CN109244879A CN201811163124.6A CN201811163124A CN109244879A CN 109244879 A CN109244879 A CN 109244879A CN 201811163124 A CN201811163124 A CN 201811163124A CN 109244879 A CN109244879 A CN 109244879A
Authority
CN
China
Prior art keywords
electric power
push rod
host
main body
chamber door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811163124.6A
Other languages
Chinese (zh)
Other versions
CN109244879B (en
Inventor
陈斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG TAILIPU ELECTRIC Co.,Ltd.
Original Assignee
陈斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈斌 filed Critical 陈斌
Priority to CN201811163124.6A priority Critical patent/CN109244879B/en
Publication of CN109244879A publication Critical patent/CN109244879A/en
Application granted granted Critical
Publication of CN109244879B publication Critical patent/CN109244879B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/46Boxes; Parts thereof or accessories therefor
    • H02B1/48Mounting of devices therein
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H71/00Details of the protective switches or relays covered by groups H01H73/00 - H01H83/00
    • H01H71/10Operating or release mechanisms
    • H01H71/1009Interconnected mechanisms
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H71/00Details of the protective switches or relays covered by groups H01H73/00 - H01H83/00
    • H01H71/10Operating or release mechanisms
    • H01H71/12Automatic release mechanisms with or without manual release

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Patch Boards (AREA)
  • Lock And Its Accessories (AREA)

Abstract

The invention discloses the electric power boxes for being convenient for fast break, its structure includes keep off the rain ceiling, chamber door, electric power host, door handle, radiating groove, the chamber door is rectangular configuration, and electric power host front end surface is installed on by manner, the door handle is installed on chamber door left end by embedded mode, and be interlocked inside electric power host.This practical circuit breaker body interior being equipped with is when needing emergency power off, positioning pressure handle can be stirred backward, it is pushed outwardly ejecting mechanism, then linkage mechanism is jacked up by transmission mechanism, and then power-off control is carried out to total tripper, it is ensured that quickly have a power failure inside electric power box, be just able to carry out power operation during opening chamber door, it avoids causing staff band electric injury, prevents serious injury.

Description

Convenient for the electric power box of fast break
Technical field
The present invention relates to electric power box fields, particularly with regard to a kind of electric power box convenient for fast break.
Background technique
Power equipment mainly includes with generating equipment and power supply unit two major classes, and generating equipment is mainly station boiler, steams Steam turbine, gas turbine, the hydraulic turbine, generator and transformer etc., power supply unit are mainly the power transmission line of various voltage class Road, mutual inductor and contactor etc., in order to protect the safety of power equipment, people usually can install in the inside of electric power box disconnected Electric delay protection device, but in the period of special, when needing to be rapidly performed by power-off, will affect the time, cause to threaten The safety of life and property of people.Existing technology can not be powered off when electric power chamber door is opened by chamber door, and work is needed Personnel, which are manually entered inside electric power box, carries out power-off control, and when biggish electric leakage accident occurs, such method is extremely easy Conduction in turn results in grievous injury with staff.
Summary of the invention
In view of the deficiencies of the prior art, the present invention is to realize by the following technical solutions: convenient for the electricity of fast break Power case, structure include keep off the rain ceiling, chamber door, electric power host, door handle, radiating groove, and the chamber door is rectangular configuration, and is passed through Manner is installed on electric power host front end surface, and the door handle is installed on chamber door left end, and and electric power by embedded mode It is interlocked inside host, lower end is equipped with the groove of activity installing radiating groove on the left of the electric power host, and the ceiling that keeps off the rain passes through Fitting mode is installed at the top of electric power host, and the electric power host includes circuit breaker main body, limiting device, ejecting mechanism, transmission Mechanism, total tripper, linkage mechanism, the circuit breaker main body is set to left upper end inside electric power host, and top is equipped with limit Device, for the limiting device through being connected at the top of the ceiling that keeps off the rain, total tripper is set to lower end on the right side of circuit breaker main body, And be interlocked with linkage mechanism right end, the linkage mechanism is located at circuit breaker lower body, is equipped in the middle part of the circuit breaker main body Transmission mechanism, the ejecting mechanism is set to circuit breaker main body upper end, and left end fits on the inside of electric power host and chamber door, institute It states linkage mechanism and is connected by transmission mechanism with ejecting mechanism.
As advanced optimizing for the technical program, the circuit breaker main body includes ceiling main body, host housing, circuit device Shell, the ceiling main body are installed at the top of host housing by fitting mode, and it is left that the circuit device shell is set to host housing Side upper end.
As advanced optimizing for the technical program, the limiting device includes positioning pressure handle, limit push rod, mobile magnetic Iron, phase magnet, the phase magnet are set at your half of host housing top left, and the limit push rod lower end is passed through Wear ceiling main body, host housing is connected with ejecting mechanism, the moving magnet by fitting mode be installed on limit push rod under End, and top and phase magnet phase magnetic, the positioning pressure handle are located at ceiling body top, and left end and phase at the top of limit push rod Connection.
As advanced optimizing for the technical program, the ejecting mechanism include reset spring, power-off push rod, push rod insert Slot, shifting sledge, fixed sling, cylinder, actuator push rod, the cylinder are set to upper end on the right side of circuit device shell, and left end in parallel With actuator push rod phase fitting, actuator push rod lower-left end is equipped with fixed sling, and is connected with transmission mechanism, and the push rod is inserted Slot position upper end on the left of circuit device shell, and internal be equipped with powers off push rod, the power-off push rod left end is connected with chamber door, described Push rod slot right end is connected by reset spring with actuator push rod, is pushed away inside the actuator push rod by shifting sledge and power-off Bar is connected.
As advanced optimizing for the technical program, the transmission mechanism includes transmission rope, No.1 coupled wheel, fixed cross Bar, driven pulley, driving rack, No. two coupled wheels, second spring, spur gear, driving cams, the spur gear are set to circuit device Lower end in the middle part of shell, and connection is engaged at top with driving rack, the driving cam is set in the middle part of spur gear, and top and linkage Mechanism fits, and the fixed transverse rod is set to upper end on the left of total tripper, and lower end passes through driven pulley and driving rack phase It fastens, by being connected on the left of second spring and circuit device shell, the No.1 coupled wheel is set to solid for the driving rack left end Determine at the top of cross bar, No. two coupled wheels are set to circuit device shell left side central portion, and the transmission rope head end is engaged with fixed sling It closes, and end is connected around No.1 coupled wheel, No. two coupled wheels with driving rack left end.
As advanced optimizing for the technical program, total tripper includes killer switch, breaker body, determines Position plate, the positioning plate is set to circuit device shell bottom righthand side, and surface is equipped with breaker body, sets in the middle part of the breaker body There is killer switch, the killer switch is interlocked with linkage mechanism.
As advanced optimizing for the technical program, the linkage mechanism include switch clamp holder, third spring, elevating lever, Interlocking bar, interlocking bar bottom both ends are installed on circuit device outer casing bottom by elevating lever, there are two the third spring is set, And connect respectively with elevating lever fitting, and be connected with interlocking bar bottom, the interlocking bar right end passes through switch clamp holder and open circuit Device switch is interlocked.
Beneficial effect
The present invention is convenient for the electric power box of fast break, when breaking down inside electric power host, by will position pressure handle to Right end is stirred, and then phase magnet and moving magnet magnetism are attracting, and the limit push rod being equipped with is upward according to the drive of moving magnet Mobile, in this way when chamber door is opened, power-off push rod loses pressure, and the cylinder being equipped with can will be powered off by actuator push rod Push rod releases outside, moves transmission rope upper end by fixed rope cingulum during actuator push rod is mobile, passes through No.1 coupled wheel, two The guiding linkage of number coupled wheel, the transmission rope lower end being equipped with can drag driving rack and engage with spur gear, and then make to be driven convex Wheel rotation, and convex surface moves up, and interlocking bar is jacked up, the interlocking bar right end being equipped with is by switching clamp holder for killer switch It pulls upwards, and then realizes power-off control, the third spring being equipped with is cooperated by elevating lever, and interlocking bar can be driven to carry out It resets.
For the prior art, the circuit breaker body interior that the present invention is equipped with can will determine when needing emergency power off Position pressure handle is stirred backward, is pushed outwardly ejecting mechanism, is then jacked up linkage mechanism by transmission mechanism, and then to total open circuit Device carries out power-off control, it is ensured that quickly has a power failure inside electric power box, is just able to carry out power operation during opening chamber door, keeps away Exempt to cause staff band electric injury, prevents serious injury.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is structural schematic diagram of the present invention convenient for the electric power box of fast break.
Fig. 2 is electric power host schematic diagram of internal structure of the invention.
Fig. 3 is electric power host the second form schematic diagram of the invention.
Fig. 4 is the enlarged diagram of A in Fig. 3.
In figure: the ceiling -1 that keeps off the rain, chamber door -2, electric power host -3, door handle -4, radiating groove -5, circuit breaker main body -301, limit Position device -302, ejecting mechanism -303, transmission mechanism -304, total tripper -305, linkage mechanism -306, ceiling main body - 3011, host housing -3012, circuit device shell -3013, positioning pressure handle -3021, limit push rod -3022, moving magnet -2023, Phase magnet -3024, reset spring -3031, power-off push rod -3032, push rod slot -3033, shifting sledge -3034, fixed rope Button -3035, actuator push rod -3037, transmission rope -3041, No.1 coupled wheel -3042, fixed transverse rod -3043, passes cylinder -3036 Movable pulley -3044, driving rack -3045, No. two coupled wheels -3046, second spring -3047, spur gear -3048, driving cams - 3049, killer switch -3051, breaker body -3052, positioning plate -3053, switch clamp holder -3061, third spring -3062, Elevating lever -3063, interlocking bar -3064.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment and Detailed description of the invention, the preferred embodiment that the present invention is further explained.
Embodiment
Fig. 1-Fig. 4 is please referred to, the present invention provides the electric power box for being convenient for fast break, and structure includes keep off the rain ceiling 1, chamber door 2, electric power host 3, door handle 4, radiating groove 5, the chamber door 2 is rectangular configuration, and is installed on electric power host 3 by manner Front end surface, the door handle 4 are installed on 2 left end of chamber door by embedded mode, and be interlocked inside electric power host 3, it is described 3 left side lower end of electric power host is equipped with the groove of activity installing radiating groove 5, and the ceiling 1 that keeps off the rain is installed on electricity by fitting mode Advocate at the top of machine 3, the electric power host 3 includes circuit breaker main body 301, limiting device 302, ejecting mechanism 303, transmission mechanism 304, total tripper 305, linkage mechanism 306, the circuit breaker main body 301 are set to 3 inside left upper end of electric power host, and top Equipped with limiting device 302, the limiting device 302 is set to through 1 top of ceiling of keeping off the rain, total tripper 305 is connected to 301 right side lower end of circuit breaker main body, and be interlocked with 306 right end of linkage mechanism, the linkage mechanism 306 is located at circuit breaker main body 301 lower ends, transmission mechanism 304 is equipped in the middle part of the circuit breaker main body 301, and the ejecting mechanism 303 is set to circuit breaker main body 301 Upper end, and left end fits on the inside of electric power host 3 and chamber door 2, the linkage mechanism 306 passes through transmission mechanism 304 and top Mechanism 303 is connected out, and the circuit breaker main body 301 includes ceiling main body 3011, host housing 3012, circuit device shell 3013, the ceiling main body 3011 is installed on 3012 top of host housing by fitting mode, and the circuit device shell 3013 is set In 3012 left side upper end of host housing, the limiting device 302 includes positioning pressure handle 3021, limit push rod 3022, moving magnet 2023, phase magnet 3024, the phase magnet 3024 is set at your half of 3012 top left of host housing, described Limit 3022 lower end of push rod is connected through ceiling main body 3011, host housing 3012 with ejecting mechanism 303, the moving magnet 2023 are installed on limit 3022 lower end of push rod, and top and 3024 phase magnetic of phase magnet, the positioning pressure by fitting mode Handle 3021 is located at 3011 top of ceiling main body, and is connected at the top of left end and limit push rod 3022, and the ejecting mechanism 303 includes Reset spring 3031, push rod slot 3033, shifting sledge 3034, fixed sling 3035, cylinder 3036, passes power-off push rod 3032 Dynamic push rod 3037, the cylinder 3036 are set to 3013 right side upper end of circuit device shell, and left end and 3037 phase of actuator push rod in parallel Fitting, the 3037 lower-left end of actuator push rod is equipped with fixed sling 3035, and is connected with transmission mechanism 304, and the push rod is inserted Slot 3033 is located at 3013 left side upper end of circuit device shell, and internal be equipped with powers off push rod 3032,3032 left end of power-off push rod It is connected with chamber door 2,3033 right end of push rod slot is connected by reset spring 3031 with actuator push rod 3037, the biography It is connected by shifting sledge 3034 with power-off push rod 3032 inside dynamic push rod 3037, the transmission mechanism 304 includes transmission rope 3041, No.1 coupled wheel 3042, fixed transverse rod 3043, driven pulley 3044,3045, No. two coupled wheels 3046 of driving rack, Two springs 3047, spur gear 3048, driving cam 3049, the spur gear 3048 are set to 3013 middle part lower end of circuit device shell, And connection is engaged at top with driving rack 3045, the driving cam 3049 is set to 3048 middle part of spur gear, and top and linkage Mechanism 306 fits, and the fixed transverse rod 3043 is set to total 305 left side upper end of tripper, and lower end passes through driven pulley 3044 are interlocked with driving rack 3045, and 3045 left end of driving rack passes through second spring 3047 and circuit device shell 3013 Left side is connected, and the No.1 coupled wheel 3042 is set to 3043 top of fixed transverse rod, and No. two coupled wheels 3046 are set to circuit 3013 left side central portion of device shell, 3041 head end of transmission rope are interlocked with fixed sling 3035, and end is around No.1 linkage 3042, No. two coupled wheels 3046 of wheel are connected with 3045 left end of driving rack, and total tripper 305 includes killer switch 3051, breaker body 3052, positioning plate 3053, the positioning plate 3053 are set to 3013 bottom righthand side of circuit device shell, and surface Equipped with breaker body 3052, killer switch 3051, the killer switch are equipped in the middle part of the breaker body 3052 3051 are interlocked with linkage mechanism 306, and the linkage mechanism 306 includes switch clamp holder 3061, third spring 3062, elevating lever 3063, interlocking bar 3064, the 3064 bottom both ends of interlocking bar are installed on 3013 bottom of circuit device shell by elevating lever 3063, There are two the third spring 3062 is set, and it is connect respectively with 3063 fitting of elevating lever, and be connected with 3064 bottom of interlocking bar, 3064 right end of interlocking bar is interlocked by switching clamp holder 3061 with killer switch 3051.
When breaking down inside electric power host 3, stirred by the way that pressure handle 3021 will be positioned to right end, then phase magnet 3024 is magnetic attracting with moving magnet 2023, and the limit push rod 3022 being equipped with is moved up according to the drive of moving magnet 2023, In this way when chamber door 2 is opened, power-off push rod 3032 loses pressure, and the cylinder 3036 being equipped with can pass through actuator push rod Power-off push rod 3032 is released outside by 3037, drives transmission rope by fixed sling 3035 during actuator push rod 3037 is mobile 3041 upper ends, by 3042, No. two guiding linkages of coupled wheel 3046 of No.1 coupled wheel, 3041 lower end of transmission rope being equipped with can Dragging driving rack 3045 is engaged with spur gear 3048, and then rotates driving cam 3049, and convex surface moves up, and will connection Lever 3064 jacks up, and 3064 right end of interlocking bar being equipped with is pulled killer switch 3051 by switching clamp holder 3061 upwards, into And realize power-off control, the third spring 3062 being equipped with is cooperated by elevating lever 3063, can drive interlocking bar 3064 into Row resets.
Reset spring 3031 of the present invention be it is a kind of utilize elasticity come work machine components.It is made of elastic material Part deformation occurs under external force, remove external force after again restore to the original state.Also make " spring ".
Problems solved by the invention is that existing technology can not be powered off when electric power chamber door is opened by chamber door, is needed Staff, which is manually entered inside electric power box, carries out power-off control, and when biggish electric leakage accident occurs, such method is extremely Conduction is easy with staff, in turn results in grievous injury, the present invention is combined with each other by above-mentioned component, it is ensured that electric power Quickly have a power failure inside case, be just able to carry out power operation during opening chamber door, avoids causing staff band electric injury, Prevent serious injury.
The basic principles, main features and advantages of the present invention have been shown and described above, the technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention can not only be realized in other specific forms under the premise of not departing from spirit of that invention or essential characteristic The present invention will also have various changes and improvements, these changes and improvements both fall within scope of the claimed invention, therefore this hair Bright claimed range is defined by appended claims and its equivalent, rather than above description limits.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. being convenient for the electric power box of fast break, structure includes keep off the rain ceiling (1), chamber door (2), electric power host (3), door handle (4), radiating groove (5), the chamber door (2) is rectangular configuration, and is installed on electric power host (3) front end surface by manner, It is characterized by:
The door handle (4) is installed on chamber door (2) left end by embedded mode, and is interlocked with electric power host (3) inside, described Lower end is equipped with the groove of activity installing radiating groove (5) on the left of electric power host (3), and the ceiling that keeps off the rain (1) is pacified by fitting mode Loaded at the top of electric power host (3);
The electric power host (3) includes circuit breaker main body (301), limiting device (302), ejecting mechanism (303), transmission mechanism (304), total tripper (305), linkage mechanism (306), it is internal left that the circuit breaker main body (301) is set to electric power host (3) Upper end, and top is equipped with limiting device (302), the limiting device (302), which is run through, to be connected at the top of the ceiling that keeps off the rain (1), described Total tripper (305) is set to lower end on the right side of circuit breaker main body (301), and is interlocked with linkage mechanism (306) right end, described Motivation structure (306) is located at circuit breaker main body (301) lower end, is equipped with transmission mechanism (304) in the middle part of the circuit breaker main body (301), The ejecting mechanism (303) is set to circuit breaker main body (301) upper end, and left end is through electric power host (3) and phase on the inside of chamber door (2) Fitting, the linkage mechanism (306) are connected by transmission mechanism (304) with ejecting mechanism (303).
2. the electric power box according to claim 1 convenient for fast break, it is characterised in that: the circuit breaker main body (301) Including ceiling main body (3011), host housing (3012), circuit device shell (3013), the ceiling main body (3011) passes through fitting Mode is installed at the top of host housing (3012), and the circuit device shell (3013) is set to upper end on the left of host housing (3012).
3. the electric power box according to claim 1 convenient for fast break, it is characterised in that: limiting device (302) packet Include positioning pressure handle (3021), limit push rod (3022), moving magnet (2023), phase magnet (3024), the phase magnet (3024) it is set at your half of host housing (3012) top left, ceiling is run through in the limit push rod (3022) lower end Main body (3011), host housing (3012) are connected with ejecting mechanism (303), and the moving magnet (2023) passes through fitting mode It is installed on limit push rod (3022) lower end, and top and phase magnet (3024) phase magnetic, the positioning pressure handle (3021) are located at At the top of ceiling main body (3011), and it is connected at the top of left end and limit push rod (3022).
4. the electric power box according to claim 1 or 3 convenient for fast break, it is characterised in that: the ejecting mechanism (303) Including reset spring (3031), power-off push rod (3032), push rod slot (3033), shifting sledge (3034), fixed sling (3035), cylinder (3036), actuator push rod (3037), the cylinder (3036) are set on circuit device shell (3013) right side in parallel End, and left end and actuator push rod (3037) phase fitting, actuator push rod (3037) the lower-left end are equipped with fixed sling (3035), and It is connected with transmission mechanism (304), the push rod slot (3033) is located at upper end on the left of circuit device shell (3013), and inside is set Have power-off push rod (3032), the power-off push rod (3032) left end is connected with chamber door (2), push rod slot (3033) right end It is connected by reset spring (3031) with actuator push rod (3037), passes through shifting sledge inside the actuator push rod (3037) (3034) it is connected with power-off push rod (3032).
5. the electric power box according to claim 1 convenient for fast break, it is characterised in that: transmission mechanism (304) packet Include transmission rope (3041), No.1 coupled wheel (3042), fixed transverse rod (3043), driven pulley (3044), driving rack (3045), No. two coupled wheels (3046), second spring (3047), spur gear (3048), driving cam (3049), the spur gear (3048) Set on lower end in the middle part of circuit device shell (3013), and connection, the driving cam are engaged with driving rack (3045) in top (3049) it is set in the middle part of spur gear (3048), and top fits with linkage mechanism (306), the fixed transverse rod (3043) is set to Upper end on the left of total tripper (305), and lower end is interlocked by driven pulley (3044) with driving rack (3045), the biography Carry-over bar (3045) left end on the left of second spring (3047) and circuit device shell (3013) by being connected, the No.1 coupled wheel (3042) it is set at the top of fixed transverse rod (3043), No. two coupled wheels (3046) are set in circuit device shell (3013) left side Portion, transmission rope (3041) head end are interlocked with fixed sling (3035), and end bypasses No.1 coupled wheel (3042), No. two Coupled wheel (3046) is connected with driving rack (3045) left end.
6. the electric power box according to claim 1 convenient for fast break, it is characterised in that: total tripper (305) Including killer switch (3051), breaker body (3052), positioning plate (3053), the positioning plate (3053) is set to circuit device Shell (3013) bottom righthand side, and surface is equipped with breaker body (3052), and open circuit is equipped in the middle part of the breaker body (3052) Device switchs (3051), and the killer switch (3051) is interlocked with linkage mechanism (306).
7. being convenient for the electric power box of fast break described according to claim 1 or 5 or 6, it is characterised in that: the linkage mechanism It (306) include switch clamp holder (3061), third spring (3062), elevating lever (3063), interlocking bar (3064), the interlocking bar (3064) bottom both ends are installed on circuit device shell (3013) bottom by elevating lever (3063), and the third spring (3062) sets There are two, and connect respectively with elevating lever (3063) fitting, and be connected with interlocking bar (3064) bottom, the interlocking bar (3064) right end is interlocked by switching clamp holder (3061) with killer switch (3051).
CN201811163124.6A 2018-09-30 2018-09-30 Power box convenient to cut off power supply fast Active CN109244879B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811163124.6A CN109244879B (en) 2018-09-30 2018-09-30 Power box convenient to cut off power supply fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811163124.6A CN109244879B (en) 2018-09-30 2018-09-30 Power box convenient to cut off power supply fast

Publications (2)

Publication Number Publication Date
CN109244879A true CN109244879A (en) 2019-01-18
CN109244879B CN109244879B (en) 2020-08-14

Family

ID=65055582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811163124.6A Active CN109244879B (en) 2018-09-30 2018-09-30 Power box convenient to cut off power supply fast

Country Status (1)

Country Link
CN (1) CN109244879B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110739609A (en) * 2019-11-13 2020-01-31 宁波奉化平西配电科技有限公司 automatic replacing device for fuse melt of sealed fuse of distribution box
CN111029194A (en) * 2019-12-11 2020-04-17 稻映(上海)科技有限公司 Closed power switch equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4752239A (en) * 1987-02-26 1988-06-21 Heinemann Electric Company Circuit breaker support and connection modifying device
CA1270287A (en) * 1985-11-08 1990-06-12 Siemens Energy & Automation, Inc. Molded case circuit breaker with front accessible control panel
US6331685B1 (en) * 2000-10-18 2001-12-18 Prolec Ge, S. De R.L. De C.V. Mounting system for a circuit breaker
CN1728307A (en) * 2002-10-30 2006-02-01 株式会社日立制作所 Solenoid operator and solenoid-operated switching device and control device for electromagnet
CN206532723U (en) * 2016-12-13 2017-09-29 东莞同济大学研究院 A kind of drawer type automatic change-over
CN207638194U (en) * 2017-12-10 2018-07-20 张思远 A kind of electric power box convenient for wiring
CN108376515A (en) * 2018-04-03 2018-08-07 莆田市荔城区湘儿贸易有限公司 A kind of electric power overhaul alarming device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1270287A (en) * 1985-11-08 1990-06-12 Siemens Energy & Automation, Inc. Molded case circuit breaker with front accessible control panel
US4752239A (en) * 1987-02-26 1988-06-21 Heinemann Electric Company Circuit breaker support and connection modifying device
US6331685B1 (en) * 2000-10-18 2001-12-18 Prolec Ge, S. De R.L. De C.V. Mounting system for a circuit breaker
CN1728307A (en) * 2002-10-30 2006-02-01 株式会社日立制作所 Solenoid operator and solenoid-operated switching device and control device for electromagnet
CN206532723U (en) * 2016-12-13 2017-09-29 东莞同济大学研究院 A kind of drawer type automatic change-over
CN207638194U (en) * 2017-12-10 2018-07-20 张思远 A kind of electric power box convenient for wiring
CN108376515A (en) * 2018-04-03 2018-08-07 莆田市荔城区湘儿贸易有限公司 A kind of electric power overhaul alarming device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110739609A (en) * 2019-11-13 2020-01-31 宁波奉化平西配电科技有限公司 automatic replacing device for fuse melt of sealed fuse of distribution box
CN111029194A (en) * 2019-12-11 2020-04-17 稻映(上海)科技有限公司 Closed power switch equipment
CN111029194B (en) * 2019-12-11 2021-11-26 稻映(上海)科技有限公司 Closed power switch equipment

Also Published As

Publication number Publication date
CN109244879B (en) 2020-08-14

Similar Documents

Publication Publication Date Title
CN109244879A (en) Convenient for the electric power box of fast break
CN114188646B (en) Photovoltaic energy storage battery box convenient to overhaul
CN108597917A (en) A kind of follow-on intelligent security-protecting and monitoring picture pick-up device
CN203531538U (en) Electric unlocking device
CN201820659U (en) Five-prevention interlocking operation device in load switchgear
CN201315419Y (en) Net door interlocking device for transformer room
CN204045424U (en) The power-actuated twin-power switch of electromagnetism
BR102012013435B1 (en) air breaker
CN104282507B (en) A kind of compact energy-saving electromagnetic operating mechanism
CN204966370U (en) High voltage isolator operating device
CN109610953A (en) A kind of machining center cooperation apparatus of permanent-magnetic door lock of power distribution cabinet
CN213519801U (en) Miniature circuit breaker that protectiveness is strong
CN208256600U (en) Spring operating mechanism and the breaker for using the operating mechanism
CN206076181U (en) Breaker of switch cabinet brake-dividing system
CN203607316U (en) Locking device of disconnector used for high voltage switch cabinet
CN207199486U (en) A kind of band closes the permanent magnet mechanism assembly of function manually
CN208938879U (en) A kind of the two poles of the earth 10kV permanent magnetic vacuum breaker
CN206921704U (en) Utilize the bistable state fast driving device of compound electric magnetic force
CN204480980U (en) A kind of compact energy-saving electromagnetic operating mechanism
CN104795223B (en) A kind of capacitance switch for transformer and capacity transfer method thereof
CN212485962U (en) SF6 cabinet that intelligence was controlled
CN203415448U (en) Cabinet door automatic interlocking device
CN203721464U (en) Novel transformer capacity-adjusting switch
CN220797516U (en) Transmission mechanism of inflatable cabinet
CN1319094C (en) Energy storage mechanism for air circuit breaker

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200710

Address after: 226600 Haian Hi-tech Industrial Development Zone, Haian City, Nantong City, Jiangsu Province (Group 1, Renqiao Village)

Applicant after: NANTONG TAILIPU ELECTRIC Co.,Ltd.

Address before: 450000 North China Water Conservancy and hydropower University, 36 North Ring Road, Jinshui District, Henan, Zhengzhou

Applicant before: Chen Bin

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant