, the biography with the target PDI fault data of target relay is realized by the source PDI of source relay
It is defeated, so terminal can by source relay obtain needed for fault data, can not only get in this way apart from it is farther away after
Fault data in electric appliance, and existing hardware is utilized, it avoids increasing cost as far as possible.
According to method as described above, optionally, before the acquisition instruction that the terminal receives user's input, also wrap
It includes:
The terminal receives triggering command;
The terminal shows that an interface, the interface include for inputting the target relay according to the triggering command
The window of the mark of device.
The mark that target relay is inputted by interface, brings great advantage to the user.
According to method as described above, optionally, before the acquisition instruction that the terminal receives user's input, also wrap
Include: the terminal receives the location information of each relay of guilty culprit power circuit, so that user is according to the positional information
Select the source relay.In this way, greatly facilitating user.
Another aspect of the invention provides the terminal for obtaining the fault data of relay in electric system, comprising:
One acquisition module includes at least one mesh in the acquisition instruction for receiving the acquisition instruction of user's input
Mark the mark of relay;
One sending module, for sending transmission instruction according to described identify to the target relay, the transmission refers to
It enables and the fault data that the target relay stores is sent by a target PDI for triggering the target relay, it is described
Target relay is located at substation different in the electric system from the terminal;
One the first receiving module, for receiving the fault data.
According to the present embodiment, user can send transmission instruction to target relay by a terminal, to trigger target
Relay sends fault data to terminal, in this way, user becomes without being moved to where target relay by existing target PDI
Fault data can be obtained at power station, saves a large amount of time, and not will increase excessive cost.
According to terminal as described above, optionally, the sending module is specifically used for: passing through one of a source relay
Source PDI sends the transmission instruction to the target relay, so that the fault data is sent to by the target relay
The source PDI, the sending module with the source substation for connecting;
First receiving module is specifically used for: receiving the fault data by the PDI of the source relay.
According to the present invention, the transmission with the target PDI fault data of target relay, and then terminal are realized by source PDI
Fault data needed for capable of being obtained by source relay, can not only get the failure in farther away relay in this way
Data, and existing hardware is utilized, it avoids increasing cost as far as possible.
According to terminal as described above, optionally, further includes:
One the second receiving module, for receiving triggering command;
One display module, for showing that an interface, the interface include for inputting according to the triggering command
State the window of the mark of target relay.
The mark that target relay is inputted by interface, brings great advantage to the user.
According to terminal as described above, optionally, further includes: a third receiving module, for receiving guilty culprit electricity
The location information of each relay on line of force road, so that user selects the source relay according to the positional information.In this way, greatly
Ground facilitates user.
Another aspect of the present invention provides the terminal for obtaining the fault data of relay in electric system, comprising:
One input unit, user input acquisition instruction by the input unit, include at least in the acquisition instruction
The mark of one target relay;
At least one communication interface, for being connect with a source relay, to receive or send data;
At least one processor is connect with the communication interface, for storing the fault data received;
At least one processor, it is as above described in any item for obtaining the failure of relay in electric system for executing
The method of data.
Another aspect of the present invention provides the terminal for obtaining the fault data of relay in electric system, comprising:
At least one processor, for storing instruction;
At least one processor, the instruction execution for being used to be stored according to the memory is according to as above described in any item
Method for obtaining the fault data of relay in electric system.
Another aspect of the present invention provides readable storage medium storing program for executing, is stored with machine readable finger in the readable storage medium storing program for executing
It enables, when being executed by a machine, the machine is executed according to as above described in any item for obtaining the machine readable instructions
The method for taking the fault data of relay in electric system.
Detailed description of the invention
Below will detailed description of the present invention preferred embodiment by referring to accompanying drawing, make those skilled in the art more
Clear above and other feature and advantage of the invention, in attached drawing:
Fig. 1 is according to one embodiment of the invention for obtaining the stream of the method for the fault data of relay in electric system
Journey schematic diagram.
Fig. 2 is according to another embodiment of the present invention for obtaining the method for the fault data of relay in electric system
Flow diagram.
Fig. 3 is according to yet another embodiment of the invention for obtaining the method for the fault data of relay in electric system
Flow diagram.
Fig. 4 is according to one embodiment of the invention for obtaining the knot of the terminal of the fault data of relay in electric system
Structure schematic diagram.
Fig. 5 is according to another embodiment of the present invention for obtaining the terminal of the fault data of relay in electric system
Structural schematic diagram.
Fig. 6 is according to yet another embodiment of the invention for obtaining the terminal of the fault data of relay in electric system
Structural schematic diagram.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, by the following examples to of the invention further detailed
It describes in detail bright.
Embodiment one
The present embodiment provides the methods for obtaining the fault data of relay in electric system.The executing subject of this method
For one for obtaining the terminal of the fault data of relay in electric system, which can be the various ends for user's operation
End, such as palm PC, personal computer etc., details are not described herein.
As shown in Figure 1, to be according to the present invention for obtaining the stream of the method for the fault data of relay in electric system
Journey schematic diagram.The method for obtaining the fault data of relay in electric system of the present embodiment includes:
Step 101, terminal receives the acquisition instruction of user's input, includes at least one target relay in acquisition instruction
Mark.
User can input acquisition instruction by the interface of terminal, with triggering following process.Target is inputted by interface
The mark of relay, brings great advantage to the user.The mark of the target relay can be manually entered by user, such as
It after inputting the mark of target relay in interface, clicks and sends key, it can generate acquisition instruction, terminal is sent in turn should
Acquisition instruction.
For example, terminal receives the triggering command of user's input first, then shows a boundary according to the triggering command
Face, the interface include the window for inputting the mark of target relay, and user can input in the window wants acquisition
The mark of target relay where fault data.User can be determined according to the information of each relay obtained in advance target after
Electric appliance, the warning message received when can also be occurred according to failure determine target relay, specifically without limitation.
It certainly, also may include the mark of multiple target relays in acquisition instruction.
Step 102, terminal according to mark to target relay send transmission instruction, the transmission instruction for trigger target after
Electric appliance sends the fault data of target relay storage by a target PDI, and target relay and terminal are located at electric system
Middle different substation.
PDI (Protection Date Interface protects data-interface) is existing communication interface in relay.
In the prior art, relay transmits real-time detection data by the PDI.Respective PDI can be passed through between different relays
Transmit real-time detection data.In the present embodiment, after target relay gets fault data, fault data is stored.
In the present embodiment, target relay transmits stored number of faults by the target PDI of itself after receiving transmission instruction
According to will not change the existing hardware structure of relay in this way, excessive cost will not be increased.
In the present embodiment, target relay is located at the position that different substations refers to target relay and terminal from terminal
Difference is set, for example, target relay is located in a target substation, terminal is located in a Ge Yuan substation, the target power transformation
The power line stood between the substation of source breaks down, and the target substation and source substation can be adjacent substation.
Step 103, terminal receives fault data.
Terminal can receive fault data by a source relay, can also be existing by being connected to target PDI
The fault data is received in communication channel, which can be wired connection or wireless connection, specifically repeat no more.
According to the present embodiment, user can send transmission instruction to target relay by a terminal, to trigger target
Relay sends fault data to terminal, in this way, user becomes without being moved to where target relay by existing target PDI
Fault data can be obtained at power station, saves a large amount of time, and not will increase excessive cost.
Embodiment two
The present embodiment makees the method for the fault data of relay in the transmission protective relaying device of embodiment one further
Supplementary explanation.
As shown in Fig. 2, for the method for the fault data of relay in the transmission protective relaying device according to the present embodiment
Flow diagram.This method comprises:
Step 201, terminal receives the acquisition instruction of user's input, includes at least one target relay in the acquisition instruction
Mark.
The step and step 101 are consistent, and details are not described herein.
Step 202, terminal sends transmission instruction to target relay by a source PDI of a source relay, so that
Fault data is sent to source PDI by target relay, and terminal with source relay station for connecting.
It can be physics wired connection between source relay and terminal, be also possible to be wirelessly connected, it specifically can be according to reality
Border needs to set.Certainly, it can be directly connected to, can also be indirectly connected between source relay and terminal.The source relay is located at
In one Ge Yuan substation.Terminal can send transmission by target PDI of the source PDI on the relay of source on target relay and refer to
It enables.Inherently there is a communication channel between source PDI and target PDI, the two can be with direct communication.
It is noted that " source " and " target " in the present invention is to distinguish different substation or relay.
Step 203, terminal receives fault data by source PDI.
When source relay gets the fault data stored in target relay by source PDI, it can be sent to and connect with it
At the terminal connect.It after terminal receives the fault data, can store under preset path, so that user checks.Certainly, it transmits
It can also show the progress of transmission, on the screen of terminal in the process so that user understands the case where transmitting.
Optionally, before step 201, further includes: terminal receives the position of each relay of guilty culprit power circuit
Information, so that user selects source relay according to location information.For example, when relay identifies its power line protected
When breaking down, its location information can be sent to terminal, it is that power circuit where event occurs that such user, which is just able to know that,
Barrier.User can determine source relay and target by the mark of each relay and the corresponding relationship of location information obtained in advance
Relay greatly facilitates user.
According to the present invention, the biography with the target PDI fault data of target relay is realized by the source PDI of source relay
It is defeated, so terminal can by source relay obtain needed for fault data, can not only get in this way apart from it is farther away after
Fault data in electric appliance, and existing hardware is utilized, it avoids increasing cost as far as possible.
Embodiment three
The present embodiment does specifically the method for obtaining the fault data of relay in electric system of above-described embodiment
It illustrates.
As shown in figure 3, for three substations A, B and C in unified power system.All had in each substation one after
Electric appliance, and each relay all has PDI.
When the power circuit between A and B breaks down, A and B can issue alarm.Such as to preset device 301
Warning message is sent, user can know the line failure between A and B according to the warning message.Optionally, the alarm signal
The location information of location information and B in breath including A, i.e. in A in relay and B relay location information.User is according to this
Location information is selected apart from oneself closer relay as source relay, such as the relay 303 in B.
After user reaches B, terminal 302 and relay 303 are subjected to physical connection.Then, user can send a touching
Send instructions, so that terminal 302 shows an interface, and inputs the mark of relay 304 in A by the interface that terminal 302 is shown
Information, and send acquisition instruction.Relay 303 according to the acquisition instruction, by the PDI of its own into A relay 304
PDI transmits the acquisition instruction.After relay 304 receives acquisition instruction, the fault data that itself is stored is passed through its own again
PDI be sent to relay 303.After relay 303 receives the fault data, terminal will be sent to by existing mode
302.User can get the fault data in A by the terminal 302.
Certainly, terminal 302 also needs to obtain the fault data of relay 303, the specific implementation such as prior art.
If the power circuit between B and C also breaks down simultaneously, it will include A, B and C respective positions in warning message
Information.If user selects B as source substation, i.e. selective relay 303 is used as source relay, then can in the acquisition instruction generated
Simultaneously to include the mark of relay 304 and the mark of relay in C, can thus get simultaneously in A and C respectively after
The fault message stored in electric appliance.
Example IV
The present embodiment provides the terminals for obtaining the fault data of relay in electric system, for executing embodiment one
Method.
As shown in figure 4, to be used to obtain the terminal of the fault data of relay in electric system according to the present embodiment
Structural schematic diagram.The terminal 400 includes 401, sending modules 402 of an acquisition module and first receiving module 403.
Wherein, the acquisition instruction that module 401 is used to receive user's input is obtained, includes at least one mesh in the acquisition instruction
Mark the mark of relay;Sending module 402 is used to send transmission instruction to target relay according to mark, and transmission instruction is for touching
The fault data that target relay sends the storage of target relay by a target PDI is sent out, target relay is located at terminal
Different substation in electric system;First receiving module 403 is for receiving fault data.
Optionally, sending module 402 is specifically used for: being sent out by a source PDI of a source relay to target relay
Transmission is sent to instruct, so that fault data is sent to source PDI by target relay, sending module 402 with source relay for connecting;
First receiving module 403 is specifically used for: receiving fault data by source PDI.
Fault data acquired in first receiving module 403 can store in a memory.
The operating method of above-mentioned each module is identical as preceding method, and details are not described herein.
According to the present embodiment, user can send transmission instruction to target relay by a terminal, to trigger target
Relay sends fault data to terminal, in this way, user is without being moved to where target relay by existing target PDI
Fault data can be obtained at target substation, saves a large amount of time, and not will increase excessive cost.
Embodiment five
The present embodiment makees further supplementary explanation to the terminal of example IV.
As shown in figure 5, to be used to obtain the terminal of the fault data of relay in electric system according to the present embodiment
Structural schematic diagram.The terminal 500 is in addition to including acquisition module 401 as shown in Figure 4, sending module 402 and the first receiving module
403, it further include second receiving module 501 and a display module 502.
Wherein the second receiving module 501 is for receiving triggering command;Display module 502 is connect with the second receiving module 501,
For showing that an interface, interface include the window for inputting the mark of target relay according to triggering command.
Optionally, the terminal of the present embodiment further includes a third receiving module 503, which receives event
The location information of each relay of power circuit where barrier, so that user selects source relay according to location information.It is received
The location information of each relay can store in memory.
The operating method of above-mentioned each module is identical as preceding method, and details are not described herein.
According to the present invention, the biography with the target PDI fault data of target relay is realized by the source PDI of source relay
It is defeated, so terminal can by source relay obtain needed for fault data, can not only get in this way apart from it is farther away after
Fault data in electric appliance, and existing hardware is utilized, it avoids increasing cost as far as possible.
Embodiment six
The present embodiment provides the terminals for obtaining the fault data of relay in electric system, for executing aforementioned implementation
The method for obtaining the fault data of relay in electric system of example.
As shown in fig. 6, to be used to obtain the terminal of the fault data of relay in electric system according to the present embodiment
Structural schematic diagram.The terminal 600 includes an input unit 601, at least one communication interface 602, at least one processor 603
With at least one display screen 604.
Wherein, user inputs acquisition instruction by input unit 601, includes at least one target relay in acquisition instruction
Mark;Communication interface 602 with a source relay for connecting, to receive or send data;Memory 603 and communication interface
602 connections, for storing the fault data received;Display screen 604 be used to execute aforementioned any embodiment for obtaining electricity
The method of the fault data of relay in Force system.
Both the input unit 601 of the present embodiment can be a display screen, be also possible to a keyboard, can also be
And combine, it can specifically select according to actual needs.Optionally, communication interface 601 can there are two, one of them can be used for
Substation connect with source, to receive or send data.Received data are, for example, the location information of fault data or each relay,
The data of transmission are, for example, acquisition instruction.The location information of each substation of electric system can be previously stored in memory 602.
Processor 603 can execute the method for obtaining the fault data of relay in electric system in aforementioned any embodiment.
According to the present embodiment, user can send transmission instruction to the target relay as target by a terminal,
Send fault data to terminal to trigger target relay by existing target PDI, in this way, user without be moved to target after
Fault data can be obtained at substation where electric appliance, saves a large amount of time, and not will increase excessive cost.
The invention of this reality also provides the terminal for obtaining the fault data of relay in electric system, including at least one is deposited
Reservoir and at least one processor.Wherein, memory is for storing instruction.Processor according to the instruction that memory stores for holding
The described method for obtaining the fault data of relay in electric system of the aforementioned any embodiment of row.
The embodiment of the present invention also provides a kind of readable storage medium storing program for executing.Machine readable finger is stored in the readable storage medium storing program for executing
It enables, for machine readable instructions when being executed by a machine, it is described for obtaining electric power that machine executes aforementioned any embodiment
The method of the fault data of System relays electric appliance.
Machine readable instructions are stored on the readable medium, which makes to handle when being executed by processor
Device executes any method above-mentioned.Specifically, system or device equipped with readable storage medium storing program for executing can be provided, it is readable at this
Store on storage medium realize above-described embodiment in any embodiment function software program code, and make the system or
The computer or processor of device read and execute the machine readable instructions being stored in the readable storage medium storing program for executing.
In this case, it is real that any one of above-described embodiment can be achieved in the program code itself read from readable medium
The function of example is applied, therefore the readable storage medium storing program for executing of machine readable code and storage machine readable code constitutes of the invention one
Point.
The embodiment of readable storage medium storing program for executing include floppy disk, hard disk, magneto-optic disk, CD (such as CD-ROM, CD-R, CD-RW,
DVD-ROM, DVD-RAM, DVD-RW, DVD+RW), tape, non-volatile memory card and ROM.It selectively, can be by communication network
Network download program code from server computer or on cloud.
It will be appreciated by those skilled in the art that each embodiment disclosed above can be in the situation without departing from invention essence
Under make various changes and modifications.Therefore, protection scope of the present invention should be defined by the appended claims.
It should be noted that step and unit not all in above-mentioned each process and each system construction drawing is all necessary
, certain step or units can be ignored according to the actual needs.Each step execution sequence be not it is fixed, can be according to need
It is adjusted.Apparatus structure described in the various embodiments described above can be physical structure, be also possible to logical construction, that is, have
A little units may be realized by same physical entity, be realized alternatively, some units may divide by multiple physical entities, alternatively, can be with
It is realized jointly by certain components in multiple autonomous devices.
In the above various embodiments, hardware cell mechanically or can be realized electrically.For example, a hardware list
Member or processor may include that permanent dedicated circuit or logic (such as special processor, FPGA or ASIC) are corresponding to complete
Operation.Hardware cell or processor can also include programmable logic or circuit (such as general processor or other programmable processing
Device), interim setting can be carried out by software to complete corresponding operating.Concrete implementation mode (mechanical system or it is dedicated forever
Long property circuit or the circuit being temporarily arranged) it can be determined based on cost and temporal consideration.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (11)
1. the method for obtaining the fault data of relay in electric system characterized by comprising
One terminal for obtaining the fault data of relay in electric system receives the acquisition instruction of user's input, described to obtain
It include the mark of at least one target relay in instruction fetch;
The terminal sends transmission instruction according to described identify to the target relay, and the transmission instruction is described for triggering
Target relay sends the fault data of the target relay storage, the target relay and institute by a target PDI
It states terminal and is located at substation different in the electric system;
The terminal receives the fault data.
2. the method according to claim 1, wherein the terminal is identified according to described to the target relay
Sending transmission instruction includes:
The terminal sends the transmission instruction to the target relay by a source PDI of a source relay, so that
The fault data is sent to the source PDI by the target relay, and the terminal with the source relay for connecting;
The terminal receives the fault data
The terminal receives the fault data by the source PDI.
3. method according to claim 1 or 2, which is characterized in that receive the acquisition instruction of user's input in the terminal
Before, further includes:
The terminal receives triggering command;
The terminal shows that an interface, the interface include for inputting the target relay according to the triggering command
The window of mark.
4. according to the method described in claim 2, it is characterized in that, the terminal receive user input acquisition instruction it
Before, further includes:
The terminal receives the location information of each relay of guilty culprit power circuit, so that user is according to the positional information
Select the source relay.
5. the terminal for obtaining the fault data of relay in electric system characterized by comprising
One acquisition module includes at least one target for receiving the acquisition instruction of user's input, in the acquisition instruction after
The mark of electric appliance;
One sending module, for sending transmission instruction according to described identify to the target relay, the transmission instruction is used
The fault data that the target relay stores, the target are sent by a target PDI in triggering the target relay
Relay is located at substation different in the electric system from the terminal;
One the first receiving module, for receiving the fault data.
6. terminal according to claim 5, which is characterized in that the sending module is specifically used for: passing through a source relay
One source PDI of device sends the transmission to the target relay and instructs, so that the target relay is by the number of faults
According to the source PDI is sent to, the sending module with the source substation for connecting;
First receiving module is specifically used for: receiving the fault data by the source PDI.
7. according to terminal described in claim 5 and 6, which is characterized in that further include:
One the second receiving module, for receiving triggering command;
One display module, for showing that an interface, the interface include for inputting the mesh according to the triggering command
Mark the window of the mark of relay.
8. terminal according to claim 6, which is characterized in that further include:
One third receiving module, the location information of each relay for receiving guilty culprit power circuit, so that user's root
The source relay is selected according to the location information.
9. the terminal for obtaining the fault data of relay in electric system characterized by comprising
One input unit, user input acquisition instruction by the input unit, include at least one in the acquisition instruction
The mark of target relay;
At least one communication interface, for being connect with a source relay, to receive or send data;
At least one processor is connect with the communication interface, for storing the fault data received;
At least one processor requires described in any one of 1-4 for perform claim for obtaining relay in electric system
Fault data method.
10. the terminal for obtaining the fault data of relay in electric system characterized by comprising
At least one processor, for storing instruction;
At least one processor is used for the instruction execution according to claim 1 any one of -4 stored according to the memory
The method for obtaining the fault data of relay in electric system.
11. readable storage medium storing program for executing, which is characterized in that be stored with machine readable instructions, the machine in the readable storage medium storing program for executing
When being executed by a machine, the machine executes according to claim 1 described in any one of -4 for obtaining readable instruction
The method of the fault data of relay in electric system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811052916.6A CN109246215B (en) | 2018-09-10 | 2018-09-10 | Method and terminal for acquiring fault data of relay in power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811052916.6A CN109246215B (en) | 2018-09-10 | 2018-09-10 | Method and terminal for acquiring fault data of relay in power system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109246215A true CN109246215A (en) | 2019-01-18 |
CN109246215B CN109246215B (en) | 2021-07-30 |
Family
ID=65061348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811052916.6A Active CN109246215B (en) | 2018-09-10 | 2018-09-10 | Method and terminal for acquiring fault data of relay in power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109246215B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1310874A (en) * | 1999-03-24 | 2001-08-29 | 通用电气公司 | Fault data synchronization via peer-to peer communications network |
CN102324790A (en) * | 2011-09-22 | 2012-01-18 | 浙江乾龙科技有限公司 | Intelligent management terminal of circuit breaker |
US20130282317A1 (en) * | 2012-04-23 | 2013-10-24 | Lsis Co., Ltd | Method of controlling fault current in system for monitoring and controlling power system |
CN104617565A (en) * | 2014-12-15 | 2015-05-13 | 国网冀北电力有限公司秦皇岛供电公司 | Device and method for rapid identification of line distribution network fault location |
CN104655980A (en) * | 2014-11-05 | 2015-05-27 | 云南电网公司楚雄供电局 | Method for quickly identifying short trouble of adjacent lines with different voltage grades based on db4 wavelet decomposition |
CN105071532A (en) * | 2015-07-20 | 2015-11-18 | 河南行知专利服务有限公司 | Transformer station automatic system |
CN106059067A (en) * | 2016-05-24 | 2016-10-26 | 国家电网公司 | Power supply system remote monitoring system |
CN107271804A (en) * | 2016-04-06 | 2017-10-20 | 西门子电力自动化有限公司 | The failure wave-recording method and apparatus of power system |
US20170340251A1 (en) * | 2014-07-11 | 2017-11-30 | The Procter & Gamble Company | Methods for assessing vaginal atrophy |
CN107819328A (en) * | 2017-09-27 | 2018-03-20 | 国家电网公司 | A kind of storage method and device of electric network fault data |
-
2018
- 2018-09-10 CN CN201811052916.6A patent/CN109246215B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1310874A (en) * | 1999-03-24 | 2001-08-29 | 通用电气公司 | Fault data synchronization via peer-to peer communications network |
CN102324790A (en) * | 2011-09-22 | 2012-01-18 | 浙江乾龙科技有限公司 | Intelligent management terminal of circuit breaker |
US20130282317A1 (en) * | 2012-04-23 | 2013-10-24 | Lsis Co., Ltd | Method of controlling fault current in system for monitoring and controlling power system |
US20170340251A1 (en) * | 2014-07-11 | 2017-11-30 | The Procter & Gamble Company | Methods for assessing vaginal atrophy |
CN104655980A (en) * | 2014-11-05 | 2015-05-27 | 云南电网公司楚雄供电局 | Method for quickly identifying short trouble of adjacent lines with different voltage grades based on db4 wavelet decomposition |
CN104617565A (en) * | 2014-12-15 | 2015-05-13 | 国网冀北电力有限公司秦皇岛供电公司 | Device and method for rapid identification of line distribution network fault location |
CN105071532A (en) * | 2015-07-20 | 2015-11-18 | 河南行知专利服务有限公司 | Transformer station automatic system |
CN107271804A (en) * | 2016-04-06 | 2017-10-20 | 西门子电力自动化有限公司 | The failure wave-recording method and apparatus of power system |
CN106059067A (en) * | 2016-05-24 | 2016-10-26 | 国家电网公司 | Power supply system remote monitoring system |
CN107819328A (en) * | 2017-09-27 | 2018-03-20 | 国家电网公司 | A kind of storage method and device of electric network fault data |
Non-Patent Citations (2)
Title |
---|
HEMANT KAGRA: "Automatic measurement of electrical parameters of signal relays", 《2011 INTERNATIONAL CONFERENCE ON ELECTRICAL AND CONTROL ENGINEERING》 * |
丁力: "IEC 61850变电站自动化通信仿真研究", <工程科技Ⅱ辑> * |
Also Published As
Publication number | Publication date |
---|---|
CN109246215B (en) | 2021-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2701340B1 (en) | Method of monitoring operation of an electric power system and monitoring system | |
CN108279340B (en) | In-situ relay protection device testing method and system | |
KR100951773B1 (en) | Apparatus and method for goose message detecting | |
CN107171293A (en) | The system and method for relay protection O&M information multidimensional issue is realized in intelligent grid | |
CN101408755A (en) | Electric power system protection and control system and distributed control system | |
CN107526349A (en) | The detection of abnormal configuration change | |
CN114330764B (en) | Operation ticket processing method and device, storage medium and electronic device | |
EP2632007B1 (en) | Apparatus and method for correcting error of acquired data | |
CN103532738A (en) | Port connection relationship determination method and device | |
CN103814501A (en) | Diagnosis for GOOSE communication | |
JP2018153073A (en) | Computerized system for managing utilization of power distribution network and configuration method thereof | |
Panda et al. | Implementation of SCADA/HMI system for real-time controlling and performance monitoring of SDR based flight termination system | |
US10270859B2 (en) | Systems and methods for system-wide digital process bus fault recording | |
CN106446311B (en) | CPU warning circuit and alarm method | |
CN109246215A (en) | For obtaining the method and terminal of the fault data of relay in electric system | |
CN108427044B (en) | Method, device, equipment and storage medium for testing fault protection function | |
JP5267839B2 (en) | Distant monitoring and control device simulation device and power system monitoring and control system | |
US10896658B1 (en) | Virtual display | |
CN106662849A (en) | Mobile human machine interface for control devices | |
KR101577891B1 (en) | System and method for providing line obstruction processing video | |
JP4128907B2 (en) | Supervisory control system | |
KR200225165Y1 (en) | Railload remote monitoring system | |
CN113469556A (en) | Method and device for generating work ticket, electronic equipment and storage medium | |
Georgescu | SCADA software used in dispatch centre for photovoltaic parks | |
CN104007889A (en) | Feedback method and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |