CN109242694A - Management method, device and project management server are invested on project line - Google Patents
Management method, device and project management server are invested on project line Download PDFInfo
- Publication number
- CN109242694A CN109242694A CN201811001954.9A CN201811001954A CN109242694A CN 109242694 A CN109242694 A CN 109242694A CN 201811001954 A CN201811001954 A CN 201811001954A CN 109242694 A CN109242694 A CN 109242694A
- Authority
- CN
- China
- Prior art keywords
- project
- certificate
- undertaking
- shared
- new investment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/06—Asset management; Financial planning or analysis
Abstract
The present invention, which provides, invests management method, device and project management server on a kind of project line, it includes: to disclose the investigation information of pre- online project and raise member for pre- online project that management method is invested on the project line, member's supporting rate data are collected, judge whether member's supporting rate reaches preset supporting rate threshold value in the given time;It is when the supporting rate of pre- online project reaches preset supporting rate threshold value, the pre- online project is online as new investment project, and the shared certificate of value distribution foundation is currently estimated according to new investment project;The project progress message of new investment project is obtained according to scheduled frequency, and by project progress message to member's publicity;When new investment project gets out of the red, starts an undertaking according to the recycling of default value and share certificate and destroy, until shared certificate recycling of starting an undertaking finishes, the project undercarriage.Management method is invested on project line of the invention, the development that idle money on line is used to push medium-sized and small enterprises' project can be effectively transferred, reduce the risk of investment project.
Description
Technical field
The present invention relates to management of investment technical fields, in particular to investment management method, dress on a kind of project line
It sets, project management server and computer storage medium.
Background technique
Often all there is the puzzlement of this problem that lacks of capital in many medium-sized and small enterprises, so that the reality of medium-sized and small enterprises
Body project is difficult to presumption principle, and medium-sized and small enterprises are also difficult to find eligible investment side in the short time.
Therefore, it is badly in need of a kind of effective ways of promotion medium-sized and small enterprises' physical items development at present.
Summary of the invention
In view of the above problems, the present invention provides management method, device, Project Management Service are invested on a kind of project line
Device and computer storage medium are reduced and are thrown effectively to transfer the development that idle money on line is used to push medium-sized and small enterprises' project
The risk of money project.
To achieve the goals above, the present invention adopts the following technical scheme that:
Management method is invested on a kind of project line, comprising:
It discloses the investigation information of pre- online physical items and raises member for the pre- online physical items, described in collection
Member's supporting rate data of pre- online physical items, judge member's supporting rate of the pre- online physical items in the given time
Whether preset supporting rate threshold value is reached;
When the supporting rate of the pre- online physical items reaches preset supporting rate threshold value, by the pre- online entity item
Mesh is online as new investment project, and total according to the foundation for currently estimating value distribution preset quantity of the new investment project
Certificate is enjoyed, for membership buying;
According to scheduled frequency obtain the new investment project include profit project progress message, and by the item
Mesh progress msg is to member's publicity;
When the new investment project gets out of the red, the shared certificate of the foundation is gradually recycled according to default value and is carried out
It destroys, until the shared certificate recycling of starting an undertaking finishes, the new investment project undercarriage.
Preferably, the shared certificate of starting an undertaking includes the electronics security based on block chain technology.
Preferably, described " when the new investment project gets out of the red, gradually to recycle the foundation according to default value
The marketing of going forward side by side of shared certificate is ruined, until the shared certificate recycling of starting an undertaking finishes, the new investment project undercarriage " include:
When the new investment project gets out of the red, the wound is gradually recycled according to the default value based on profit variation
Industry is shared certificate marketing of going forward side by side and is ruined;
When the quantity that certificate is shared in the foundation that recycling is destroyed reaches the preset ratio of total quantity, start an undertaking described altogether
The value for enjoying certificate is fixed as default value;
The value that certificate is shared according to the foundation for being fixed as default value recycles remaining described in the given time
It starts an undertaking and shares certificate, recycling finishes new investment project described in undercarriage.
Preferably, management method is invested on the project line, further includes:
After issuing the shared certificate of starting an undertaking, judge whether in the given time sale finishes the shared certificate of starting an undertaking;
When sale does not finish the shared certificate of starting an undertaking in the given time, recovery of funds is given according to former selling price
The member of the shared certificate of starting an undertaking, and new investment project described in undercarriage are bought.
Preferably, management method is invested on the project line, further includes:
According to the project progress message, judge whether the new investment project goes bankrupt;
When new investment project bankruptcy, according to default frequency and the default value recycling shared certificate of starting an undertaking, and under
New investment project described in frame.
The present invention also provides invest managing device on a kind of project line, comprising:
Project judgment module, for disclosing the investigation information of pre- online physical items and being the pre- online physical items
Member is raised, member's supporting rate data of the pre- online physical items is collected, judges the pre- online entity in the given time
Whether member's supporting rate of project reaches preset supporting rate threshold value;
Wire module in project, for when the supporting rate of the pre- online physical items reaches preset supporting rate threshold value,
The pre- online physical items are online as new investment project, and value distribution is currently estimated according to the new investment project
Certificate is shared in the foundation of preset quantity, for membership buying;
Project process obtains module, for obtaining the item including profit of the new investment project according to scheduled frequency
Mesh progress msg, and by the project progress message to member's publicity;
Shared certificate recycling module, for gradually recycling institute according to default value when the new investment project gets out of the red
The marketing of going forward side by side of the shared certificate of foundation is stated to ruin, until the shared certificate recycling of starting an undertaking finishes, the new investment project undercarriage.
Preferably, the shared certificate recycling module includes:
First recovery unit, for when the new investment project gets out of the red, according to the default valence based on profit variation
Value gradually recycles the shared certificate of starting an undertaking marketing of going forward side by side and ruins;
It is worth fixed cell, the quantity that certificate is shared in the foundation for destroying when recycling reaches the default ratio of total quantity
When example, the value for starting an undertaking shared certificate is fixed as default value;
Second recovery unit, for sharing the value of certificate according to the foundation for being fixed as default value, in the predetermined time
The interior remaining shared certificate of starting an undertaking of recycling, recycling finish new investment project described in undercarriage.
Preferably, managing device is invested on the project line, further includes:
Judgment module is sold, after issuing the shared certificate of starting an undertaking, judges the shared certificate of starting an undertaking whether in pre- timing
Between it is domestic sell off it is complete;
Recovery of funds module, for being sold according to original when sale does not finish the shared certificate of starting an undertaking in the given time
The member for having bought the shared certificate of starting an undertaking, and new investment project described in undercarriage are given in recovery of funds by price.
The present invention also provides a kind of project management server, including memory and processor, the memory is for depositing
Computer program is stored up, the processor runs the computer program so that the project management server executes the item
Management method is invested on mesh line.
The present invention also provides a kind of computer storage medium, it is stored with used in the project management server
Computer program.
The present invention provides and invests management method on a kind of project line, this method comprises: disclosing examining for pre- online physical items
It examines information and raises member for the pre- online physical items, collect member's supporting rate data of the pre- online physical items,
Judge whether member's supporting rate of the pre- online physical items reaches preset supporting rate threshold value in the given time;When described
When the supporting rate of pre- online physical items reaches preset supporting rate threshold value, using the pre- online physical items as new investment item
Mesh is online, and shares certificate according to the foundation for currently estimating value distribution preset quantity of the new investment project, purchases for member
It buys;According to scheduled frequency obtain the new investment project include profit project progress message, and by the project into
Information is spent to member's publicity;When the new investment project gets out of the red, described start an undertaking gradually is recycled according to default value and is shared
Certificate marketing of going forward side by side is ruined, until the shared certificate recycling of starting an undertaking finishes, the new investment project undercarriage.On project line of the invention
Management of investment method can effectively transfer the development that idle money on line is used to push medium-sized and small enterprises' project, and by line
Physical items progress is supervised, the risk of investment project is reduced.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and match
Appended attached drawing is closed, is described in detail below.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment
Attached drawing is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as
It is limiting the scope of the invention.
Fig. 1 is the flow chart that management method is invested on a kind of project line of the offer of the embodiment of the present invention 1;
Fig. 2 is a kind of flow chart for shared certificate recycling that the embodiment of the present invention 2 provides;
Fig. 3 is the flow chart that management method is invested on a kind of project line of the offer of the embodiment of the present invention 3;
Fig. 4 is the flow chart that management method is invested on a kind of project line of the offer of the embodiment of the present invention 4;
Fig. 5 is the structural schematic diagram that managing device is invested on a kind of project line of the offer of the embodiment of the present invention 5;
Fig. 6 is the knot that the shared certificate recycling module of managing device is invested on a kind of project line of the offer of the embodiment of the present invention 5
Structure schematic diagram;
Fig. 7 is the structural schematic diagram that managing device is invested on another project line of the offer of the embodiment of the present invention 5.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete
Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist
The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause
This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below
Range, but be merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not having
Every other embodiment obtained under the premise of creative work is made, shall fall within the protection scope of the present invention.
Embodiment 1
Fig. 1 is the flow chart that management method is invested on a kind of project line of the offer of the embodiment of the present invention 1, and this method includes
Following steps:
Step S11: disclosing the investigation information of pre- online physical items and raises member for pre- online physical items, collects
Member's supporting rate data of pre- online physical items, judge member's supporting rate of the pre- online physical items in the given time
Whether preset supporting rate threshold value is reached.
In the embodiment of the present invention, physical items namely real economy product, including substance, spirit products & services
The economic activities product such as production, circulation, such as may include the products such as education, culture, knowledge, information, art and sport
Production and service.Wherein, the investigation information of the pre- online physical items may come from the project expert of management platform, can be with
It goes to the physical items location to investigate by project expert, then gives and investigate the investigations such as result, opinion and suggestion letter
Breath, the investigation information physical items it is pre- it is online before announce in the management of investment platform of project, in management of investment platform
Registered members may browse through the investigation information of the pre- online physical items.Wherein, which can be in project pipe
It is run in reason server.
In the embodiment of the present invention, member is in the registered members namely management of investment platform of above-mentioned management of investment platform
The investor of physical items on line, these members are the client of management of investment platform and the resource of management of investment platform,
Online physical items will can receive the investment of member, to obtain the thrust of development.Wherein, the registration information of the member
Also it can store in the project management server.
Step S12: when the supporting rate of pre- online physical items reaches preset supporting rate threshold value, by the pre- online reality
Body project is online as new investment project, and total according to the foundation for currently estimating value distribution preset quantity of new investment project
Certificate is enjoyed, for membership buying.
In the embodiment of the present invention, while management of investment platform discloses the investigation information of pre- online physical items, may be used also
To provide the connection voted a go-ahead in platform, to obtain member to the degree of support of pre- online physical items, only entity item
, just can be online by the physical items progress when purpose supporting rate reaches preset value, and be its shared certificate of distribution foundation, member's purchase
The physical items can be carried out to invest on line by buying the shared certificate of the foundation.Wherein it is possible to utilize algorithm in management of investment platform
Or application program is supported the statistics of rate, such as " support " of the physical items can be provided in management of investment platform
And the link of " opposition ", as long as member can launch support by selection option or oppose online ticket, then by applying journey
Sequence counts supporting rate, when supporting rate is more than 50%, can the online physical items, for new investment project.
In the embodiment of the present invention, just online new investment project, includes the physical items in management of investment platform
All information, for example including founder, progress, financial statement and the project plan etc. for having project.In management of investment platform
The shared certificate of the foundation for the new investment project just issued can estimate value with expert and sell, which shares certificate distribution
Preset quantity, and can also put and be sold in batches in different times, to mitigate the burden of platform.It is shared to sell foundation
The acquisition fund of certificate can directly transfer to the physical items, to push physical items development profit, keep the foundation shared
The value of certificate gradually goes up according to profit according to preset ratio, and investment member therefrom makes a profit.
Step S13: according to scheduled frequency obtain new investment project include profit project progress message, and by item
Mesh progress msg is to member's publicity.
In the embodiment of the present invention, which can also comment rate to obtain the new investment item according to the scheduled time
Purpose project progress message, wherein the project progress message include the real-time financial statement of physical items, project it is real-time
The information such as progress and current profit.For example, the management of investment platform can monthly carry out the acquisition of the project progress message,
And announced in management of investment platform or temporal frequency is weekly etc., here without limitation.
In the embodiment of the present invention, which can also supervise the online entity from project progress message
Project can determine that the project side unilaterally breaks a contract, and can if project side does not develop the physical items after obtaining promotion fund
To demand penalty, and compensate buy the physical items start an undertaking shared certificate member after, undercarriage reality in management of investment platform
Body project.
Step S14: when new investment project gets out of the red, according to default value, gradually recycling foundation is shared certificate and is carried out
It destroys, until shared certificate recycling of starting an undertaking finishes, new investment project undercarriage.
In the embodiment of the present invention, when online physical items get out of the red, which can open foundation
The foundation that the recycling channel of shared certificate namely the physical items side can gradually recycle distribution using fund by the platform is total
Certificate is enjoyed, also its value is improved the shared certificate of foundation at this time because of the profit of project.Wherein, value, namely investment pipe are preset
The preset ratio that platform can get a profit according to project promotes the value for shared certificate of starting an undertaking, and attracts member to sell, Jin Erda
To the purpose of recycling.The secondary dealing city for sharing certificate by management of investment platform can be entered after membership buying that starts an undertaking just issued
, certificate is shared in foundation at this time can carry out free transaction by the management of investment platform between member, project side
The shared certificate channel of recycling foundation may be the secondary market namely project side can be by the second level of the management of investment platform
Market recycling, which is started an undertaking, shares certificate.
In the embodiment of the present invention, the foundation of recycling is shared certificate and is destroyed immediately by management of investment platform, does not have value effect
Power, in order to avoid investment market is upset, and after project side recycles the shared certificate of foundation of all distribution using fund completely, the line
The entire investment pushing course of upper physical items terminates, undercarriage physical items in management of investment platform, the physical items institute
Having the right, it is all to give back project side.
In the embodiment of the present invention, it includes the electronics security based on block chain technology that certificate is shared in above-mentioned foundation.That is, about
The information such as all information, including value, transaction and destruction of certificate are shared in the foundation can guarantee its disclosure by block chain technology
It is transparent.Wherein, the shared certificate of the foundation of membership buying, which can be transferred in private block chain wallet, carries out safekeeping, and member
All information for shared certificate of starting an undertaking can be checked by the block chain browser that management of investment platform provides.It is flat in management of investment
Platform recycling is started an undertaking after certificate is shared in foundation and can also be stored in specified block chain wallet, carries out freeze operation, is allowed to no longer flow
It is logical.
Embodiment 2
Fig. 2 is a kind of flow chart for shared certificate recycling that the embodiment of the present invention 2 provides, and is included the following steps:
Step S21: when new investment project gets out of the red, wound is gradually recycled according to the default value based on profit variation
Industry is shared certificate marketing of going forward side by side and is ruined.
In the embodiment of the present invention, above-mentioned according to the default value based on profit variation, i.e. management of investment platform can be according to
The preset ratio of project profit promotes the value for shared certificate of starting an undertaking, so that attracting member to sell the foundation shares certificate, to reach back
Receive the purpose for shared certificate of starting an undertaking.Shared certificate after the recovery of starting an undertaking is destroyed by management of investment platform, is recycled the fund used and is come
From in project side, management of investment platform can transfer a part of fund reward online as agent program as agreed.
Step S22: it when the quantity of the shared certificate of the foundation that recycling is destroyed reaches the preset ratio of total quantity, will start an undertaking altogether
The value for enjoying certificate is fixed as default value.
In the embodiment of the present invention, reach the preset ratio of total quantity in the recycling quantity of the shared certificate of the foundation of physical items
When, which can fix the single value that certificate is shared in the foundation immediately, and by it is remaining start an undertaking shared power according to
Fixed value is recycled.For example, can be when the foundation of physical items is shared certificate recycling and destroyed to 80%, the investment pipe
Platform fixes the single value that certificate is shared in the foundation, and the shared power of remaining 20% foundation is carried out according to fixed value
Recycling.
Step S23: it according to the value of the shared certificate of the foundation for being fixed as default value, recycles in the given time remaining
It starts an undertaking and shares certificate, recycling finishes undercarriage new investment project.
In the embodiment of the present invention, certificate is shared in the foundation of the remaining physical items all to return within the predetermined time
It receives and destroys, for the overdue member without selling remaining shared certificate of starting an undertaking, which can be according to fixed wound
Industry shares certificate price and carries out pressure recycling.Wherein, the project side of the physical items is after shared certificate value of assessment of starting an undertaking, can be with
The fund that recycling uses, and undercarriage physical items in advance disposably are paid off to management of investment platform, by the management of investment platform
Trustship residue, which is started an undertaking, shares the recycling destruction business of certificate.By way of above-mentioned fixed remaining shared certificate value of starting an undertaking, Ke Yiyou
Effect control, which is started an undertaking, shares increasing without limitation for certificate value, prevents other people from maliciously raising the shared certificate value of foundation to influence market warp
Ji.
Embodiment 3
Fig. 3 is the flow chart that management method is invested on a kind of project line of the offer of the embodiment of the present invention 3, and this method includes
Following steps:
Step S31: disclosing the investigation information of pre- online physical items and raises member for pre- online physical items, collects
Member's supporting rate data of pre- online physical items, judge member's supporting rate of the pre- online physical items in the given time
Whether preset supporting rate threshold value is reached.
This step is consistent with above-mentioned steps S11, and details are not described herein.
Step S32: when the supporting rate of pre- online physical items reaches preset supporting rate threshold value, by the pre- online reality
Body project is online as new investment project, and total according to the foundation for currently estimating value distribution preset quantity of new investment project
Certificate is enjoyed, for membership buying.
This step is consistent with above-mentioned steps S12, and details are not described herein.
Step S33: distribution is started an undertaking after shared certificate, and judging to start an undertaking, in the given time whether sale finishes shared certificate.
Step S34: when sale does not finish shared certificate of starting an undertaking in the given time, fund is moved back according to former selling price
Return the member for having bought shared certificate of starting an undertaking, and undercarriage new investment project.
In the embodiment of the present invention, certificate is shared in the foundation which can also manage the online physical items, and
Judge that whether the foundation of the physical items shares certificate in the scheduled time by algorithm or application program in management of investment platform
It is domestic sell off it is complete.It does not sell and finishes when the shared certificate of the foundation of the physical items in the management of investment platform in the given time, it should
The foundation having been sold out can be shared certificate and recycled by selling price by management of investment platform, and the undercarriage physical items.Wherein, only
After having sold the foundation just issued and having shared certificate, which just transfers to project side for sale acquisition fund.Pass through this
Kind, which is started an undertaking, shares the way to manage of certificate, can effectively mitigate the online burden envied of management of investment platform and accelerate member's spare time
Dissipate the flowing of fund.
Step S35: according to scheduled frequency obtain new investment project include profit project progress message, and by item
Mesh progress msg is to member's publicity.
This step is consistent with above-mentioned steps S13, and details are not described herein.
Step S36: when new investment project gets out of the red, according to default value, gradually recycling foundation is shared certificate and is carried out
It destroys, until shared certificate recycling of starting an undertaking finishes, new investment project undercarriage.
This step is consistent with above-mentioned steps S14, and details are not described herein.
Embodiment 4
Fig. 4 is the flow chart that management method is invested on a kind of project line of the offer of the embodiment of the present invention 4, and this method includes
Following steps:
Step S41: disclosing the investigation information of pre- online physical items and raises member for pre- online physical items, collects
Member's supporting rate data of pre- online physical items, judge member's supporting rate of the pre- online physical items in the given time
Whether preset supporting rate threshold value is reached.
This step is consistent with above-mentioned steps S11, and details are not described herein.
Step S42: when the supporting rate of pre- online physical items reaches preset supporting rate threshold value, by the pre- online reality
Body project is online as new investment project, and total according to the foundation for currently estimating value distribution preset quantity of new investment project
Certificate is enjoyed, for membership buying.
This step is consistent with above-mentioned steps S12, and details are not described herein.
Step S43: according to scheduled frequency obtain new investment project include profit project progress message, and by item
Mesh progress msg is to member's publicity.
This step is consistent with above-mentioned steps S13, and details are not described herein.
Step S44: according to project progress message, judge whether new investment project goes bankrupt.
Step S45: when the bankruptcy of new investment project, according to default frequency and the default shared certificate of value recycling foundation, and under
Frame new investment project.
In the embodiment of the present invention, management of investment platform obtains the progress that project is realized on line according to scheduled temporal frequency
After information, the progress msg can also be analyzed, judges whether the online physical items are in bankruptcy status, such as can be divided
The financial statement in progress msg is analysed, and then judges whether project goes bankrupt.When physical items bankruptcy, the management of investment is flat
Platform can star emergency risk prediction scheme, in preset time frequency, such as one monthly be transferred from risk emergency preplan fund
Point fund is started an undertaking according to the recycling of default value and shared certificate and is destroyed, the final undercarriage physical items, invests damage to reduce member
It loses.
Step S46: when new investment project gets out of the red, according to default value, gradually recycling foundation is shared certificate and is carried out
It destroys, until shared certificate recycling of starting an undertaking finishes, new investment project undercarriage.
This step is consistent with above-mentioned steps S14, and details are not described herein.
Embodiment 5
Fig. 5 is the structural schematic diagram that managing device is invested on a kind of project line of the offer of the embodiment of the present invention 5.
Managing device 500 is invested on the project line includes:
Project judgment module 510, for disclosing the investigation information of pre- online physical items and raising for pre- online physical items
Collect member, collects member's supporting rate data of pre- online physical items, judge the pre- online physical items in the given time
Whether member's supporting rate reaches preset supporting rate threshold value.
Wire module 520 in project, for when the supporting rate of pre- online physical items reaches preset supporting rate threshold value,
The pre- online physical items are online as new investment project, and preset according to the value distribution of currently estimating of new investment project
Certificate is shared in the foundation of quantity, for membership buying.
Project process obtains module 530, for obtaining the project including profit of new investment project according to scheduled frequency
Progress msg, and by project progress message to member's publicity.
Shared certificate recycling module 540, for when new investment project gets out of the red, gradually recycling to be created according to default value
Industry is shared certificate marketing of going forward side by side and is ruined, until shared certificate recycling of starting an undertaking finishes, new investment project undercarriage.
As shown in fig. 6, the shared certificate recycling module 540 includes:
First recovery unit 541, for when new investment project gets out of the red, according to the default valence based on profit variation
Value gradually recycles the marketing of going forward side by side of the shared certificate of foundation and ruins.
It is worth fixed cell 542, the quantity of the shared certificate of the foundation for destroying when recycling reaches the preset ratio of total quantity
When, the value for shared certificate of starting an undertaking is fixed as default value.
Second recovery unit 543, for the value according to the shared certificate of the foundation for being fixed as default value, in the predetermined time
The remaining shared certificate of starting an undertaking of interior recycling, recycling finish undercarriage new investment project.
As shown in fig. 7, investing managing device 500 on the project line further include:
Judgment module 550 is sold, after issuing the shared certificate of foundation, whether in the given time to judge to start an undertaking shared certificate
Sale finishes.
Recovery of funds module 560, for being sold according to original when sale does not finish shared certificate of starting an undertaking in the given time
The member for having bought shared certificate of starting an undertaking, and undercarriage new investment project are given in recovery of funds by price.
In the embodiment of the present invention, above-mentioned modules and the more detailed function description of unit can refer to aforementioned implementation
The content of corresponding portion in example, details are not described herein.
In addition, the project management server includes memory and place the present invention also provides a kind of project management server
Device is managed, memory can be used for storing computer program, and processor is by running the computer program, to make project management
Server executes the function that the modules in managing device and each unit are invested on the above method or above-mentioned project line.
Memory may include storing program area and storage data area, wherein storing program area can storage program area, extremely
Application program (such as sound-playing function, image player function etc.) needed for a few function etc.;Storage data area can store
Created data (such as audio data, phone directory etc.) etc. are used according to project management server.In addition, memory can
To include high-speed random access memory, can also include nonvolatile memory, a for example, at least disk memory,
Flush memory device or other volatile solid-state parts.
The present embodiment additionally provides a kind of computer storage medium, uses for storing in above-mentioned project management server
Computer program.
In several embodiments provided herein, it should be understood that disclosed device and method can also lead to
Other modes are crossed to realize.The apparatus embodiments described above are merely exemplary, for example, the flow chart in attached drawing and
Structure chart shows the body in the cards of the device of multiple embodiments according to the present invention, method and computer program product
System structure, function and operation.In this regard, each box in flowchart or block diagram can represent a module, program segment or
A part of code, a part of the module, section or code include one or more for realizing defined logic function
The executable instruction of energy.It should also be noted that in the implementation as replacement, function marked in the box can also be with
Occur different from the sequence marked in attached drawing.For example, two continuous boxes can actually be basically executed in parallel, it
Can also execute in the opposite order sometimes, this depends on the function involved.It is also noted that structure chart and/or stream
The combination of each box in journey figure and the box in structure chart and/or flow chart, can with execute as defined in function or
The dedicated hardware based system of movement is realized, or can be come using a combination of dedicated hardware and computer instructions real
It is existing.
In addition, each functional module or unit in each embodiment of the present invention, which can integrate, forms one solely together
Vertical part is also possible to modules individualism, and an independent portion can also be integrated to form with two or more modules
Point.
If the function is realized and when sold or used as an independent product in the form of software function module, can
To be stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention substantially or
Say that the part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products,
The computer software product is stored in a storage medium, including some instructions are used so that computer equipment (can be with
It is smart phone, personal computer, server or network equipment etc.) execute the complete of each embodiment the method for the present invention
Portion or part steps.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store
The medium of program code.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, appoints
What those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, answer
It is included within the scope of the present invention.Therefore, protection scope of the present invention is answered described is with scope of protection of the claims
It is quasi-.
Claims (10)
1. investing management method on a kind of project line characterized by comprising
It discloses the investigation information of pre- online physical items and raises member for the pre- online physical items, collect described pre- online
Member's supporting rate data of physical items, judge whether member's supporting rate of the pre- online physical items reaches in the given time
Preset supporting rate threshold value;
When the supporting rate of the pre- online physical items reaches preset supporting rate threshold value, using the pre- online physical items as
New investment project is online, and shares certificate according to the foundation for currently estimating value distribution preset quantity of the new investment project, supplies
Membership buying;
According to scheduled frequency obtain the new investment project include profit project progress message, and by the project process
Information is to member's publicity;
When the new investment project gets out of the red, the shared certificate of starting an undertaking marketing of going forward side by side gradually is recycled according to default value and is ruined,
Until the shared certificate recycling of starting an undertaking finishes, the new investment project undercarriage.
2. investing management method on project line according to claim 1, which is characterized in that the shared certificate of starting an undertaking includes base
In the electronics security of block chain technology.
3. investing management method on project line according to claim 1, which is characterized in that described " when the new investment item
When mesh gets out of the red, the shared certificate of starting an undertaking marketing of going forward side by side gradually is recycled according to default value and is ruined, until the shared certificate of starting an undertaking
Recycling finishes, the new investment project undercarriage " include:
When the new investment project gets out of the red, described start an undertaking gradually is recycled according to the default value based on profit variation and is shared
Certificate marketing of going forward side by side is ruined;
When the quantity that certificate is shared in the foundation that recycling is destroyed reaches the preset ratio of total quantity, by the shared certificate of starting an undertaking
Value is fixed as default value;
The value that certificate is shared according to the foundation for being fixed as default value recycles the remaining foundation altogether in the given time
Certificate is enjoyed, recycling finishes new investment project described in undercarriage.
4. investing management method on project line according to claim 1, which is characterized in that further include:
After issuing the shared certificate of starting an undertaking, judge whether in the given time sale finishes the shared certificate of starting an undertaking;
When sale does not finish the shared certificate of starting an undertaking in the given time, recovery of funds has been bought according to former selling price
The member of the shared certificate of starting an undertaking, and new investment project described in undercarriage.
5. investing management method on project line according to claim 1, which is characterized in that further include:
According to the project progress message, judge whether the new investment project goes bankrupt;
When new investment project bankruptcy, the shared certificate of starting an undertaking, and undercarriage institute are recycled according to default frequency and default value
State new investment project.
6. investing managing device on a kind of project line characterized by comprising
Project judgment module, for disclosing the investigation information of pre- online physical items and raising meeting for the pre- online physical items
Member collects member's supporting rate data of the pre- online physical items, judges the pre- online physical items in the given time
Whether member's supporting rate reaches preset supporting rate threshold value;
Wire module in project, for when the supporting rate of the pre- online physical items reaches preset supporting rate threshold value, by this
Pre- online physical items are online as new investment project, and currently estimate value distribution present count according to the new investment project
Certificate is shared in the foundation of amount, for membership buying;
Project process obtains module, for obtaining the project process including profit of the new investment project according to scheduled frequency
Information, and by the project progress message to member's publicity;
Shared certificate recycling module, for gradually recycling the wound according to default value when the new investment project gets out of the red
Industry is shared certificate marketing of going forward side by side and is ruined, until the shared certificate recycling of starting an undertaking finishes, the new investment project undercarriage.
7. investing managing device on project line according to claim 6, which is characterized in that the shared certificate recycling module packet
It includes:
First recovery unit, for when the new investment project gets out of the red, according to the default value based on profit variation by
The marketing of going forward side by side of the step recycling shared certificate of starting an undertaking is ruined;
It is worth fixed cell, when the quantity that certificate is shared in the foundation for destroying when recycling reaches the preset ratio of total quantity,
The value for starting an undertaking shared certificate is fixed as default value;
Second recovery unit returns in the given time for sharing the value of certificate according to the foundation for being fixed as default value
The remaining shared certificate of starting an undertaking is received, recycling finishes new investment project described in undercarriage.
8. investing managing device on project line according to claim 6, which is characterized in that further include:
Judgment module is sold, after issuing the shared certificate of starting an undertaking, judges whether in the given time described start an undertaking share certificate
Sale finishes;
Recovery of funds module, for when sale does not finish the shared certificate of starting an undertaking in the given time, according to former selling price
Recovery of funds is given to the member for having bought the shared certificate of starting an undertaking, and new investment project described in undercarriage.
9. a kind of project management server, which is characterized in that including memory and processor, the memory is based on storing
Calculation machine program, the processor runs the computer program so that the project management server executes according to claim 1
Management method is invested on to project line described in any one of 5.
10. a kind of computer storage medium, which is characterized in that it is stored in project management server as claimed in claim 9
Used computer program.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811001954.9A CN109242694A (en) | 2018-08-30 | 2018-08-30 | Management method, device and project management server are invested on project line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811001954.9A CN109242694A (en) | 2018-08-30 | 2018-08-30 | Management method, device and project management server are invested on project line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109242694A true CN109242694A (en) | 2019-01-18 |
Family
ID=65069922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811001954.9A Pending CN109242694A (en) | 2018-08-30 | 2018-08-30 | Management method, device and project management server are invested on project line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109242694A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106934717A (en) * | 2017-03-06 | 2017-07-07 | 苏州爱的网络科技有限公司 | A kind of network investment and financing method and investment and financing system |
CN108322465A (en) * | 2018-01-31 | 2018-07-24 | 腾讯科技(深圳)有限公司 | Resource sharing, request, processing method, device, storage medium and equipment |
-
2018
- 2018-08-30 CN CN201811001954.9A patent/CN109242694A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106934717A (en) * | 2017-03-06 | 2017-07-07 | 苏州爱的网络科技有限公司 | A kind of network investment and financing method and investment and financing system |
CN108322465A (en) * | 2018-01-31 | 2018-07-24 | 腾讯科技(深圳)有限公司 | Resource sharing, request, processing method, device, storage medium and equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hitt et al. | Are acquisitions a poison pill for innovation? | |
Wixom et al. | How to monetize your data | |
Khodabandehlou et al. | Comparison of supervised machine learning techniques for customer churn prediction based on analysis of customer behavior | |
Pazgal et al. | Behavior-based discrimination: Is it a winning play, and if so, when? | |
Dierckx et al. | Information technology and innovation in small and medium-sized enterprises | |
Rahmani et al. | Review the impact of advertising and sale promotion on brand equity | |
CN110008248A (en) | A kind of data processing method and device | |
DE102008028574A1 (en) | A method and system for providing relevant consumer coupons based on financial transaction history and internet browsing activity | |
Dombrovska et al. | The prospects of integration of the advertising market of Ukraine into the global advertising business | |
Hu et al. | Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games | |
Taleizadeh et al. | How cash-back strategy affect sale rate under refund and customers’ credit | |
Tairova et al. | The Essence And Content Of Marketing In The Field Of Innovation | |
Tao et al. | Optimal initial coin offering under speculative token trading | |
Haxthausen | Valuing brands and brand investments: Key learnings and future expectations | |
CN109214929A (en) | Investment oversight method and device | |
KR101750825B1 (en) | A crowd funding platform system for securing investors by continuously providing objective investing information and the funding method by using the same | |
CN109242694A (en) | Management method, device and project management server are invested on project line | |
CN110175904A (en) | Detection method, system, equipment and the storage medium of shop volume of the flow of passengers level ground effect | |
Meidan | Bank marketing strategies | |
Fandaru | A new design of Raskin Program (an analysis of the RASDA implementation in Kulonprogo Regency) | |
Mentoh et al. | Conceptual study of the impacts of electronic-words-of-mouth (E-WOM) on consumers’ continuance intention and brand loyalty of Islamic insurance (Takaful) | |
KR20110131956A (en) | Apparatus and method for banking service of game | |
Thakur et al. | FILTERING PROFITABLE FROM NOT-SO-PROFITABLE CUSTOMERS USING CUSTOMER RELATIONSHIP MANAGEMENT (CRM) TECHNOLOGY. | |
Proctor | Corporate restructuring: the pitfalls of changing industry structure | |
Bryan et al. | Intangible capital |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190118 |
|
RJ01 | Rejection of invention patent application after publication |